8QFORVHG *ULG /LEUDU\ 1HZ 9LVLRQ IRU WKH +HOVLQNL 3XEOLF /LEUDU\ The traditional library is being challenged by the transformation of the library program itself. The typologies of the contents mutate, creating a new need both operational and spatial. The library has been a focal point of an urban life. The proposal suggests an infrastructure that embraces the unexpected and changeable program in an urban context. Instead of adopting the prevalent free-formed which reacts to the variable circumstances that could that offers the library as a timeless infrastructure for urban life. space -JCSBS BSZ -JCSBSZ SBN 1SPHSBN
Fixed Program - Library collection - Education
space
-JCSBSZ 1SPHSBN
Library program
-JCSBSZ 1SPHSBN
Urban structure Space linked to progr
! " #
- Lounges “oases� - Interactive spaces - Quiet areas
Intersections as a facility hub
operates similar to an urban structure. The urban grid is made three-dimensional, and the program is arranged to embrace the changing of the time. The program
programs meet, there becomes the intersections with interactions between various activities. The urban the future needs for the library.
Intersection Hubs
$ %
Fixed program
- Circulation points - Client service point - Public toilets
Infrastructure Un-fixed program
Un-fixed program - Pop-up info spot - Temporary exhibitions - Space reservations
0
20
50
100m
Panel No.
1 /10 GISA515
Urban plan / 1:2000
view from the parliament building
west pedestrian way
0
5
12.5
25m
Panel No. N
2 /10 10 GISA515 IS SA515 A515 A51
Siteplan / 1:500
Open ground
‍ " *)('ؾ‏
1F/ Main Lobby
" tions of the grid is scattered on the ground, so that the visitors can freely
homogeneity of the ground blur the inside and the outside of the library. The service vehicles enter the premises from the north-east corner, where & # well as the in-between spaces.
0
Panel No.
3 /10 GISA515
2
5
10m
@
vertical
horizontal
connect to underground space
+18.6m
diagonal +18.6m +12.9m
+12.9m +8.7m
+3.0m
2F/ Child Children’s dren’s world
2F/ view from the rentable exhibition
6(N ?
0
2
5
10m
K and diagonal connections. The regularity of the grid gives a clear idea of circulation inside the building, while providing a freedom of movement in every direction.
â&#x20AC;ŤŘľâ&#x20AC;Ź2F of learning and doing. The <living lab> is visible from all parts of the # # moment. From the main lobby, the escalator leads the visitors directly to the <oases (lounge)> space, where the people meet and interact. The <rentable exhibition> space is accessible directly through the core on the south-most corner, allowing for an independent use of the space. The <Childrenâ&#x20AC;&#x2122;s world> is easily accessible from the sub-lobby on the north side.
â&#x20AC;ŤŘľâ&#x20AC;Ź3F
Panel No.
4 /10 GISA515
6 " " 7 ties requiring daylight and open platform are located. Each program has abundant terrace space which opens up the library to the exterior world. The <library collection> is located together with the <teaching/group
8 9 ; = practice. The project space and the lounge are sharing a communal
# ? directly reachable from the lounge area in the center, where the escalator is connecting the visitors to the upper collections as well.
Library system
Libr
ary
Mat
eria
lH
an
dlin
g
a
g din
are
a
Lo
Book conveyor belt (Distribution) Book conveyor belt (Return) Loading / material handling return automat
24
-hou
r re
turn
ha
tch
X K Y Z 9 6![ " easier to the correct location. Self-automat system
4F/ Library collection
4F/ view from the quiet area
Roof garden
0
2
5
( & " ( &
10m
â&#x20AC;ŤŘľâ&#x20AC;Ź4F spaces. The largest collection hall is directly accessible from the main " and the service space supports the library facilities systematically 9 # point, public toilets and circulation hubs are located. These programs the clients.
â&#x20AC;ŤŘľâ&#x20AC;ŹRoof shaded spots on the intersections. The visitors can access the roof through the staircases on the west and on the south. Various activities such as sun bathing, resting, viewing, and projection auditing can occur on the roof.
Panel No.
5 /10 GISA515
Connection to underground space
Connection to the underground space
City Tunnel
In the future, connection to the underground cultural space can be possible through the foyer on the B1 level. The foyer is serving both
B1/ Cimena, Multi-purpose hall foyer
X'N %
` {{ {
0
2
5
the cinema and multi-purpose hall. By connecting to the underground # # 7 the ground, as well as a air shaft penetrating the building vertically from underground to the top.
