BOBBY WHITE LIVE LA: A Live - Work Community Thesis Advisor: Bob Nalls
Site Summary & Existing Conditions The site was discover following a studying of potential sites located within a rezoning area defined by the City of Los Angeles that coincided with the completion of the Exop Line extension from Culver City to Santa Monica. This site takes advantage of new zoning class that incentives modern, creative industry on previously light industrial land. The two structures occupying the site will be removed for a dense, transit oriented, live - work community wedged between an transit corridor & a traditionally multi family neighborhood. Site
118,00 SF 2.7 ACRES
Existing Structures
Demolish Structures
Site Area
Exposition Metro Line
I-10 Highway
Noise Impacts
Multi Family Residentail
Commercial / Retail
Industrial
Single Family Residentail
Palms Metro Station
Institutional
Site
w Motor Ave
Woodbine Park
Palms Station
Context Program Use
Pedestrian Connections
Prevailing Winds
Program Abstract, Planning, Key Zoning & Other Restrictions New Industry - NI(EC) The New Industry zone is an employment zone with uses tailored to 21st century and creative industries such as digital technology, Research and Development, media, design, Publishing, Motion Pictures, and Broadcasting. Supporting uses associated with these industries, such as light manufacturing, assembly, and limited retail or Restaurants, are also appropriate. Residential Uses are prohibited, with the exception of limited Live/Work Units, in order to preserve employment opportunity. PROGRAM TYPE
Live / Work Units • Live/Work Units within a Project shall have an average size of at least 750 square feet. • A minimum of 70 percent of total floor area of a Live/Work Unit, excluding area used for bathrooms and storage, shall be open with no fixed interior separation walls. • Workspace - Each Live/Work Unit shall have at least one continuous workspace that is a minimum of 150 square feet and measures not less than 15 feet in at least one dimension and no less than 10 feet in any dimension. The required workspace shall be clearly demarcated on the approved building plans MAP D: ZONING MAP D: ZONING Parking HF • Live/Work Units. A minimum of 1 automobile parking space and 1 long-term bicycle parking space per Live/Work Unit are required. 43 2. ZONING AND DEVELOPMENT STANDARDS
✓
\tV-
\
N
\
1.0 INTRODUCTION
*
i
'A4'
\
V the future development of the area within >,a *half-mile of the Metro Exposition «*■ Line Phase 2 V»...... stations (See Figure 1 below). The ECTNP Area is located % 5, 10, and within City Boote Council Districts s 11, and comprises portions of the t\*0 Si* 'ftP* VJ West 6#P°S Los Angeles, Palms-Mar Vista-Del Rey, and West Adams-Baldwin Hills-Leimert Community Plan areas. It is located entirely within the incorporated City of Los Angeles, and abuts the City of Culver City and the City ofCity Santa Monica. of
Regional Vicinity Map
Single Family R1
Metro Line [III Community Plan Areas Plan Subareas
■o
o °o. %•'P
&
Multiple Family R2
RD1.5, RD2, RD3, RD4 R3, R3(EC) R4 RAS4
/
^ \\
lift
\
,
%
60,000 SF
45,000 SF
50% OF SITE AREA
60,000 SF
45,000 SF
THIRD FLOOR OFFICE
50% OF SITE AREA
60,000 SF
100%
30 - 50,00 SF
100%
30 - 50,00 SF
BELOW GRADE
45,000 SF
40,000 SF 40,000 SF
35% OF SITE AREA
480,000-500,000 SF
40,000 SF
40,000 SF
30 - 50,00 SF
30 - 50,00 SF
386,5 00 - 406,500SF
[1
THE FIRST 3 FLOORS SERVE THE COMMERCIAL AND RETAIL COMPONENT OF THE BUILDING. MULTI LEVEL RETAIL WITH EXTERIOR ENTRY ARE TYPICAL OF SOUTHER CALIFORNIA.
