JE Dunn Advanced Industries Qualifications

Page 1


ADVANCED INDUSTRIES

100 YEARS OF PARTNERSHIP

As the 7th largest domestic general building contractor in the U.S., with offices in 26 locations, JE Dunn Construction is dedicated to being an indispensable business partner. We start by understanding our clients’ purpose, goals, and customers, and then deliver transformational solutions with guaranteed results.

Our commitment to clients and their building goals is unwavering, guided by our family and employee-owned philosophy.

At JE Dunn, our purpose is to enrich lives through inspired people and places.

Manufacturing facilities are key assets in supply chains, often transforming communities with job creation. JE Dunn collaborates closely with these clients to meet aggressive schedules, provide flexible spaces, and integrate complex automation systems. These project types include consumer goods, automotive/EV battery, warehousing/logistics, and food & beverage.

500+

ENGINEERING NEWS-RECORD (ENR) RANKINGS

5

18 INDUSTRIAL & MANUFACTURING

Industrial & Manufacturing

MANUFACTURINGELECTRONIC ASSEMBLY

9

MANUFACTURINGSEMICONDUCTORS

Industrial & Manufacturing Projects $10B

Total Project Value

ADVANCED INDUSTRIES

JE Dunn is one of the leading construction companies in the semiconductor industry. We work in some of the most complex facilities providing certainty of results while maintaining transparency through all aspects of a project. We align the client’s vision through our preconstruction expertise, world-class safety program, and proactive employees to provide our partners with an unmatched experience on their projects.

200+

Semiconductor & Microelectronics Projects

$ 5B

Semiconductor & Microelectronics Projects

Total Project Value

MANUFACTURING

9

DOMESTIC GENERAL BUILDING

9

CONSTRUCTION MANAGER-AT-RISK

EXPERIENCE & CAPABILITIES

NATIONAL FOOTPRINT

26 offices coast-to-coast

10 logistics facilities

3 prefabrication manufacturing facilities

MULTI-YEAR WORK PROGRAM EXPERIENCE

With multiple sophisticated Fortune 100 clients

END-TO-END PARTNERS

From initial site study and selection to conceptual programming, construction, installation, and beyond, we are committed to supporting you throughout the entire project life cycle.

INTEGRATED DESIGN SERVICES

In-house architecture and design management to enhance speed to market and certainty of outcome.

OFF-SITE MANUFACTURING CAPABILITIES

Schedule savings and improved quality

DIRECT PROCUREMENT

Ensures no scope gaps and fewer layers of markups

SCAN TO LEARN MORE ABOUT JE DUNN’S INDUSTRIAL & MANUFACTURING TEAM

INNOVATION

LENS: ESTIMATING SOFTWARE

JE Dunn’s conceptual estimating program providing you an earlier and more accurate view of your project while delivering continuous cost certainty

APTITUDE

JE Dunn’s smart building solutions platform providing customized low voltage solutions

SELF-PERFORM

Increased value, quality, schedule and skilled labor availability

IN-HOUSE ENGINEERING SERVICES

Equipment and constructability reviews for a smoother process and onsite troubleshooting skills

DESIGN-BUILD INTEGRATOR

In-house liaison between design and construction team providing a united partnership to the Owner

CLIENT TESTIMONY

“What really set JE Dunn apart for me was the genuine bonding of relationships and true concern for success. They’re an organization that really cares about what they’re doing and the relationships that they form.”

WHERE DO WE FIT? EVERYWHERE.

Pinpoint where your project is on the road map. How can we help?