10m
â&#x20AC;ŤŘľâ&#x20AC;ŹB1 Media programs that do not require daylight are situated such as music, radio station, game room, etc. are situated on the underground level. 7
Connection to the future underground space towards the Finland music hall is possible though the foyer area. This will extend the buildingâ&#x20AC;&#x2122;s
â&#x20AC;ŤŘľâ&#x20AC;ŹB2 ^ X_ " $`7@ $`7@ core penetrating the building. The distribution of the technical services K ; physical form.
Panel No.
6 /10 GISA515
Longitudinal sections
Flexible & Easy access to individual program 1:200 0
2
5
10m
- User visitor
Elevator (ground floor) Entrance
staff / maintenance
Lib
rary
ad
ry
al H
an
ff
Lo
Ma
teri
sta ing
dlin
g
ge
ra
sto
ra
Lib
Staff Logistic / service Elevator (ground floor) Entrance
- Access to programs Collection
Collection Oases Oases Lobby
Learning and doing
Childrenâ&#x20AC;&#x2122;s world
Sub- Lobby
Learning and doing
Main Lobby
Cinema, Multi purpose Hall
Cinema Multi-purpose Hall Underground Foyer
Living Lab
Panel No.
7 /10 GISA515
Living Lab Oases Main Lobby
Succesive sections M L
A
B
C
D
E
F
G
H
I
J
K
K
J
L
I
H G
F
E
D C B A
M
Cross sections 1:200 0
C
G
Connection to the underground space Exsiting Plan
F
Panel No.
8 /10 GISA515
H
K
2
5
10m
1:200
Elevation
0
West Elevation
2
5
10m
South Elevation
<
Roof Window / Trussed Frame, Triple Glazed Window with Electric Louver < Exterior Wall / Grid type Metal Fabric on Exposed White Concrete, ( Pre-cast, Pre-tensioned ) Roof Window / Trussed Frame, Triple Glazed Window with Electric Louver <
< Exterior Window Triple Glazed Window with solar control coating
< Balcony / Steel handrail on Exposed Concrete
< Exterior Window Triple Glazed Window with solar control coating < Exterior Window Triple Glazed Window with solar control coating <
LOADING / SUB-ENTRY
Exterior Ceiling / Metal Fabric on Exposed white Concrete.
ENTRY
VOID
6XUIDFH $UHD 'DWD
100% 9135m2
Net Area of Envelope:
Exterior Detail
ENTRY
29% /Glass: roofwindow sidewindow
2725m2 975m2 1750m2
71% /Solid: 6410m2 Floorconcrete 2840m2 Sideconcrete 3572m2
(double skin ) 57% /Metal Fabric: 5210m2
Program area chart
Â&#x192;
^ "
Â&#x201A;
'Â&#x2021;__ _
%
783
Public toilets
330
Public services
'Â&#x2021;Â&#x2C6;
Meeting and lounge area
6'Â&#x2C6;
Stage
30
Â&#x201E; & Â&#x2026; Â&#x2020;
Â&#x2030;Â&#x2030; _
Events spaces
X Â
'6Â&#x2021;_
Cinema
384
Multi-purpose hall
6_Â&#x2039;
Furniture and stage prop storage
94
%
envelope acts as a shade structure during the summer
4F
X
57
Living lab
_'Â&#x2C6;
% #
99
Rentable exhibition space
'Â&#x152;Â&#x2039;
Â&#x160;#
'Â&#x2039;
Â? #
Â&#x152;Â&#x2019;Â&#x2039;
@ Â&#x2018;
_Â&#x2039;6
Restaurant
6'_
Public sauna
'Â&#x152;_
Â&#x201A; Â&#x2026; Â&#x2020;
99
3F The collections area and spaces linked to it
'Â&#x2039;'6
Fixed client-service point
6_[
Interactive spaces
__Â&#x2019;
% Z Z
Â&#x2039;Â&#x2019;Â&#x152;
Quiet areas
6Â&#x2039;Â&#x2030;
Learning and doing
_(
Technical conceptual sections Sun (Winter)
6.5 degree
6'Â&#x152;Â&#x2030;
%
_Â&#x2C6;'' '
Z@ ; Â&#x201D; Z
Â&#x2019;Â&#x2019;'
Â&#x201D; Â&#x2026; Â&#x2020;
'Â&#x2021;Â&#x2039;
Â&#x201E; Â&#x2026; Â&#x2020;
6Â&#x2039;Â&#x2019;
Â&#x192;
'Â&#x2C6;Â&#x152;
TV and radio studio
57
^ & Z Z
Â&#x2030;Â&#x2030; '
%
_6[
[_'
Sun (Summer) 57.5 degree
Core
Core
Core
Core Â?