PUBLIC PEDESTRIAN SPACE A LINEAR PARK BUFFERS STREET ACTIVITY FROM PEDESTRIAN ZONE AND PROVIDES A SPACE FOR COMMUNITY GATHERING AND ACTIVITIES. ALSO SERVES AS EXTERIOR DINING SPACE FOR RESTAURANTS.
<?
m
Q
&
CONCEPT: A SERIES OF COURTS BUILDING ON THE PATTERS OF CONTEXT, CULTURE AND CLIMATE. A SERIES OF OPEN COURTS REORIENT THEMSELVES TO THE DESIRED PROGRAM ASSOCIATED WITH EACH PORTION OF THE BUILDING. SOME COURTS OPEN TO THE PUBLIC, OTHERS ARE FOR RESIDENTS OR TENANTS
Pico Boulevard between Centinela Avenue and 1-405
CITY Pico Boulevard between 1-405 and Patricia Avenue
m % % Q Palms Boulevard between Motor ■4 Avenue and National Boulevard >■ Palms -
#1 m
MULTI LEVEL COMMERCIAL / RETAIL
c u l v er
Q National Boulevard between Mentone and Castle Heights Avenues
. ■
Q Motor Avenue between I-10 and Venice Boulevard
\
Parking -- P
y
©
Public Facilities -- PF
& % [""] \ / rlgp C \ ic6",d Jn et *5 \N oN1" j
N
0
2,
A 0
750
1,500 Feet
Map not to scale.
A
a4-
%
ttl:r<
»
«ecj
BUND'
This byby Metro his project irojectisispartially parti. funded led Metro
“ ' -
v///_____
0^
2-8 | Proposed Exposition Corridor Transit Neighborhood Plan By Certified Neighborhood Councils, Business Improvement District(s) or other community organizations; • By private property owners, developers and business owners, in conjunction with development projects or as voluntary improvements; • By the City in conjunction with street improvement projects, Metro Call for Projects funding or other grants (construction only).
O
&v
o'
1
ny i a
Legend
X
Single Family
IPULVEDA MU(EC) --
M M
mm
\
\
-
©
Metro Transit Station 1/2-Mile Radius
———
Oi
HJ(EC)-- Hybrid Industrial: Jobs Emphasis
RAS4
HR(EC)-- Hybrid Industrial: Residential Emphasis
>8.
s
S
V
A 0
Fvc 1,500 Feet 4SSSB \
>n; 750
3O ftY6
Proposed Exposition Corridor Transit Neighborhood Plan
Exposition Corridor Transit Neighborhood Plan Boundary Streetscape Plan Segments
i
Public Facilities -- PF
5^
&
L.o
ft
== Metro Line
•
$
Open Space -- OS
CM, MR1, M1, M2 NI(EC) -- New Industry
■
" *
Mixed Use: Commercial/Residential
Hybrid Industrial
R3, R3(EC) R4
Prepared by the Department of City Planning & Gruen Associates
\
o
Parking - P
Industrial
RD1.5, RD2, RD3, RD4
\ \
Other
CR, C1, C2, C4
Multiple Family
\
WESTWOOD
Commercial
R2
Plan Subareas
\
9
&
a%
Zoning R1
Community Plan Areas
City of LA - Rezoning Along Expo Line
Per this Streetscape Plan, streetscape improvements may be constructed and/or maintained through a variety of means, including:
&*
VA
Metro Transit Station
------- Metro Line
CM, MR1, M1, M2
HJ(EC) -- Hybrid Industrial: Jobs Emphasis
\
Legend
A
Hybrid Industrial NI(EC) -- New Industry
v.