Cost and Schedule

Options

Modeling

Location/ Site Analysis

Space Planning

Plan Stage-gatesFunding

Master Planning

Design EvaluationPartner

Value Proposition Canvas

Cost & Schedule Alignment

Facility Programming Permitting Plan

Value-Added

Options

Modeling (i.e. Sustainability)

Team Selection & Alignment

Basis of Design

Facility Design

Early Studies Trade Partner Selection Vendor PreQualification

Constructibility Reviews

Target Value Delivery (TVD)

Trade Partner Engagement

Pre-Fabrication

Procurement/Buyout

BIM/VDC/Digital Delivery/Autodesk Build

Early Design and Procurement Packages Labor Negotiations & Subcontract Agreements

Construction Pull-Planning

Construction Plans and Specifications

Bid Documents and Evaluation

Tracking & Expediting

Pre-Install Meetings

Site-Specific Training

Submittals

Change

Management

Equipment FATs Support

Quality

Assurance

Safety Management

Equipment

Startup

Control

Systems Startup Testing & Balancing

Operator Training Warranties

Facility

Acceptance Testing

Operations and Maintenance

Enhanced Turnover Package

Closeout

Documentation

Regulatory Documentation

Lessons Learned

Benchmark for the Future

PREFABRICATION, MODULARIZATION & OFFSITE MANUFACTURING (OSM)

Maintaining the integrity of design and maximizing constructability is always at the forefront of our process when evaluating prefabrication opportunities. JE Dunn’s approach to prefabrication integration works to collaboratively optimize the design, maximize schedule, enhance safety, and effectively utilize resources. This approach works well within a high performing team structure with aligned goals and clear lines of communication.

PREFABRICATION/MODULARIZATION

Internal Project Timeline for Early Project Delivery

& OFFSITE MANUFACTURING (OSM)

ENGAGE US HERE

PRECONSTRUCTION

develop prefab / osm plan

Develop a project-specific plan for RFP for early vendors and trades

Identify design efficiencies for optimization of prefab/modularization and OSM

PROJECT DEFINITION

execution alignment

Establish vision & alignment of project needs

Include prefab/modularization and OSM strategies for consideration during early feasibility and concept phases

DESIGN-ASSIST

early trades onboard

Award design-assist trade partners and vendors to start early prefab/ modularization & OSM planning and design

PLANNING & LOGISTICS

team collaboration

Right people in the right room making the right decisions for prefab/modularization & OSM utilization and coordination

Team is working together to design and coordinate to release for fabrication

CONSTRUCTION

fabrication & delivery

Components and packages are in fabrication and being expedited, and will begin installation for a final delivery Metric tracking is on-going

IN-HOUSE ENGINEERING

JE Dunn has maintained in-house MEP staff since the early 1990s. Our experience, knowledge and understanding of MEP systems has allowed us to better support over $3.5 billion of completed projects annually.

Our MEP group are not the engineers of record, but they are a key second set of eyes on these very important scopes of work. They support the development of the initial mechanical/electrical budgets, and as design progresses, they are involved in developing bid scopes and evaluations of mechanical/electrical trade partner bids. As the project moves into construction, they remain part of the project and provide field inspections on installed systems to confirm compliance with bid documents.

detailed mep process

In addition to the purchasing initiative and in order to make these efforts streamlined for JE Dunn, we’ve created a detailed MEP equipment vendor buyout process. This process is used predominately to eliminate schedule delays and provide competitive pricing for clients on large equipment purchases. In some cases, especially in this saturated market, this equipment may have 22-26 week lead time. Our team will get a minimum of three vendor quotes for each material type, when available.

global buying power

JE Dunn has a national purchasing initiative that includes a team of professional buyers and logisticians from coast to coast. This fully automated ordering platform allows us to obtain goods and services at the best price - saving millions of dollars for our clients annually. We have the in-house talent to provide a turn-key mission solution, including purchasing all of the major long lead equipment.

EARLY MEP ENGAGEMENT

The first step that we recommend on most of our projects is to engage our in-house MEP experts. Our process begins with the following key items:

• Identify Prefabrication opportunities.

• Value Management. Best components to fit the program.

• Procurement. Work with trade partners to drive down cost.

• Schedule Enhancements. Identify opportunities.

• Provide input on the best equipment and system type for the budget and the specific needs of the project.

• Constructability. Ensure the most cost-effective routing of services, while accounting for maintenance and performance.

