Part 1 Cv

Page 1

ARCHITECTURAL PORTFOLIO

Part I

D e v i s Ta k o BA Architecture


Higher Education

Me Devis Tako Part 1

2019/22

BA Architecture

Architecture, BA Hons University of Greenwich - London

Overall Grade 1st // 71

07928 582629 takoarchitects@gmail.com

Architecture, BA Hons (interrupted) 2011/12 Polytechnic University of Tirana - Albania

issuu.com/devistako

Overall Grade Profile

II(i) // 7/10

Awards

Enthusiastic Part 1 Architectural Assistant with over one year of practical experience and a recently completed BA in Architecture. Excited to take on a role that allows me to demonstrate my strong work ethic and a diverse skill set developed throughout my academic and professional journey. Having successfully completed my final year in BA Architecture, I bring a well-rounded understanding of design principles and proficiency in both manual and digital mediums. My dedication to effective communication is evident through my adept use of tools like Revit and the creation of physical models. Throughout my academic tenure, I developed a passion for designing in real-world contexts. I thrive in projects where I can experiment with abstract forms and subsequently translate them into practical structures that align with programmatic requirements and site context. Beyond university, I proactively applied my architectural skills to small-scale projects, gaining valuable insights into their professional application. This hands-on experience has expanded my perspective and honed my problem-solving abilities. In addition to my architectural pursuits, I bring a robust background in the senior levels of the hospitality business. This experience has equipped me with invaluable skills such as leadership, teamwork, and adaptability in a professional environment. My multifaceted background positions me as a well-rounded and versatile professional ready to contribute effectively to architectural projects.

Software and Skills Revit

Photoshop

AutoCAD

Hand Drawing

Enscape

Modelling

AJ student prize Undergraduate - Nomination 2022 RIBA Presidents Bronze Medal Part 1 - Nomination 2022

Work Part 1 Architectural Assistant Studio Moren - 57D, Jamestown Road, Greater London NW1 7DB, https://studiomoren.co.uk Aug 2022 / Aug 2033 Collaborated seamlessly with the design team at Studio Moren, actively participating in the conceptualization and development of architectural designs across various projects. Played a pivotal role in the design development phase for 4-6 Bedford Place, The Seraphine providing creative input and producing detailed sketches and 3D models. Leveraged proficiency in industry-standard software tools, including AutoCAD, Revit, to translate intricate design concepts into detailed and precise drawings. Conducted thorough on-site visits, meticulously gathering essential data for site analysis and offering valuable insights to enrich the design process. Worked closely alongside project managers, ensuring the coordination of project timelines and the timely delivery of project milestones. Contributed significantly to the preparation of construction documents, adhering rigorously to industry standards and local building codes. Actively engaged in client meetings, skillfully communicating design concepts and adeptly incorporating client feedback into iterative project revisions. Stayed abreast of industry trends, proactively integrating innovative solutions into design proposals to enhance overall project quality. Senior Manager Layalina Ltd - 2/3 Beauchamp Place, SW3 1NG - 0275418296 Jun 2017 / Aug 2022

InDesign

References (Available upon request.) Mark Wood

Alex Bilton

Partner - Studio Moren markw@studiomoren.co.uk

Tutor - Univerity of Greenwich 07795 143200 a.bilton@greenwich.ac.uk

Collaborated seamlessly within a tight-knit team of 12 employees, taking on diverse responsibilities that included strategic planning, meticulous organization, and the efficient control of restaurant operations. Flourished in high-pressure scenarios, consistently delivering and upholding a superior standard of service. Demonstrated a unwavering commitment to ensuring a secure working and guest environment, effectively minimizing the risk of injuries and accidents in compliance with stringent UK Health and Safety regulations.


‘23

Bedford Place Work Experience

03 DESIGN EVALUATION

CASE STUDY : GROUND FLOOR

This visual provides an impression of the ground floor level of No. 4,5 and 6 Bedford Place.

Bedford Place Programme Reconfigure and extension of the space, improve and restore, hotel Site

London

Year

2021-2022

Partner

Mark Wood

No. 6

No. 5

No. 4

The structure, situated at 4-6 Bedford Place within the Bloomsbury Conservation Area, is set to undergo a remarkable transformation. Originally three Georgian terraced houses, the building is slated to be converted into a 43-room luxury hotel. The envisioned space will include a reception area, a stylish bar and lounge, and a range of room categories, including standard, suite, and accessible rooms.

4-6 BEDFORD PLACE, BLOOMSBURY Design & Access Statement March 2023

37

Notably, the restoration process for this Grade II listed building is guided by a heritage-focused approach. This methodology has been integral from the project’s inception, ensuring a thoughtful and respectful refurbishment. As part of the expansion, three additional wings will be added to the rear, strategically extending the accommodation while preserving the historical and architectural significance of the property.