^ EXPOSITION CORRIDOR TRANSIT NEIGHBORHOOD PLAN
/ r,-\:
Open Space -- OS
Industrial
Wmm*
v
I ■CL
Other
TTY _ \ w\ \
\ \ y^\ % >-■ X \\ \ ^ ft'"4 < %V
■
0
Commercial
HR(EC)-- Hybrid Industrial: Residential Emphasis
Prepared by the Department of City Planning & Gruen Associates
50% OF SITE AREA
SECOND FLOOR RETAIL & OFFICES
SHARED SEMI PUBLIC TERRACES
Q Sepulveda Boulevard between Olympic and National Boulevards
LOS ANGELES
CULVER C1, C2, C4 CITY CR, MU(EC) -- Mixed Use: Commercial/Residential
H
144,000 SF
GROUND FLOOR RETAIL & RESTAURANT
EXTERIOR Figure 2 also shows the location of three additional streetENTRY segments, which AMENITY SPACE ON Although 3RD FLOOR are associated with the Livable Boulevards Streetscape Plan. INFRASTRUCTURE these segments fall within the boundary of the BUFFERING Exposition FROM Corridor Transit Neighborhood Plan, the provisions of the Exposition Corridor Streetscape Plan do not apply to these street segments. See the Livable Boulevards Streetscape Plan for detail.
P s' QoiympipBoulevandbetween Centinela andBarringtonAvenues •
V
M
15,000 SF
80%
r FIGURE 2. Streetscape Plan Segments
& Zoning
15,000 SF
ELEVATED RESIDENTIAL
iV\
«*<*• *'
EXPOSITION CORRIDOR TRANSIT NEIGHBORHOOD PLAN
SANTA MONICA
TERRACE / ENTERTAIN, EXERCISE / PLAY
Preliminary Program
>f'
Mar Vista Del Rey
BEVERLY HILLS
ECTNP \
Metro Transit Station
15,000 SF
AMENITIES (OUTDOOR)
1%
Q Bundy Drive between Missouri Avenue and Pico Boulevard
II
Legend
15,000 SF
INTRODUCTION
Figure 2 shows the Exposition Corridor Transit Neighborhood Plan boundary and the five streetscape segments that are included in the Exposition Corridor Streetscape Plan:
\
sb
30,000 SF
AMENITIES (INDOOR)
TOTAL PROGRAM AREA
1.1 Boundaries
;o
The Exposition Corridor Streetscape Plan provides a blueprint for v%t. streetscape improvements in the public right-of-way that aims to create a \t % pedestrian-friendly environment that encourages walking and transit use. <t-v % in conjunction % \ with the \ The Streetscape Plan is developed Exposition Pu LVEJ s -.ft \\ % i Corridor Transit Neighborhood Plan (ECTNP), a Specific Plan that guides
40
45,000 SF
40,000 SF
GYM, CONFERENCE, COMMUNITY
BELOW GRADE
West Los Angeles
40
60,000 SF
30,000 SF / 2500 SF = 14 UNITS
\
1
Santa FIGURE 1. Monica
45,000 SF/ 1500 SF = 68 UNITS
2 BEDROOM APT
180,000 SF
75,000 SF
N \
&
1 BEDROOM APT
PARKING
ood ic
;0
GROSS SF 172,500 SF
100,000 SF
PARK & PEDESTRIAN SPACE
a
-8
FACTOR 75%
75,000 SF/1200 SF = 63 UNITS
PUBLIC
cn tunj'-_i c_i cm czni^^-flzziciiT
o -8
230,000 SF
LIVE / WORK UNITS
COMMERCIAL / RETAIL
2. ZONING AND DEVELOPMENT STANDARDS
✓
NET SF
RESIDENTIAL
|
2-9
V
'
iff
9% \•5
6
\ PT
<0 SC' TOTAL SITE AREA
PALMS
/
CULVER CITY
Preliminary Plan & section Diagram
✓ Of
> O<5A ✓
.V
v N
^
Map not to scale.
118,125 SF
Case Studies & Influence The two case studies that influenced me the most were both long buildings with a context of distinct edges. This is the mutual characteristic of constrained sites with linear proportions led me to study how each of these buildings interacted with the commercial component, residential component. Each lifts the residential component creating space below for public engagement in a unique way. This served as the inspiration for my approach on the site.
