1
2
3
5
4
6
7
8
10
9
11
12 13 14
16
15
17
19
18
73271 1460
5320
7279 3800
20477
8799
5400
5300
9677
5400
13636
7698
12100
8800
A ENTRANCE TO MONK QUARTERS
5800
NOT ACCESSIBLE
ALTAR FOR FOUNDERS AND KAPITANS
STORAGE ROOM
8226
area 17 m2
FFL: 570
UP 200
ANCESTRAL WORSHIP HALL
area 26 m2
area 26.34 m2
FFL: 370
FFL: 370
UP 200
UP 100
B 2426
ALTAR FOR PAST RESIDENTIAL MONKS
ALTAR FOR GODDESS OF BIRTH, DA SHI YE, TIGER GODS
ANCESTRAL WORSHIP HALL
STONE GARDEN area 47.34 m2
FFL: 370
UP 200
area 26.34 m2
area 26.11 m2
FFL: 370
FFL: 370
UP 200
STORAGE ROOM
NOT ACCESSIBLE
area 16.98 m2
FFL: 570
STORAGE ROOM
UP 100 UP 50 UP 50
UP 100
FFL: 470
area 33.53 m2
FFL: 470 FFL: 170
FFL: 270
FFL: 170
FFL: 270
FFL: 170
FFL: 370
UP 100
UP 200
area 15.79 m2
C
area 15.74 m2
STAFF OFFICE
FFL: 370
UP 100
UP 100
D
7° 63.1
UP 200
MEETING ROOM 4315
area 64.83 m2
GODDESS MA CHOR ALTAR
GUAN GONG, GUAN PIN AND ZHOU CHANG ALTAR
GODDESS GUAN YIN ALTAR
FFL: 470
TUA PEK GONG ALTAR
E
MANAGER OFFICE area 21.25 m2
FFL: 470
F
4640
DA ZHONG YEH ALTAR
ALTAR FOR GODDESS AND PROSPERITY
ANCESTRAL WORSHIP HALL
CHER LAN ALTAR
area 83.28 m2
area 83.28 m2
FFL: 270
MAIN TEMPLE HALL
FFL: 270
area 1271.83 m2
UP 100
FFL: 270
G
3012
38093
20167
UP 50
H
SAINT BOON CHEONG ALTAR
FFL: 220
UP 100
ACCESSIBLE
UP 25
UP 25
I
NOT
UP 25
UP 25
3500
J K
TABLET ROOM
TABLET ROOM area 20.39 m2
FFL: 170
FFL: 270
area 20.39 m2
FFL: 170
FFL: 270
UP 100 UP 25 UP 25
L
UP 100
UP 50
UP 25 UP 25
ANNEXE GATE 4595
M
ANNEXE GATE PRAYER PAVILION
JOSS STICKS STALL area 27.43 m2
UP 170 DN 60
UP 100
5°
FFL: 120
UP 50
DN 100
UP 170
FFL: 170
DN 60
UP 270
area 88.11 m2
FFL: 170
UP 200
UP 200 DN 170
UP 100
DN 60 DN 60
N
UP 200
UP 50
TOILET area 82.2 m2
FFL: 0 UP 200
INCINERATION SITE
COURTYARD
area 101 m2
area 341.6 m2
13 °
DN 390
FFL: 390
9805
FFL: 120 0 150
GARDEN area 83.86 m2
STORAGE
UP 170
UP 50
UP 100
FFL: 170
O MAIN ENTRANCE
UP 120
SECONDARY ENTRANCE
N
SECONDARY ENTRANCE
GL: 0
PROJECT TITLE
TAYLOR’S UNIVERSITY Wisdom
• Integrity
• Excellence
ARC 60305 METHODS OF DOCUMENTATION & MEASURED DRAWINGS CHENG HOON TENG TEMPLE, JALAN TOKONG, KAMPUNG DUA ,75200 MELAKA.
