1:20 detail
The ‘quiet space’ facade build up 1. 175mm CLT structural wall panel
U-Values:
14
2. VCL 3. 220mm Wood fibre insulation
Roof: 0.14W/m^2K
4. Aluminium lintel 5. Aluminium frame, top hung
1
Pilkington K Double glazed window
2
with low-e coating
3
6. DPM
Wall: 0.17W/m^2K Floor: 0.13W/m^2K
4
7. 25x50mm Treated timber battens
5
8. Corten steel panel cladding with 100mm recessed fixings 9. Jakob vertical green facade rope system attached via the cladding recesses. Fixings placed at 1000mm vertical centres
6
10. Primary Glulam beam, spanning
7
from Load-bearing CLT external wall to
8
interior Glulam column
9
11. CLT floor panel secondary structure - spanning across Glulam beams
10
12. Raised planter to provide views
11
and grounding for Jakob rope system, raised to allow ventilation behind cladding 13. Concrete raft foundation with external insulation to allow continuity
12
of insulation. Concrete up-stand raises the CLT from ground level (min 150mm)
13
14. Parapet with aluminium coping to protect the internal wall build up, whilst allowing for insulation continuity Primary structure
Secondary structure Insulation
Weather skin Glazing system Other
0m
0.5m
1m
1.5m
2m
2.5m
3m
Windows: 1.2W/m^2K