The Radian, Philadelphia Erdy McHenry
One Santa Fe, DTLA Michael Maltzan Architects
Narrative
Existing Site: Barren Industrial Edge
LINK
DISTRIBUTE
ENGAGE
SOCIALIZE
TRANSPORT
LOCALIZE
DENSIFY
ENTERTAIN
SUSTAIN
TERMINATE
Process Drawings & Models The initial form finding studies were done via hand crafted study models. Variations on the modern court yard were explored. The most interesting and dynamic scheme emerged naturally and studies of variations on that form were generated and iterated upon.
Mid Review Presentation
Photovoltaics
Leveraging the southern California sun, the unique siting of the live work program volumes lends itself to establishing a continious energy generating asset.
Daylighting ROOF EE
75’
SI EE
64’
FIF EE
53’
FOR EE
42’
IR EE
28’
SECON EE
The relatively shallow module connects two of its 4 perimeter walls to the exterior. Taking advantage of the moderate LA climate, an exterior single loaded corridor affords the units ample light.
86’
SEEN EE
Ventilation
The shallow module also affords the use of natural cross ventilation within the unit reducing the buildings reliance on systems for much of the year, lessening energy costs for tenants.
14’
GRON EE
0’
PARKING EE
-10’
Views
With multi directional view from each unit, tenants and employees feel connected to the natural rhythms of the world they live in promoting metal and physical wellbeing. PHT LT AY » 24,000 SQU FT T CLLT SYT » T UT UT VTT
Semi Private Courts
The modular units collect in a variety of ways, creating unique adjacencies to one another along the corridor space that connects them. While these unique connections create small moments of shared space, large, semi private courtyards connect the building massing and create areas for gathering outdoors
Public Courts
Similar to the relationship formed above by the building’s massing, courts that welcome the neighborhood and public front the street helping to establish the site as an anchor building.
V / T »IX OF SHARED AND PRIVATE YE » 80 T
Barrier Wall & Ciruculation Spine
In order to establish an acoustical separation from the intrastructure corridor to the north a custom wall that responds to the context of each court will sheild the Live Work units from the constant buzz of automobiles. POO OURT OURT
OURT
AM TO LEVE EO
OURT
V / T » LOFT YPE » 32 T
OG OURT
Commercial & Ammenity Podium
OMMERCIA INING ERRACE MENITY ERRACE
Below Grade Parking CL » 80,000 SQU FT » RTUT S WTH EXT
OMMERCIA / ETAURANT
RDT AT » GY » C R » U D ETTT
LIVE / WORK MENITIE
OMMERCIA / ETAURANT
AM TO OURT
INING ERRACE
OMMERCIA FFICE
COMMERCIA » 80,000 SQU FT
SERVICE ORRIDOR LIVE / WORK LOBBY
REAI & COMMERCIA » 80,000 SQU FT
LOADING DOCK & RAH PICK- OMMERCIA LOBBY
OMMERCIA / ETAI AR LOADING ZONE
LIVE / WORK AR LOADING ZONE
ERTICA CIRCUATION TO OBBY
248 PARKING SPACES » 120 RDT S »128 PUBL S
ERTICA CIRCUATION TO OBBY
Mid Review - Feedback Received PRESENTATION •
•
Graphics are clear however, they need better consistency and implementation.
Code outlined 50% max Live / Work units can be adjusted - to much commercial.
•
Organization creates circuitous circulation - how can plinth be
•
Hierarchy of who, what, when, where, why & how?
•
How do narrative diagrams tie into formal design elements? -
•
Terrace courtyards to allow street access.
creating a link between the narrative and design work.
•
Study commercial / residential relation in section.
Consolidate information - show more slides for graphic clarity.
•
Study sunlight interface with rotated upper massing.
•
broken for better circulation?
PROGRAM & ORGANIZATION PRECEDENT STUDIES
•
•
Include precedent studies & diagrams.
•
Explain lessons learned from each and how it relates to the
•
design.
•
Program square footage totals may be high - reconsider ratio between residential / commercial. Consider reducing overall size.