DRAWING TITLE
TEMPLE COMPLEX GROUND FLOOR PLAN
DRAWING NO. Starting Date
21 January 2018
Date
01 March 2018
Scale
1:75
Drawn by
Poh Jia Jou
Checked by
Mr. Koh Jing Hao
Measured by
Group 1
SHEET NO.
02 CHT-002
ENTRANCE TO MONK QUARTERS
NOT ACCESSIBLE
ALTAR FOR FOUNDERS AND KAPITANS
STORAGE ROOM
ANCESTRAL WORSHIP HALL
ALTAR FOR GODDESS OF BIRTH, DA SHI YE, TIGER GODS
ANCESTRAL WORSHIP HALL
STONE GARDEN
STORAGE ROOM
UP 200 UP 200
UP 100
UP 200
UP 200
NOT ACCESSIBLE STORAGE ROOM
UP 100 UP 50 UP 50
UP 100
ALTAR FOR PAST RESIDENTIAL MONKS
STAFF OFFICE
UP 100 UP 200 UP 100
UP 100
UP 200
MEETING ROOM GODDESS MA CHOR ALTAR
DA ZHONG YEH ALTAR
GUAN GONG, GUAN PIN AND ZHOU CHANG ALTAR
GODDESS GUAN YIN ALTAR
TUA PEK GONG ALTAR
ALTAR FOR GODDESS AND PROSPERITY
ANCESTRAL WORSHIP HALL
MANAGER OFFICE
CHER LAN ALTAR
MAIN TEMPLE HALL UP 100 UP 50
SAINT BOON CHEONG ALTAR
UP 100
NOT ACCESSIBLE
UP 25
UP 25 UP 25
UP 25
TABLET ROOM
TABLET ROOM
UP 200
UP 100 UP 25 UP 25
UP 100
UP 50
UP 25 UP 25
ANNEXE GATE
ANNEXE GATE
UP 170 DN 60
UP 100
DN 60
PRAYER PAVILION
JOSS STICKS STALL
5°
UP 270
DN 100
UP 170
UP 50
UP 200 DN 170
UP 100
DN 60 DN 60
UP 200
UP 50
TOILET UP 200
INCINERATION SITE
COURTYARD
DN 390
0 150
STORAGE
UP 170
UP 50
UP 100
SECONDARY ENTRANCE
PROJECT TITLE
TAYLOR’S UNIVERSITY Wisdom
• Integrity
• Excellence
ARC 60305 METHODS OF DOCUMENTATION & MEASURED DRAWINGS CHENG HOON TENG TEMPLE, JALAN TOKONG, KAMPUNG DUA ,75200 MELAKA.
MAIN ENTRANCE
UP 120
SECONDARY ENTRANCE
N
GARDEN
13 °
DRAWING TITLE
TEMPLE COMPLEX GROUND FLOOR TILES PATTERN PLAN
DRAWING NO. Starting Date
21 January 2018
Date
01 March 2018
Scale
1:75
Drawn by
Poh Jia Jou
Checked by
Mr. Koh Jing Hao
Measured by
Group 1
SHEET NO.
