SHADOW OF ANGKOR HOTEL SIEMREAP MEP DRAWING SET
DESIGNER: DUC DINH DATE: SEPTEMBER 4, 2013
GENERAL NOTES
LIST OF DRAWING DWG NO.
DRAWING
ISSUE
REMARK
COVER SHEET
Sept 4, 2013
For Construction
G-001
LIST OF DRAWING
Sept 4, 2013
For Construction
G-002
ELECTRICAL LEGENDS AND SYMBOL
Sept 4, 2013
For Construction
F-101
GROUND FLOOR FIRE SAFETY & SPRINKLER LAYOUT PLAN
Sept 4, 2013
For Construction
F-102
FIRST FLOOR FIRE SAFETY & SPRINKLER LAYOUT PLAN
Sept 4, 2013
For Construction
F-103
SECOND FLOOR FIRE SAFETY & SPRINKLER LAYOUT PLAN
Sept 4, 2013
For Construction
P-101
GROUND FLOOR PLUMBING PLAN
Sept 4, 2013
For Construction
P-102
FIRST FLOOR PLUMBING PLAN
Sept 4, 2013
For Construction
P-103
SECOND FLOOR PLUMBING PLAN
Sept 4, 2013
For Construction
M-101
GROUND FLOOR MECHANICAL VENTILATION PLAN
Sept 4, 2013
For Construction
M-102
FIRST FLOOR MECHANICAL VENTILATION PLAN
Sept 4, 2013
For Construction
M-103
SECOND FLOOR MECHANICAL VENTILATION PLAN
Sept 4, 2013
For Construction
E-101
GROUND FLOOR ELECTRICAL PLAN
Sept 4, 2013
For Construction
E-102
FIRST FLOOR ELECTRICAL PLAN
Sept 4, 2013
For Construction
E-103
SECOND FLOOR ELECTRICAL PLAN
Sept 4, 2013
For Construction
The contractor to be responsible for: - Verifying all drawings, specifications,dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. - Submitting samples and shop drawings for review and approval by designer before commencing works. - Ensuring that all work is keeping with all international building codes. - All necessary repairs, patching and cleaning of site during and after completition of works. - Verifying existing site conditions prior to submissions of quotations. - Not starting the construction unless these drawings are signed approved. - All work specified on all drawings and specifications and supplying all necessary materials and labour required to complete all phases of work in accordance with the designer's standards. - All dimensions are in millimeter.
SPECIFIC NOTES :
NO.
A B
A B
DATE:
REVISIONS:
DETAIL NO. SHEET NO.
ASSIGNMENT TITLE:
MEP SET
DRAWING TITLE:
LIST OF DRAWINGS
NAME: DUC DINH COURSE: CONSTRUCTION STUDIES 2 TERM: JULY 2013 ASSIGNMENT NO.: 3
Raffles International College DATE: 04-09-2013 SCALE: 1:1
SHEET:
G-001
GENERAL NOTES
ELECTRICAL SYMBOL ABBREVIATIONS @ cL
AT
ELECTRICAL SYMBOL S
m2
METER SQUARE
A/C
AIR CONDITIONING
ALUM.
ALUMINIUM
BOARD
CEM.
CEMENT
DOORBELL
DOWNLIGHT
WALL OUTLET
S
3-WAY SWITCH
WALL SCONE
HD
PLUMBING SYMBOL COLD WATER SUPPLY
HEAT DETECTOR
HOT WATER SUPPLY
G GROUND OUTLET
3
D
DIMMER SWITCH
PENDANT LIGHT
AIR SUPPLY FAN
RECTAGULAR PENDANT LIGHT
SPRINKLER LINE
CEILING HIGHT
CL.
CEILING
CONC.
CONCRETE
COL.
COLUMN
DEPT.
DEPARTMENT
DET.
DETAIL
DIA.
DIAMETER
DIM.
DIMENSION
DN.
DOWN
DWG.
DRAWING
ELEVATION
EQ.
EQUAL
EXST.
EXISTING
EXT.
EXTERIOR
F.D.
