Devonne Coll MArch Portfolio Sample

Page 1

YEAR SIX_THESIS DATA DERIVE:

DEVELOPMENT OF INITIAL COVENTRY STUDY, STARTING FROM MAPPING AREAS OF FRICTION, TO PIXEL MAPS OF LAND USE OVER TIME, AND FLUX MAPS TO SHOW THE NUMBER OF SPATIAL USE CHANGES THROUGHOUT TIME

HACKING COVENTRY This group project aimed to investigate the postconflict environment of Coventry. We were interested in the idea that trauma and conflict can be a catalyst for change. Trauma is a key part of Coventry’s history due to its destruction in World War II and the deindustrialisation of the car production trade. Hacking is the art of reassembling a system to produce a different result and we defined Coventry as a complex system, and us as hackers aiming to find points of weakness or opportunity in the city for architectural intervention, to improve the system. We perceived the city’s system as spatial (physical) and behavioural, both affecting the changing appropriation of space over time, which sees the conflict between the stasis and flux of space. Aiming to uncover the points of friction between flux and stasis, we mapped the land use throughout the city centre over time, and then created flux maps, showing patterns of how the actual programming of spaces has changed. These maps and patterns were then used to create a three dimensional cellular automata model of the city, a computer-based projected simulation of how the spatial and behavioural systems of the city may continue to change in the future. The aim of this model was to reveal potential areas of intervention or to suggest programmatic requirements that will benefit the city in the future, allowing intelligent and informed decisions to be made benefitting the system from a bottom-up collaboration rather than top-down instigation.

1900s

1910s

1920s

1930s

1950s

1970s

1990s

2010s CELLULAR AUTOMATA MODEL DEVELOPMENT


YEAR SIX_THESIS HACKING COVENTRY: Following from the group project, my work aimed to create an interjection which would be responsive and adaptive to Coventry’s everchanging spatial needs. Hacking Coventry is a civic hub and infrastructural interjection that aims to provide residents of Coventry with a new type of public realm space, which they are able to ‘hack’ and continuously reprogramme to suit their changing needs. Based upon the basic programmes of sports, event and marketplace, the scheme’s strategy employs methods so that these programmes may become interchangeable with each other, and therefore the programme can be chosen by the user. This is achieved through the use of time based grid systems incorporating all programmes, and the strategic use of surface treatments, colour and materiality which change to reflect the different uses. The scheme is situated upon Junction 6 of the Ring Road a seemingly inappropriate site, yet is the key node separating the inner and outer city centre, separating residents from the city. Challenging this fixture whose only current purpose if for mobility, aims to hack this site and reprogramme what is it used for,, turning this ‘non-place’ into a significant, social, cultural and dynamic place for Coventry’s residents.




DRAWING: SHORT SECTIONS A - F WITH SPATIAL HACKS SCALE: 1:200 @ A1 WIDTH

The circulation strategy is a key driver of the project, determing the connections between different spaces and their changing programmes. Surface (treatment and spatial quality) and form are also particularly significant especially the idea that a surface can be considered as a continuously changing plane perceived not specifically as a floor, roof or wall, but all three and can be manipulated between these planes. The scheme was developed extensively in section so that it is continuously changing along every grid line, in order to explore the spatial flux throughout the scheme. Below shows gridlines A-F and their changing spatial hacks, from performance spaces, market spaces, walkways and sport ramps and courts.


HACKING COVENTRY DRAWING: SOUTH FACING ELEVATION SCALE:

1:200 @ A1 HEIGHT

KEY:

HACKING COVENTRY DRAWING: SOUTH FACING ELEVATION SCALE: KEY:

1:200 @ A1 HEIGHT


HACKING COVENTRY DRAWING: LONG SECTION AA SCALE:

1:200 @ A1 HEIGHT

KEY:

HACKING COVENTRY DRAWING: LONG SECTION BB SCALE: KEY:

1:200 @ A1 HEIGHT


15

13

14

19

18

23 20

21 22

17

16

01

02

03

05

1:20 @ A1

01 // CONCRETE PILE FOUNDATIONS (600 X 600MM PILE CAP) 02 // CONCRETE SLAB 03 // REINFORCEMENT BARS 04 // 1500MM DEEP PRISMATICTRUSSES 05 // WELDED STEEL PLATES (USED TO FORM LARGE COLUMNS, 800 X 800 AT BASE) 06 //150MM I SECTION 07 // 150MM C SECTION 08 // 50MM FLOOR INSULATION 09 // 150MM STEEL DECK WITH CONCRETE INFILL 10 // 20MM SCREED 11 // SERVICE DUCT 12 // SPRINKLER SYSTEM 13 // DRAINAGE CHANNEL 14 // INTERNAL DOUBLE GLAZING WITH OPENABLE WINDOWS 15 // RIGID INSULATION 16 // SUSPENSION ROD 17 // SQUARE HOLLOW SECTION 18 // 250MM U CHANNEL GLASS WITH TRANSLUCENT INSULATION 19 // MOTORISED BLIND 20 // THERMALLY BROKEN STEEL SUPPORT BRACKET 21 // ALUMINIUM LOUVRES 22 // ALUMINIUM VENTILATION CHANNEL 23 // AIRFLOW OPENING 24 // ALUMINIUM COPING 25 // STEEL MESH 26 // HANDRAILINGS 27 // WATERPROOF CAPPING 28 // ASTROTURF SURFACING 29 // UPLIGHTING

KEY:

SCALE:

DRAWING: 1: 20 SECTION THROUGH FACADE

HACKING COVENTRY

19 18

20

23

21 22

26 15 16

28

12

11

04

06

07

08

10 09

26

21

29


01

02

03

06

13

14

19 17 20 21 22 16

11

05

04

28 10 09 06

29 15

07

09 08

10

27

26

21

18

21

24

01 // Concrete Pile Foundations (600 x 600mm Pile Cap) 02 // Concrete Slab 03 // Reinforcement Bars 04 // 1500mm deep PrismaticTrusses 05 // Welded Steel Plates (used to form large columns, 800 x 800 at base) 06 //150mm I Section 07 // 150mm C Section 08 // 50mm Floor Insulation 09 // 150mm Steel Deck with Concrete Infill 10 // 20mm Screed 11 // Service Duct 12 // Sprinkler System 13 // Drainage Channel 14 // Internal Double Glazing with openable windows 15 // Rigid Insulation 16 // Suspension Rod 17 // Square Hollow Section 18 // 250mm U Channel Glass with Translucent Insulation 19 // Motorised Blind 20 // Thermally Broken Steel Support Bracket 21 // Aluminium Louvres 22 // Aluminium Ventilation Channel 23 // Airflow Opening 24 // Aluminium Coping 25 // Steel Mesh 26 // Handrailings 27 // Waterproof Capping 28 // Astroturf Surfacing 29 // Paved Surfacing

3D CUT THROUGH FACADE:

INTEGRATED TECHNOLOGIES MODULE // ENVELOPE

3D FACADE STUDY


1:1000 DEVELOPMENTAL MODELS


FINAL 1:200 SECTIONAL MODEL


EXTERNAL VIEW FROM THE EXTERNAL GRID


EXTERNAL VIEW APPROACHING FROM THE RING ROAD

EXTERNAL VIEW APPROACHING FROM THE RING ROAD AT NIGHT


EXTERNAL VIEW APPROACHING THE JUNCTION FROM THE CITY CENTRE

EXTERNAL VIEW UNDERNEATH THE RING ROAD ROUNDABOUT


INTERNAL VIEW OF THE COMMUNITY HUB, STREET AND EVENT/ SPORT SPACE


YEAR 5_ DATA DERIVE : OCCUPY AND CONTROL BRADFORD PART OF THE ‘ISSUES OF URBANIZATION’ EXHIBITION, GUANGDONG MUSEUM OF ART, CHINA This group project was an abstract installation, visualising the relationship between Bradford as an urban centre and the occupation & control of space through the case study of the 2001 Bradford riots. We collected data in order to understand the factors of the riot and visualised this through three dimensional simulations, whilst allowing the user to experience this information through a digital avatar. Multiple simulations including the riot event, police and rioter’s perspectives were created. This project was an exploration of how to re-represent research, as well as an opportunity to develop scripting and coding skills.


YEAR FIVE_ CREATURE FEATURE : [UN]REGULATED MODULAR MARKET Expanding upon the notion of the control of space within the city centre, my scheme investigated the failing retail sector in the city, an unusual situation as Bradford was historically known for local products and retail. This scheme aimed to reintroduce local retail; I proposed a factory which produced mobile and transformable retail units for local businesses that can allow them to infiltrate into the city. The retail units unfold to display their products once they reach their destination and this feature is also incorporated into the factory building design. Panels and walls unfold to create slack spaces, courtyards and viewing platforms dependant on the changing uses of the building whether factory production, or local public based marketing events are occuring. Different colours, fluoresecent lighting and supergraphics were used to identify zones and transforming panels, dependant on their public or private use, and the types of spaces they are creating or affecting - whether this may be the factory, marketing or distribution aspect. These visuals show the external day and night views.


VIEW INTO LOADING AND WORKSHOP AREAS, WITH UNFOLDING PLANES AND PLATFORMS

VIEW FROM CENTRAL CANOPY CONNECTING ADJOINING BUILDINGS ONCE UNFOLDED

VIEW INTO ONE OF THE ASSEMBLY WORKSHOPS

A MOBILE RETAIL UNIT IN THE CITY CENTRE


YEAR FIVE_ [RE]MODEL : THE URBAN WALKER A conceptual kinetic model exploring how the proposed retail units could unfold and ‘walk’ around the city centre, using a mechanism based upon the work of Theo Jansen. The movements were achieved by the use of an Arduino with a script to run servo motors.


PART 1 PLACEMENT_

notes

Key - Schools Construction, Engineering and Motor Vehicles

EAST BERKSHIRE COLLEGE

ESOL, Community and Languages Health, Caring and Educational Pathways

During a year long Part 1 placement working for Bond Bryan Architects, a practice primarily focused on education based projects, the majority of my time was spent working on a refurbishment and new build project at East Berkshire College, Slough, which included a sports hall, hospitality suite and indoor street. I was greatly involved in the project from Stage C through to Tender.

Learning and Development Academy General / Administration Creative and Service Industries

Plant

GF0-002 A: 35 m2

Sixth Form and Business

Equipment Store Sports Hall

GF0-003 A: 60 m2

Area Outside Project 1.

Motor Vehicle CAD/CAM Workshop

GF0-001 A: 597 m2

GF0-004 A: 55 m2

Motor Engineering GF0-005 A: 75 m2

Female WC GF0-009 A: 19 m2

Male Changing Female Changing Rooms Rooms GF0-007 A: 46 m2

GF0-008 A: 55 m2

275

Dis. WC

Workshop 3.

GF0-011 A: 6 m2

Female WC Male WC

Male WC

GF0-013 A: 13 m2

GF0-012 A: 9 m2

GF0-014 A: 18 m2

Dis. Change / WC Dis. Change / WC Circulation GF0-018Data Cupboard GF0-016 A: 6 m2

GF0-017 A: 11 m2

A: 6 m2

GF0-010 A: 165 m2

Circulation GF0-015 A: 122 m2

Motor Engineering

GF0-027 A: 2 m2

Circulation Circulation GF0-020 A: 23 m2

Laundry GF0-023 A: 6 m2

Sports Science Classroom GF0-022 A: 52 m2

A: 19 m2

GF0-021 A: 76 m2

Store GF0-026 A: 4 m2

Lift

A: 4 m2

Lobby

GF0-019 A: 48 m2 Managers Office Reception

GF0-028 GF0-025 A: 4 m2 A: 7 m2

Quiet Study

Office

GF0-103 A: 40 m2

GF0-024 A: 20 m2

Library Office

(07)010

GF0-104 A: 9 m2

Library

(07)011

GF0-102 A: 350 m2

Street

GF0-101 A: 645 m2

Multi-Functional Room GF0-107 A: 8 m2 Assistive Technology GF0-108 A: 25 m2

Reception GF0-105 A: 24 m2

Multi-Functional Room

A: 2 m2

GF0-106 A: 30 m2

Data Cupboard GF0-135 Electrical Cupboard A: 3 m2 GF0-136

Circulation GF0-109 A: 9 m2

Assistive Technology GF0-110 A: 36 m2

Multi-Functional Room GF0-112 Store A: Multi-Functional 7 m2 GF0-111 Room A: 4 m2 GF0-112 A: 7 m2

Student Services GF0-114 A: 71 m2

Toilets

GF0-018 A: 21 m2

Interview Room Interview Room Interview Room GF0-111 GF0-111 GF0-111 A: 7 m2 A: 7 m2 A: 8 m2