Copyright: All rights reserved. This drawing must not be reproduced without permission. Only the original drawing should be relied upon. Contractors, sub-contractors and suppliers must verify all dimensions on site before commencing any work or making any shop drawings.

NE

All shop drawings to be submitted to the architect / interior designer for comment prior to fabrication.

BB

A-100-111

This drawing is to be read in conjunction with the architect's / interior designer's specification, bills of quantities / schedules, structural, mechanical & electrical drawings and all discrepancies are to be reported to the architect / interior designer.

A-100-121

NE

A-050-111

BB

A-050-121

Copyright: All rights reserved. This drawing must not be reproduced without permission.

Copyright: All rights reserved. This drawing must not be reproduced without permission.

Only the original drawing should be relied upon. Contractors, sub-contractors and suppliers must verify all dimensions on site before commencing any work or making any shop drawings.

Only the original drawing should be relied upon. Contractors, sub-contractors and suppliers must verify all dimensions on site before commencing any work or making any shop drawings.

All shop drawings to be submitted to the architect / interior designer for comment prior to fabrication.

All shop drawings to be submitted to the architect / interior designer for comment prior to fabrication.

This drawing is to be read in conjunction with the architect's / interior designer's specification, bills of quantities / schedules, structural, mechanical & electrical drawings and all discrepancies are to be reported to the architect / interior designer.

This drawing is to be read in conjunction with the architect's / interior designer's specification, bills of quantities / schedules, structural, mechanical & electrical drawings and all discrepancies are to be reported to the architect / interior designer.

Do not scale from this drawing. Dimensions are in millimetres unless otherwise stated.

Do not scale from this drawing. Dimensions are in millimetres unless otherwise stated.

Studio Moren Ltd will coordinate with all other consultants in relation to statutory items / elements under that consultants control. These items may be shown on Studio Moren Ltd drawings for coordination purposes, however they remain under that consultants design and control.

NOTES

Studio Moren Ltd will coordinate with all other consultants in relation to statutory items / elements under that consultants control. These items may be shown on Studio Moren Ltd drawings for coordination purposes, however they remain under that consultants design and control.

Studio Moren Ltd will coordinate with all other consultants in relation to statutory items / elements under that consultants control. These items may be shown on Studio Moren Ltd drawings for coordination purposes, however they remain under that consultants design and control.

NOTES

Application site/ownership

1

Proposed penetrations / excavation to structure / fabric / earthwork removal

1

11

Proposed features such as plant and fixed furniture removal

Room 02

Room 7

9

1

1

12

15 sqm

1.

Windows / Roof tiles to be cleaned, replaced, repaired,

A

Means of Escape

Store

Store

Second Floor

AA A AA-050-120

Proposed new Brickwork to match existing London Proposed new painted Stucco / Render.

1

4.

Proposed new painted timber Sash Windows / Doors.

5.

Proposed new Contemporary, minimalist

6.

Proposed new brickwork arches above openings.

7.

Proposed new painted metal Balustrade / Railings.

8.

Proposed new garden Staircase with painted

9.

Existing Sash windows, (refurbished if reconditioned if

1

style Conservatory.

AA

1

metal Handrails / Balustrades.

A-050-120

A-100-120

Refuge Area

2. 3.

Stock (in a non-weathered state.)

9

1 Room 7

Refuge Area

Existing Masonry / Render / Metalwork / Timber / Doors / conserved, restored, painted as required.

27 sqm

Means of Escape

1

Material key:

Third Floor

Room 03

26 sqm

13

Proposed structure / fabric element removal

'Pod' insertions at No. 6 Bedford Place

Room 01

13

16

1

Site Boundary

'Pod' insertions at No. 5 Bedford Place

All fire related elements and items as set out within the Fire Engineers Fire Strategy Report. Fire rating of elements / components require fire certification from certified test bodies to be provided to both the Fire Engineer & Building Control for review and sign off, prior to procurement and installation.

NOTES

Proposed walls to be filled in 'Pod' insertions at No. 4 Bedford Place

Do not scale from this drawing. Dimensions are in millimetres unless otherwise stated.

13

All fire related elements and items as set out within the Fire Engineers Fire Strategy Report. Fire rating of elements / components require fire certification from certified test bodies to be provided to both the Fire Engineer & Building Control for review and sign off, prior to procurement and installation.