'(
Atrium
Atrium
[Â&#x2019;Â&#x2039;
Â
6_Â&#x2C6;
Â?
34
@
45
WCs
57
%
Â&#x2019;'Â&#x2021;
%
'Â&#x2039;[
Returns automat room
'_Â&#x2039;
%
__Â&#x2021;
X' Service spaces
Machinery Room
Machinery Room
Machinery Room Ventilation for City Tunnel
Heating Cooling Lighting Ventilation
Panel No.
9 /10 GISA515
Ventilation for City Tunnel
X_
Â&#x2039;Â&#x2C6;
X and server room
55
@
93
Â&#x201A;
Â&#x2039;'
X
39
Service and loading area
400
Distribution substation
_Â&#x2C6;
@ Technical spaces
Â&#x2019;Â&#x2019;'
Space reservations required @ @
Â&#x201E; " Â&#x2026; _Â&#x2020;
GHP System
GHP System
Â&#x2021;_Â&#x152;
IT and other equipment areas
'Â&#x2C6;Â&#x152;Â&#x2019;' 6
Standard Fabrication, Assembly Building, Weaving Structure,
Is
Economical, Low Emission, Strong, Eco Friendly, Easy
Steel for rooftop light structure SS-1
SS-2
SS-3
4 elements x 9 set
SP-1
Steel Rectangular Post for Fixed Programe Tube 7 x 16 set = 112 pcs
PW-A
PW-D
PW-B
Pre-cast, Pre-Tensioned Concrete Wall for Fixed Program Tube
PW-C
A - 19 pcs B - 16 pcs C - 8 pcs D- 24 pcs E - 24 pcs F - 25 pcs
PW-E
PW-F Pre-cast, Pre-tensioned Concrete Slab for Fixed Program Tube / Top
PS-1
8 x 18 set = 144 pcs
Pre-cast, Pre-tensioned Concrete Slab for Linked Program Tube / Top & Bottom
PS-2
5 x 18 set = 90 pcs
Pre-cast, Pre-tensioned Concrete Slab for Fixed Program Tube / Bottom
PS-3
8 x 18 set = 144 pcs
PS-4A
Pre-cast, Pre-tensioned Concrete Slab for Linked Program Cantilever / Bottom 16 pcs
Pre-cast, Pre-tensioned Concrete Slab for Fixed Program Cantilever / Bottom
PS-4B
Waffle Slab / In-site Construction
16 pcs
PS-5A
Pre-cast, Pre-tensioned Concrete Slab for Linked Program Cantilever / Top 16 pcs
Pre-cast, Pre-tensioned Concrete Slab for Fixed Program Cantilever / Top
PS-5B
16 pcs
Pre-cast, Pre-tensioned Concrete Beam for Linked Program / Top & Bottom
PB-1
4 x 23 sets = 92 pcs
Rooftop Window
PB-2
Pre-cast, Pre-tensioned Concrete Beam for Fixed Program / Top & Bottom 7 x 42 sets = 294 pcs
PG-1
Pre-cast, Pre-tensioned Concrete Girder for Outline of Program / Top & Bottom
PG-2
1 - 42 pcs 2 - 32 pcs 3 - 96 pcs 4 - 48 pcs 5 - 16 pcs 6 - 48 pcs
PG-3
PG-4
PG-5
PG-6
CS
Pre-cast, Pre-tensioned Concrete Slab for Core Hub 48 pcs
CG-A
Pre-cast, Pre-tensioned Concrete Main Girder for Core Hub A - 96 pcs B - 96 pcs
CG-B
CW-A
Pre-cast, Pre-tensioned Concrete Main Wall for Core Hub A - 96 pcs B - 96 pcs
CW-B
M-A
Metal Fabric Grid for Fixed, Program A - 48 pcs B - 24 pcs C - 24 pcs D - 18 pcs
M-B
10 x 10 x10m cube M-C
5 x 5 x 5m cube Panel No.
10 /10 GISA515
1 x 1 x 1m cube
M-D
ALL