The worlds’ full of wondrous places to explore. The highlighted red zone represents the countries that I’ve visited to date. Every country had its own culture, dialect and architecture. The combination of studying architecture and travelling has widened my visionary vocabulary by implementing what I see into my designs. My ambitions to proceed developing this chart and expand my vision through the world of architecture.

1


2


BORDESLEY HOUSE. PROFESSIONAL COMMISSION. TYPE:RESIDENTIAL. LOCATION:LAUGHTON, UK. NOVEMBER 2017.

Bordesley House, was one of my first project at MBH. Having assisted the main architect in submitting the project for planning, it gave me the opportunity to have a better understanding of Stage 0-3. The client’s looking to extend the existing house, however they are uncertain on the final aesthetic of the house. I am currently working close up with the client to satisfy their demand to turn the house into a beautiful piece of art, as well as effectively functional.

3


01.

Exploded Isometric views of the front and rear of the house.

4


New front porch .

New Master-Berdroom-Balcony.

Conversion of use for the garage.

5


DRAWING NOTES

COPYRIGHT © This drawing and the details herein not be reproduced, altered or pass Do not scale from this drawing.

Any errors or omissions are to be r

All drawings are to be read in conju related Architect's and other Consu

PROPOSED EXTENSION AT FIRST FLOOR

01.

ELEVATIO

PATIO

New Roof Tile- Color Dark Grey New roof feature to be added to the existing roof

Existing vertical hanging tile to replace with Hardieplank cladding.

Hardie Plank cladding

FIRE PLACE

ELEVATION 3

Existing Roof Tile to replace with new Tile- Color Dark Grey

KITCHEN 5.5MT X 9.1MT

Existing brick wall to be removed from here and new wall to construct in line with the main wall

UTILITY ROOM 3MT X 5.2MT

SI R

FFL=49.84 CL=52.18

TOILET 1.3MTX1.8MT

EXISTING GARAGE 5.3MT X 5.2MT FFL=49.78

Up

SNUG AREA New staircase

Existing garage door to be redecorated with a new facing

Ne gla

ELEVATIO

KEY PLAN N.T.S.

Proposed New Porch.

PROPOSED FRONT ELEVATION(1) SCALE 1:50 @ A1

Existing window to reposition in line with the new first floor window. Existing window opening to infill to match the existing opening.

Solid timber door with full height glazed panels to the either side

All the existing windows to replace with new Double Glazed Sash Windows.

SCALE BAR 1:50@A1

PROPOSED EXTENSION AT FIRST FLOOR

Existing Roof Tile to replace with new Tile- Color Dark Grey

0

1

New Roof Tile- Color Dark Grey

REV

DATE

DESCRIPTION

Hardie Plank cladding Existing vertical hanging tile to replace with Hardieplank cladding.

Metal railing. Color- Dark Grey

2950

MB Rosemount House, Rosem www.mbhltd.com PROJECT

Proposed New Porch.

BORDESLEY HOUS LAUGHTON ROAD LAUGHTON BN8 6DB DRAWING TITLE

PROPOSED ORANGERY

PROPOSED REAR ELEVATION(2) SCALE 1:50 @ A1

PROPOSED FRONT ELEVATIONS DRAWN BY

EA

CHECKED BY

AS

DAT

6

18

DRA

1


BP OIL. Unfortunately, the planning application for the following project got declined due its location on site, as well as creating an unpleasant view for the locals. Due to the declined offer, BP asked us to generate some key visuals for different zones looking down in to the site. The idea was to emphasize the fact that the building blends in with the landscape and that it will be well covered by a lot of vegetation all around its boundary. Carrying out site analysis was key as it helped me select the most suitable materials for the constructions and camouflage of the building.

7


01.

8


2.

This drawing is to be read in conjunction with drawings 20 Existing Site Layout 22 Proposed Site Plan 23 Proposed Elevations 24 Proposed Building Elevations 25 Internal Building Plan

3.

Any advertisements are indicative and are subject to a advertisement application

4.

Any neighbouring buildings shown on the elevations are have been extrapolated from site photographs, They ha measured.

