ELECTRICAL, LIGHTING, PLUMBING, FIRE SAFETY, SPRINKLER AND MECHANICAL PLANS

Page 1

SHADOW OF ANGKOR HOTEL SIEMREAP MEP DRAWING SET

DESIGNER: DUC DINH DATE: SEPTEMBER 4, 2013


GENERAL NOTES

LIST OF DRAWING DWG NO.

DRAWING

ISSUE

REMARK

COVER SHEET

Sept 4, 2013

For Construction

G-001

LIST OF DRAWING

Sept 4, 2013

For Construction

G-002

ELECTRICAL LEGENDS AND SYMBOL

Sept 4, 2013

For Construction

F-101

GROUND FLOOR FIRE SAFETY & SPRINKLER LAYOUT PLAN

Sept 4, 2013

For Construction

F-102

FIRST FLOOR FIRE SAFETY & SPRINKLER LAYOUT PLAN

Sept 4, 2013

For Construction

F-103

SECOND FLOOR FIRE SAFETY & SPRINKLER LAYOUT PLAN

Sept 4, 2013

For Construction

P-101

GROUND FLOOR PLUMBING PLAN

Sept 4, 2013

For Construction

P-102

FIRST FLOOR PLUMBING PLAN

Sept 4, 2013

For Construction

P-103

SECOND FLOOR PLUMBING PLAN

Sept 4, 2013

For Construction

M-101

GROUND FLOOR MECHANICAL VENTILATION PLAN

Sept 4, 2013

For Construction

M-102

FIRST FLOOR MECHANICAL VENTILATION PLAN

Sept 4, 2013

For Construction

M-103

SECOND FLOOR MECHANICAL VENTILATION PLAN

Sept 4, 2013

For Construction

E-101

GROUND FLOOR ELECTRICAL PLAN

Sept 4, 2013

For Construction

E-102

FIRST FLOOR ELECTRICAL PLAN

Sept 4, 2013

For Construction

E-103

SECOND FLOOR ELECTRICAL PLAN

Sept 4, 2013

For Construction

The contractor to be responsible for: - Verifying all drawings, specifications,dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. - Submitting samples and shop drawings for review and approval by designer before commencing works. - Ensuring that all work is keeping with all international building codes. - All necessary repairs, patching and cleaning of site during and after completition of works. - Verifying existing site conditions prior to submissions of quotations. - Not starting the construction unless these drawings are signed approved. - All work specified on all drawings and specifications and supplying all necessary materials and labour required to complete all phases of work in accordance with the designer's standards. - All dimensions are in millimeter.

SPECIFIC NOTES :

NO.

A B

A B

DATE:

REVISIONS:

DETAIL NO. SHEET NO.

ASSIGNMENT TITLE:

MEP SET

DRAWING TITLE:

LIST OF DRAWINGS

NAME: DUC DINH COURSE: CONSTRUCTION STUDIES 2 TERM: JULY 2013 ASSIGNMENT NO.: 3

Raffles International College DATE: 04-09-2013 SCALE: 1:1

SHEET:

G-001


GENERAL NOTES

ELECTRICAL SYMBOL ABBREVIATIONS @ cL

AT

ELECTRICAL SYMBOL S

m2

METER SQUARE

A/C

AIR CONDITIONING

ALUM.

ALUMINIUM

BOARD

CEM.

CEMENT

DOORBELL

DOWNLIGHT

WALL OUTLET

S

3-WAY SWITCH

WALL SCONE

HD

PLUMBING SYMBOL COLD WATER SUPPLY

HEAT DETECTOR

HOT WATER SUPPLY

G GROUND OUTLET

3

D

DIMMER SWITCH

PENDANT LIGHT

AIR SUPPLY FAN

RECTAGULAR PENDANT LIGHT

SPRINKLER LINE

CEILING HIGHT

CL.

CEILING

CONC.

CONCRETE

COL.

COLUMN

DEPT.

DEPARTMENT

DET.

DETAIL

DIA.

DIAMETER

DIM.

DIMENSION

DN.

DOWN

DWG.

DRAWING

ELEVATION

EQ.