Toilets

GF0-019 A: 19 m2

Acc. WC SF0-120 A: 4 m2

Circulation GF0-121 A: 71 m2

Circulation GF0 A: 31 m2

Interview Interview Security Room Room GF0-125 GF0-123 A: 7 m2

GF0-124 A: 7 m2

Plant GF0-126 A: 12 m2

A: 14 m2

Office

GF0-130 A: 5 m2

Reception Back Office GF0-128 A: 38 m2 Riser GF0-137 A: 3 m2

Course Enquiries Office

Plant GF0-138 A: 3 m2

ELEC

Store GF0-132 A: 8 m2

WC

Hospitality En-suite

A: 6 m2

Disabled WC GF0-131 A: 10 m2

GF0-222 A: 9 m2

Hotel Room Circulation GF0-201 A: 29 m2

GF0-202 A: 56 m2

GF0-129 A: 34 m2

Hospitality Seminar

Reception

GF0-221 A: 26 m2

GF0-133 A: 36 m2

Course Enquiries GF0-134 A: 116 m2

Female WC GF0-203 A: 25 m2

Circulation

Changing Room

Circulation

Male WC GF0-204 A: 26 m2

Circulation GF0-205 A: 85 m2

GF0-206 A: 27 m2

Dis. WC Dis. WC GF0-208 GF0-217 A: 6 m2 A: 4 m2

Technician's COSHH GF0-218 Office GF0-210 A: 3 m2 A: 7 m2

(07)013

GF0-214 A: 124 m2 V: 745.64 m3

T0 09.05.12 Tender Issue revisions

DC

Changing Room GF0-209 A: 30 m2

Circulation GF0-211 A: 17 m2

verralls house 95 high street westerham kent TN16 1RE

Kitchen 1

T F

GF0-212 A: 93 m2

Linen Store GF0-213

Circulation GF0-224 A: 6 m2

GF0-215 A: 2 m2 A: 11 m2

Kitchen 2 GF0-216 A: 103 m2

Dry Store GF0-223 A: 17 m2

+44 (0)1959 567 300 +44 (0)1959 562 840

D - design T - tender C - construction

E info@bondbryan.co.uk W www.bondbryan.com PT - pre-tender

PL - planning P - preliminary R - record

East Berkshire College East Berkshire College Station Road Langley Proposed Ground Floor Plan

Proposed Ground Floor Plan

Equipment Store GF0-219 A: 8 m2 Bar Store GF0-220 A: 8 m2

Bar

Restaurant

GF0-207 A: 34 m2

TENDER

(07)012

A: 11 m2

Project 1 scale

date

1:200@A0

09.05.12

job no

(category) dwg no

drawn

checked

CB

DC

revision

11-092 (07)001

11-092 (07)001 T 0 This drawing is Š Bond Bryan Architects Ltd. If in doubt ASK. Drawing measurements shall not be obtained by scaling. Verify all dimensions prior to construction. Immediately report any discrepancies on this drawing to Architect. This drawing shall be read in conjunction with associated specifications and related consultant's documents.


289

11-092 (21)810 DETAIL EWD3 W11 – Feature Timber Wall Panels Spec Ref: K21/115

W10 – Partitions to WC's and Showers & Cleaner's Stores Spec Ref: K32/120B & 120C

W9 – IPS / Back Panels to WC's and Showers K32/120A

W8 – Mirrors Spec Ref: N13/438

W7 – Vinyl Wall Graphics Spec Ref:M52/110

W6 – Whiteboard Paint Spec Ref: M60/140

W5 – Acoustic Panels Spec Ref: N10/197

W4 – Ceramic Tiles Spec Ref: M40/113

W3 – Painted Plaster / Blockwork (for WC's) Spec Ref: M60/110B

W2 – Painted Plaster / Blockwork (for non-high traffic areas) Spec Ref: M60/110A

W1 – Painted Plaster / Blockwork (for high traffic areas) Spec Ref: M60/110

Wall Finish Key:

SC A

111

W13 – Folding Partitions Spec Ref: L20/540

W12 – Hygienic Wall Cladding Spec Ref: K13/110

W11 – Feature Timber Wall Panels Spec Ref: K21/115

W10 – Partitions to WC's and Showers & Cleaner's Stores Spec Ref: K32/120B & 120C

W9 – IPS / Back Panels to WC's and Showers K32/120A

W8 – Mirrors Spec Ref: N13/438

W7 – Vinyl Wall Graphics Spec Ref:M52/110

W6 – Whiteboard Paint Spec Ref: M60/140

W5 – Acoustic Panels Spec Ref: N10/197

W4 – Ceramic Tiles Spec Ref: M40/113

W3 – Painted Plaster / Blockwork (for WC's) Spec Ref: M60/110B

4,175

W2 – Painted Plaster / Blockwork (for non-high traffic areas) Spec Ref: M60/110A

W1 – Painted Plaster / Blockwork (for high traffic areas) Spec Ref: M60/110

Wall Finish Key:

(TYPE 38)

MJ

F9 – Vinyl Plank

F8 – Sports Vinyl System Spec Ref: M50/161

F7 – Vinyl Sheet (for Circulation Areas) Spec Ref: M50/151

F6 – Anti-Slip Vinyl Sheet (for Showers) Spec Ref: M50/155

F5 – Heavy Duty Anti-Slip Vinyl Sheet (for Kitchens) Spec Ref: M50/156

F4Anti-Slip Vinyl Sheet (for WC's & Other) Spec Ref: M50/158

F5 Porcelain Tile Spec Ref: M40/110 Colour Change

F4 Porcelain Tile Spec Ref: M40/110

F3 – Carpet Tile Spec Ref: M30/130B

F2 – Carpet Tile Spec Ref: M30/130A

F1 – Carpet Tile Spec Ref: M30/130

Floor Finish Key:

SC B

GF0-022 A: 52 m2

F14 Epoxy Floor Paint Spec Ref: M60/180

F13 Anti Static Vinyl Spec Ref: M50/159

F12 – Protective Loose Lay Flooring Tile System Spec Ref: M50/163

F11 – Sprung PU System Spec Ref: K21/111

F10 – Entrance Matting Spec Ref: N10/170

F9 – Vinyl Plank Spec Ref: M50/150

F8 – Sports Vinyl System Spec Ref: M50/161

F7 – Vinyl Sheet (for Circulation Areas) Spec Ref: M50/151

F6 – Anti-Slip Vinyl Sheet (for Showers) Spec Ref: M50/155

F5 – Heavy Duty Anti-Slip Vinyl Sheet (for Kitchens) Spec Ref: M50/156

F4Anti-Slip Vinyl Sheet (for WC's & Other) Spec Ref: M50/158

F5 Porcelain Tile Spec Ref: M40/110 Colour Change

F4 Porcelain Tile Spec Ref: M40/110

F3 – Carpet Tile Spec Ref: M30/130B

4,960

F1 – Carpet Tile Spec Ref: M30/130 5,030 x 1,000 F2 – GF0-022-W1 Carpet Tile Spec Ref: M30/130A

S3

S3

W1

W1 W1

F3 – Carpet Tile Spec Ref: M30/130B

F2 – Carpet Tile Spec Ref: M30/130A

F1 – Carpet Tile Spec Ref: M30/130

GF0-022-D1 Floor Finish Key:

1,475 x 2,110

GF0-001 A: 597 m2

Sports Hall

F14 Epoxy Floor Paint Spec Ref: M60/180

F13 Anti Static Vinyl Spec Ref: M50/159

F12 – Protective Loose Lay Flooring Tile System Spec Ref: M50/163

F11 – Sprung PU System Spec Ref: K21/111

F10 – Entrance Matting Spec Ref: N10/170

F9 – Vinyl Plank Spec Ref: M50/150

SC C

F8 – Sports Vinyl System Spec Ref: M50/161

F7 – Vinyl Sheet (for Circulation Areas) Spec Ref: M50/151

F6 – Anti-Slip Vinyl Sheet (for Showers) Spec Ref: M50/155

F5 – Heavy Duty Anti-Slip Vinyl Sheet (for Kitchens) Spec Ref: M50/156

F4Anti-Slip Vinyl Sheet (for WC's & Other) Spec Ref: M50/158

F5 Porcelain Tile Spec Ref: M40/110 Colour Change

F4 W2 S2 Porcelain Tile Spec Ref: M40/110

Sports Science Classroom

Floor Finish Key:

Note: 105m2 Acoustic Panels Ecophon Wallpanel A with SuperG (High Impact Resistant) Finish to be fixed to walls with framing system. Colour: TBC Spec Ref: N10/197 Additional 105m2 To Adjacent Wall At Mid Level on Wall

S3

W1

18,048

S2

W2

W2

S2

W2

GF0-020 A: 23 m2

S2

W1

4,960

(TYPE 32)

Bracing

(TYPE 22)

S1

S3 – Hard Wood (Sports Hall) Spec Ref: K21/111

Note: Support for ceiling mounted basketball hoops to be designed by Sub-Consultant and approved by Structural Engineer. To be coordinated during production stage.

MJ S1

S1

W1

GF0-001-ExD4 2,035 x 2,110

W1

S1

SC D

8

9

10

11

12

13

14

15

16

1HR

(TYPE 23)

(TYPE 7)

Note: 105m2 Acoustic Panels Ecophon Wallpanel A with SuperG (High Impact Resistant) Finish to be fixed to walls with framing system. Colour: TBC Spec Ref: N10/197 Additional 105m2 To Adjacent Wall At Mid-Level on Wall

Note: All fittings to be flush with wall finish as Sport England Guidance.

W1

S2 – Coved Anti-Slip Vinyl (All Types) Spec Ref: M50/740, 740A & 770

S1 – Painted MDF / Softwood Spec Ref: P20/200

Skirting Key:

(TYPE 1) 40dB

Circulation

(TYPE 23)

(TYPE 7)

S3

(TYPE 37)

4,175

4,175

1

SC-CW-03

SC E

MJ 111 29

TYPE 21 W2

S2

SC E

W2 S2

S2

W2

W2

S2

S2

W2

W2

S2

W3 W3/4

GF0-012 A: 9 m2

S2

W3/4

1,305

W2

W2

S2

S2

S2

S2

W3/4

S2

SC E1

S2

W3

S2

W3

S2

S2

GF0-021 A: 76 m2

Store GF0-026 A: 4 m2

1/2 HR (TYPE 1)

GF0-023 A: 6 m2

Laundry

(TYPE 7)

2,715

5,355

(TYPE 22)

A: 4 m2

Lift

(TYPE 7)

W3

Circulation

Wall Mounted Water Fountain

1HR (TYPE 23)

1HR

S2

W3/4/10

GF0-007 A: 46 m2

1HR (TYPE 2) 40dB

W3/4

W3/4/8

(TYPE 23)

1/2HR (TYPE 7)

1HR S2 (TYPE 2) 45dB

GF0-016 A: 6 m2

S2

W2

W2

GF0-003 A: 60 m2

1 HR (TYPE 2) 45dB

Male WC

HD

W2

W2

S2

1HR (TYPE 7)

GF0-002 A: 35 m2

W2

Male Changing Rooms

(TYPE 2) 45dB

S2

W3/8/9/10

W3

Dis. Change / WC

S2

S2

S2

W2

W2

Plant

W2

S2

1HR

(TYPE 37)

Equipment Store

S2

S2

GF0-002-ExD1 2,035 x 2,110

5,355

S2

Ex RWP

GF0-007-D1 910 x 2,110

S1

S1

SC E2

W2

S1

W2

W2

S1

1,335

1/2 HR (TYPE 1)

(TYPE 1)

S1

W1

W1

W1

SC F

W2

W1

1,010 x 2,110 GF0-024-D1

W1

S1

GF0-017 A: 11 m2

Circulation

S1

1HR (TYPE 2) 45dB

S1

S1

W1

W1

S1

Ex RWP

SC F

S1

S1

1,375

Office

GF0-024 A: 20 m2

GF0-028 A: 4 m2

S1

SC F1

Managers Office

1HR (TYPE 2) 40dB

W1

GF0-008-D1 910 x 2,110

W3/4

S2

W3/4

W2/7

S1

W2

W2

S1

S1

S1

W2

W2/7 S1

2,770

W2

W2

S1

GF0-025 A: 7 m2

Reception

S2

GF0-018 A: 6 m2

W3/4

W3/4/8

1,250 x 2,110 GF0-025-D1

W2

S2

W3

W3

S2

Dis. Change / WC

(TYPE 2) 45dB

S1

S2

S2

W3/4/10

1 HR (TYPE 2) 45dB

W3

GF0-008 A: 55 m2

(TYPES22) 45dB

S2

S2

S2

W2

W2

S2

GF0-013 A: 13 m2

SC F2

S2

SC-CW-01

1,965 x 2,100 GF0-027-D1

Data Cupboard GF0-027 A: 2 m2

(TYPE 2) 45dB

Female WC

HD

S2

W3/4

W3/8/9

S2

W2

W3/8/9/10

W3/10

(TYPE 23)

(TYPE 23) (TYPE 7)

W2

(TYPE 2) 45dB

1HR

Female Changing Rooms

Extend Existing foundation to support new blockwork wall and extend existing concrete slab to suit see Structural Engineers drawings for details

S2

GF0-004 A: 55 m2

E 2

E 1

20

19

18

17

16

15

14

13

SC A

SC B

S1

W1

Lobby

W1

GF0-019 A: 48 m2

W7

GF0-019-ExD1 1965 x 2110

S1

TP

TP

S2

ST

S1

ST 8

ST 7

ST 6

ST 5

ST 4

S2

SC D

7

SC E

SC E

SC E1

S2

W3

W3/4/8/9

(TYPE 2) 45dB

W3/9/10

W3/4

S2

S2

(TYPE 2) 45dB

GF0-014 A: 18 m2

S2

SC C

8

1

(TYPE 2) 45dB

W3/4/8/9

Male WC

ST 3

GF0-011 A: 6 m2

Dis. WC

ST 2

S2

W3/4

W3/9/10

W3

S2

GF0-009 A: 19 m2

Female 1 WC

Vending Machines

TP

TP

TP

TP

1/2 HR (TYPE 1)

S2

TP

TP

TP

TP

(TYPE 23)

(TYPE 23) 1HR (TYPE 7)