SCHEDULE OF FINISHES

WALLING External face of building clad in brick cladding panels finish 'A skirt at base.

CROP FIELDS

ROOFING To comprise of insulated composite metal sheeting laid to fal building.

CROP FIELDS

SHOPFRONT Aluminium shop front with a SAA finish with encasement to s laminated safety glass.

All glazing to be to BS 6262 with Class C of BS 6206. Including Dor-matic electric sliding door, (Fail safe in open pos EXTERNALS

NEW 2m HIGH TIMBER CLOSEBOARDED FENCE ON PCC RETAINING WALL

37.300

38.100

36.600

TARMAC

B

AIR / WATER BAY

36.600

3

VR2

4

P7

07

Access Zone

B FLUSH KERB

6320

CONCRETE 03 P4 2

3

VR2

B

B

4

02

P3

CONTROL

NEW SALES BUILDING

B

08 B

38.000

2 x FL 3m H 1 2

34

1

2

3

VR2

P1

5m H TANK VENT STACK

BELOW GROUND FILLS

TARMAC

B

NEW FORECOURT CANOPY TARMAC

37.500 37.000 38.200

37.750

PRICE SIGN

B

38.250

UDIMORE

Mostly new PCC retaining walls as noted on site plan 22

SITE LIGHTING Lighting to specialists design, generally as per site plan draw B

-

Denotes New bollard

NEW DDA & 4 NO PARENT & CHILD PARKING BAYS

ACCESS

35.700 30

29

28

27

26

35.200

36.700

36.700

4NO. NEW CYCLE HOOPS

New F/L 3m H

NEW LOW LEVEL PCC RETAINING WALL

NEW EGRESS CROSSOVER FOOTPATH

CROSSOVER WORKS SUBJECT TO AGREEMENT WITH HIGHWAYS AUTHORITY

BOUNDARY FENCING

CONCRETE

NEW INGRESS CROSSOVER 38.850

B

36.600

B

DCD

FORM NEW CONCRETE ACCESS RAMP AND STAIRS FROM CUSTOMER PARKING

NEW W/L

CONCRETE

Steel framed double gates to be clad same.

DISUSED LAND

25

B

4

All over 125x25mm Horizontal ground board. All fencing to be fixed on 100x100mm posts at min 2m centres

35.650

STORE ENTRANCE

VR

NEW W/L

36.800 ENTRANCE

HAZARDOUS ZONE

35.700

B

01

36.850 P2

PRE CAST CONCRETE MODULAR RETAINING WALLS TO FORM SITE BOUNDARY WITH EXCESS LAND USED TO FORM BANKING WITH LANDSCAPED AREA OVER TO ENHANCE SCREENING OF SITE

STAIRS

38.100

FORM NEW PCC RETAINING STRUCTURE TO REAR OF SALES BUILDING TO LOWER SITE LEVEL

36.200

04

1

NEW W/L

B

P5

37.200

35.750 25000 O/A BUILDING WIDTH

B

05

COMPOUND To comprise of 1.8m high timber fencing with 100x38mm S.W. r 100x25mm S.W. vertical close board

OUTLINE OF GOODS DELIVERY VEHICLE

4

BLOCK PAVING

NEW 2m HIGH TIMBER CLOSEBOARDED FENCE ON PCC RETAINING WALL

VR2

SITE SURFACING Situ concrete surfacing to re-fueling area / delivery area an surfacing to areas as indicated to include Smatex wearing cou

36.700

Trolley Shelter

ATM

3

2 x New F/L 3m H

GOODS IN

Access Zone

External CO² Plant Site Specific Location

COMPOUND AREA

B

TARMAC

2

EXTERNAL PLANT

36.700

06

P6 1

EXTENDED RETAINING WALL TO PROVIDE LOADING PLATFORM FOR GOODS DELIVERIES

35.800 New F/L 3m H B

B

4 NO PUMP ISLANDS AND FORECOURT CANOPY

2 x 80,000 LITRE UNDERGROUND FUEL STORAGE TANKS

BUILDING TERRACE New building terrace to be formed and receive new block pav building. - New Bollards to kerb line. - Flat kerbing along shopfront.