EQUAL

EXST.

EXISTING

EXT.

EXTERIOR

F.D.

FLOOR DRAIN

FIN.

FINISH

FL.

FLOOR

GYP.

GYPSUM

HDWD.

HARDWOOD

JAN.

JANITOR

MAX.

MAXIMUM

MIN.

MINIMUM

N.I.C.

NOT IN CONTRACT

N.T.S.

NOT TO SCALE

PTL.

PLASTIC LAMINATE

PLYWD.

PLYWOOD

R.A.G.

RETURN AIR GRILL

REF.

REFRIGERATOR

RM.

ROOM

S.A.G.

SUPPLY AIR GRILL

SPEC.

SPECIFICATION

THK.

THICK

TYP.

TYPICAL

W/

WITH

WD.

WOOD

-

-

-

-

-

-

-

-

-

-

-

-

-

-

WASHDRAIN PIPE

FIRE ALARM CALL POINT EXHAUSTED FAN

IP AIR SUPPLY DUCT

TELEPHONE OUTLET

FIRE ALARM CONTROL PANEL

CLEANING HOLE W/ COPPER COVER M

PENDANT LIGHT (SMALL)

TV

CABLE TV OUTLET

AIR EXHAUST DUCT

CEILING FAN

J

JUNCTION BOX

RANGE HOOD

COVE LIGHTING

WATER METER VALVE

C02 EXTINGUISHER

SPRINKLER LINE N1

FIRE INSTRUCTION NOTICE

H

WATER HEATER SPECIFIC NOTES :

Room number IDENTITY SHOWS ELEVATION/SECTION IN-XX

Room name

TOTAL PAGE OR PAGE NUMBER Height of Ceilling Level of floor IDENTITY SHOWS ELEVATION/SECTION

ELECTRICAL

ELEV.

MAIN WASTE PIPE

FIRE ALARM SOUNDER

CERAMIC

CH.

ELEC.

B

ARCHITECTURE

BD.

CER.

ONE WAY SWITCH

FIRE&SAFETY SYMBOL

CENTER LINE DIAMETER OR ROUND

ARCH.

FIXTURE SYMBOL

The contractor to be responsible for: - Verifying all drawings, specifications,dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. - Submitting samples and shop drawings for review and approval by designer before commencing works. - Ensuring that all work is keeping with all international building codes. - All necessary repairs, patching and cleaning of site during and after completition of works. - Verifying existing site conditions prior to submissions of quotations. - Not starting the construction unless these drawings are signed approved. - All work specified on all drawings and specifications and supplying all necessary materials and labour required to complete all phases of work in accordance with the designer's standards. - All dimensions are in millimeter.

Floor Symbol

TOTAL PAGE OR PAGE NUMBER

Ceilling Symbol WX

INTERIOR ELEVATION VIEW DERECTION

WALL SYMBOL

A B

A B

DATE:

REVISIONS:

FLOOR SYMBOL

FF-XX

DOOR NUMBER

DETAIL NO. SHEET NO.

DOOR SYMBOL

ROOM NUMBER

SECTION SYMBOL FINISHING CODE

1 CF-1

A

FINISHING CODE

COLUMN GRID LINE NO.

CL-XX

ASSIGNMENT TITLE:

CEILING SYMBOL

MEP SET

DRAWING TITLE:

ELECTRICAL SYMBOL

SEE DETAIL NAME: DUC DINH COURSE: CONSTRUCTION STUDIES 2 TERM: JULY 2013 ASSIGNMENT NO.: 3

Raffles International College DATE: 04-09-2013 SCALE: 1:1

SHEET:

G-002


GENERAL NOTES The contractor to be responsible for: - Verifying all drawings, specifications,dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. - Submitting samples and shop drawings for review and approval by designer before commencing works. - Ensuring that all work is keeping with all international building codes. - All necessary repairs, patching and cleaning of site during and after completition of works. - Verifying existing site conditions prior to submissions of quotations. - Not starting the construction unless these drawings are signed approved. - All work specified on all drawings and specifications and supplying all necessary materials and labour required to complete all phases of work in accordance with the designer's standards. - All dimensions are in millimeter.