• Assist in the evaluation and selection of the mechanical and electrical trade partners for the project.

• Assist in Right-Sizing MEP equipment and systems to ensure your money is invested appropriately for maximum value

• Review change orders for accuracy.

• Review pay applications to ensure our trade partners do not over-bill.

• Provide site inspections to verify proper installation. Faulty installations can result in premature failure, maintenance issues, and performance issues, all of which will result in increased cost over the life of the project.

WHY JE DUNN?

DELIVERY METHODS

We have executed large, complex advanced industrial and manufacturing projects in multiple delivery methods:

• Engineer-Procure-Construct

• Integrated Project Delivery

• Design Build

• Construction Manager at Risk

JE Dunn is among the largest contractors in the nation and one of the foremost builders in the advanced manufacturing space. We work with expert precision in and around these sensitive environments and are experienced with a variety of delivery methods.

We are committed to understanding our clients’ needs, priorities and sensitive focal points. JE Dunn specializes in seamless project delivery, and our broad range of expertise is driven by the objective to provide certainty of results.

It is our goal to partner throughout the entire project life cycle, from site study and selection support to conceptual programming through construction, installation and post-construction.

HOW WE’RE DIFFERENT

speed to market

At JE Dunn, we know that speed, quality, and flexibility for future growth are critical to project success. Once construction begins, we are strong believers that BIM and prefabrication will help gain budget and schedule efficiencies.

certainty of results

We take a fully integrated approach, focusing on early identification of goals, risks constraints, and challenges. Leveraging enhanced collaboration, lean construction practices and industry-leading technology and innovation allows our team to create an efficient project plan, leading to on time completion and delivery within budget.

Advanced manufacturing facilities contain complex MEP systems. Given that these systems represent a significant portion of the cost of these projects, JE Dunn’s in-house MEP team thoroughly evaluates initial cost, performance criteria and life cycle costs to ensure long-term value.

beginning with the end in mind

Our team offers customized approaches to requirements associated with both greenfield projects and expansions to operating plants. In operating facilities, we work collaboratively to develop a production safety plan, ensuring complete segregation of construction from process areas.

Throughout construction, we test and document, taking corrective action as needed. Proactive management creates a smooth testing and commissioning process.

APTITUDE: A STRATEGIC PARTNERSHIP

The Aptitude Advantage

The customizable, full-scope building connectivity solution developed to let owners, operators and occupants get more value out of their buildings.

Born from over a century of design-build and construction tech know-how, Aptitude: Intelligent Integration uses a one-of-akind, goal-oriented development process and the most powerful technology available to deliver the “big-picture view” of buildings. That means a completely connected built-environment, one made of a virtuous cycle of efficiencies and smart decisions for our clients and everyone using their spaces.

Complete Coordination

Aptitude coordinates and manages every part of the design and installation process, providing a single source of truth for the entire project. That means less upfront costs and significantly less chance of add- and change-risk, ensuring a better performing builtenvironment from day one.

Foundation of Function

Building Services & Systems Aptitude Connects

Safety and Security

Access Control

Closed Circuit TV

Fire Alarm

First Responder Radio

Infant Abduction

Intrusion Protection

Mass Notification

Nurse Call / Code Blue

Turnstiles / Barrier Gates

Engage & Interactive

Audio Visual

Client Experience

Digital Signage

Mobile Device Integration

Business Operations

Analytics

Asset Tracking

Connected Environments

Data Networks

Phone Systems

Wireless Network

Basic Building Functions

Building Automation

Equipment Rooms

Fiber Optic

Grounding & Bonding

Lighting Control

Outside Plant

Structured Cable

From power consumption, security, and occupant use, to historical records, performance metrics and system future-proofing, Aptitude uses as much information as possible to establish the methods, assets and goals needed to both enhance a building’s functions and support the business needs of everyone associated with it.