03 CHT-003
1
2
3
5
4
6
7
8
10
9
1460
11
12 13 14
16
15
17
19
18
59711 17999
12100 18398
9677 5320
20477
Y1 Y2
13636
5300
Y3
Y5
Y6
A 27 ° FALL
27 ° FALL
27 ° FALL
27 ° FALL
27 ° FALL
27 ° FALL
27 ° FALL
27 ° FALL
5800
VOID
8200
27 ° FALL
27 ° FALL
27 ° FALL
27 ° FALL
27 ° FALL
27 ° FALL
27 ° FALL
27 ° FALL
VOID
VOID
VOID 20 ° FALL
20 ° FALL
Y4
X1 118 ° FALL
C
28.04 ° FALL
31 ° FALL
22 ° FALL
X1
20 ° FALL
20 ° FALL
22 ° FALL
31° FALL
2400
B
D
25.03 ° FALL
E
30 ° FALL
30 ° FALL
15493
X3
27.75 ° FALL
24.75 ° FALL
X2
24.75 ° FALL
27.75 ° FALL
11993
F
X2
30 ° FALL
X3
VOID
VOID
G H 30 ° FALL
30 ° FALL
38093
30 ° FALL
24.75 ° FALL
3500
K
24.75 ° FALL
27.75 ° FALL
J
27.75 ° FALL
I
L UP 170 UP 100
34 ° FALL
4595
26.27 ° FALL
26.27 ° FALL
35.29 ° FALL
15.84° FALL
M 26.27 ° FALL
5°
27 ° FALL
X4
X4
UP 170 UP 100
26.27 ° FALL
26.27 ° FALL
DN 100 DN 170
26.27 ° FALL
N 27 ° FALL
Y4
9805
14400
X5
X5
15.84 ° FALL
0 150
UP 170 UP 100
20 ° FALL
20 ° FALL
27 ° FALL
27 ° FALL
27 ° FALL
O
Y1 Y2
PROJECT TITLE
TAYLOR’S UNIVERSITY Wisdom
• Integrity
• Excellence
ARC 60305 METHODS OF DOCUMENTATION & MEASURED DRAWINGS CHENG HOON TENG TEMPLE, JALAN TOKONG, KAMPUNG DUA ,75200 MELAKA.
Y3
N
20 ° FALL
Y5
Y6
DRAWING TITLE
TEMPLE COMPLEX ROOF PLAN
DRAWING NO. Starting Date
21 January 2018
Date
01 March 2018
Scale
1:75
Drawn by
Poh Jia Jou
Checked by
Mr. Koh Jing Hao
Measured by
Group 1
SHEET NO.
04 CHT-004
1
2
3
5
4
6
7
8
10
9
11
12 13 14
16
15
17
19
18
73271 1460
7279
5320
3800
8799
20477 5400
9677
5300 5400
13636
7698
12100
8800
A
5800
NOT ACCESSIBLE
ENTRANCE TO MONK QUARTERS
8226
STORAGE ROOM
ALTAR FOR FOUNDERS AND KAPITANS
ANCESTRAL WORSHIP HALL
STONE GARDEN VOID
ANCESTRAL WORSHIP HALL
ALTAR FOR GODDESS OF BIRTH, DA SHI YE, TIGER GODS
STORAGE ROOM
NOT ACCESIBLE
STORAGE ROOM STAFF OFFICE
B 2426
ALTAR FOR PAST RESIDENTIAL MONKS
C
VOID
VOID
D 4315
MEETING ROOM GODDESS MA CHOR ALTAR
GODDESS GUAN YIN ALTAR
TUA PEK GONG ALTAR
GUAN GONG, GUAN PIN AND ZHOU CHANG ALTAR
E
MANAGER OFFICE
F
4640
DA ZHONG YEH ALTAR
ANCESTRAL WORSHIP HALL
ALTAR FOR GODDESS AND PROSPERITY VOID
MAIN TEMPLE HALL
CHER LAN ALTAR
VOID
SAINT BOON CHEONG ALTAR
3012
38093
H
20167
G
I J 3500
TABLET ROOM
K
TABLET ROOM
L ANNEXE GATE
ANNEXE GATE
4595
M PRAYER PAVILION
JOSS STICKS STALL
N TOILET
INCINERATION SITE 9805
COURTYARD GARDEN
STORAGE
O
N
SECONDARY ENTRANCE
SECONDARY ENTRANCE MAIN ENTRANCE
PROJECT TITLE
TAYLOR’S UNIVERSITY Wisdom
• Integrity
• Excellence
ARC 60305 METHODS OF DOCUMENTATION & MEASURED DRAWINGS CHENG HOON TENG TEMPLE, JALAN TOKONG, KAMPUNG DUA ,75200 MELAKA.