Motor Vehicle CAD/CAM Workshop

SC 3

SC 2

SC 1

ST 18

ST 20

SC 7

16

15

14

13

12

11

10

9

6

SC 6

SC D

5

SC 3

SC C

4

SC 5

SC B

3

SC 4

SC A

2

SC 2

175

SC 1

SC E2

SC F

SC F

SC F1

SC F2

E 6

E 5

E 4

E 3

ST 20

ST 19

ST 18

ST 17

ST 16

ST 15

ST 14

ST 13

ST 12

ST 11

ST 10

ST 9

ST 8

ST 7

ST 6

ST 5

ST 4

ST 3

ST 2

ST 1

ST A

ST A

SC 6A

SC 4A

SC 3A

ST B

ST B

275

SC 7

SC 6

SC 5

SC 4

ST C

ST C

ST D

ST D

ST A

1

2

3

4

5

6

7

8

E A

E A

E B

E B

E C

E C

ST F

ST F

E D

E D

E E

E E

ST 3

ST 2

ST 1

E F

E F

ST 20

ST 19

ST 18

ST 17

ST 16

ST 15

ST 14

ST 13

ST 12

ST 11

ST 10

ST 9

ST 8

ST 7

ST 6

ST 5

ST 4

ELEC

E 6

E 5

E 4

E 3

E 2

E 1

13

14

15

16

17

18

19

20

10

9

10

1

2

3

4

5

6

7

8

9

5

6

7

8

09.05.12

1:50@A0

AS

drawn

This drawing is © Bond Bryan Architects Ltd. If in doubt ASK. Drawing measurements shall not be obtained by scaling. Verify all dimensions prior to construction. Immediately report any discrepancies on this drawing to Architect. This drawing shall be read in conjunction with associated specifications and related consultant's documents.

CB

checked

revision

11-092 (07)010 T 0

(category) dwg no

date

scale

Detailed Ground Floor Plan Sports Centre

East Berkshire College Station Road Langley

East Berkshire College

PT - pre-tender

E info@bondbryan.co.uk W www.bondbryan.com PL - planning P - preliminary R - record

+44 (0)1959 567 300 +44 (0)1959 562 840 D - design T - tender C - construction

DC

Glazed Screens (32)400, (32)500, (32)501, (32) 502

- Internal Doors (32)001, (32)100, (32)101, (32)102

- Curtain Wall (31)500, (31)501, (31)502, (31)503

- Windows (31)400, (31)401

- External Doors (31)001, (31)100, (31)101

- External Wall Types (21)800, (21)801

- Internal Wall Types (22)100, (22)101

- All kitchen areas to recieve trovex diamond finish

- All steel columns to recieve casing (type 26) to achieve fire protection

- All dimensions shall be verified on site before proceeding with the work

- All dimensions are millimetres unless noted otherwise

verralls house 95 high street westerham kent TN16 1RE

job no

4

Existing Building Fabric

T0 09.05.12 Tender Issue revisions

T F

3

Area Outside Project 1.

(07)013

E G

E G

- Do not scale from drawings.

Notes:

ST E

ST E

1HR (TYPE 5)

S2

RWP

13

14

15

16

17

18

19

20

(07)011

9

(07)012

E 2

E 1

SC 3

SC 2

SC 1

11

(07)010

2

Location Plan:

1

notes

12

RWP

Finishes Key:

SC 7

SC 6

SC 5

SC 4

SC 3

SC 2

SC 1

6,655 6,655 6,655 6,655 6,655 7,600

MJ GF0-001-ExD2 2,035 x 2,110

MJ (TYPE 37)

MJ GF0-001-ExD1 2,035 x 2,110

MJ (TYPE 36)

1HR (TYPE 7) 60dB GF0-001-D1 1,965 x 2,110

1/2HR (TYPE 7)

289 111 33,053 111 130

GF0-001-ExD3 2,035 x 2,110

GF0-020-D1 1,965 x 2,110

1HR (TYPE 2) 45dB

4,960

17 7

RWP

RWP RWP (TYPE 23) (TYPE 23)

1HR (TYPE 23) 1HR (TYPE 23) (TYPE 23) (TYPE 7)

(TYPE 2) 45dB

4,960

18 6

GF0-012-D1 910 x 2,110

1HR (TYPE 2) 45dB 1,010 x 2,110

4,175

19 5

(TYPE 23)

SC D

20 4

910 x 2,110 GF0-013-D1

SC C

21 3

(TYPE 2) 45dB

SC B

22 2

(TYPE 2) 45dB (TYPE 2) 45dB

GF0-001-D2 1,965 x 2,110

(TYPE 7) (TYPE 7) 1HR (TYPE 7)

TP

1 HR (TYPE 23) 1,920 x 2,100 GF0-021-D2

TP

GF0-004-GS1 (TYPE 2) 45dB

SC A

GF0-020-ExD1 1,965 x 2,110

(TYPE 32) GF0-022-W2 5,030 x 1,000

GF0-023-D1 1,010 x 2,110 GF0-026-D1 910 x 2,110

(TYPE 23)

(TYPE 2) 45dB (TYPE 23)

(TYPE 2) 45dB GF0-017-D1 1,010 x 2,110

TP

1HR (TYPE 2) 40dB 1HR

1/2 HR (TYPE 1) 1/2 HR (TYPE 1)

GF0-017-D2

1HR (TYPE 7)

(TYPE 2) 40dB

1 HR (TYPE 2) 45dB

1HR (TYPE 2)

1HR (TYPE 2) 40dB 1,010 x 2,110 GF0-028-D1

1 HR (TYPE 2) 45dB

GF0-021-D1 1,965 x 2,110

1HR (TYPE 2) (TYPE 2) 40dB

11-092 (21)810 DETAIL EWD2

2,000 x 1,340 GF0-019-D1

910 x 2,110 GF0-014-D1

(TYPE 35)

1/2 HR (TYPE 1)

10

For Continuation Refer to Drawing (07)011

GF0-004-D1 1,965 x 2,110 (TYPE 23) (TYPE 7) 1,010 x 2,110 GF0-011-D1

TENDER

(TYPE 1)

9

8

7

6

5

4

3

2

1 11

10 12

11-092 (21)810 DETAIL EWD1

910 x 2,110 GF0-009-D1

TP

20

340

19

(TYPE 35)

18

GF0-019-D1 1,965 x 2,110

17

(TYPE 2)

16

1HR (TYPE 2)

15

1HR (TYPE 23)

9

8

7

6

5

4

3

2

1 11

10 12

14

(TYPE 2)

2

1 5

4

3 8

7

6 11

10

9

22

21

20

19

18

17

12

13

(TYPE 2) 45dB

N Detailed Ground Floor Plan - Sports Centre 11-092 (07)010

N

11-092 (21)810 DETAIL EWD4

11-092 (24)001


E 6

E 5

E 4

E 3

1,380 X 1,590 GF0-SW-W1

3,000

ST 20

ST 19

ST 18

ST 17

ST 16

ST 15

ST 14

ST 13

GF0-101-ExD4 2700 x 2750 GF0-101-ExD3 2700 x 2750

ST 12

ST A

1,965 x 2,110 GF0-101-D5

ST B

3,000

W1

S1

W1

W1 W1

GF0-101-ExD2 2422 x 4340

ST C

S1

3,000

GF0-101-GS4 (above)