Integrated Improvements

With Intelligent Integration, building systems and services function to serve one another, and relationships, patterns and dependencies are revealed. That provides actionable information that can be used to increase operational efficiencies, reduce maintenance costs, and enhance the comfort and safety of a building’s occupants.

SAFETY AT JE DUNN

Safety is more than a process, procedure, and protocol for JE Dunn. It is part of the culture that we live, breathe, and keep at the forefront of our minds at all times. Our goal is to send everyone on our jobsites home to their families in the same shape they came to work. Our safety motto is EVERYONE. EVERYWHERE. ALL THE TIME.

JE Dunn has an excellent safety history. The National Council on Compensation Insurance rates general contractors yearly based on their claims cost from on-the-job inquiries. According to the N.C.C.I, the intrinsic industry average is 1.0 and the lower the modifier the better the safety record of the contractor.

Our safety plan will be in addition to and in excess of the applicable provisions of federal, state and municipal safety and health laws and building codes. Should any of these requirements conflict, the more stringent regulations will apply.

The safety culture of our company starts at the top and is supported and communicated throughout our company.

The Safety Director, the Project Manager, and the Project Superintendent are jointly responsible and accountable for your project safety

This accountability system continues through the senior management level

Safety results are measured for each division and Division Managers are responsible for the results

This team approach incorporates safety into the entire construction process.

We have developed a written safety program that meets or exceeds all federal, state, and local requirements.

Project safety meetings are held weekly and incorporate safety hand-outs and “toolbox safety training” pertinent to existing conditions.

We also provide continual, offsite safety training to include first aid, C.P.R., trenching safety, safe crane operation and so on.

All subcontractors are required to provide their own site specific, written safety program and are invited to attend all of our weekly safety meetings.

INDUSTRIAL & MANUFACTURING PROJECT EXPERIENCE

LG CHEM

MANUFACTURING PLANT PHASE I

Clarksville, Tennessee

Size: 1,150,000 SF

Total Investment Value: $3.2 B (Construction Cost Confidential)

Architect: Gresham Smith

Owner: LG Chem

Addition of 29,000 SF to the existing library, creating additional meeting rooms, classrooms and enclose the children’s room. The project also includes renovating the existing 27,000 SF library and expanding the parking lot.

GEORGIA-PACIFIC

FACILITY MODIFICATIONS (PROJECT COBBLER)

Darlington, South Carolina

Size:

81,270 SF

Cost:

$20.9 M

Architect: Randall-Paulson

Owner: Georgia-Pacific

After expanding the existing facility and adding production capacity, JE Dunn provided extensive upgrades within GeorgiaPacific’s existing Dixie Pressware manufacturing facility. JE Dunn renovated the north half of the facility to accommodate a longer, taller printer and a new in-floor conveyor system.

FACILITY EXPANSION (PROJECT PEACH)

Darlington, South Carolina

Size:

291,842 SF

Cost: $48.6 M

Architect: Randall-Paulson

Owner: Georgia-Pacific

A safe quality foods (SQF) certified expansion to an existing Dixie plate manufacturing facility. Through innovative phasing by JE Dunn, the facility remained operational throughout construction. Rather than constructing the large manufacturing addition first, we built the 88,000 SF new finished goods warehouse on the far end of the site. We coordinated the relocation and installation of existing converting equipment into the new manufacturing space in a staged fashion so that production could continue.

YKK AP

RESIDENTIAL WINDOW & DOOR MANUFACTURING FACILITY

Macon, Georgia

Size:

400,000 SF

Cost: $65 M

Architect: SSOE

Owner: YKK AP

This new residential window and door manufacturing facility will serve as an advanced, model plant for YKK’s AP’s North American operations. JE Dunn worked closely with SSOE on this highly collaborative project to deliver a 400,000 SF manufacturing facility, including office space, campus infrastructure, roads, parking, truck docks, and other site requirements.