SPECIFIC NOTES :

NO.

A B

A B

DATE:

REVISIONS:

DETAIL NO. SHEET NO.

ASSIGNMENT TITLE:

MEP SET

DRAWING TITLE:

GROUND FLOOR FIRE SAFETY & SPRINKLER LAYOUT PLAN

NAME: DUC DINH COURSE: CONSTRUCTION STUDIES 2 TERM: JULY 2013 ASSIGNMENT NO.: 3

Raffles International College DATE: 4-09-2013 SCALE: 1:75

SHEET:

F-101


GENERAL NOTES The contractor to be responsible for: - Verifying all drawings, specifications,dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. - Submitting samples and shop drawings for review and approval by designer before commencing works. - Ensuring that all work is keeping with all international building codes. - All necessary repairs, patching and cleaning of site during and after completition of works. - Verifying existing site conditions prior to submissions of quotations. - Not starting the construction unless these drawings are signed approved. - All work specified on all drawings and specifications and supplying all necessary materials and labour required to complete all phases of work in accordance with the designer's standards. - All dimensions are in millimeter.

SPECIFIC NOTES :

NO.

A B

A B

DATE:

REVISIONS:

DETAIL NO. SHEET NO.

ASSIGNMENT TITLE:

MEP SET

DRAWING TITLE:

FIRST FLOOR FIRE SAFETY & SPRINKLER LAYOUT PLAN

NAME: DUC DINH COURSE: CONSTRUCTION STUDIES 2 TERM: JULY 2013 ASSIGNMENT NO.: 3

Raffles International College DATE: 4-09-2013 SCALE: 1:75

SHEET:

F-102


GENERAL NOTES The contractor to be responsible for: - Verifying all drawings, specifications,dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. - Submitting samples and shop drawings for review and approval by designer before commencing works. - Ensuring that all work is keeping with all international building codes. - All necessary repairs, patching and cleaning of site during and after completition of works. - Verifying existing site conditions prior to submissions of quotations. - Not starting the construction unless these drawings are signed approved. - All work specified on all drawings and specifications and supplying all necessary materials and labour required to complete all phases of work in accordance with the designer's standards. - All dimensions are in millimeter.

SPECIFIC NOTES :

NO.

A B

A B

DATE:

REVISIONS:

DETAIL NO. SHEET NO.

ASSIGNMENT TITLE:

MEP SET

DRAWING TITLE:

SECOND FLOOR FIRE SAFETY & SPRINKLER LAYOUT PLAN

NAME: DUC DINH COURSE: CONSTRUCTION STUDIES 2 TERM: JULY 2013 ASSIGNMENT NO.: 3

Raffles International College DATE: 4-09-2013 SCALE: 1:75

SHEET:

F-103


GENERAL NOTES The contractor to be responsible for: - Verifying all drawings, specifications,dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. - Submitting samples and shop drawings for review and approval by designer before commencing works. - Ensuring that all work is keeping with all international building codes. - All necessary repairs, patching and cleaning of site during and after completition of works. - Verifying existing site conditions prior to submissions of quotations. - Not starting the construction unless these drawings are signed approved. - All work specified on all drawings and specifications and supplying all necessary materials and labour required to complete all phases of work in accordance with the designer's standards. - All dimensions are in millimeter.

SPECIFIC NOTES :

NO.

A B

A B

DATE:

REVISIONS:

DETAIL NO. SHEET NO.

ASSIGNMENT TITLE:

MEP SET

DRAWING TITLE:

GROUND FLOOR PLUMBING PLAN

NAME: DUC DINH COURSE: CONSTRUCTION STUDIES 2 TERM: JULY 2013 ASSIGNMENT NO.: 3

Raffles International College DATE: 4-09-2013 SCALE: 1:75

SHEET:

P-101


GENERAL NOTES The contractor to be responsible for: - Verifying all drawings, specifications,dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. - Submitting samples and shop drawings for review and approval by designer before commencing works. - Ensuring that all work is keeping with all international building codes. - All necessary repairs, patching and cleaning of site during and after completition of works. - Verifying existing site conditions prior to submissions of quotations. - Not starting the construction unless these drawings are signed approved. - All work specified on all drawings and specifications and supplying all necessary materials and labour required to complete all phases of work in accordance with the designer's standards. - All dimensions are in millimeter.