All fire related elements and items as set out within the Fire Engineers Fire Strategy Report. Fire rating of elements / components require fire certification from certified test bodies to be provided to both the Fire Engineer & Building Control for review and sign off, prior to procurement and installation.

required) and fitted with rear fixed mirrored spandrels to ameliorate structure behind.

1

10. Proposed lift overrun with lead cladding.

1

11. Access Ladders and Gantries for the purpose of roof

9

Room 7

1

1

access / maintenance / health & safety. 12. Lanterns reconditioned as required and to include translucent glazing.

1 13. New authentic, consistent chimney pots replacements as

1

1

required.

First Floor

14. Proposed Lead flat roof / similar.

14

15. Decking / Planting to flat roof areas. 16. Proposed PV Panels 17. Blocked existing openings

Room 09 18 sqm

Room 08 16 sqm

Room 05

Room 06

Room 07

14 sqm

16 sqm

14 sqm

Room 04

Entry

4

1

1

4

1

20 sqm

17

Bar Store

1

1

1

1

1

Ground Floor P1 P0 P0

ISSUED FOR PLANNING

rev amendments

10.03.23

DT

date

by chk

studio moren Ltd architecture urban design interior design creative media www.studiomoren.co.uk studio@studiomoren.co.uk

4 Lower Ground Floor

t: 020 7267 4440

architecture

ISSUED FOR PLANNING ISSUED FOR PLANNING

rev amendments

MW

57d jamestown road london nw1 7db UK

20.04.23 10.03.23

DT DT

date

by chk

8

MW MW

studio moren Ltd architecture urban design interior design creative media www.studiomoren.co.uk studio@studiomoren.co.uk

Plant

P1 P0

studio moren Ltd architecture urban design interior design creative media www.studiomoren.co.uk studio@studiomoren.co.uk

Room 5

Store

client

Nebra Property

drawing title

Demolition Lower Ground Floor Plan

drawing status

PLANNING

4-6 Bedford Place London, WC1B 5JD

project

client

Nebra Property

drawing title

Proposed Third Floor Plan

SW

A-100-110 1

2

5

BB

A-100-121

drawing title

Proposed Section B-B

drawing status

PLANNING scale

date

drawn by

1:50 @ A1 1:100 @ A3

10.03.23

DT

job no.

drawing no.

revision

1890

A-100-103

P0

SW

A-050-110

Bedford Pl

BB

A-050-121 0

1

2

5

MW MW

4-6 Bedford Place London, WC1B 5JD

client

Nebra Property

DT DT

by chk

t: 020 7267 4440

architecture

project

4-6 Bedford Place London, WC1B 5JD

10.07.23 10.03.23

date

57d jamestown road london nw1 7db UK

t: 020 7267 4440

architecture

project

ISSUE FOR PLANNING ISSUE FOR PLANNING

rev amendments

4

57d jamestown road london nw1 7db UK

drawing status

scale

date

drawn by

1:50 @ A1 1:100 @ A3

10.03.23

DT

job no.

drawing no.

revision

1890

A-050-099

NO. 7

Site

PLANNING NO. 6

P1 0

1

2

5

scale

date

drawn by

1:50 @ A1 1:100 @ A3

10.03.23

DT

job no.

drawing no.

revision

1890

A-100-121

P1

NO. 5

NO. 4

NO. 3


‘23

03 DESIGN PROPOSALS

The Seraphine

Copyright: All rights reserved. This drawing must not be reproduced without permission. Only the original drawing should be relied upon. Contractors, subcontractors and suppliers must verify all dimensions on site before commencing any work or making any shop drawings. All shop drawings to be submitted to the architect / interior designer for comment prior to fabrication. This drawing is to be read in conjunction with th architect's / interior designer's specification, bills of quantities / schedules, structural, mechanical & electrical drawings and all discrepancies are to be reported to the architect / interior designer. Do not scale from this drawing. Dimensions are in millimetres unless otherwise stated. All fire related elements and items as set out within the Fire Engineers Fire Strategy Report. Fire rating of elements / components require fire certification from Copyright: All rights reserved. This drawing must not be reproduced without permission. Only the original drawing should be relied upon. Contractors, subcontractors and suppliers must verify all dimensions on site before commencing any and worksign or making shop drawings. All shop drawings to beLtd submitted to thewith architect / interior designer for comment prior to fabrication. This that drawing is to becontrol. read in conjunction with certified test bodies to be provided to both the Fire Engineer & Building Control for review off, prior any to procurement and installation. Studio Moren will coordinate all other consultants in relation to statutory items / elements under consultants These items may bethe shown on Studio Moren Ltd drawings for coordination purposes, however they remain under that consultants design and control. architect's / interior designer's specification, bills of quantities / schedules, structural, mechanical & electrical drawings and all discrepancies are to be reported to the architect / interior designer. Do not scale from this drawing. Dimensions are in millimetres unless otherwise stated. All fire related elements and items as set out within the Fire Engineers Fire Strategy Report. Fire rating of elements / components require fire certification from