GEORGIA-PACIFIC

NEW DIXIE

MANUFACTURING PLANT

Jackson, Tennessee

Size:

893,600 SF

Cost: $221 M

Architect: Randall-Paulson

Owner: Georgia-Pacific

JE Dunn is leading a design-build team to deliver a new greenfield plant for Georgia-Pacific’s Dixie brand. It is the first new, ground-up Dixie facility constructed since 1991. The new facility will increase production capacity, meeting increased consumer demand. This is a prototype facility for Georgia-Pacific and the front-end planning process on this project will be key to defining scope for future new facilities.

U.S. DEPARTMENT OF ENERGY

Kansas City, Missouri

Size: 1,572,278 SF

Cost: $540.6 M

Architect: HNTB, SSOE

Owner: CenterPoint Properties

The 1.5B SF, secure, campus houses large and microelectronic manufacturing spaces, laboratories, mission critical operations, offices and warehouse space for the Department of Energy. This is one of the most sophisticated data centers in the country

SOUTHEAST TOYOTA DISTRIBUTORS VEHICLE

FACILITY

PROCESSING

Commerce, Georgia

Size:

375,000 SF

Cost: $90.4 M

Architect: Nelson Worldwide

Owner: J.M. Family Enterprises

A new Vehicle Processing Center for the world’s largest independent distributor of Toyota vehicles. When vehicles arrive via train, they are stored on site. Twelve buildings across the 300-acre site allow for repairs, accessory installation, fueling and more. The new facility replaces an existing facility in close proximity, and JE Dunn was instrumental in the transition process.

SOUTHEAST TOYOTA DISTRIBUTORS

JAXPORT PROCESSING CENTER

Jacksonville, Florida

Size:

380,000 SF

Cost: $100 M

Architect: kasper architects + associates

Owner: Jacksonville Port Authority

In 2022, JAXPORT announced its $210 million agreement to relocate and modernize the Southeast Toyota Distributors’ existing vehicle processing operations from Talleyrand to Blount Island in Jacksonville, FL. The new JAXPORT Processing Center will consist of seven buildings totaling over 380,000 SF, including a fuel island, on over 88 acres of land.

GLOCK UNITED STATES MANUFACTURING FACILITIES

Smyrna, Georgia

JE Dunn has been onsite at Glock since 2009, constructing facilities totaling $100M. Our project experience includes:

• 5040 Building Manufacturing Renovation

• Building B Manufacturing Plant

• 5300 Glock Tactical Facility

• 6200 Glock Assemblies

TRIMET BUS MAINTENANCE FACILITY

Portland, Oregon

Size:

180,000 SF

Cost: $136 M

Architect: Stantec

Owner: TriMet

New bus maintenance facility with fuel and wash building installations on an existing and operating site. The 24/7 operational site required detailed logistics and coordination of shipments, movement of construction equipment, & parking of TriMet staff.

MANUFACTURING AND DISTRIBUTION PROJECTS

Olathe, Kansas

JE Dunn has constructed more than 25 projects for Garmin International over the years. Garmin is a leader in the technology industry and continues to create a need to expand their manufacturing facility at its headquarters in Olathe, Kansas.

• Manufacturing Addition and Remodel: 113,692 SF, threestory addition and remodel to the manufacturing facility

• Warehouse Expansion: expansion created an additional 230,368 SF of much needed space for storage and distribution

CONFIDENTIAL SEMICONDUCTOR

MANUFACTURING CLIENT

PROJECT ROADRUNNER

Hillsboro, Oregon

Size:

200,000 SF Cost: $524 M

Architect: Jacobs

Construction of (2) separate clean manufacturing spaces in (2) separate buildings on an active 500+ acre Campus. We were also responsible for (52) major supporting MEP systems. The majority of these systems required us to tie them into existing operating systems. The physical locations of each facility were surrounded by vibration and EMI-sensitive operating technology. Both facilities were built with zero impacts to the owner’s operations.