REPRESENTATION TECHNIQUES UNIT PLANS
•
Axon has opportunity to tie in all aspects of design in a clear
•
Include plans, sections, diagrams.
and legible way, continue to integrate design decisions into an
•
Show how unit plan orientation relates to massing.
axonometric diagram. •
Section drawings should be larger and shown in a more
MASSING
prominent place on the sheet - this project relies heavily on
•
section.
Plinth massing scheme isolates units from community.
Photovoltaics
Leveraging the southern California sun, the unique siting of the live work program
Mid Review - Feedback Response In response to feedback, I altered my approach to how the living unit and the working unit relate. Given the site constraints and the two vastly different conditions to the north and south, a natural boundary emerged. A wall of functional program that provided acoustic separation between the courts to the south and the freeway to the north - naturally this volume became occupied with the working component and circulation.
Post Mid Review : Process IEW WALKING ET ALONG SOUTH FACADE
OM SOUTH-AT O SITE
OM SEVENTH EVEL PRIVATE ALCONY
IEW SOUTH AT ROM HIRD EVEL NTERTAINMENT ERRACE
IEW ROM SECOND EVEL OMMERCIAL / ETAIL SACE
IEW ROM FOURTH EVEL WALKWAY OVER FITNE OURT
Technical Review Presentation
ȸȀȇȧȨȀȣȇȲ ȣȇȋȷȜ ȧȷȃșȄȷ ȋȷȸȇȀȇȲ ȀȄȬȄȲ ȄȤȎȃȜȷȄȋȨȤ ȸȺȨȋȨȒȨȜȋȷȄș ȷȀȀȷȚ
LIVE-WORK DEVELOMENT IN PALM, O NGELE THAT BRING A NEW LEVEL CONVINCE AND CONNECTION TO YOU ENTRERENEUR AND CREATIVE IN ET .
A
B