ACOUSTICALLY TREATED AND DISCRETELY LOCATED ROOFTOP PLANT NOTES

REFUSE AND RECYCLING CONTAINERS STORED WITHIN A TIMBER CLAD ENCLOSURE TO IMPROVE NOTES VISUAL AMENITY

certified test bodies to be provided to both the Fire Engineer & Building Control for review and sign off, prior to procurement and installation. Studio Moren Ltd will coordinate with all other consultants in relation to statutory items / elements under that consultants control. These items may be shown on Studio Moren Ltd drawings for coordination purposes, however they remain under that consultants design and control.

Work Experience

Drawing based on CADPlan Survey. Ref.:13072-01 At this stage, these drawings are subject to further design coordinat from: structural, fire, M&E, and acoustics consultants.

Drawing based on CADPlan Survey. Ref.:13072-06 At this stage, these drawings are subject to further design coordination from: structural, fire, M&E, and acoustics consultants.

Application Site Application Site

03 DESIGN PROPOSALS Key

Key

Copyright: All rights reserved. This drawing must not be reproduced without permission. Only the original drawing should be relied upon. Contractors, subcontractors and suppliers must verify all dimensions on site before commencing any work or making any shop drawings. All shop drawings to be submitted to the architect / interior designer for comment prior to fabrication. This drawing is to be read in conjunction with the architect's / interior designer's specification, bills of quantities / schedules, structural, mechanical & electrical drawings and all discrepancies are to be reported to the architect / interior designer. Do not scale from this drawing. Dimensions are in millimetres unless otherwise stated. All fire related elements and items as set out within the Fire Engineers Fire Strategy Report. Fire rating of elements / components require fire certification from certified test bodies to be provided to both the Fire Engineer & Building Control for review and sign off, prior to procurement and installation. Studio Moren Ltd will coordinate with all other consultants in relation to statutory items / elements under that consultants control. These items may be shown on Studio Moren Ltd drawings for coordination purposes, however they remain under that consultants design and control.

Front of House

Front of House

The Seraphine Boutique hotel

Back of House Guest Rooms

INTERNAL LAYOUT - PL ALLOCATION

NOTES

Back of House

Drawing based on CADPlan Survey. Ref.:13072-06 At this stage, these drawings are subject to further design coordination from: structural, fire, M&E, and acoustics consultants.

Guest Rooms

Programme Reconfigure and extension of the space, improve and restore, hotel Key Plant

Plant Application Site Existing Building Refurbishment: The internal layout of the existing Existing Building Refurbishment: hotel does not form part of the The internal layout of the existing Proposed modest roof plant allocation planning application and does not hotel does not form part of the 01 A-2A not visible from public realm require planning permission 0-03 planning application and does not A-1 185 Copyright: All rights reserved. This drawing must not be reproduced without permission. Only the original drawing should be relied upon. Contractors, subcontractors and suppliers must verify all dimensions on site before commencing any work or making any shop drawings. All shop drawings to be submitted to the architect / interior designe Copyright: All rights reserved. This drawing must not be reproduced without permission. Only the original drawing should be relied upon. Contractors, subcontractors and suppliers must verify all dimensions on site before commencing any work or making/ any shop drawings. Allmechanical shop drawings to be submitted theall architect / interiorare designer for comment to fabrication. This drawing is toscale be read conjunction the require planning permission architect's / interior designer's specification, bills of quantities schedules, structural, & electrical drawingstoand discrepancies to be reported to theprior architect / interior designer. Do not frominthis drawing. with Dimensions are in millimetres unless otherwise stated. All fire related elements and items as set out within the Fire Enginee All fire related elements and as set out within FireLtd Engineers Fire Strategy Fire rating of components require fire certification architect's / interior designer's specification, bills of quantities / schedules, structural, mechanical & electrical drawings and all discrepancies are to be reported to the architect / interior designer. Do not scale from this drawing. Dimensions are in millimetres unless otherwise stated. Front of House certified test bodies to be provided to both the Fire Engineer & Building Control for review and sign off, prior to procurement items and installation. Studiothe Moren will coordinate with allReport. other consultants in elements relation to/ statutory items / elements under that from consultants control. These items may be shown on Studio Moren Ltd drawings for coordination purposes, however they rema /

Site

London

Year

2021-2022

Partner

Mark Wood

ly

on

sq m area 1500m turning

the for ce

V ible enan certified test bodies to be provided to both the Fire Engineer & Building Control for review and sign off, prior to procurement and installation. Studio Moren Ltd will coordinate with all other consultants in relation to statutory items / elements under that consultants control. These items may be shown on Studio Moren Ltd drawings for coordination purposes, however they remain under that consultants and control. ss AO design ce aint r

e

Key

New Lifts & Stair

1

Ris

ac Ev Lift

A-1 185

Drawing based on CADPlan Survey. Ref.:13072-12 At this stage, these drawings are subject to further design coordination nks from: structural, Ta fire, M&E, and acoustics consultants.