FLOOR DRAIN
FIN.
FINISH
FL.
FLOOR
GYP.
GYPSUM
HDWD.
HARDWOOD
JAN.
JANITOR
MAX.
MAXIMUM
MIN.
MINIMUM
N.I.C.
NOT IN CONTRACT
N.T.S.
NOT TO SCALE
PTL.
PLASTIC LAMINATE
PLYWD.
PLYWOOD
R.A.G.
RETURN AIR GRILL
REF.
REFRIGERATOR
RM.
ROOM
S.A.G.
SUPPLY AIR GRILL
SPEC.
SPECIFICATION
THK.
THICK
TYP.
TYPICAL
W/
WITH
WD.
WOOD
-
-
-
-
-
-
-
-
-
-
-
-
-
-
WASHDRAIN PIPE
FIRE ALARM CALL POINT EXHAUSTED FAN
IP AIR SUPPLY DUCT
TELEPHONE OUTLET
FIRE ALARM CONTROL PANEL
CLEANING HOLE W/ COPPER COVER M
PENDANT LIGHT (SMALL)
TV
CABLE TV OUTLET
AIR EXHAUST DUCT
CEILING FAN
J
JUNCTION BOX
RANGE HOOD
COVE LIGHTING
WATER METER VALVE
C02 EXTINGUISHER
SPRINKLER LINE N1
FIRE INSTRUCTION NOTICE
H
WATER HEATER SPECIFIC NOTES :
Room number IDENTITY SHOWS ELEVATION/SECTION IN-XX
Room name
TOTAL PAGE OR PAGE NUMBER Height of Ceilling Level of floor IDENTITY SHOWS ELEVATION/SECTION
ELECTRICAL
ELEV.
MAIN WASTE PIPE
FIRE ALARM SOUNDER
CERAMIC
CH.
ELEC.
B
ARCHITECTURE
BD.
CER.
ONE WAY SWITCH
FIRE&SAFETY SYMBOL
CENTER LINE DIAMETER OR ROUND
ARCH.
FIXTURE SYMBOL
The contractor to be responsible for: - Verifying all drawings, specifications,dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. - Submitting samples and shop drawings for review and approval by designer before commencing works. - Ensuring that all work is keeping with all international building codes. - All necessary repairs, patching and cleaning of site during and after completition of works. - Verifying existing site conditions prior to submissions of quotations. - Not starting the construction unless these drawings are signed approved. - All work specified on all drawings and specifications and supplying all necessary materials and labour required to complete all phases of work in accordance with the designer's standards. - All dimensions are in millimeter.
Floor Symbol
TOTAL PAGE OR PAGE NUMBER
Ceilling Symbol WX
INTERIOR ELEVATION VIEW DERECTION
WALL SYMBOL
A B
A B
DATE:
REVISIONS:
FLOOR SYMBOL
FF-XX
DOOR NUMBER
DETAIL NO. SHEET NO.
DOOR SYMBOL
ROOM NUMBER
SECTION SYMBOL FINISHING CODE
1 CF-1
A
FINISHING CODE
COLUMN GRID LINE NO.
CL-XX
ASSIGNMENT TITLE:
CEILING SYMBOL
MEP SET
DRAWING TITLE:
ELECTRICAL SYMBOL
SEE DETAIL NAME: DUC DINH COURSE: CONSTRUCTION STUDIES 2 TERM: JULY 2013 ASSIGNMENT NO.: 3
Raffles International College DATE: 04-09-2013 SCALE: 1:1
SHEET:
G-002
GENERAL NOTES The contractor to be responsible for: - Verifying all drawings, specifications,dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. - Submitting samples and shop drawings for review and approval by designer before commencing works. - Ensuring that all work is keeping with all international building codes. - All necessary repairs, patching and cleaning of site during and after completition of works. - Verifying existing site conditions prior to submissions of quotations. - Not starting the construction unless these drawings are signed approved. - All work specified on all drawings and specifications and supplying all necessary materials and labour required to complete all phases of work in accordance with the designer's standards. - All dimensions are in millimeter.
SPECIFIC NOTES :
NO.