A
B
A
B
F
C
F
E
C
D
E
D
ȃȋȇȇȜ ȋȀȄȣ ȸȇȀȧȨȀȷȋȇȲ ȣȇȋȷȜ ȬȎȷȀȲ F
C
E
D
ȸȇȀȧȨȀȷȋȇȲ ȃȋȇȇȜ ȧȜȨȨȀ
XON
NIT PLAN
DINING TERRACE
FITNESS TERRACE
A
ENTERTAINMENT TERRACE
B
F
C
E
ȣȇșȺȷȤȄșȷȜ ȃȸȷșȇ ȧȨȀ șȇȄȜȄȤȬ ȣȨȎȤȋȇȲ ȺȒȷș ȃȚȃȋȇȣ
D
IEW ROM SECOND EVEL ERRACE OOKING SOUTH AT A
ȃȋȷȄȤȜȇȃȃ ȃȋȇȇȜ ȋȎȐȇ ȃȎȸȸȨȀȋȃ
B
F
C
E
șȨȤȋȄȤȄȨȎȃ ȀȄȬȄȲ ȄȤȃȎȜȷȋȄȨȤ
IEW ROM NTERIOR ERRACE OURT
D
ȣȇșȺȷȤȄșȷȜ ȇȘȺȷȎȃȋ ȬȀȄȜȜ ȐȇȚȨȤȲ
OT EVEL
ȧȜȎȃȺ ȣȨȎȤȋȇȲ ȲȨȕȤ ȜȄȬȺȋ ȧȄȘȋȎȀȇ l ¦ & * e
lbb* G Y x * GY
A
B
A
B
A
9* * * F
F
B
A
F
B
E
C
F
B
A
D
C
F
B
A
E
C
F
B
A
C
E
D
1/4” = 1’-0”
NTRY EVEL
D
E
C
1’
2’
1/4” = 1’-0”
4’
1’
2’
1/4” = 1’-0”
4’
1’
2’
4’
XON
D
E
C
F
AMPITHEARTER
D
E
C
E
D
D
XON
NIT PLAN
ƹ șȷȃȋ ȄȤ ȸȜȷșȇ șȨȤșȀȇȋȇ ȃȜȷȐ
FITNESS TERRACE
B
)ȄȷȬȨȤȷȜȜȚ 'ȀȷșȇȲ ȺȇȷȀ ;ȷȜȜ
ENTERTAINMENT TERRACE
B
F
F
C
C
E
E
D
B
F
C
E
ȄȤȋȇȬȀȷȜ ȄȀȀȄȬȷȋȄȨȤ ȃȚȃȋȇȣ
D 1/32” = 1’-0”
A
1’
2’
4’
IEW WALKING ET ALONG SOUTH FACADE
șȨȤȋȄȤȄȨȎȃ ȀȄȬȄȲ ȄȤȃȎȜȷȋȄȨȤ
IEW ROM SECOND EVEL OMMERCIAL / ETAIL SACE ƶ ƹ
OT EVEL
ȧȜȷȋ ȜȨșȗ ȝȄȤș ȸȷȤȇȜ ȨȒȇȀ ƹ ȸȜȚȕȨȨȲ ȃȎȐȃȋȀȷȄȬȺȋ Ƹ ȷȄȀȃȸȷșȇ ȕȇȷȋȺȇȀ ȐȷȀȀȄȇȀ ȷȤȲ ƹ ȀȄȬȄȲ ȄȤȃȎȜȷȋȄȨȤ ȨȤ șȨȜȲ ȧȨȀȣȇȲ ȣȇȋȷȜ ȧȀȷȣȄȤȬ ȇȘȋȇȀȄȨȀ ȬȚȸȃȎȣ ȸȷȄȤȋȇȲ
Ⱥȷȧȋ 4ȸȇȤȄȤȬ ȧȨȀ :ȇȀȋȄșȷȜ (ȄȀșȎȜȷȋȄȨȤ
D
ƶ ƹ
ƶ ƹ
ƶ ƹ
ƹ șȷȃȋ ȄȤ ȸȜȷșȇ șȨȤșȀȇȋȇ ȃȜȷȐ
ƶ ƹ
DINING TERRACE A
A
ƹ șȷȃȋ ȄȤ ȸȜȷșȇ șȨȤșȀȇȋȇ șȨȜȎȣȤ
ȕȨȨȲ ȺȇȷȲȇȀ ȋȀȄȣ ȃȜȄȲȄȤȬ ȇȘȋȇȀȄȨȀ ȲȨȨȀ ȕȄȋȺ ȄȤȃȎȷȜȋȇȲ ȬȜȷȃȃ ȎȤȄȋȃ
ȷȜȎȣȄȤȎȣ ȃȋȨȀȇȧȀȨȤȋ ȃȚȃȋȇȣ
ȄȤȋȇȀȄȨȀ ȬȚȸȃȎȣ ȸȷȄȤȋȇȲ
D
)ȄȷȬȨȤȷȜȜȚ 'ȀȷșȇȲ ȺȇȷȀ ;ȷȜȜ
XON
NIT PLAN
Ⱥȷȧȋ 4ȸȇȤȄȤȬ ȧȨȀ :ȇȀȋȄșȷȜ (ȄȀșȎȜȷȋȄȨȤ
A
B
F
C
E
8ȕȨ ;ȷȚ (ȷȃȋ ȄȤ ȸȜȷșȇ (ȨȤșȀȇȋȇ ȜȷȐ
D