Back of House

Existing Building Refurbishment: Guest Rooms The internal layout of the existing hotel does not form part of the Plant planning application and does not require planning permission Existing Building Refurbishment: The internal layout of the existing hotel does not form part of the planning application and does not require planning permission

e

rag

Sto

Guest Rooms

ff

nt

pla

roof

ated

nu

atte

lly

stica

02 10-0 A-11853

ou

A-1 185

t

s ike

B

use Ho ping e Ke

.

V/ AO er Ris

Application Site

The diagrams opposite show where the plant be accom based on average sizes anticipated as suitable for a pro size.

ved mo ll Re htwe Lig

New Lifts & Stair

Proposed Plant located in Basement

ac Ev Lift

Sta

E

nt

Pla

Corridor

Ac

2 B-B -00 20 3

Please refer to the views elsewhere in this document wh demonstrate this principle.

sq m 1500m area turning

ct

Ele

Plant

Situated in the Abingdon Ward within the London Borough of Kensington & Chelsea, ‘The Seraphine’ posed a complex yet thrilling challenge. Nestled in a conservation area, adjacent to a listed building, and occupying a prominent corner position, the project required a meticulous approach. The design philosophy aimed to rejuvenate the building’s character by restoring it to its original appearance and elevating its aesthetic to seamlessly integrate with the existing streetscapes.

The plant allocation strategy for the scheme provides sp proposed massing. The proposal has been designed to the plant’s visual impact locating the plant primarily at ba whilst the rear roof plant is barely visible from street level

NOTES

Front of House

20- 3 A-1 185

B B-20-0302

900

Front of House

N

-00 10 53 A-1 18

A-A001

1900x

V/ AO er Ris

ac Ev Lift

Back of House

2 B-B -00 20 3 A-1 185

ac m of or do ose rp pu

single

Guest Rooms

Plant

Key

ch

Hat

std

Back of House

Application Site

A-A 001 203

A-1 185

Our Lady of Victories

B B-20-0302

Ilchester Mansions (behind)

Victories (behind) Our Lady of Basement Proposed Plan (NTS)

A-1 185

The planned refurbishment and extension of the hotel are set to introduce Proposed modest30 roof plant allocation not visible from public realm new guestrooms, featuring a rooftop extension to optimize guest accommodations. The design strategy involves updating, repairing, and enhancing the existing ground floor facade, unifying the space into a cohesive and recognizable street front. This thoughtful transformation is intended to attract visitors, tourists, and locals alike, creating a welcoming ambiance that encourages entrance and engagement with the vibrant surroundings 6x Proposed Guest rooms

P0

architecture

Issued for Planning

rev amendments

architecture

12.06.23

client

DT

MW

Guestroom chk

Guestroom

Guestroom

P2 P1 P0

0

drawing title Guestroom

Guestroom

Corridor

3

A-1 185

Fourth floor 1 3 Fourth floor 6

Third floor

Fourth Floor Plan

01 A-2A 0-0

10

EXISTING GROUND project Guestroom FLOOR SERVICE scale date drawn by Boutique Hotel Proposal ACCESS RETAINED 1:200 @ A3 12.06.23 DT Third floor

Guestroom

0

1

3

6

Fourth 10 floor

20 drawing title

Corridor

Guestroom

JMK Group

Guestroom date by

First floor

t: 020 7267 4440

Guestroom

Corridor

studio moren Ltd architecture urban design Guestroom interior design creative media www.studiomoren.co.uk studio@studiomoren.co.uk

Guestroom

Guestroom

Guestroom

3 CYCLE SPA date PARKING drawn by

scale

LOCATEDYFIN 1:200 @ A3 VISITORS 11.07.22 NTS @ A4Third floor

Basement Floor Plan

NTS @ A4

Issued for Planning drawing status Issue for Planning

client Guestroom

10.05.23 FK MW no. Second floor 11.11.22job DT MW Second floorYF MW 11.07.22

Issue for Planning

PLANNING

rev amendments

date

drawing no. JMK Group

S

03 10-03 A-1 185

First floor

drawing status

Corridor revision

6x Proposed Guest rooms

Corridor

0

job no.