DRAWING TITLE
CHENG HOON TENG TEMPLE COMPLEX REFLECTED CEILING PLAN
DRAWING NO. Starting Date
08 January 2018
Date
01 March 2018
Scale
1:75
Drawn by
Luther Chong
Checked by
MR. KOH JING HAO
Measured by
Group 1
SHEET NO.
05 CHT-005
22
MAIN RIDGE
UN
CURVED RIDGE
PAITOU
YAN-WEI-CHI
MAIN RIDGE
UN
CRESCENT TIE BEAM
CURVED RIDGE RAFTERS OF 90MM WIDTH AND 90MM SPACING
SHORT POST PAITOU
TIE BEAM
YAN-WEI-CHI PURLINS OF RADIUS 93MM
TAILIANG ROOF TRUS SYSTEM (SAN TONG WU KUAH FORM)
CRESCENT TIE BEAM TIMBER COLUMN
RAFTERS OF 90MM WIDTH 'HUO' GABLE END AND 90MM SPACING
COLUMN BASE SHORT POST
FENG HUO WALL TIE BEAM PURLINS OF RADIUS 93MM
TAILIANG ROOF TRUS SYSTEM (SAN TONG WU KUAH FORM)
PILASTER (FU PI CHIA)
ISOMETRIC OF SIDE AUXILIARY BUILDING
TIMBER COLUMN
'HUO' GABLE END
COLUMN BASE
SCALE 1 : 40
PROJECT TITLE
DRAWING TITLE
FENG HUO WALL
TAYLOR’S UNIVERSITY •
•
ARC 60305 METHODS OF DOCUMENTATION & MEASURED DRAWINGS CHENG HOON TENG TEMPLE, JALAN TOKONG, KAMPUNG DUA ,75200 MELAKA.
PILASTER (FU PI CHIA)
ROOF DETAILS OF SIDE AUXILIARY BUILDING
DRAWING NO. Starting Date
21 January 2018
Date
01 March 2018
Scale
1 : 40
Drawn by
Chee Jia Xin
Checked by
MR KOH JING HAO
Measured by
Group 1
CHT- 020
SHEET NO.
20 22
M
L
J
K
I
H
G
D
E
F
C
A
B
38096
9083
1968
1951
1399
1266
1509
3208
5959
2640
896
2400
5801
3215
MAIN TEMPLE
30°
30°
BACK AUXILIARY BUILDING
11454
2680
AUXILIARY BUILDING
30°
30° 27°
20°
27°
27°
5558
20°
6 OD
7 OD GROUND LEVEL
COVERED SPACE
MAIN ENTRANCE
PROJECT TITLE
TAYLOR’S UNIVERSITY Wisdom
• Integrity
• Excellence
ARC 60305 METHODS OF DOCUMENTATION & MEASURED DRAWINGS CHENG HOON TENG TEMPLE, JALAN TOKONG, KAMPUNG DUA ,75200 MELAKA.
COURTYARD
OUTER PRAYER PAVILION
OUTER FOYER
EXTERNAL FOYER
INTERNAL LOBBY
MAIN INNER HALL
REAR DEITIES BAY
MAIN TEMPLE HALL
STONE GARDEN
DRAWING TITLE
SECTION Y3
DRAWING NO. Starting Date
21 January 2018
Date
01 March 2018
Scale
1:50
Drawn by
Jia Jou, Jia Min
Checked by
Mrr. Koh Jing Hao
Measured by
Group 1
SHEET NO.
