Earth Brick With all the talk on prefabrication in the building industry I started to think about how we could incorporate this approach into our own natural buildings. Masonry block technology must be one of the earliest forms of prefabrication and it was such a great concept it is still very prevalent today. Light earth can be formed into pre-made masonry bricks, reducing the drying time compared to walls formed insitu. It has other advantages as well. It allows the cladding and joinery to be installed first which means the building can be ‘closed in’ before the earthen work begins.
DIAGRAM - ABOVE:
01 - Highly vapour permeable building warp air barrier 02 - Drained and vented cavity 03 - Rainscreen cladding 04 - Subfloor cladding 05 - Subfloor ventilation 06 - Finished clay plaster 07 - 70 mm light earth masonry 08 - Timber bracing, infill with cob 09 - 140 mm light earth masonry between studs 10 - Suspended timber floor 11 - Pier foundations
22
EARTH BUILDING MAGAZINE
|
www.earthbuilding.org.nz
Typical light earth walls, 300 mm thick have to dry both ways i.e. to the inside and to the outside. This means that cladding cannot be installed until the light earth is fully dry and a 10 mm clay plaster is applied to the outside face of the wall (as the air barrier). This will take months and will slow down the building schedule. During this time the walls must be protected from wet weather with tarps. If the building can be ‘closed in’ first, the owners could lay the light earth masonry and apply the internal clay plaster themselves without having to worry about the weather. This would save costs and allow them to focus on the fun, earth building elements of the build. If they were not comfortable framing the house themselves and the light earth bricks were made to suit conventional light timber framing, they could contract the frame and shell construction out to a conventional house builder. To achieve high performing walls, the external light timber frame could be composed of 140 mm thick stud work without nogs or dwangs. An infill layer of light earth bricks could be laid between these studs set into 20 mm rough clay mortar.