Modelling Personal Project

I took it upon myself after COVID 19, to finish my A level project. I dedicated time between my university studies to build the model that I never got the chance to do. My design was to design a public leisure centre/swimming facility. The existing building is derelict and in need of a redesign to avoid any further antisocial behaviour taking place on site. The site is located in Holmbush Retail Park, Shoreham-by-Sea, West Sussex. The design and model created features a multistorey leisure centre equip with 25m pool, gym, studio, outdoor field, and café. There was no need to extend the parking as I maintained the existing one and the new design had to be contained inside the current site plot.