07 CHT-007
22
A
C
B
D
E
G H
F
I
J
K
L
M
N
38088 5795
3651
12950
5887
ANCESTRAL WORSHIP HALL
OFFICE
ANCESTRAL WORSHIP HALL
ANCESTRAL WORSHIP HALL
9805
5014
MAIN TEMPLE ROOF
5559
10573
BACK AUXILARY BUILDING ROOF
GROUND LEVEL
A
C
B
D
E
G H
F
5795
3651
10738
ALTAR FOR GODDESS OF BIRTH AND TIGER GODS
PRAYER PAVILION
ALTAR FOR GODDESS AND PROSPERITY
I 38088
J
K
L
M
O
N
3504
14400
TABLET HALL
INCINERATION SITE AND BATHROOM
5559
BACK AUXILIARY BUILDING ROOF
11457
5898
MAIN TEMPLE ROOF
GROUND LEVEL
SECTION Y4 ,Y5 SCALE 1 : 75
PROJECT TITLE
TAYLOR’S UNIVERSITY Wisdom
• Integrity
• Excellence
ARC 60305 METHODS OF DOCUMENTATION & MEASURED DRAWINGS CHENG HOON TENG TEMPLE, JALAN TOKONG, KAMPUNG DUA ,75200 MELAKA.
DRAWING TITLE
SECTIONS Y4 , Y5
DRAWING NO. Starting Date
21 January 2018
Date
01 March 2018
Scale
1 : 75
Drawn by
Darren Tan
Checked by
Mr Koh Jing Hao
Measured by
Group 1
SHEET NO.
08 CHT-008
22
6
7
8
9
5802
10
11
6816
12
13
7
6
5802
MAIN TEMPLE HALL ROOF RIDGE
7180
MAIN TRANSVERSE BEAM
4277
GROUND LEVEL
FRONT ELEVATION
13
12
11
10
9
8
18420
MAIN TEMPLE HALL ROOF RIDGE
7180
MAIN TRANSVERSE BEAM
4277
4277
GROUND LEVEL
BACK ELEVATION
PROJECT TITLE
TAYLOR’S UNIVERSITY Wisdom
• Integrity
• Excellence
ARC 60305 METHODS OF DOCUMENTATION & MEASURED DRAWINGS CHENG HOON TENG TEMPLE, JALAN TOKONG, KAMPUNG DUA ,75200 MELAKA.
DRAWING TITLE
MAIN TEMPLE COMPLEX FRONT AND BACK ELEVATION
DRAWING NO. Starting Date
21 January 2018
Date
01 March 2018
Scale
1 : 50
Drawn by
Chong Yit JIa, Goh Jyia Whey,
Checked by
Mr. Koh Jing Hao
Measured by
Group 1
SHEET NO.
11 CHT-011
6
10
9
7
12 13
19091 326
5787
6816
5801
362
2312
D
GODDESS MA CHOR ALTAR
GUAN GONG, GUAN PIN AND ZHOU CHANG ALTAR
GODDESS GUAN YIN ALTAR
6054
E
14581
MAIN TEMPLE HALL
UP 50
3119
19896
H
UP 25
UP 25
UP 25
UP 25
1479
J
1292
K UP 50
1400
L
PRAYER PAVILION
3216
4616
M
N
UP 50
N MAIN TEMPLE COMPLEX FLOOR PLAN SCALE 1 : 50
PROJECT TITLE
TAYLOR’S UNIVERSITY Wisdom • Integrity • Excellence
ARC 60305 METHODS OF DOCUMENTATION & MEASURED DRAWINGS CHENG HOON TENG TEMPLE, JALAN TOKONG, KAMPUNG DUA ,75200 MELAKA.
DRAWING TITLE
MAIN TEMPLE COMPLEX FLOOR PLAN
DRAWING NO. Starting Date
21January 2018
Date
01 March 2018
Scale
1 : 50
Drawn by
Poh Jia Jou
Checked by
Mr Koh Jing Hao
Measured by
Group 1
SHEET NO.