NEW 3m HIGH PCC RETAINING WALL WITH LAND GRADED BACK TO PROVIDE GREEN SCREENING TO SITE

2

20000 O/A BUILDING LENGTH

1

Bin

CREATE 7 No. NEW SHOPFRONT CUSTOMER PARKING BAYS AND 1No. DDA.

Bin

36.850

P8

Bin

NEW FORECOURT CANOPY TARMAC

DISUSED LAND

35.200

CREATE NEW 1.8m HIGH TIMBER COMPOUND WITH GATES

36.800

37.100 15

CANOPY New traditional forecourt canopy and white profiled aluminium fittings with acrylic fascias to take oil company signage (subj application).

16

TARMAC

Bin

B

CREATE NEW VEHICULAR ACCESS RAMP TO LOWER PARKING LEVEL

ROAD

FORM NEW LOW LEVEL LANDSCAPING BUFFER TO REPLACE EXISTING TO LA APPROVAL

37.100

CROSSOVER WORKS SUBJECT TO AGREEMENT WITH HIGHWAYS AUTHORITY

FOOTPATH

FOOTPATH

36.450

FORM NEW LOW LEVEL LANDSCAPING BUFFER TO REPLACE EXISTING TO LA APPROVAL

C

23.05.17

REVISED BUILDING GLAZING

B

18.04.17

REVISED BUILDING ACCESS

A

07.04.17

NR

DATE

REVISED BUILDING & EXTE DESCRIPTION

REVISIONS

PLANNIN

STATUS

BP OIL

Asset Develo

BP RYE SF Udimore Ro Rye, TN31 6AA

BP OIL UK Ltd

Asset Development

WITAN GATE HOUSE MILTON KEYNES BUCKS MK9 1ES Tel No 01908 853000 Fax No 01908 853999 DRAWN: DATE:

MAS JAN'17

DESIGN CHECKED: DATE:

PSB JAN'17

APPROVED: DATE:

-

ATRACK CHECKED: DATE: SCALE:

A1 ORIGINAL PLOT SIZE

0

10 SCALE - METRES - 1:200 @ A1

20

PROPOSED

1:200 @ A1

DRAW

300

SCALED DIMENSIONS SHOULD NOT BE TAKEN FROM THIS DRAWING (APPROPRIATE FOR A1 ONLY)

ARCHITECT:

MB

This drawing has been produced in accordance with BP Oil UK Ltd re Copyright of BP Oil UK Ltd. Illegal use is prohibited. Reprodu BP Oil UK Ltd, Asset Development, 500-600 Witan


GENERAL NOTES

PRE CAST CONCRETE MODULAR RETAINING WALLS TO FORM SITE BOUNDARY WITH 2m H CLOSE BOARDED TIMBER FENCE ABOVE

NEW PRICE SIGN SUBJECT TO SEPARATE CTA APPLICATION

FOR DETAILED BUILDING ELEVATIONS SEE DRAWING 24

OUTLINE OF NEW FORECOURT CANOPY

PRE CAST CONCRETE MODULAR RETAINING WALLS TO FORM SITE BOUNDARY WITH 2m H CLOSE BOARDED TIMBER FENCE ABOVE

5200mm min

NEW 5m HIGH TANK VENT STACK

Light

DENOTES APPROXIMATE EXTENTS OF NEW INGRESS CROSSOVER

NEW PUMP AND ISLAND

Light

LANDSCAPING BUFFER TO BE AGREED WITH LOCAL AUTHORITY

Light

Solar Film

Solar Film

Vinyl

Vinyl

PRE CAST CONCRETE MODULAR RETAINING WALLS TO FORM SITE BOUNDARY WITH 2m H CLOSE BOARDED TIMBER FENCE ABOVE

PRE CAST CONCRETE MODULAR RETAINING WALLS TO FORM SITE BOUNDARY WITH EXCESS LAND USED TO FORM BANKING WITH LANDSCAPED AREA OVER TO ENHANCE SCREENING OF SITE

This drawing is to be read in conjunction with drawin 20 Existing Site Layout 22 Proposed Site Plan 23 Proposed Elevations 24 Proposed Building Elevations 25 Internal Building Plan

3.