4Ȥȇ ;ȷȚ (ȷȃȋ ȄȤ ȸȜȷșȇ (ȨȤșȀȇȋȇ ȜȷȐ A
B
F
C
E
D
(ȷȃȋ ȄȤ ȸȜȷșȇ (ȨȤșȀȇȋȇ 'ȇȷȣ
(ȷȃȋ ȄȤ ȸȜȷșȇ (ȨȤșȀȇȋȇ (ȨȜȎȣȤ
OT EVEL
8ȕȨ ;ȷȚ (ȷȃȋ ȄȤ ȸȜȷșȇ (ȨȤșȀȇȋȇ ȜȷȐ
ƶ ƹ
E
ƹ șȷȃȋ ȄȤ ȸȜȷșȇ ȋȕȨ ȕȷȚ șȨȤ șȀȇȋȇ ȃȜȷȐ
4Ȥȇ ;ȷȚ (ȷȃȋ ȄȤ ȸȜȷșȇ
1/4” = 1’-0”
ƶ ƹ ƶ ƹ ƶ ƹ ƶ ƹ (ȨȤșȀȇȋȇ ȜȷȐ NTRY EVEL
1’
2’
4’
4ȸȇȤ ȋȨ 'ȇȜȜȨȕ
(ȷȃȋ ȄȤ ȸȜȷșȇ (ȨȤșȀȇȋȇ (ȨȜȎȣȤ
)ȄȷȬȨȤȷȜȜȚ 'ȀȷșȇȲ ƶ ƹ ȺȇȷȀ ;ȷȜȜ ƶ ƹ
ƶ ƹ
A
B
F
C
E
1’
2’
4’
(ȷȃȋ ȄȤ ȸȜȷșȇ (ȨȤșȀȇȋȇ 'ȇȷȣ
)ȄȷȬȨȤȷȜȜȚ 'ȀȷșȇȲ ȺȇȷȀ ;ȷȜȜ
2ȎȜȋȄ +ȜȨȨȀ )ȄȷȬȨȤȷȜ 'ȀȷșȄȤȬ
1/4” = 1’-0”
4ȸȇȤ ȋȨ 'ȇȜȜȨȕ
ƶ ƹ
C
D
1/4” = 1’-0”
ƶ ƹ
1’
2’
4’
1/4” = 1’-0”
1’
2’
4’
4’
XON
ȣȇșȺȷȤȄșȷȜ ȸȜȇȤȎȣ ȃȸȷșȇ
ƶ ƹ
ƶ ƹ
1’
2ȎȜȋȄ +ȜȨȨȀ )ȄȷȬȨȤȷȜ 'ȀȷșȄȤȬ
șȷȃȋ ȄȤ ȸȜȷșȇ șȨȤșȀȇȋȇ șȨȜȎȣȤ ȐȇȚȨȤȲ
YICAL ER EVEL TRUCTURAL FRAMING PLAN
2’
4’
TRUCTURAL XON IAGRAM - YICAL ODULE
YICAL ER EVEL TRUCTURAL FRAMING PLAN 1/4” = 1’-0”
2’
D 1/32” = 1’-0”
NTRY EVEL
1’
ƶ ƹ
F
E
ƶ ƹ
B
C
ƶ ƹ
A
F
ƶ ƹ
B
AMPITHEARTER
ƶ ƹ
A
9* * *
ƶ ƹ
lbb* G Y x * GY
ƶ ƹ
l ¦ & * e
1/4” = 1’-0”
1’
2’
4’
XON
EW SOUTH AT ROM HIRD EVEL NTERTAINMENT ERRACE
TRUCTURAL XON IAGRAM - YICAL ODULE
TRUCTURAL XON IAGRAM - YICAL ODULE
TRUCTURAL XON IAGRAM - YICAL ODULE
IEW ROM FOURTH EVEL WALKWAY OVER FITNE OURT
ȸȀȇȲȄȃȋȷȜ ȀȷȄȃȇȲ ȋȇȀȀȷșȇ ȧȜȨȨȀȄȤȬ ȃȚȃȋȇȣ
ȤȷȋȄȒȇ ȲȀȨȎȬȺȋ ȀȇȃȄȃȋȷȤȋ ȬȀȷȃȃȇȃ ȷȤȲ ȃȺȀȎȐȃ ȀȷȄȃȇȲ ȸȜȷȤȋȄȤȬ ȐȇȲ
Final Presentation 8th floor 7th floor 6th floor 5th floor 4th floor 3rd floor 2nd floor ground floor parking floor
Final Presentation
Enlarged Ground Level Plan
Enlarged 3rd Level Terrace Plan
Typical Upper Level Plan
Final Presentation
Final Presentation
Final Presentation