12 CHT-012
22
L
M
N
H
J
K
4616
D
E
14581
3216
1400
1265
1506
3119
6054
2637
2800
MAIN TEMPLE ROOF
PORCELAIN ROOF TILES
PRAYER PAVILION ROOF CRESCENT TIEBEAM
LATTICE HOLLOWS
CHOI TUO 'TURTLE HUMP' ROOF
11457
4379
TUO BASE
CHAH CHIO
MAIN TRANSVERSE BEAM
CHEAN FEN TUO SHORT POST 'KUAH TOH' BRACKET
TUO KUNG 'BA CHE' TIE BEAM
LANTURN BEAM MAIN TRANSVERSE BEAM
4277
DECORATIVE BRACKET
GROUND FLOOR LEVEL
COVERED SPACE
6
EXTERNAL FOYER
OUTER FOYER
INTERNAL LOBBY
9
7
MAIN INNER HALL
REAR DEITIES BAY
12
10
13
19132 338
5817
6815
5815
347
7179
Main Temple Roof
4 OD
11456
3 OD
MAIN TRANSVERSE BEAM
4277
2 OD
5 OD
GROUND LEVEL
PROJECT TITLE
TAYLOR’S UNIVERSITY Wisdom
• Integrity
• Excellence
ARC 60305 METHODS OF DOCUMENTATION & MEASURED DRAWINGS CHENG HOON TENG TEMPLE, JALAN TOKONG, KAMPUNG DUA ,75200 MELAKA.
DRAWING TITLE
SECTION Y3, X5
DRAWING NO. Starting Date
21 January 2018
Date
01 March 2018
Scale
1:50
Drawn by
Yu Jia, Jia Xin
Checked by
Mr. Koh Jing Hao
Measured by
Group 1
SHEET NO.
13 CHT-013
22
YAN-WEI-CHI ROOF RIDGE
PAI TOU / CURVED RIDGE 325
WA DANG / EAVE TILES
YING SHAN ROOF STYLE
1000
2600
1000
FLOOR PLAN OF MAIN ENTRANCE
RAFTERS CHIEN NIEN DECORATIVE ELEMENTS
TIMBER VENTILATION WINDOWS WITH 'CHI HU' CARVINGS FINSIHED WITH 'TACHI' / BLACK ORGANIC STAIN
DOU GONG
TIMBER COLUMN
CHIEN NIEN DECORATIVE CARVING
GONG SHI / LION STATUE (FEMALE)
GONG SHI / LION STATUE (MALE)
GRANTE CCOLUMN BASE ELEVATED GRANITE SLAB
TIMBER DOOR WITH GOLD GLIDING FINISH GUARDED BY 'THE EIGHT IMMORTALS
AXONOMETRIC VIEW OF MAIN GATE
PROJECT TITLE
TAYLOR’S UNIVERSITY Wisdom
• Integrity
• Excellence
ARC 60305 METHODS OF DOCUMENTATION & MEASURED DRAWINGS CHENG HOON TENG TEMPLE, JALAN TOKONG, KAMPUNG DUA ,75200 MELAKA.
DRAWING TITLE
DETAILS OF MAIN ENTRANCE GATE
DRAWING NO. Starting Date
21 JANUARY 2018
Date
01 MARCH 2018
Scale
1 : 25
Drawn by
LIM ZHAO YIN
Checked by
MR KOH JING HAO
Measured by
GROUP 1
SHEET NO.
14 CHT-014
22
9
7
5810
10
6770
12
5810
J
K
FLOOR PLAN OF MAIN TEMPLE COMPLEX PARTITION SCALE 1 : 50
1565
MAIN TEMPLE HALL ENTRANCE FACADE
1298
ENTRANCE PLAGUE HEIGHT
3564
MAIN TEMPLE HALL ENTRANCE
GROUND LEVEL
FRONT ELEVATION OF MAIN TEMPLE COMPLEX PARTITION
AXONOMETRIC VIEW OF MAIN TEMPLE COMPLEX PARTITION
SCALE 1 : 50
SCALE 1 : 50
PROJECT TITLE
TAYLOR’S UNIVERSITY Wisdom
• Integrity
• Excellence
ARC 60305 METHODS OF DOCUMENTATION & MEASURED DRAWINGS CHENG HOON TENG TEMPLE, JALAN TOKONG, KAMPUNG DUA ,75200 MELAKA.