Any advertisements are indicative and are subject to advertisement application

4.

Any neighbouring buildings shown on the elevations have been extrapolated from site photographs, They measured.

01.

WALLING External face of building clad in brick cladding panels fini skirt at base.

ROAD LEVEL

DENOTES APPROXIMATE EXTENTS OF NEW EGRESS CROSSOVER

This drawing has been prepared for the sole purpos planning permission.

2.

SCHEDULE OF FINISHES

GROUND LEVEL

ROAD LEVEL

1.

ROOFING To comprise of insulated composite metal sheeting laid to building.

ELEVATION 1

SHOPFRONT Aluminium shop front with a SAA finish with encasement laminated safety glass.

Scale 1/200

All glazing to be to BS 6262 with Class C of BS 6206. Including Dor-matic electric sliding door, (Fail safe in open EXTERNALS

CANOPY New traditional forecourt canopy and white profiled alumi fittings with acrylic fascias to take oil company signage ( application). BUILDING TERRACE New building terrace to be formed and receive new block building. - New Bollards to kerb line. - Flat kerbing along shopfront.

SITE SURFACING Situ concrete surfacing to re-fueling area / delivery area surfacing to areas as indicated to include Smatex wearing FOR DETAILED BUILDING ELEVATIONS SEE DRAWING 24

PRE CAST CONCRETE MODULAR RETAINING WALLS TO FORM REAR SITE BOUNDARY WITH 2m H CLOSE BOARDED TIMBER FENCE ABOVE

OUTLINE OF NEW FORECOURT CANOPY

5200mm min

PRE CAST CONCRETE MODULAR RETAINING WALLS TO FORM SITE BOUNDARY WITH EXCESS LAND USED TO FORM BANKING WITH LANDSCAPED AREA OVER TO ENHANCE SCREENING OF SITE

NEW ACCESS RAMPS & STEPS TO REAR STORE ENTRANCE

CO² External Plant Site Specific Location

PRE CAST CONCRETE MODULAR RETAINING WALLS TO FORM REAR SITE BOUNDARY WITH 2m H CLOSE BOARDED TIMBER FENCE ABOVE

COMPOUND To comprise of 1.8m high timber fencing with 100x38mm S.W 100x25mm S.W. vertical close board

All over 125x25mm Horizontal ground board. All fencing to be fixed on 100x100mm posts at min 2m cen

NEW PUMP AND ISLAND

TIMBER COMPOUND LINE

CO² External Plant

NEW PRICE SIGN SUBJECT TO SEPARATE CTA APPLICATION

NEW 5m HIGH TANK VENT STACK

Steel framed double gates to be clad same.

