A Zer0 Waste Brewery Lynchburg, VA Jeremy McClure
A brewery has two responsibilities. One to the community and one to the environment. To the community it needs to help facilitate interaction, play and enlightenment, and to the environment, it needs to leave as little impact as possible and give back what it can.
A brewery is:
• A destination and point of interest • Connected to the urban context • A perfect location to educate people on the intersection of agriculture, water, biology and energy.
Existing Breweries in the Lynchburg Area – 50 miles
Existing Breweries in in Charlottesville, VA
Center City Size Comparison
SITE
Founded in 1786 Named after John Lynch Large mineral export hub
Shops and Restaurants
Trails and City Corridors
The Brewery
Pedestrian Spaces
PEDESTRAIN PATH PLAN
Occupancy and Parking Room Name Taproom Kitchen Merchandising Dry Storage Cold Storage Brewery Office Brewery Control Room Pump Room Mill Room Laboratory Shipping and Receiving
Occupancy Type Assembly, Unconcentrated Kitchen, Commercial Merch, Grade Floor Area Accessory Storage Area Accessory Storage Area Industrial Business Area Industrial Mech, Equipment Room Industrial Industrial Merch, Shipping Area
SQ FT Per Person
SQ FT of Room 15 200 30 300 300 100 100 100 300 100 100 300
4960 3346 1763 680 670 13963 1200 400 100 496 372 1500 Total SQ FT
29450
Allowed Occupancy 330.67 16.73 58.77 2.27 2.23 139.63 12.00 4.00 0.33 4.96 3.72 5.00 Total Occupancy 580.3066667 580
Parking Requirement 1 per 4 1 per 3 2 per 1000 SQ FT 1 per 4 1 per 4 1 per 4 1 per 3 1 per 4 1 per 4 1 per 4 1 per 4 2 per 3
City of Lynchburg Zoning Ordinance – Adopted February 23, 2016: Section 35.2-62.4 Required Number of Parking Spaces - (d) Shared Parking. Shared parking may be approved by the technical review committee (TRC) during final site plan review. Uses sharing parking need not be located on the same lot, but shall be located within the same block or an adjacent block.
4 3 0.8 4 4 4 3 4 4 4 4 1.667
82.66666667 5.576666667 0.8 0.566666667 0.558333333 34.9075 4 1 0.083333333 1.24 0.93 2.99940012 Number of Parking Spaces 135.3285668 136
Site Parking and Approach
CALLOUT PLAN
The West End Terminus
The System
Temperature & Precipitation
WATER DIAGRAM
WATER DIAGRAM
Taproom
Brewery
The Structure
Terminus
Quick Video
Cheers