DRAWING TITLE
DETAILS OF MAIN TEMPLE COMPLEX PARTITION
DRAWING NO. Starting Date
21 February 2018
Date
01 March 2018
Scale
1 : 50
Drawn by
Lim Zhao Yin
Checked by
Mr Koh Jing Hao
Measured by
Group 1
SHEET NO.
15 CHT-015
22
Dou Gong
Crescent Tiebeam
Lattice hollows
TOP VIEW 1:10 Tuo Base
Column
ISOMETRIC VIEW 1:15
ELEVATION VIEW 1:20 PROJECT TITLE
TAYLOR’S UNIVERSITY Wisdom
• Integrity
• Excellence
ARC 60305 METHODS OF DOCUMENTATION & MEASURED DRAWINGS CHENG HOON TENG TEMPLE, JALAN TOKONG, KAMPUNG DUA ,75200 MELAKA.
DRAWING TITLE
DETAILS DRAWING OF CHUAN DOU STRUCTURE IN MAIN TEMPLE HALL
DRAWING NO. Starting Date
21 January 2018
Date
01 March 2018
Scale
AS SHOWN
Drawn by
Goh Jyia Whey, Tan Yang
Checked by
Mr. Koh Jing Hao
Measured by
Group 1
SHEET NO.
16 CHT-016
22
8691 8618.8886
1024
499.9007
1024.2411
900 900.0000
1035 1035.0000
975
995 995.0000
985
976
975.0000
975.8397
976.8760
999 1005.9905
230 230
500
x 230 230.0000
REAR PURLIN R 113 226.4101
226
DETAIL
R 93
1045
TIE BEAM
SECOND BEAM 670.0000
ISOMETRIC OF CHUAN DOU TIMBER STRUCTURE IN MAIN TEMPLE HALL
230
230.0000
670
THIRD BEAM
124.6843
MAIN TRANSVERSE BEAM
230.0000
SCALE 1:25
228 124
585.2913
712
230
LANTERN BEAM
DECORATIVE BRACKET
750.4336
750.4061
225.4061
225 225.0000
3985
225.0000
750
225
750
225
30°
R 113
R 93
R 93
360
30°
360.1598
231.5420
230.0000
x 305.4838
230
370.9790
305
GROUND LEVEL
370
232
SECTION X OF TIMBER STRUCTURE IN MAIN TEMPLE HALL
SECTION Y OF TIMBER STRUCTURE IN MAIN TEMPLE HALL
SCALE 1:25
SCALE 1:25
DETAIL OF CHUAN DOU STRUCTURE SCALE 1:15
PROJECT TITLE
TAYLOR’S UNIVERSITY Wisdom • Integrity • Excellence
ARC 60305 METHODS OF DOCUMENTATION & MEASURED DRAWINGS CHENG HOON TENG TEMPLE, JALAN TOKONG, KAMPUNG DUA ,75200 MELAKA.
DRAWING TITLE
DETAILS DRAWING OF CHUAN DOU STRUCTURE IN MAIN TEMPLE HALL
DRAWING NO. Starting Date
21 JANUARY 2018
Date
01 MARCH 2018
Scale
AS SHOWN
Drawn by
Lee Shi Yin
Checked by
Mr Koh Jing Hao
Measured by
Group 1
SHEET NO.
17 CHT-017
22
DETAIL NUMBER
01
DETAIL NUMBER
02
DETAIL NUMBER
03
DETAIL NUMBER
04
SCALE
1 : 10
SCALE
1 : 10
SCALE
1:5
SCALE
1:3
DESCRIPTION
INVERTED BELL SHAPE CHIEN NIEN ON GABLE WALL
DESCRIPTION
SCENERY CHIEN NIEN ON THE WALL
DESCRIPTION
WARRIORS CHIEN NIEN FIGURENES ON COPING
DESCRIPTION
GODS ON LION CHIEN NIEN FIGURENES ON COPING
DETAIL NUMBER
05
DETAIL NUMBER
06
DETAIL NUMBER
07
DETAIL NUMBER
08
SCALE
1 : 10
SCALE
1:3
SCALE
1:2
SCALE
1:2
DESCRIPTION
EIGHT IMMORTALS GOLD GILDING ON DOOR
DESCRIPTION
DRAGON PLASTERING ON WALL PANEL
DESCRIPTION
BIRD PLASTERING ON WALL PANEL
DESCRIPTION
GOLD GILDING DEPICTING THE STORY BIRTH OF BUDDHA
PROJECT TITLE
TAYLOR’S UNIVERSITY Wisdom
• Integrity
• Excellence
ARC 60305 METHODS OF DOCUMENTATION & MEASURED DRAWINGS CHENG HOON TENG TEMPLE, JALAN TOKONG, KAMPUNG DUA ,75200 MELAKA.