A B
A B
DATE:
REVISIONS:
DETAIL NO. SHEET NO.
ASSIGNMENT TITLE:
MEP SET
DRAWING TITLE:
GROUND FLOOR FIRE SAFETY & SPRINKLER LAYOUT PLAN
NAME: DUC DINH COURSE: CONSTRUCTION STUDIES 2 TERM: JULY 2013 ASSIGNMENT NO.: 3
Raffles International College DATE: 4-09-2013 SCALE: 1:75
SHEET:
F-101
GENERAL NOTES The contractor to be responsible for: - Verifying all drawings, specifications,dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. - Submitting samples and shop drawings for review and approval by designer before commencing works. - Ensuring that all work is keeping with all international building codes. - All necessary repairs, patching and cleaning of site during and after completition of works. - Verifying existing site conditions prior to submissions of quotations. - Not starting the construction unless these drawings are signed approved. - All work specified on all drawings and specifications and supplying all necessary materials and labour required to complete all phases of work in accordance with the designer's standards. - All dimensions are in millimeter.
SPECIFIC NOTES :
NO.
A B
A B
DATE:
REVISIONS:
DETAIL NO. SHEET NO.
ASSIGNMENT TITLE:
MEP SET
DRAWING TITLE:
FIRST FLOOR FIRE SAFETY & SPRINKLER LAYOUT PLAN
NAME: DUC DINH COURSE: CONSTRUCTION STUDIES 2 TERM: JULY 2013 ASSIGNMENT NO.: 3
Raffles International College DATE: 4-09-2013 SCALE: 1:75
SHEET:
F-102
GENERAL NOTES The contractor to be responsible for: - Verifying all drawings, specifications,dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. - Submitting samples and shop drawings for review and approval by designer before commencing works. - Ensuring that all work is keeping with all international building codes. - All necessary repairs, patching and cleaning of site during and after completition of works. - Verifying existing site conditions prior to submissions of quotations. - Not starting the construction unless these drawings are signed approved. - All work specified on all drawings and specifications and supplying all necessary materials and labour required to complete all phases of work in accordance with the designer's standards. - All dimensions are in millimeter.
SPECIFIC NOTES :
NO.
A B
A B
DATE:
REVISIONS:
DETAIL NO. SHEET NO.
ASSIGNMENT TITLE:
MEP SET
DRAWING TITLE:
SECOND FLOOR FIRE SAFETY & SPRINKLER LAYOUT PLAN
NAME: DUC DINH COURSE: CONSTRUCTION STUDIES 2 TERM: JULY 2013 ASSIGNMENT NO.: 3
Raffles International College DATE: 4-09-2013 SCALE: 1:75
SHEET:
F-103
GENERAL NOTES The contractor to be responsible for: - Verifying all drawings, specifications,dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. - Submitting samples and shop drawings for review and approval by designer before commencing works. - Ensuring that all work is keeping with all international building codes. - All necessary repairs, patching and cleaning of site during and after completition of works. - Verifying existing site conditions prior to submissions of quotations. - Not starting the construction unless these drawings are signed approved. - All work specified on all drawings and specifications and supplying all necessary materials and labour required to complete all phases of work in accordance with the designer's standards. - All dimensions are in millimeter.
SPECIFIC NOTES :
NO.
A B
A B
DATE:
REVISIONS:
DETAIL NO. SHEET NO.
ASSIGNMENT TITLE:
MEP SET
DRAWING TITLE:
GROUND FLOOR PLUMBING PLAN
NAME: DUC DINH COURSE: CONSTRUCTION STUDIES 2 TERM: JULY 2013 ASSIGNMENT NO.: 3
Raffles International College DATE: 4-09-2013 SCALE: 1:75
SHEET:
P-101
GENERAL NOTES The contractor to be responsible for: - Verifying all drawings, specifications,dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. - Submitting samples and shop drawings for review and approval by designer before commencing works. - Ensuring that all work is keeping with all international building codes. - All necessary repairs, patching and cleaning of site during and after completition of works. - Verifying existing site conditions prior to submissions of quotations. - Not starting the construction unless these drawings are signed approved. - All work specified on all drawings and specifications and supplying all necessary materials and labour required to complete all phases of work in accordance with the designer's standards. - All dimensions are in millimeter.