SPECIFIC NOTES :

NO.

A B

A B

DATE:

REVISIONS:

DETAIL NO. SHEET NO.

ASSIGNMENT TITLE:

MEP SET

DRAWING TITLE:

FIRST FLOOR PLUMBING PLAN

NAME: DUC DINH COURSE: CONSTRUCTION STUDIES 2 TERM: JULY 2013 ASSIGNMENT NO.: 3

Raffles International College DATE: 4-09-2013 SCALE: 1:75

SHEET:

P-102


GENERAL NOTES The contractor to be responsible for: - Verifying all drawings, specifications,dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. - Submitting samples and shop drawings for review and approval by designer before commencing works. - Ensuring that all work is keeping with all international building codes. - All necessary repairs, patching and cleaning of site during and after completition of works. - Verifying existing site conditions prior to submissions of quotations. - Not starting the construction unless these drawings are signed approved. - All work specified on all drawings and specifications and supplying all necessary materials and labour required to complete all phases of work in accordance with the designer's standards. - All dimensions are in millimeter.

SPECIFIC NOTES :

NO.

A B

A B

DATE:

REVISIONS:

DETAIL NO. SHEET NO.

ASSIGNMENT TITLE:

MEP SET

DRAWING TITLE:

SECOND FLOOR PLUMBING PLAN

NAME: DUC DINH COURSE: CONSTRUCTION STUDIES 2 TERM: JULY 2013 ASSIGNMENT NO.: 3

Raffles International College DATE: 4-09-2013 SCALE: 1:75

SHEET:

P-103


GENERAL NOTES The contractor to be responsible for: - Verifying all drawings, specifications,dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. - Submitting samples and shop drawings for review and approval by designer before commencing works. - Ensuring that all work is keeping with all international building codes. - All necessary repairs, patching and cleaning of site during and after completition of works. - Verifying existing site conditions prior to submissions of quotations. - Not starting the construction unless these drawings are signed approved. - All work specified on all drawings and specifications and supplying all necessary materials and labour required to complete all phases of work in accordance with the designer's standards. - All dimensions are in millimeter.

SPECIFIC NOTES :

NO.

A B

A B

DATE:

REVISIONS:

DETAIL NO. SHEET NO.

ASSIGNMENT TITLE:

MEP SET

DRAWING TITLE:

GROUND FLOOR MECHANICAL VENTILATION PLAN

NAME: DUC DINH COURSE: CONSTRUCTION STUDIES 2 TERM: JULY 2013 ASSIGNMENT NO.: 3

Raffles International College DATE: 4-09-2013 SCALE: 1:75

SHEET:

M-101


GENERAL NOTES The contractor to be responsible for: - Verifying all drawings, specifications,dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. - Submitting samples and shop drawings for review and approval by designer before commencing works. - Ensuring that all work is keeping with all international building codes. - All necessary repairs, patching and cleaning of site during and after completition of works. - Verifying existing site conditions prior to submissions of quotations. - Not starting the construction unless these drawings are signed approved. - All work specified on all drawings and specifications and supplying all necessary materials and labour required to complete all phases of work in accordance with the designer's standards. - All dimensions are in millimeter.

SPECIFIC NOTES :

NO.

A B

A B

DATE:

REVISIONS:

DETAIL NO. SHEET NO.

ASSIGNMENT TITLE:

MEP SET

DRAWING TITLE:

FIRST FLOOR MECHANICAL VENTILATION PLAN

NAME: DUC DINH COURSE: CONSTRUCTION STUDIES 2 TERM: JULY 2013 ASSIGNMENT NO.: 3

Raffles International College DATE: 4-09-2013 SCALE: 1:75

SHEET:

M-102


GENERAL NOTES The contractor to be responsible for: - Verifying all drawings, specifications,dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. - Submitting samples and shop drawings for review and approval by designer before commencing works. - Ensuring that all work is keeping with all international building codes. - All necessary repairs, patching and cleaning of site during and after completition of works. - Verifying existing site conditions prior to submissions of quotations. - Not starting the construction unless these drawings are signed approved. - All work specified on all drawings and specifications and supplying all necessary materials and labour required to complete all phases of work in accordance with the designer's standards. - All dimensions are in millimeter.