DRAWING TITLE
ORNAMENT DETAIL DRAWING IN MAIN TEMPLE HALL
DRAWING NO. Starting Date
21 January 2018
Date
01 March 2018
Scale
As shown
Drawn by
Jyia Whey, Jia min
Checked by
Mr. Koh Jing Hao
Measured by
Group 1
SHEET NO.
18 CHT-018
22
AN ZI JI (HORSE SADDLE) ROOF RIDGE
CUSTOM MADE EAVES TILES ( WA DANG) WITH 120MM HEIGHT AND 240MM WIDTH
DOWN TURNED UNGLAZED TERRACOTTA TILES (BAN WA TILES) LIME MORTAR GROUT TO HOLD THE TILES TOGETHER UP TURNED UNGLAZED TERRACOTTA TILES BATTEN WITH 20MM THICKNESS
RAFTER OF 90MM WIDTH AND 90MM SPACING
RAFTER OF 90MM WIDTH AND 90MM SPACING MAIN PURLIN WITH 130MM RADIUS
SECONDARY PURLIN WITH 93MM RADIUS
WOODEN BEAM JIN (GOLD ELEMENT) GABLE END
ISOMETRIC OF BACK AUXILIARY BUILDING SCALE 1 : 35
PROJECT TITLE
TAYLOR’S UNIVERSITY Wisdom
• Integrity
• Excellence
ARC 60305 METHODS OF DOCUMENTATION & MEASURED DRAWINGS CHENG HOON TENG TEMPLE, JALAN TOKONG, KAMPUNG DUA ,75200 MELAKA.
DRAWING TITLE
ROOF DETAILS DRAWING OF BACK AUXILIARY BUILDING
DRAWING NO. Starting Date
21 January 2018
Date
01 March 2018
Scale
1 : 35
Drawn by
Lee Shi Yin
Checked by
Mr Koh Jing Hao
Measured by
Group 1
SHEET NO.
19 CHT-019
22
MAIN RIDGE
UN
CURVED RIDGE
PAITOU
YAN-WEI-CHI
CRESCENT TIE BEAM RAFTERS OF 90MM WIDTH AND 90MM SPACING SHORT POST
TIE BEAM PURLINS OF RADIUS 93MM
TAILIANG ROOF TRUS SYSTEM (SAN TONG WU KUAH FORM)
TIMBER COLUMN 'HUO' GABLE END COLUMN BASE
FENG HUO WALL
PILASTER (FU PI CHIA)
ISOMETRIC OF SIDE AUXILIARY BUILDING SCALE 1 : 40
PROJECT TITLE
TAYLOR’S UNIVERSITY Wisdom
• Integrity
• Excellence
ARC 60305 METHODS OF DOCUMENTATION & MEASURED DRAWINGS CHENG HOON TENG TEMPLE, JALAN TOKONG, KAMPUNG DUA ,75200 MELAKA.
DRAWING TITLE
ROOF DETAILS OF SIDE AUXILIARY BUILDING
DRAWING NO. Starting Date
21 January 2018
Date
01 March 2018
Scale
1 : 40
Drawn by
Chee Jia Xin
Checked by
Mr Koh Jing Hao
Measured by
Group 1
CHT- 020
SHEET NO.
20 22