SPECIFIC NOTES :
NO.
A B
A B
DATE:
REVISIONS:
DETAIL NO. SHEET NO.
ASSIGNMENT TITLE:
MEP SET
DRAWING TITLE:
FIRST FLOOR PLUMBING PLAN
NAME: DUC DINH COURSE: CONSTRUCTION STUDIES 2 TERM: JULY 2013 ASSIGNMENT NO.: 3
Raffles International College DATE: 4-09-2013 SCALE: 1:75
SHEET:
P-102
GENERAL NOTES The contractor to be responsible for: - Verifying all drawings, specifications,dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. - Submitting samples and shop drawings for review and approval by designer before commencing works. - Ensuring that all work is keeping with all international building codes. - All necessary repairs, patching and cleaning of site during and after completition of works. - Verifying existing site conditions prior to submissions of quotations. - Not starting the construction unless these drawings are signed approved. - All work specified on all drawings and specifications and supplying all necessary materials and labour required to complete all phases of work in accordance with the designer's standards. - All dimensions are in millimeter.
SPECIFIC NOTES :
NO.
A B
A B
DATE:
REVISIONS:
DETAIL NO. SHEET NO.
ASSIGNMENT TITLE:
MEP SET
DRAWING TITLE:
SECOND FLOOR PLUMBING PLAN
NAME: DUC DINH COURSE: CONSTRUCTION STUDIES 2 TERM: JULY 2013 ASSIGNMENT NO.: 3
Raffles International College DATE: 4-09-2013 SCALE: 1:75
SHEET:
P-103
GENERAL NOTES The contractor to be responsible for: - Verifying all drawings, specifications,dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. - Submitting samples and shop drawings for review and approval by designer before commencing works. - Ensuring that all work is keeping with all international building codes. - All necessary repairs, patching and cleaning of site during and after completition of works. - Verifying existing site conditions prior to submissions of quotations. - Not starting the construction unless these drawings are signed approved. - All work specified on all drawings and specifications and supplying all necessary materials and labour required to complete all phases of work in accordance with the designer's standards. - All dimensions are in millimeter.
SPECIFIC NOTES :
NO.
A B
A B
DATE:
REVISIONS:
DETAIL NO. SHEET NO.
ASSIGNMENT TITLE:
MEP SET
DRAWING TITLE:
GROUND FLOOR MECHANICAL VENTILATION PLAN
NAME: DUC DINH COURSE: CONSTRUCTION STUDIES 2 TERM: JULY 2013 ASSIGNMENT NO.: 3
Raffles International College DATE: 4-09-2013 SCALE: 1:75
SHEET:
M-101
GENERAL NOTES The contractor to be responsible for: - Verifying all drawings, specifications,dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. - Submitting samples and shop drawings for review and approval by designer before commencing works. - Ensuring that all work is keeping with all international building codes. - All necessary repairs, patching and cleaning of site during and after completition of works. - Verifying existing site conditions prior to submissions of quotations. - Not starting the construction unless these drawings are signed approved. - All work specified on all drawings and specifications and supplying all necessary materials and labour required to complete all phases of work in accordance with the designer's standards. - All dimensions are in millimeter.
SPECIFIC NOTES :
NO.
A B
A B
DATE:
REVISIONS:
DETAIL NO. SHEET NO.
ASSIGNMENT TITLE:
MEP SET
DRAWING TITLE:
FIRST FLOOR MECHANICAL VENTILATION PLAN
NAME: DUC DINH COURSE: CONSTRUCTION STUDIES 2 TERM: JULY 2013 ASSIGNMENT NO.: 3
Raffles International College DATE: 4-09-2013 SCALE: 1:75
SHEET:
M-102
GENERAL NOTES The contractor to be responsible for: - Verifying all drawings, specifications,dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. - Submitting samples and shop drawings for review and approval by designer before commencing works. - Ensuring that all work is keeping with all international building codes. - All necessary repairs, patching and cleaning of site during and after completition of works. - Verifying existing site conditions prior to submissions of quotations. - Not starting the construction unless these drawings are signed approved. - All work specified on all drawings and specifications and supplying all necessary materials and labour required to complete all phases of work in accordance with the designer's standards. - All dimensions are in millimeter.