GF0-101-ExD1 1410 x 2422

ST D

S1

W2 W2

Riser GF0-137 A: 3 m2

W2

W2/7

S1

E A

(TYPE 24)

E A

440

W2

S1

(TYPE 9-1) 40dB

S1

W2

S1

S1

Interview Room GF0-111 A: 7 m2

GF0-101-D6 1,965 x 1,945

W1

S1

S1

W2

W2

1,010 x 2,710 GF0-116-D1

W2

S1

2,560

E-CW-03A

E B

S1

W1

E B

GF0-133 A: 36 m2

W2

3,000

S1

W2

W2

Reception

(TYPE 9)

W2

S1

GF0-128 A: 38 m2

Reception Back Office

S1

(TYPE 24)

GF0-124 A: 7 m2

W2

GF0-128-D1 1,010 x 2,350

E C

Store GF0-111 A: 4 m2

W2

W2

W1

S1

S1

W1

(TYPE 24)

(TYPE 24)

(TYPE 24)

S1

W1

W1

HD

Toilets

GF0-018 A: 21 m2

S1

SF0-120 A: 4 m2

GF0-121 A: 71 m2

3,000

W2

S1

Acc. WC

HD

W2

W2

S1

W2

S1

W2

W2

E D

W2

S1

W2

W2

W2

S1

W2

S1

W2

3,000

GF0-129-D1 1,965 x 2,350

W2

W2

S1

GF0-129 A: 34 m2

S1

S1

S1

W2

W2

E E

(TYPE 9)

TP

(TYPE 32)

W2

W2

3,000

W2

S2

W2

W2

S2

W2

Store GF0-132 S2 A: 8 m2

E F

1,965 x 2,100 GF0-132-D1

S2

(TYPE 32)

(TYPE 21)

1/2 HR (TYPE 24)

3,000

ST 18

W3/4

W3/4

S2

W3/4

GF0-131 A: 10 m2

Disabled WC

A: 6 m2

WC

E 2

E 1

ST 20

E G

RWP

(TYPE 32)

(TYPE 21)

1,010 by 2,100 GF0-131-D1

S2

W3/4 Floor Raised Access

S2

E G

(TYPE 24)

(TYPE 24)

E-CW-01

1HR (TYPE 7) 1 HR (TYPE 24)

(TYPE 24)

1/2 HR (TYPE 1)

ELEC

Plant GF0-126 A: 12 m2

E F

ST 20

ST 19

ST 18

ST 17

ST 16

ST 15

ST 14

ST 13

ST 12

Raised Access Floor

W2

E-CW-02

W2

GF0-134 A: 116 m2

(TYPE 24)

Plant GF0-138 A: 3 m2

910 x 2,110 GF0-138-D1

Course Enquiries

(TYPE 21)

(TYPE 9-1) 40dB

GF0-130 A: 5 m2

1,010 x 2,110 GF0-125-D1

E E

HD

GF0-019 A: 19 m2

Toilets

TP

(TYPE 24)

Office

HD

S1

(TYPE 9-1) 45dB

W2

W2

S1

Multi-Functional Room GF0-112 A: 7 m2

1,010 x 2,710 GF0-113-D1

(TYPE 2) 40dB

Course Enquiries Office

W2

TP

S1

Half Height (Type 9-1) 45dB Wall Below (Type 2) 50dB

1HR (TYPE 23)

(TYPE 2) 45dB

GF0-125 A: 14 m2

TP

TP

TP

TP

Security

1HR (TYPE 23)

TP

TP

S1

W2

(TYPE 9-2) 45dB

Assistive Technology GF0-108 A: 25 m2

S1

W2

W2

S1

Assistive Technology GF0-110 A: 36 m2

W2

Multi-Functional Room GF0-112 A: 7 m2

(TYPE 24)

E D

S1

S1

W2

S1

1,010 x 2,710 GF0-112-D1

W2

W2

W2

S1

GF0-108-D2 1,010 x 2,710

S1

S1

(TYPE 9-1) 40dB

1/2 HR (TYPE 1)

Circulation

(TYPE 2) 40dB

S1

ST F

S1

W2

W2

S1

1 HR (TYPE 2) 50dB

910 x 2,710 GF0-111-D1

1HR (TYPE 23)

(TYPE 9) 40dB

W2

W2

(TYPE 1)

S1

S1

Multi-Functional Room GF0-109 A: 9 m2

S1

W2

1 HR (TYPE 1)

Interview Room

E C

W2 S1

GF0-124-D2 1,010 x 2,110

1,010 x 2,110 GF0-124-D1

(TYPE 26) 1HR

W2

S1

W2

S1

S1

S1

W2

W2

W2

GF0-114-D1 1,965 x 2,110

W2

W2

S1

W2

ST E

GF0-123-D2 1,010 x 2,110

GF0-123 A: 7 m2

Interview Room

W2

1 HR (TYPE 2)

S1

1,010 x 2,110 GF0-123-D1

1HR (TYPE 23)

(TYPE 9) 40dB

S1

S1

W2

W2

(TYPE 24)

(TYPE 2) 40dB

1HR

W2

Interview Room GF0-111 A: 7 m2

1,010 x 2,710 GF0-117-D1

S1

S1

S1

GF0-106 A: 30 m2

Circulation

S1

W2

S1

S1

Multi-Functional Room GF0-107 A: 8 m2

(TYPE 2) 50dB

S1

W2

W2

(TYPE 24)

3,000

S1

W1

1 HR (TYPE 5)

13

14

15

16

17

18

19

20

W1

GF0 A: 31W1m2

S1 Circulation

1HR (TYPE 7)

S1

(TYPE 24)

S1

1HR (TYPE 23)

1,010 x 2,710 GF0-115-D1

S1

Interview Room GF0-111 A: 8 m2

S1

W2

S1

GF0-114 A: 71 m2

Student Services

-

GF0-105 A: 24 m2

-

-

Reception

-

S1

S1

(TYPE 9-2) 45dB

GF0-108-D1 1,010 x 2,710

20

19

18

17

16

15

S2

13

14

SC 7

SC 6

SC A

SC B

E 6

E 5

E 4

E 3

E 2

E 1

SC C

SC D

SC D

16

15

14

13

12

11

10

9

8

SC E

SC E

SC E1

SC E2

SC F

SC F

SC F1

SC F2

275

SC 7

SC 6

SC 5

SC 4

ST C

ST C

ST D

ST D

8

20

19

18

17

16

15

14

13

E A

E A

E B

E B

ST E

ST E

E C

E C

ST F

ST F

E D

E D

E E

E E

ST 3

ST 2

ST 1

E F

E F

ST 20

ST 19

ST 18

ST 17

ST 16

ST 15

ST 14

ST 13

ST 12

ST 11

ST 10

ST 9

ST 8

ST 7

ST 6

ST 5

ST 4

ELEC

E G

E G

E 2

E 1

E 6

E 5

13

14

15

16

17

18

19

20

10

1

2

3

4

5

6

7

8

9

S3 – Hard Wood (Sports Hall) Spec Ref: K21/111

S2 – Coved Anti-Slip Vinyl (All Types) Spec Ref: M50/740, 740A & 770

S1 – Painted MDF / Softwood Spec Ref: P20/200

Skirting Key:

F14 F14 -F14 Epoxy Floor Paint Epoxy Floor Floor Paint Paint Epoxy Spec Ref: M60/180 Spec Spec Ref: Ref: M60/180 M60/180

F13 F13 -F13 Anti Static Vinyl Anti Static Static Vinyl Vinyl Anti Spec Ref: M50/159 Spec Spec Ref: Ref: M50/159 M50/159

F12 – F12 – – F12 Protective Loose Lay Protective Loose Loose Lay Lay Protective Flooring Tile System Flooring Tile System Flooring Tile System Spec Ref: M50/163 Spec Ref: Ref: M50/163 M50/163 Spec

F11 – F11 – – F11 Sprung PU System Sprung PU PU System System Sprung Spec Ref: K21/111 Spec Spec Ref: Ref: K21/111 K21/111

F10 – F10 – – F10 Entrance Matting Entrance Matting Matting Entrance Spec Ref: N10/170 Spec Spec Ref: Ref: N10/170 N10/170

F9 – F9 – – F9 Vinyl Plank Vinyl Vinyl Plank Plank Spec Ref: M50/150 Spec Ref: Ref: M50/150 M50/150 Spec

F8 – F8 – – F8 Sports Vinyl System Sports Vinyl System SportsRef: Vinyl System Spec M50/161 Spec Ref: Ref: M50/161 M50/161 Spec

F7 – F7 – – F7 Vinyl Sheet Vinyl Sheet Sheet Vinyl (for Circulation Areas) (for Circulation Areas) (for Circulation Areas) Spec Ref: M50/151 Spec Ref: Ref: M50/151 M50/151 Spec

F6 – F6 – – F6 Anti-Slip Vinyl Sheet Anti-Slip Vinyl Vinyl Sheet Anti-Slip (for Showers) Sheet (for Showers) (for Showers) Spec Ref: M50/155 Spec Ref: Ref: M50/155 M50/155 Spec

F5 – F5 – – F5 Heavy Duty Anti-Slip Heavy Duty Duty Anti-Slip Anti-Slip Heavy Vinyl Sheet Vinyl Sheet Sheet Vinyl (for Kitchens) (for Kitchens) Kitchens) (for Spec Ref: M50/156 Spec Spec Ref: Ref: M50/156 M50/156

F4F4F4Anti-Slip Vinyl Sheet Anti-Slip Vinyl Sheet Sheet Anti-Slip (for WC'sVinyl & Other) (for WC's WC's & & Other) Other) (for Spec Ref: M50/158 Spec Ref: Ref: M50/158 M50/158 Spec

F5 F5 -F5 Porcelain Tile Porcelain Tile Porcelain Spec Ref: Tile M40/110 Spec Ref: M40/110 M40/110 Spec ColourRef: Change Colour Change Change Colour

F4 F4 -F4 Porcelain Tile Porcelain Tile Tile Porcelain Spec Ref: M40/110 Spec Ref: Ref: M40/110 M40/110 Spec

F3 – F3 – F3 – Tile Carpet Carpet Tile Tile Carpet Spec Ref: M30/130B Spec Ref: Ref: M30/130B M30/130B Spec

F2 – F2 – F2 – Tile Carpet Carpet Tile Tile Carpet Spec Ref: M30/130A Spec Ref: Ref: M30/130A M30/130A Spec

F1 – F1 – – F1 Carpet Tile Carpet Tile Tile Carpet Spec Ref: M30/130 Spec Ref: Ref: M30/130 M30/130 Spec

10

9

(07)012 T 0

revision

CB

checked

5

7

8

This drawing is © Bond Bryan Architects Ltd. If in doubt ASK. Drawing measurements shall not be obtained by scaling. Verify all dimensions prior to construction. Immediately report any discrepancies on this drawing to Architect. This drawing shall be read in conjunction with associated specifications and related consultant's documents.

11-092

(category) dwg no

job no

AS

09.05.12

1:50@A0

drawn

date

scale

Detailed Ground Floor Plan Entrance/Street

East Berkshire College Station Road Langley

East Berkshire College

6

PT - pre-tender

E info@bondbryan.co.uk W www.bondbryan.com PL - planning P - preliminary R - record

+44 (0)1959 567 300 +44 (0)1959 562 840 D - design T - tender C - construction

T F

verralls house 95 high street westerham kent TN16 1RE

T0 09.05.12 Tender Issue revisions

W13 – W13 – Partitions Folding Folding Partitions Spec Ref: L20/540 Spec Ref: L20/540

W12 – W12 – Wall Cladding Hygienic Hygienic Cladding Spec Ref:Wall K13/110 Spec Ref: K13/110

W11 – W11 – Timber Wall Panels Feature Feature Wall Panels Spec Ref:Timber K21/115 Spec Ref: K21/115

W10 – W10 – to WC's Partitions Partitions to WC's and Showers & Cleaner's Stores and Showers & Cleaner's Stores Spec Ref: K32/120B & 120C Spec Ref: K32/120B & 120C

W9 – W9 /–Back Panels to WC's IPS IPS Showers / Back Panels to WC's and and Showers K32/120A K32/120A

W8 – W8 – Mirrors Mirrors Spec Ref: N13/438 Spec Ref: N13/438

W7 – W7 –Wall Graphics Vinyl Vinyl Ref:M52/110 Wall Graphics Spec Spec Ref:M52/110

W6 – W6 – Whiteboard Paint Whiteboard Paint Spec Ref: M60/140 Spec Ref: M60/140

W5 – W5 – Panels Acoustic Acoustic Spec Ref:Panels N10/197 Spec Ref: N10/197

W4 – W4 – Tiles Ceramic Ceramic Spec Ref:Tiles M40/113 Spec Ref: M40/113

W3 – W3 – Plaster / Blockwork Painted Painted Plaster / Blockwork (for WC's) (for WC's) Spec Ref: M60/110B Spec Ref: M60/110B

W2 – W2 – Plaster / Blockwork Painted Painted Plaster / Blockwork (for non-high traffic areas) (for non-high traffic areas) Spec Ref: M60/110A Spec Ref: M60/110A

Wall Finish Key: Wall Finish Key: W1 – W1 – Plaster / Blockwork Painted Painted Plasterareas) / Blockwork (for high traffic (for high areas) Spec Ref:traffic M60/110 Spec Ref: M60/110

Floor Finish Key: Floor Finish Finish Key: Key: Floor

Glazed Screens (32)400, (32)500, (32)501, (32) 502

- Internal Doors (32)001, (32)100, (32)101, (32)102

- Curtain Wall (31)500, (31)501, (31)502, (31)503

- Windows (31)400, (31)401

- External Doors (31)001, (31)100, (31)101

- External Wall Types (21)800, (21)801

- Internal Wall Types (22)100, (22)101

- All kitchen areas to recieve trovex diamond finish

- All steel columns to recieve casing (type 26) to achieve fire protection

- All dimensions shall be verified on site before proceeding with the work

- All dimensions are millimetres unless noted otherwise

- Do not scale from drawings.