CONFIDENTIAL SEMICONDUCTOR MANUFACTURING CLIENT

Hillsboro, Oregon

Size: 69,000 SF (total)

Cost: $37.5 M

Architect: SSOE Group

65,000 SF retrofit of an existing Fab facility for a new technology process. Extensive mechanical and electrical support systems included chilled water, process and house vacuum, process gases, ultrapure water, waste systems, telecom, power, air systems, and general and corrosive exhaust. Additionally, 4,000 SF upgrade to an operating data center that provided IT support to the technology process.

CONFIDENTIAL SEMICONDUCTOR

MANUFACTURING CLIENT

FAB 8.1 BASEBUILD

Malta, New York

Size: 178 Acres

Cost: $200 M

Architect: Jacobs, M+W Group

Capacity upgrades to an existing operating semiconductor manufacturing facility. Base build work for the Fab 8.1 Scenario 19 ramp included upgrades to an existing PCW system, acid waste treatment systems, process mechanical (vacuum, chilled water, acid, exhaust, etc.), power capacity upgrades, clean room build outs, clean room lab build outs, and bulk gas systems.

CONFIDENTIAL SEMICONDUCTOR

MANUFACTURING CLIENT

Fort Collins, Colorado

Size: Various Cost: $215.3 M

Architect: Mazzetti+GBA

JE Dunn provided phased construction services to expand a confidential client’s advanced manufacturing production capacity. Projects have provided fast-track conversion of office space to clean room wafer manufacturing, central utility building, fan attic and warehouse, testing and office facility.

CONFIDENTIAL SEMICONDUCTOR

MANUFACTURING CLIENT

FACTORY CAPACITY AND RELIABILITY UPGRADES

Santa Clara, California

Size: 5,000 SF

Cost: $159 M

Architect: SSOE Group

This project consisted of capacity upgrades to existing clean manufacturing campus to support new manufacturing processes, replacement of aging equipment to increase reliability, seismic upgrades and other owner maintenance work to enhance the performance of the campus. The work included extensive mechanical and electrical system upgrades, including the installation of new make-up air handling units, new general and corrosive exhaust systems, RUPS Power system, boilers, cooling towers and chillers, and various waste systems to support the new manufacturing processes.

CONFIDENTIAL SEMICONDUCTOR TOOL

MANUFACTURING CLIENT

California & Oregon

Size: Varies

Cost: $201 M (total)

Architect: SSOE Group & HDR

JE Dunn has been awarded a Master Services Agreement with a global supplier of innovative wafer fabrication equipment, to provide facilities construction, project management and associated services for their ongoing needs in three of their facilities, two in the Bay Area and one in the Portland Area. Facilities projects include lab projects, infrastructure, facilities and site works, office space (tenant improvement), and tool installation.

CONFIDENTIAL SEMICONDUCTOR

CLIENT

Hillsboro, Oregon

Size: 50,000 SF Cost: $136 M Architect: SSOE Group

This project included a 50,000 SF elevated, multi-level link that connected three existing fab facilities together. These links provided an avenue for an extensive automated material handling system to carry product throughout the different fabs and reduce tool/equipment redundancy amongst them.

CONFIDENTIAL SEMICONDUCTOR MANUFACTURING CLIENT

Hillsboro, Oregon

Size: 100,000 SF Cost: $49 M

Architect: SSOE Group

This project consisted of capacity upgrades to an existing semiconductor fabrication campus to support new clean manufacturing processes. Work consisted of a conversion of an existing 100,000 SF clean room from 200 mm to 300 mm wafer fab with extensive mechanical and electrical system upgrades. Construction was performed in central utility buildings, sub-fab support levels and in the clean rooms.

CONFIDENTIAL SEMICONDUCTOR

MANUFACTURING CLIENT

FAB EXPANSION & CUP UPGRADES

Boise, Idaho

Size: 54,000 SF Cost: $202 M Architect: Page

Fabrication build out of Building 51, a 54,000 SF fully functional R&D manufacturing facility, and associated Central Plant Utility Building (CUP) 39. This project was completed with no interruptions to the production of this fully operational fab.