ROAD LEVEL

GROUND LEVEL

BOUNDARY FENCING

Metal Goods in Doors Colour White

ROAD LEVEL

Mostly new PCC retaining walls as noted on site plan 22

SITE LIGHTING Lighting to specialists design, generally as per site plan d

ELEVATION 2

B

-

Denotes New bollard

Scale 1/200

FOR DETAILED BUILDING ELEVATIONS SEE DRAWING 24

ALL SIGNWARE INDICATIVE SUBJECT TO SEPARATE CTA APPLICATION PRICE SIGN

OUTLINE OF FORECOURT CANOPY

FOR DETAILED BUILDING ELEVATIONS SEE DRAWING 24

PRICE SIGN

OUTLINE OF FORECOURT CANOPY RAMPED VEHICULAR ACCESS TO REAR OF SITE

VEHICULAR ACCESS RAMP TO LOWER LEVEL PARKING

REPLACEMENT LANDSCAPING TO BE AGREED WITH LOCAL AUTHORITY

TIMBER COMPOUND ATM

COMPOUND AREA & GATES

Light

Night Pay Unit

ATM

UDIMORE ROAD

UDIMORE ROAD

OPEN FIELDS TO SIDE

OUTLINE OF STEPS & RAMPED ACCESS TO REAR STORE ENTRANCE

ELEVATION 3

LOADING PLATFORM FOR GOODS DELIVERIES

ELEVATION 4

Scale 1/200

Scale 1/200

ELEVATION 5

ELEVATION 4

ELEVATION 3

ELEVATION 2

23.05.17 REVISED BUILDING GLAZI 18.04.17 REVISED BUILDING ACCES 07.04.17 REVISED BUILDING & EXT

NR

DATE

DESCRIPTION

REVISIONS

PLANN

STATUS

PRICE SIGN

OUTLINE OF FORECOURT CANOPY PRE CAST CONCRETE MODULAR RETAINING WALLS TO FORM SITE BOUNDARY WITH EXCESS LAND USED TO FORM BANKING WITH LANDSCAPED AREA OVER TO ENHANCE SCREENING OF SITE

OUTLINE OF SALES BUILDING

CROP FIELDS

C B A

CROP FIELDS

BP OI

Asset Dev

NEW 2m HIGH TIMBER CLOSEBOARDED FENCE ON PCC RETAINING WALL

37.300

38.100

36.600

AIR / WATER BAY

36.600

VR2

P7

Bin Access Zone

2

1

2

3

VR2

4

1

2

3

3

VR2

4

VR2

6320

05

36.200

04

B FLUSH KERB

03

B

B

02

P3

CONTROL

NEW SALES BUILDING

B

B

B

OPEN FIELDS TO SIDE

4NO. NEW CYCLE HOOPS

30

29

28

27

26

UDIMORE ROAD

CONCRETE NEW LOW LEVEL PCC RETAINING WALL

NEW EGRESS CROSSOVER FOOTPATH

38.250

ROAD

UDIMORE

FORM NEW LOW LEVEL LANDSCAPING BUFFER TO REPLACE EXISTING TO LA APPROVAL

37.100

Asset Development

WITAN GATE HOUSE MILTON KEYNES BUCKS MK9 1ES Tel No 01908 853000 Fax No 01908 853999

35.200

New F/L 3m H

CROSSOVER WORKS SUBJECT TO AGREEMENT WITH HIGHWAYS AUTHORITY

FOOTPATH

FOOTPATH

36.450

ELEVATION 1

FORM NEW LOW LEVEL LANDSCAPING BUFFER TO REPLACE EXISTING TO LA APPROVAL

ELEVATION 5 Scale 1/200

MAS JAN'17

DESIGN CHECKED: DATE:

PSB JAN'17

SCALE:

0

10 SCALE - METRES - 1:200 @ A1

20

PROPOSE

-

ATRACK CHECKED: DATE:

Scale 1/1250

A1

DRAWN: DATE:

APPROVED: DATE:

ELEVATION KEY

ORIGINAL PLOT SIZE

BP RYE Udimore Rye, TN31 6AA

BP OIL UK Ltd

BANKED LANDSCAPED AREA

35.700

36.700

36.700

B

DCD

FOOTPATH CROSSOVER WORKS SUBJECT TO AGREEMENT WITH HIGHWAYS AUTHORITY

B

ACCESS

STAIRS

NEW W/L

NEW INGRESS CROSSOVER 38.850

STORE ENTRANCE

ENTRANCE

B

36.600

DISUSED LAND

NEW DDA & 4 NO PARENT & CHILD PARKING BAYS 25

B

TARMAC

37.000

G/L AT SHOP

PRE CAST CONCRETE MODULAR RETAINING WALLS TO FORM SITE BOUNDARY WITH EXCESS LAND USED TO FORM BANKING WITH LANDSCAPED AREA OVER TO ENHANCE SCREENING OF SITE