Notes:

Existing Building Fabric

Area Outside Project 1.

(07)013

E 6

E 5

E 4

ST B

ST B

7

E 3

SC 6A

SC 4A

SC 3A

3

E 4

ST A

ST A

1

E 3

ST 20

ST 19

ST 18

ST 17

ST 16

ST 15

ST 14

ST 13

ST 12

ST 11

ST 10

ST 9

ST 8

ST 7

ST 6

ST 5

ST 4

ST 3

ST 2

ST 1

(07)011

9

(07)012

E 2

E 1

SC 3

SC 2

SC 1

Finishes Key:

7

SC 3

SC C

6

SC 5

SC B

5

SC 4

SC A

4

SC 2

3

SC 1

6

3,000 3,000

S1

S1

GF0-101 A: 645 m2

(TYPE 24) (TYPE 24)

notes

5

(07)010

2

2,225 775 3,000 3,000 3,000 3,000 3,000 3,000 3,000 3,930

4

GF0-102-GS5 2,750 GF0-101-D1 1,500 x 2,505 GF0-102-GS6 2,750 x 2,505 GF0-101-D2 1,500 x 2,505 GF0-102-GS7 2,750 x 2,505 GF0-101-D3 1,500 x 2,505 GF0-114-GS2 2,750 x 2,505 GF0-114-GS1 2,750 x 2,505

(TYPE 24)

ST-CW-01 1HR (TYPE 5)

E-CW-03

(TYPE 2) 40dB

(TYPE 26) (TYPE 26) (TYPE 26) (TYPE 26) (TYPE 26)

RWP TYPE 24 (TYPE 22) (TYPE 22)

TYPE 24

(TYPE 24) (TYPE 24) (TYPE 23)

(TYPE 26) (TYPE 26) (TYPE 26) (TYPE 26) (TYPE 21)

(TYPE 2) 40dB

(TYPE 26) (TYPE 26) (TYPE 26) (TYPE 26) (TYPE 2) 40dB 1HR

1

Location Plan:

(TYPE 3) 50dB

ST 11

(TYPE 26)

Street

)

(TYPE 26) (TYPE 26) (TYPE 26) (TYPE 26)

2,600 6,930 2,940 3,000 3,000 4,100 (TYPE 21)

(TYPE 2) 45dB

(TYPE 26) (TYPE 24) (TYPE 24)

(TYPE 9-2) 45dB (TYPE 9-2) 45dB GF0-135-D1 1,800 x 2,100

(TYPE 1) GF0-110-D1 1,475 x 2,710

(TYPE 24) (TYPE 1)

(TYPE 24) (TYPE 24) 1HR (TYPE 23)

(TYPE 1)

(TYPE 9-2) 40dB

GF0-107-D1 1,010 x 2,710 GF0-109-D1 1,010 x 2,710

(TYPE 9-2) 40dB

11

For Continuation Refer Drawing (07)011

1HR

(TYPE 22) 1HR (TYPE 22) 1HR (TYPE 22)

1HR (TYPE 24) 1 HR (TYPE 5)

1HR (TYPE 5) 1HR (TYPE 7)

24 E YP (T

1,965 x 2,110 GF0-122-D1

1HR (TYPE 23) 1HR (TYPE 21)

1 HR (TYPE 24) 1HR (TYPE 24) 1HR (TYPE 7)

(TYPE 23)

(TYPE 24) (TYPE 24)

(TYPE 9-1) 40dB

1/2 HR (TYPE 1) Electrical Cupboard GF0-136 A: 2 m2

(TYPE 1)

Data Cupboard GF0-135 A: 3 m2

(TYPE 24) (TYPE 24)

1,600 x 2,100 GF0-136-D1

12

2,770 GF0-102-W6 2,770 x 1,590 GF0-102-W7 2,770 x 1,590 GF0-108-W1 2,770 x 1,590 GF0-108-W2 2,770 x 1,590 GF0-110-W1 2,755 x 1,590 GF0-110-W2

(TYPE 24) (TYPE 24) (TYPE 24) (TYPE 24) 1,965 x 2,100 GF0-121-D3

55dB (TYPE 3) (TYPE 9-1) 40dB

1HR

1 HR (TYPE 24) 1HR (TYPE 24) (TYPE 24) 1HR (TYPE 7) 1HR (TYPE 24)

1HR 1,965 x 2,110 GF0-121-D4

399 x 2,110 GF0-121-GS2 1/2 HR (TYPE 24)

1HR (TYPE 7) (TYPE 24)

10

ST 11

(TYPE 21)

For Continuation Refer to Drawing (07)013

RWP

910 X 1,945 GF0-101-D4

1 HR (TYPE 5)

)

24

(TYPE 26)

12

11

10

9

8

7

6

5

4

E

3

(T YP

2

1

11-092 (21)810 DETAIL EWD5

GF0-121-D2 1,965 x 2,110

1HR (TYPE 24)

393 x 2,110 GF0-121-GS1

(TYPE 26)

9

8

7

6

5

4

3

2

1 12

11

10

GF0-121-D1 1,965 x 2,110

GF0-130-D1 1,010 x 2,110

1HR (TYPE 24)

20

(TYPE 24)

19

Infill HIgh Level Windows

18

1HR (TYPE 24)

17

1HR (TYPE 24)

16

Infill HIgh Level Windows

15

(TYPE 30)

2 9

8

7

6

5

4

3

2

1 11

10 12

14

DC

TENDER

GF0-205-ExD1 1965 x 2110

2

1 5

4

3 8

7

6 11

10

9

22

21

20

19

18

17

12

13

(TYPE 26)

N Detailed Ground Floor Plan - Entrance/Street 11-092 (07)012

11-092 (21)810 DETAIL EWD6

N

(TYPE 24)

1

2

3

4


EXTERNAL VIEW OF THE ENTRANCE

INTERNAL VIEW OF THE ENTRANCE

INTERNAL VIEW OF THE INDOOR STREET

EXTERNAL VIEW OF THE SPORTS HALL


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.