SPECIFIC NOTES :

NO.

A B

A B

DATE:

REVISIONS:

DETAIL NO. SHEET NO.

ASSIGNMENT TITLE:

MEP SET

DRAWING TITLE:

SECOND FLOOR MECHANICAL VENTILATION PLAN

NAME: DUC DINH COURSE: CONSTRUCTION STUDIES 2 TERM: JULY 2013 ASSIGNMENT NO.: 3

Raffles International College DATE: 4-09-2013 SCALE: 1:75

SHEET:

M-103


GENERAL NOTES The contractor to be responsible for: - Verifying all drawings, specifications,dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. - Submitting samples and shop drawings for review and approval by designer before commencing works. - Ensuring that all work is keeping with all international building codes. - All necessary repairs, patching and cleaning of site during and after completition of works. - Verifying existing site conditions prior to submissions of quotations. - Not starting the construction unless these drawings are signed approved. - All work specified on all drawings and specifications and supplying all necessary materials and labour required to complete all phases of work in accordance with the designer's standards. - All dimensions are in millimeter.

SPECIFIC NOTES :

NO.

A B

A B

DATE:

REVISIONS:

DETAIL NO. SHEET NO.

ASSIGNMENT TITLE:

MEP SET

DRAWING TITLE:

GROUND FLOOR ELECTRICAL PLAN

NAME: DUC DINH COURSE: CONSTRUCTION STUDIES 2 TERM: JULY 2013 ASSIGNMENT NO.: 3

Raffles International College DATE: 4-09-2013 SCALE: 1:75

SHEET:

E-101


GENERAL NOTES The contractor to be responsible for: - Verifying all drawings, specifications,dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. - Submitting samples and shop drawings for review and approval by designer before commencing works. - Ensuring that all work is keeping with all international building codes. - All necessary repairs, patching and cleaning of site during and after completition of works. - Verifying existing site conditions prior to submissions of quotations. - Not starting the construction unless these drawings are signed approved. - All work specified on all drawings and specifications and supplying all necessary materials and labour required to complete all phases of work in accordance with the designer's standards. - All dimensions are in millimeter.

SPECIFIC NOTES :

NO.

A B

A B

DATE:

REVISIONS:

DETAIL NO. SHEET NO.

ASSIGNMENT TITLE:

MEP SET

DRAWING TITLE:

FIRST FLOOR ELECTRICAL PLAN

NAME: DUC DINH COURSE: CONSTRUCTION STUDIES 2 TERM: JULY 2013 ASSIGNMENT NO.: 3

Raffles International College DATE: 4-09-2013 SCALE: 1:75

SHEET:

E-102


GENERAL NOTES The contractor to be responsible for: - Verifying all drawings, specifications,dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. - Submitting samples and shop drawings for review and approval by designer before commencing works. - Ensuring that all work is keeping with all international building codes. - All necessary repairs, patching and cleaning of site during and after completition of works. - Verifying existing site conditions prior to submissions of quotations. - Not starting the construction unless these drawings are signed approved. - All work specified on all drawings and specifications and supplying all necessary materials and labour required to complete all phases of work in accordance with the designer's standards. - All dimensions are in millimeter.

SPECIFIC NOTES :

NO.

A B

A B

DATE:

REVISIONS:

DETAIL NO. SHEET NO.

ASSIGNMENT TITLE:

MEP SET

DRAWING TITLE:

SECOND FLOOR ELECTRICAL PLAN

NAME: DUC DINH COURSE: CONSTRUCTION STUDIES 2 TERM: JULY 2013 ASSIGNMENT NO.: 3

Raffles International College DATE: 4-09-2013 SCALE: 1:75

SHEET:

E-103


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.