Álvaro Siza TERRAÇOS DE BRAGANÇA LISBOA - Portugal
ÁLVARO SIZA
siza@mail.telepac.pt COORDINATING ARCHITECTS CONTRACTOR COLLABORATING ARCHITECTS
PHOTOGRAPHY
1st phase: Clemente Menéres 2nd phase: Miguel Nery Ferrovial - Agromán, S.A. Ashton Richards Francesca Montalto Claúdia Vogel Cristina Ferreirinha Vitor Oliveira Michele Gigante Maria Moita Mitsunori Nakamura Atsushi Ueno Tomoko Kawai Jose Rodrigues
COLLABORATORS Project Management Structure Electrical Installation Mechanical, Plumbing, Drainage and Gas Landscape architecture Client
STA - Segadães Tavares Associados, Lda. António Segadães Tavares António Vieira Pereira Carlos Palma João Gomes da Silva Imopólis - Sociedade Gestora de Fundos de Investimento Imobiliário, S. A.
DATES BEGINNING OF CONSTRUCTION
1992
END OF CONSTRUCTION
2004
179
09
Álvaro Siza
COLLECTIVE HOUSING LISBOA - Portugal
DESCRIPTIVE BRIEF The housing, service and commercial complex Terraços de Bragança occupies a parcel of nearly 5000 m2 situated between António Maria Cardoso and Alecrim, which arises in a perfectly consolidated area, like an interval that needs to be filled. Care was taken to establish a dialogue with the environment to find the first motivations for the definition of the project; as well as to make a conscientious reading of the terrain, its topography, and the footprints left by those who had lived there and given it meaning. Those footprints trace back at least to the beginning of the14th century, the period of completion of the Muralla Fernandina city wall. The construction of this defense structure clearly defined the border of the metropolis, reinforcing what once was a natural border - the strong existing slope in the terrain, previously assumed as the limit of the wall of the Convent of San Francisco da Cidade, from the 13th century (a Convent whose building still exists today and houses the Escola Superior de Belas Artes). These grounds had gradually been urbanized, on both the inside and the outside of the city walls, building new roads and buildings on the summit of the hillside, such as the palace of the Dukes of Bragança and, later, the Jansen Beer Factory The demolitions carried out on the site twenty years ago had left a section of the city wall exposed, nowadays clearly visible, along with the tower and the extreme southwest access door to the city, as well as an ensemble of brick foundations which presumably belonged to the Jansen Beer Factory. This ensemble sensibly divides the terrain in half longitudinally and parallel to the roads which, in the meantime had been opened: Rua António Maria Cardoso, on the inside, above, and Rua do Alecrim on the lower side. This topological, geographical and historical fragmentation which divides the terrain in two, connecting the parts parallel to the access roads, is adopted by the project, both in morphological and programmatic terms. In this way, an ensemble of three buildings has been built on the terrain which borders the Rua do Alecrim, each facing the street and 15,5m in depth. The program is also similar: the ground floors (1 or 2 depending on the case) are intended for commerce, while the upper floors for offices and housing. On the high part of the site, the area which borders Rua António Maria Cardoso, two residential buildings were constructed. The two buildings contact the ground through columns, separated from each other by a large distance, defined to preserve the existing ruins of the Muralla Fernandina (city wall), historical testimony which greatly increases the value of the terrain. According to the previous inquiries made to IPPARNT, this will become a museum area, integrated in the open space of the housing and open to the public.
180
All five buildings share the same underground parking area (9002 m2), with three common entrances from Rua do Alecrim, while a circular ramp guarantees the connection between the various floors. The building has a reinforced concrete structure, made up of columns and continuous, mushroom-shaped slabs. On the basement level, the perimeter walls will be constructed according to the berlinesque shoring system with drained air cavity and double interior brick wall to avoid eventual infiltrations. The construction above grade will have brick walls with air cavity and thermal insulation. The interior partitions will be brick to plaster and paint. The roofs will be flat, waterproofed and thermally insulated with an inverted roof system. On Rua do Alecrim, exterior finish of the buildings will be Lioz stone up to the last floor of office or commercial spaces, and the remaining levels, which correspond to housing units, will be finished in tile. The buildings bordering Rua António Maria Cardoso will have a Lioz stone base until the first housing level and balconies of the buildings. The remaining wall surfaces will be finished in tile. The exterior windows are double, in enameled wood, with interior shutters for solar protection.
