TRACKMOTION AUTOMATION SYSTEM – TRANSPORTING RAILS
AUTOMATION EXAMPLE: SOFT MACHINING OF GEARS (COMPLETE LINE)
AUTOMATION EXAMPLE: SOFT TURNING OF PULLEYS FOR CVT TRANSMISSIONS
93 SECOND CYCLE TIME
AUTOMATION EXAMPLE: SOFT TURNING OF SPROCKETS (COMPLETE LINE)
Turning of first and second side (OP 10/OP 20)
Parts storage area for up to 400 workpieces, including TrackMotion
Turning of the first side (OP 10) Turning of the second side (OP 20)
6
TRANSPORTING PARTS AS IF THEY WERE ON
28 SECOND CYCLE TIME
+ TrackMotion automation system, consisting of
1 Track
2 Lift and turn-over unit (TransLift)
3 E-container
+ Completely modular system (ex. adaptable in length)
37 SECOND CYCLE TIME
+ TransLift lift and turn-over unit
+ Adaptable to a wide variety of components (chucked and shaft parts)
+ Replaces belts, pick-and-place units and changers
+ Z-stroke of up to 650 mm (26 in) is possible
+ Raw and finished parts storage area can be adapted to a wide variety of components (chucked and shaft parts)
+ The use of stacker pallets enables the storage of up to 400 raw and finished parts.
Roller deburring (OP 40)
Gear hobbing (OP 30)
Gear hobbing (OP 30)
Parts storage area for up to 400 workpieces, including TrackMotion
Turning of both sides (OP 10 and OP 20)
2 1 3
7
Roller deburring (OP 40)