JNK guests photo album

Page 1

www.jnkheaters.co.kr

HA CHANG HO of Samsung Engineering

&

PARK KYUN JUNG of JNK Heaters


Visit Doosan Vina, Sep.05.2019

Visit Doosan Vina, Jan.16.2020


Cavern project, Jun.16.2020


Check the Cavern project progress, Jun.10.2020


Products of Cavern project are prepared for shipment, Jul.03.2020


Assistant Doosan Vina’s management

Check project progress, Dec.14.2020


Cavern project shipment, Jul.06.2020


Inspection at the shop, Dec.14.2020


Begin HSVC OL1 project production, Jul.07.2020


Work with Boiler’s management, Dec.17.2020


Deliver 1st shipment of HSVC OL1, Aug.12.2020


Work with Boiler’s management, Dec.17.2020


Deliver 2nd shipment of HSVC OL1, Aug.14.2020


Review TOP Fired Heater product and shipment progress


Products of HSVC OL1 project, Aug.12.2020


Witness HSVC OL1 5th shipment, Dec.15.2020


Load 5th HSVC OL1 shipment, Dec.14.2020


Witness 2nd TOP Fired Heater shipment, Jan.14.2021


Transport products of HSVC OL1 project to the port for 5th shipment, Dec.15.2020


Take souvenir photos prior 2nd TOP Fired Heater product shipped, Jan.14.2021


HSVC OL1 final shipment, Dec.16.2020


Memorial moments with TOP Fired Heater products, Jan.14.2021


Fabricate TOP Fired Heater products, Mar.27.2020


Satisfaction signals before the vessel of 2nd TOP Fired Heater shipment departs, Jan.14.2021


Shop out TOP Fired Heater products, Mar.28.2020


Entertain and enjoy life after work


TOP Fired Heater product, Jun.03.2020


Entertain and enjoy life after work


TOP Fired Heater product, Jun.14.2020

TOP Fired Heater product, Jul.03.2020


Happy moments


TOP Fired Heater product, Aug.12.2020


Get together for the 2nd TOP Fired Heater shipment, Jan.06.2021


TOP Fired Heater project progress, Sep.23.2020


Together before the 2nd TOP Fired Heater shipment, Jan.06.2021


TOP Fired Heater project progress, Sep.23.2020


TOP Fired Heater project progress, Nov.04.2020


TOP Fired Heater project progress, Nov.25.2020


Transport TOP Fired Heater product to the port for shipment, Jan.10.2021


Transport TOP Fired Heater product to the port for shipment, Jan.10.2021


TOP Fired Heater product onboard for shipment, Jan.13.2021


We have had good time, sharing and memories together and we hope to filled the rest of the pages with many other best moments with you. Thank you very much for your always support and hope to welcome you again soon!


Doosan Heavy Industries Vietnam Dung Quat Economic Zone Binh Thuan, Binh Son, Quang Ngai, Vietnam Tel: (84 255) 36 18900 - Fax: (84 255) 36 18950 Website: http://doosan-vina.com


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.