Bring your machines’ electronics up to speed again: Machine availability is secured. Productivity has increased.
EMAG E-TUNING
EMAG E-TUNING
The favorable boost in productivity
The favorable boost in productivity
Spare parts expenditure will be reduced.
Ask for your individual E-TUNING offer! We will check your machines and manufacturing systems and you will get a plan for optimisation including a „Return of Investment” calculation.
Your contact EMAG ServicePlus Phone: +49 7162 17-4300
EMAG Gruppen-Vertriebs- und Service GmbH Austrasse 24 | 73084 Salach Germany www.emag.com
EMAG E-TUNING The favorable boost in productivity
With EMAG E-TUNING you will increase your machine availability and productivity. Profit of a decrease in tool costs. Spare part – older components
EMAG E-TUNING – state-of-the-art components
Price-performance advantage
The costs of spare parts for the older control systems on EMAG machines are frequently considerably higher than that of spares for the newer electronics. The reason is that components for older control systems often are only produced in low quantities. With EMAG E-TUNING you will reduce the costs for electronic components and increase machine availability – advantageous actualisation and modernisation of control systems and other electronic components.
Costs
Commissioning
Spare part
New part
– Higher prices for spare parts
+ State-of-the-art technology
– No up-to-date technology
+ All-in service (installation and
– Reduced availability
This ensures the maximum availability and increased productivity of your EMAG machines – and at the same time a noticeable reduction in future spare parts costs.
Practical example: „Bottleneck” machines Starting point • A production line with five machines produces 1,600 differential housings per day • Investment of EUR 22,000.– for a component upgrade on two machines used to clear in-line bottlenecks Advantages of this upgrade • Cycle time gain in bottleneck machines increases line productivity by 12% • Surplus profit of EUR 6,720.– per day through the production of an additional 192 components at EUR 35.– each • Customer receives additional spare parts worth EUR 12,000.– for use in other EMAG machines in the group Financial projection Investment - EUR 22,000.– New set of spare parts + EUR 12,000.– Surplus profit through productivity increase over two days + EUR 13,440.– Total in two days + EUR 3,440.– Surplus after capital costs are covered
commissioning) + Increased productivity + More innovation + Additional spare part stocks for further EMAG machines
Result Even after just a short period of time, the investment of EUR 22,000.– has already been amortized. The ROI is achieved after just two days.