PLANNING

P0

A-100-104

1853 by chk

Guestroom

Corridor

Second floor

london nw1 7db

Corridor

t: 020 7267 4440

57d

Guestroom jamestown road project

Boutique Hotel Proposal UK

Corridor

studio moren Ltd architecture urban design interior design creative media www.studiomoren.co.uk studio@studiomoren.co.uk

Guestroom

Third floor

Corridor

Guestroom

57d jamestown road london nw1 7db UK

Corridor

Guestroom

Corridor

Guestroom

Corridor

Guestroom

7x Proposed Guest rooms

4 -00 10 3 A-1 185

Corridor

W

Fourth floor

Proposed set back shallow pitched roof form partially accommodates lift overrun behind.

New lift behind

1

First floor

Corridor

Proposed Fourth Floor Plan (NTS)

Guestroom

3

drawing no.

1853

6

Second floor

10

First floor

A-100-099

revision

P2

20

219 - 223 Kensington High Street BOUTIQUE HOTEL PROPOSAL Design + Access Statement June 2023 The elevation demonstrates that the church is the tallest building of merit within this urban block although the Waitrose development is NEIGHBOURING BUILDING taller. 0 1 3 6 HEIGHTS The heights of the proposal remain subservient to the church and commensurate in scale with 209-223 High Street Kensington and the mansion blocks on the of Abingdon Road side street.

35.5M AOD PARAPETS

EARLS RD COURT

38.5M AOD OVERRUNS

t: 020 7267 4440

P3 P2 P1 P0

26.2M AOD PARAPET

Guest Rooms studio moren Ltd t: 020 7267 4440 architecture urban design media 12.06.23interior DT design MW creativeclient Plant 37.4M AOD 10.05.23www.studiomoren.co.uk RA MW JMK Group studio@studiomoren.co.uk APEX 11.11.22 DT MW Existing Building Refurbishment: 11.07.22 YF MW

Issue for Planning Issue for Planning Issue for Planning Issue for Planning

rev amendments

28M AOD PARAPET

28-30m

AVERAGE PARAPET 26 - 28m

28M AOD PARAPET

29.3M AOD APEX

date

architecture by chk

30.5M AOD PARAPET

28M AOD PARAPET 25.2M AOD PARAPET

24-26m

57d jamestown road london nw1 7db UK

27.5M AOD EAVES

31.2M AOD APEX

project drawn by

drawing title

scale

date

Proposed section Section BB

1:200 @ A3 N0-0A4 01 NTS @ 1 3

11.07.22

drawing status

PLANNING

The internal layout of the existing hotel does not form part of the planning application and does not require planning permission

P3 P2 P1 P0

BOUTIQUE HOTEL PROPOSAL Design + Access Statement June 2023

A-1 1853

drawing title

Boutique Hotel Proposal DT

section B Proposed 2 B-20-030Section AA A-1 185

5

A-1 18

Issued for Planning Issued for Planning Issued for Planning Issued for Planning

job no.

1853

rev amendments

12.06.23 DT MW drawing no. 10.05.23 DT MW 11.11.22 DT MW 11.07.22 YF MW

A-120-002

date

by chk

client revision

drawing status

JMK Group

P3

PLANNING E

29.3M AOD PARAPET RAILINGS

2 0-00 A-11 1853 900

ET RE ST

PATER ST

SITE 22.9M AOD PARAPET

Boutique Hotel Proposal Back of House

At this stag from: struc

Basement

Kensington High Street

A-20A-001

20

P4

A-100-104

225 - 227 Kensington High Street

1900x

30-32m

ORE LIM S PHIL RDEN GA

1

Key PROPOSED BUILDING 3 HEIGHTS 6 10 project Front of House

57d jamestown road london nw1 7db UK

Section AA (NTS)

Our Lady of Victories (Screen)

1853

single

23.4M AOD PARAPET

0

20

30.3M AOD APEX

date by chk Proposed Plant located in Basement

229 - 231 Kensington High 2-14 Street Abingdon Road

ILCHESTER MANSIONS

32+m

PLANNING

rev amendments

std

SCREEN

Guestroom

NOTES

225 - 227 Kensington High Street

10

Building heights legend:

GH HI

30.5M AOD PARAPET

OUR LADY OF VICTORIES

Abingdon Road

architecture

Key Plan

ON GT IN NS KE

31.2M AOD APEX

studio moren Ltd architecture urban design interior design creative media www.studiomoren.co.uk studio@studiomoren.co.uk

This detailed analysis shows the different building heights comparing those designated of merit with the listed church.

