Beyond The Workplace Presentation Panel

Page 1

NEO GUILD HOUSE VIEW FROM HARDWARE LANE

VIEW FROM GROUND FLOOR

VIEW FROM LEVEL 04 DEVICE APPLICATION PROCESS

$20BOSS

1. SITE APPLICATION

COUNSELLING

$20BOSS

COUNSELLING

Step 01: Grid Set Grid (4m x 4m), allocate entry facades and offset to the closest grid create a zone of entrance

LIBRARY

LIBRARY

FFL:6m

TOTAL:36m

AUDITORIUM MARKET

YOUNG SOCIAL PIONEER

Step 04: Business Faculty/Public Program zoning assigning each faculty and large programs into sections of the site relative to adjoining facades. Exposure to density shows collaborative programs.

PLAYGROUND

YOUTHLAB

AUDITORIUM

LEVEL 00

Grid Application Circulation Inputs

LEVEL 0

Built/Unbuilt Zones Faculty/Public

LEVEL 0.5

LEVEL 01

Lvl 00

LEVEL 1

Lvl 01

LEVEL 1.5

LEVEL 02

YOUTHLAB

LEVEL 03

Lvl 02

LEVEL 04

Step 01: Translation Translate each program into Oceanic or Continental Plates

Step 01: Extraction Extract all the unbuilt zones beginning with the site application outcome x 8 and triangulate each surface

Step 01: Thermal Metamorphism Extract Market space on every floor and from the zone boundary, extract points 2m apart. Step 02: Metaball Generate Metaball by using script design technique. Which becomes the public interaction with the enclosed programs.

Step 0: Patch Stack the newly created circles on top of each other and use the technique ‘Patch ‘ in order to generate the Volcano/Magma Chamber.

Step 03: Device driven furnture the space created because of the ‘Metaball’ transforms into furniture aht public can use as seats or display platform fot the office.

Step 03: Overlay and Boolean Overlay the Volcano/Magma Chamber form onto the previous plate tectonic outcome and apply Boolean operation

Step 04: Apply tectonic shifts Collide the programs with each other and enhancing the result through each level, pushing and pulling the rooms resulting in void zones and squeezed enclosure.

PLAYGROUND

MARKET

4. METAMORPHISM APPLICATION

Step 03: Collision These movement types can create collision behaviour depending on the adjacent plate type and movement types. By narrowing down the collision type to tension, compression and shear, we can begin the shift.

FURNITURE

Step 03: Built/Unbuilt Divide the lands into built (rooms) and unbuilt (platforms) by calculating the area with > 50m2: unbuilt < 50m2: built zones

YOUNG SOCIAL PIONEER

3. IGNEOUS INTRUSION APPLICATION

Step 02: Movement types By analysing each program and its generic purpose, we can assign each program with a type of plate movement typologies

OPENINGS

Step 02: Main Circulation Create orthogonal circulation paths (2m Wide) from midpoint, connecting through the site except adjacent entrance and secondary expressway (1m Wide) except adjacent points, disregard paths outside of site boundary.

2. TECTONIC PLATE APPLICATION

Step 03: Regional Metamorphism Translate and dedicate metamorphic rock type onto each program. Then mimic the process of the regional metamorphism giving characteristic to the transformations.

Step 04: Volcano Invert the device process in order to expose the building to the public realm and re-fit the building into the boundary.

LEVEL 05

Lvl 03

LEVEL 2

Lvl 04

Lvl 05

LEVEL 2.5

Input Circles Stacked together

LEVEL 3

Patched Volcano Form

LEVEL 3.5

Boolean Operation

Market nodes on every levels Metaball script design

Boolean Operation

LEVEL 4.5

LEVEL 5.5

LEVEL 4

LEVEL 5

DIAGRAMMATIC PLANS YSP

YSP

Warburton Ln

Racing Club Ln

Warburton Ln

Racing Club Ln

Warburton Ln

Racing Club Ln

YSP

$20 BOSS YSP

$20 BOSS $20 BOSS

YSP MARKET

YSP MARKET

COUNSELLING

PLAYGROUND

Hardware Ln

Hardware Ln

Hardware Ln

COUNSELLING

MARKET

YLAB

LIBRARY

LIBRARY MARKET

KEY

WAITING AREA

LEDEND Facade Curtain Glazing Wall

Circulation Path/Public Zone

Market Zone

Enclosed Room

AUDITORIUM

YLAB

AUDITORIUM

Device Driven Furniture

Landscape Garden

TECH Void Zone

VIP

Bourke St

Bourke St

GROUND FLOOR

BUSINESS FACULTIES

$20 BOSS

YOUNG SOCIAL PIONEERS

YOUTH LAB

CONSULTING

Bourke St

LEVEL 02.5

SECTION ALONG BOURKE STREET

AMPHIPOLITE

GNEISS

QUARTZITE

GRANITE

LEVEL 04

SECTION ALONG HARDWARE LANE

KEY PLANS 1:150

PUBLIC PROGRAMS

METACONGLOMERATE

HORNFEL

MARBLE

COAL

AUDITORIUM

LIBRARY

MARKET

PLAYGROUND


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.