TECHNICAL DATA SURFACE AREA OF SITE
TOTAL GROSS CONSTRUCTION AREA 22.872,00 m2
4.849,00 m2 FLOOR LEVELS ABOVE GRADE
SURFACE AREA OF ENSEMBLE Building 1
257,30 m2
Building 1
Building 2
639.55 m
2
Building 2
5
Building 3
929,70 m
2
Building 3
4/5
Public passage
70,00 m2
Building 4
705,20 m
2
Building 5
260,50 m
2
Total
6
Public passage Building 4
5
Building 5
4
2695,40 m
2
FLOOR LEVELS BELOW GRADE CONSTRUCTED VOLUME
Building 1,2 e 3
Building 1
4.847,00 m
Building 2
7.807,00 m2
Building 3
11.938,80 m2
Public passage
2
11.988,80 m2
Building 5
4.397,50 m2
NUMBER OF OFFICE UNITS 10 NUMBER OF COMMERCIAL SPACES
SURFACE AREA OF PAVEMENT 1.587,00 m2
Building 2
2.432,90 m2
Building 3
3.993,20 m2
7 NUMBER OF PARKING SPACES 187
344,50 m2
Building 4
4.220,10 m2
Building 5
1.291,70 m2
Total
36
43.107,40 m2
Building 1
Public passage
3 5/2
NUMBER OF HOUSING UNITS
2.128,30 m2
Building 4 Total
Building 4 e 5
NUMBER OF STORAGE UNITS 41
13.869,40 m2 FAÇADE HEIGHT
AREA OF PUBLIC SPACE 2.153,60 m2 INDEX OF RECLAMATION 2,86 INDEX OF OCCUPATION
Building 1
17,50 m
Building 2
16,80 m
Building 3
17,80/14,70 m
Public passage
17,20 m
Building 4
18,20 m
Building 5
17,00 m
0,55 DEPTH WATERPROOFED SURFACE AREA 2.934,10 m2
Building 1
15,00 m
Building 2
15,50 m
Building 3
15,50 m
Public passage
GROSS CONSTRUCTED SURFACE AREA 13.869,40 m2
15,50 m
Building 4
15,50/19,20 m
Building 5
12,40/14,90 m
GROSS CONSTRUCTED AREA ABOVE GRADE 9.002,60 m2
181
09
4 COLLECTIVE HOUSING - EDITORIAL PENCIL
TERRAÇOS DE BRAGANÇA Álvaro Siza
West elevation 0
1:700
182
10
20m
183
09
4 COLLECTIVE HOUSING - EDITORIAL PENCIL
TERRAÇOS DE BRAGANÇA Álvaro Siza
0
10
20m
East elevation
1:700
0
184
1:500
10
20m
South elevation
West elevation 0
10
20m
1:700
185
09
186
4 COLLECTIVE HOUSING - EDITORIAL PENCIL
TERRAÇOS DE BRAGANÇA Álvaro Siza
187
09
4 COLLECTIVE HOUSING - EDITORIAL PENCIL
TERRAÇOS DE BRAGANÇA Álvaro Siza
Interior East elevation 0
1:700
188
10
20m
189
09
4 COLLECTIVE HOUSING - EDITORIAL PENCIL
TERRAÇOS DE BRAGANÇA Álvaro Siza
Section
1. Parking lot 2. Machine room 3. Storage room 4. Waste room 5. Room 6. Garden storage 7. Technical gallery 8. Antechamber 9. Access corridor 10. Ventilation room
0
1:500
Section 190
Section
10
20m
191
09
4 COLLECTIVE HOUSING - EDITORIAL PENCIL
TERRAÇOS DE BRAGANÇA Álvaro Siza
N
0
1:500
Floor level 0 192
10
20m
1. Parking lot 2. Machine room 3. Pump room 4. Tank 5. Technical gallery 6. Stock area 7. Ventilation room 8. Waste room 9. Loading / Unloading area 10. Shop 1 (floor 1) 11. Shop 2 (floor 2) 12. Shop 3 13. Shop 4 14. Ventilator room 15. Storage room 16. Void 17. Desk 18. Small office 19. Medium office 20. Large office 21. Library 22. Reception 23. Archive 24. Meeting room 25. P. Trasf. 26. Garden storage
Floor level 3 193
09
4 COLLECTIVE HOUSING - EDITORIAL PENCIL
TERRAÇOS DE BRAGANÇA Álvaro Siza
27. Lobby 28. Corridor 29. Single room 30. Hall 31. Living room 32. Dining room 33. Balcony 34. Laundry 35. Terrace 36. Service room 37. Water
N
0
10
1:500
Partial floor plan, height level 32.94
194
Floor level 5
20m
The two buildings contact the ground through columns, separated from each other by a large distance, deďŹ ned to preserve the existing ruins of the Muralla Fernandina (city wall), historical testimony which greatly increases the value of the terrain.
195
09
4 COLLECTIVE HOUSING - EDITORIAL PENCIL
TERRAÇOS DE BRAGANÇA Álvaro Siza N
0
1:500
27. Lobby 28. Corridor 29. Bedroom 30. Hall 31. Living room 32. Dining room 33. Balcony 34. Laundry 35. Terrace 36. Service room 37. Water
Floor level 6 196
10
20m
197
MODULATION OF FAÇADES
D1
D2
Secci贸n D 3
D3 0
1
2
3
4
5m
1:150
1. Row of Stone,23cm from axis 2. Acerto Tiles 3. Alignmemt L. Special Stone type L U. Special Stone type U V. Special Stone type V M. Special Stone type M C. Special Stone type C Cut stone Brick Concrete
199
Section A
Section B
0
Floorplan type
Ground oor level 200
1:150
1
2
3
4
5m
Section C
Section D
Roof level 1
Roof level 201
Sliding window elevation
Sliding window section
D. 0
D. 1
D. 2 202
D. 3
D. 5
D. 7
D. 4
D. 6
D. 8
D. 9
1. Lioz Stone 2. Stainless steel corner board 80x55x5 mm 3. Profile vedante cruzfer m8115 4. Profile vedante cruzfer st. E2018.93 Concrete
Brick
Mortar
Tile
Wood
Insulation
Marble
Steel
Refill
203