Section BB (NTS) 2

Guestroom

High Street Kensignton does BOH BOH architect's / interior designer's specification, bills of quantities / schedules, structural, mechanical & electrical drawings and all discrepancies are to be reported to the architect / interior designer. Do not scale from this drawing. DimensionsCafe are in&millimetres unless otherwise stated. All fire related elements and items as set out within the Fire Engineers Fire Strategy Report. Fir Retail not form part of planning Kitchen Office in relation to statutory items / elements under that consultants control. These items may be shown on Studio Moren Ltd drawings for coordination purposes, however they remain under that consultants d test bodies to be provided to both the Fire Engineer & Building Control for review and sign off, prior to procurement and installation. Studio Moren Ltd will coordinate with all other consultants Issued forcertified Planning 10.05.23 FK MW application client drawing status job no. drawing no. Issued For Planning 24.01.23 FK Ground MC floor Ground revision floor Ground floor Issue for Planning 11.11.22 DT MW JMK Group Drawing based on CADPlan Survey. Ref.:13072-10 Issue for Planning 13.10.22 YF MW NOTE Issue for Planning 11.07.22 YF MW Lobby House Lobby Drawing ba Guestroom Storage Keeping Corridor

Guestroom

Basement

03 DESIGN PROPOSALS

P4 P3 P2 P1 P0

Corridor

architecture

01 CONTEXT ANALYSIS AND EVALUATION

Hotel Reception

t: 020 Retail 7267 4440

Corridor

Cafe &

studio moren Ltd architecture urban design floormedia interiorGround design creative www.studiomoren.co.uk studio@studiomoren.co.uk

Guest Access

project drawing title scale date drawn by 57d Copyright: All rights reserved. This drawing must not be reproduced without permission. Only the original drawing should be relied upon. Contractors, subcontractors and suppliers must verify all dimensions on site before commencing any work or making any shop drawings. All shop drawings to be submitted to the architect / interior designer for comment prior to fabrication. This drawing is to be read in conjunction with the jamestown road Boutique Hotel Proposal Fourth Floor Plan 1:200 @ A3 11.07.22 YF fire certification from architect's / interior designer's specification, bills of quantities / schedules, structural, mechanical & electrical drawings and all discrepancies are to be reported to the architect / interior designer. Do not scale from this drawing. Dimensions are in millimetres unless otherwise stated. All fire related elements and items as set out within the Fire Engineers Fire Strategy Report. Fire rating of elements / components require london nw1 7db certified test bodies to be provided to both the Fire Engineer & Building Control for review and sign off, prior to procurement and installation. Studio Moren Ltd will coordinate with all other consultants in relation to statutory items / elements under that consultants control. These items may be shown on Studio Moren Ltd drawings for coordination purposes, however they remainsection under that NTS @ A4 Nando's of consultants 229-231 design and control. UK Copyright: All rights reserved. This drawing must not be reproduced without permission. Only the original drawing should be relied upon. Contractors, subcontractors and suppliers must verify all dimensions on site before commencing any work or making any shop drawings. All shop drawings to be submitted to the architect / interior designer for comment prior to fa

ac Ev Lift

V or AO er Ris

OUR LADY OF VICTORIES

New Lifts & Stair

en

Lin

22-24m

30.5M AOD OVERRUNS 28.6M AOD OVERRUNS 26.2M AOD PARAPET

ON ABINGD S ON MANSI

24.8M AOD PARAPET 27.5M AOD PARAPET

ILCHESTER MANSIONS

20.4M AOD PARAPET

CLERGY HOUSE

N RD GDO ABIN

20.9M AOD PARAPET

RESIDENTIAL

19.3M

20-22m 28M AOD PARAPETS

16M 19M

17M

20M

26M

18M

sq m area 1500m turning

B B-20-0302

16.7M

A-1 185

SITE

209-223 HIGH STREET KENSINGTON

SCREEN

m sq 1500m area turning

RH

29.7 AOD APEX

W 4

-00 10 3 A-1 185

A-20A-001 A-1 1853

209-223 HIGH STREET KENSINGTON 219 - 223 Abingdon Road

BOUTIQUE HOTEL PROPOSAL Design + Access Statement June 2023

15

Abingdon Road

225-227 HIGH STREET KENSINGTON 225 - 227 Kensington High Street

229-231 HIGH STREET KENSINGTON 229 - 231 Kensington High Street

233 KHS.

Our Lady of Victories 'screen'

235 KHS.

237 - 243 Kensington High Street (Waitrose)

SCREEN DATUM THRESHOLD

S

03 10-0 A-1 1853

15x Existing Guest rooms (not inclu 1x Proposed Guest room


‘23

Yoga House Competition

Yoga House in the Bog Programme Small building, Living and Yoga Space, environmentally friendly Site