SPECIFIC NOTES :
NO.
A B
A B
DATE:
REVISIONS:
DETAIL NO. SHEET NO.
ASSIGNMENT TITLE:
MEP SET
DRAWING TITLE:
SECOND FLOOR MECHANICAL VENTILATION PLAN
NAME: DUC DINH COURSE: CONSTRUCTION STUDIES 2 TERM: JULY 2013 ASSIGNMENT NO.: 3
Raffles International College DATE: 4-09-2013 SCALE: 1:75
SHEET:
M-103
GENERAL NOTES The contractor to be responsible for: - Verifying all drawings, specifications,dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. - Submitting samples and shop drawings for review and approval by designer before commencing works. - Ensuring that all work is keeping with all international building codes. - All necessary repairs, patching and cleaning of site during and after completition of works. - Verifying existing site conditions prior to submissions of quotations. - Not starting the construction unless these drawings are signed approved. - All work specified on all drawings and specifications and supplying all necessary materials and labour required to complete all phases of work in accordance with the designer's standards. - All dimensions are in millimeter.
SPECIFIC NOTES :
NO.
A B
A B
DATE:
REVISIONS:
DETAIL NO. SHEET NO.
ASSIGNMENT TITLE:
MEP SET
DRAWING TITLE:
GROUND FLOOR ELECTRICAL PLAN
NAME: DUC DINH COURSE: CONSTRUCTION STUDIES 2 TERM: JULY 2013 ASSIGNMENT NO.: 3
Raffles International College DATE: 4-09-2013 SCALE: 1:75
SHEET:
E-101
GENERAL NOTES The contractor to be responsible for: - Verifying all drawings, specifications,dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. - Submitting samples and shop drawings for review and approval by designer before commencing works. - Ensuring that all work is keeping with all international building codes. - All necessary repairs, patching and cleaning of site during and after completition of works. - Verifying existing site conditions prior to submissions of quotations. - Not starting the construction unless these drawings are signed approved. - All work specified on all drawings and specifications and supplying all necessary materials and labour required to complete all phases of work in accordance with the designer's standards. - All dimensions are in millimeter.
SPECIFIC NOTES :
NO.
A B
A B
DATE:
REVISIONS:
DETAIL NO. SHEET NO.
ASSIGNMENT TITLE:
MEP SET
DRAWING TITLE:
FIRST FLOOR ELECTRICAL PLAN
NAME: DUC DINH COURSE: CONSTRUCTION STUDIES 2 TERM: JULY 2013 ASSIGNMENT NO.: 3
Raffles International College DATE: 4-09-2013 SCALE: 1:75
SHEET:
E-102
GENERAL NOTES The contractor to be responsible for: - Verifying all drawings, specifications,dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. - Submitting samples and shop drawings for review and approval by designer before commencing works. - Ensuring that all work is keeping with all international building codes. - All necessary repairs, patching and cleaning of site during and after completition of works. - Verifying existing site conditions prior to submissions of quotations. - Not starting the construction unless these drawings are signed approved. - All work specified on all drawings and specifications and supplying all necessary materials and labour required to complete all phases of work in accordance with the designer's standards. - All dimensions are in millimeter.
SPECIFIC NOTES :
NO.
A B
A B
DATE:
REVISIONS:
DETAIL NO. SHEET NO.
ASSIGNMENT TITLE:
MEP SET
DRAWING TITLE:
SECOND FLOOR ELECTRICAL PLAN
NAME: DUC DINH COURSE: CONSTRUCTION STUDIES 2 TERM: JULY 2013 ASSIGNMENT NO.: 3
Raffles International College DATE: 4-09-2013 SCALE: 1:75
SHEET:
E-103