Latvia, Baltic Sea

Year

2021-2022

Champions Julian Fok, Gareth Cotter, Elvira Salyahetdinova Group Devis Tako The competition site is characterized by lush muddy bogs encircled by a meandering river and dense forest. A solitary cabin, nestled within this natural habitat, stands as the sole architectural presence. Upon visiting the site, the design team was captivated by its richness, inspiring the proposal to both preserve and emulate the area’s natural beauty while capturing its poetic essence. Taking cues from the organic forms of pinecones and mushrooms abundant on the site, the design reflects the mushroom’s shape, allowing the proposal to delicately “touch the Earth.” Embracing the Fibonacci sequence observed in pinecones, the roof takes on a unique form that not only introduces natural light but also serves practical purposes—providing shading, collecting rainwater, and harnessing renewable energy. The proposal seamlessly interweaves timber structures, functional elements, and diverse natural inspirations, creating a harmonious device that honors the site’s innate beauty. It envisions a space that fosters inner serenity for yoga practitioners, establishing a direct connection to the tranquil Latvian surroundings. This innovative design not only respects the site’s ecological balance but also provides a sanctuary where nature and architecture coexist in a symbiotic dance.


Y3

Flat Iron Theatre Educational

Flat Iron Theatre Programme Public space, theatre, commercial, educational Site

Flat Iron Square

Year

2021-2022

Tutors

Alex Bilton / George King

Flat Iron Theatre is set to become a notable landmark along the Victorian rail viaduct, ready to unlock the potential of Flat Iron Square. The ground-floor market stall will serve as a vibrant hub, sparking engagement within the local communities of Southwark Council and bringing life to the site. At the core of the building’s philosophy is community, epitomized by the Open Air Theatre. Nestled amidst the rhythmic traffic of passing trains, this space is designed for communal use, inviting gatherings and performances.

28 24

9

27 23 26

22 8

29

8

21 30

35

20

25

9 8 9

18

In addition, the formal theatre is envisioned as a dynamic facility fostering young artist development, training initiatives, and the creation of new works. The rooftop bar, a distinctive addition to the site, promises panoramic views of the city, offering a unique perspective to visitors. With community at its heart and a commitment to artistic growth, Flat Iron Theatre seeks to weave itself into the cultural fabric of Southwark, providing a multifaceted space for both local engagement and artistic expression.

10 34

19

18

11

33

31

32

7

6 5

3

17

4

31

12 13 14 16

8 9 6 16

11

8

7

9 16

12 9

8

13 15 1

14

12

6

1

13

4

15

14

3 2

17

1 13

1. Concrete footing 2. Steel post base 3. Water services 4. Electrical services 5. Family 2 steel bracket 6. Wooden slats

7. Steel rebar 12 mm 8. Family 6 Mass Timber Column 9. Beam 10. Gutter 11. Wood window 12. Internal SIP’s wall wood panel

15

14

12. Internal SIP’s wall wood panel 13. Thermal insulation layer 14. External SIP’s wall wood panel 15. Waterproof membrane 16. Steel beam 17. Timber wall - Stairs suporting structure

18. Steel column 19. Glass facade 20. Celling wood panels 21. Wood floor joists 22. Thermal insulation layer 23. Floor wood panels

24. Flat roof waterprove membrane 25. Glass roof 26. Double glazing unit 27. Roof wood unit 28. Lean to roof glass 29. Steel beam

29. Steel beam 30. Glass canopy 31. Auditorium seat from reclaim timber 32. Loge 33. Wood door 34. Acoustic slat wood wall panels 35. Wood blinds


Y2

Shielding from the invisible Educational

Shielding for the Invisible Programme Offline zone for social interaction / Public space, attraction, view point Site

Greenwich Park, London

Year

2020-2021

Tutors

Louis Sullivan / Xuhong Zheng

This project is rooted in the historical significance of Greenwich as a Center for Global Telecommunications in 1850 and a thorough examination of the site. The concept revolves around the creation of a factory dedicated to manufacturing subsea cable trees, utilizing damaged and old subsea cables that were historically employed for data communication, but now repurposed to block electromagnetic signals and establish a Faraday cage. The design incorporates a public viewing platform where data signals are intentionally blocked. However, strategically positioned key views and seating areas are meticulously crafted to encourage social interaction. This innovative approach not only pays homage to Greenwich’s telecommunications legacy but also transforms historical artifacts into functional and interactive elements that engage the public in a unique way.


cel: 0792 858 2629 e-mail: takoarchitects@gmail.com portfolio: issuu.com/devistako


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.