35.650 FORM NEW CONCRETE ACCESS RAMP AND STAIRS FROM CUSTOMER PARKING

36.800

P1

PRICE SIGN

35.700 NEW W/L

B

01

36.850 P2

CONCRETE

37.750

FORM NEW PCC RETAINING STRUCTURE TO REAR OF SALES BUILDING TO LOWER SITE LEVEL

B

P5

P4

NEW FORECOURT CANOPY

37.500 38.200

NEW W/L

4

BLOCK PAVING

NEW 2m HIGH TIMBER CLOSEBOARDED FENCE ON PCC RETAINING WALL

ATM

P6 1

CONCRETE

BELOW GROUND FILLS

TARMAC

OUTLINE OF GOODS DELIVERY VEHICLE

35.750 25000 O/A BUILDING WIDTH

38.000

2 x FL 3m H HAZARDOUS ZONE

2 x New F/L 3m H

36.700

Trolley Shelter

B

B

08

38.100

COMPOUND AREA GOODS IN

Access Zone

36.700 TARMAC

37.200

EXTERNAL PLANT External CO² Plant Site Specific Location

B

5m H TANK VENT STACK

EXTENDED RETAINING WALL TO PROVIDE LOADING PLATFORM FOR GOODS DELIVERIES

35.800 New F/L 3m H B

07

06

Bin

CREATE 7 No. NEW SHOPFRONT CUSTOMER PARKING BAYS AND 1No. DDA.

4

NEW 3m HIGH PCC RETAINING WALL WITH LAND GRADED BACK TO PROVIDE GREEN SCREENING TO SITE

3

20000 O/A BUILDING LENGTH

2

Bin

36.850

P8 1

4 NO PUMP ISLANDS AND FORECOURT CANOPY

Bin

NEW FORECOURT CANOPY

2 x 80,000 LITRE UNDERGROUND FUEL STORAGE TANKS

UDIMORE ROAD

CREATE NEW 1.8m HIGH TIMBER COMPOUND WITH GATES

36.800

37.100

TARMAC

LINE OF RETAINING WALL

35.200 16

TARMAC

15

DISUSED LAND

CREATE NEW VEHICULAR ACCESS RAMP TO LOWER PARKING LEVEL

TARMAC

B B

1:200 @ A1

D

30

SCALED DIMENSIONS SHOULD NOT BE TAKEN FROM THIS DRAWING (APPROPRIATE FOR A1 ONLY)

ARCHITECT:

This drawing has been produced in accordance with BP Oil UK Lt Copyright of BP Oil UK Ltd. Illegal use is prohibited. Rep BP Oil UK Ltd, Asset Development, 500-600 Wi


Additionally, in this project, I was recalled to create various options for one of their new sales buildings. The idea was to create a two-floor sales building which stands out from the ground floor and projects out to the motorway. It’s well evident that BP main colors green, which gave me the idea to reflect their colors out to the public, from a very far distance. I am excited to see what option the client’s going to choose in order to initiate the project.

9


01.

10


HOMEMAKING - DOMUM. 3RD YEAR STUDIO. TYPE:RESIDENTIAL. LOCATION: LIVERPOOL, TOXTETH, UK. JAN 2017 - MAY 2017.

11


“Whenever we talk of home,we talk of family, we talk of people but I never think of four walls and a roof. It means. Whenever we talk of home,we talk of love and safety and you can’t get it anywhere else but at home.”

Following the brief, my first instinct was to go back in time to my own roots and understand what home means to me and others close to myself. This exercise helped me to understand what a “home” is and what you’d expect from it. I carried out a few interviews and I started to understand what connects people to this secure place we called home.

02.

The different phases of the project allowed me to develop a residential building for ex-military people who are displaced and no longer have a home to go to. Different from other residential buildings, the design of this hostel will permit them to re-arrange space at their own commodity. ‘Domum’ derives from the Latin language and it stands for home. A home should make you feel secure and comfortable. With the concept of the utilisation of hard and soft flexibility, this project will allow the residents to mix with the community but to also benefit of a private space which they can change to make their self-feel like they were at home

12


13


LIVERPOOL,TOXTETH (HISTORICAL MAPS)

02.

14


Diagrammatic conceptual models.

Utilising foam board, I experimented the shape and connectivity between the building that I have placed on the longitudinal site. The foam board allowed me to directly visualise the potential geometry of the building and the ability to be amended within the perimeter of the site. As evident, the images represent the steps that I took to achieve my final design. The diagram represents a sequence of Public and Private spaces of the design. Mixing the displaced one with the community features the main purpose of the programme. The circulation of Public and Private area emphasizes the ideology of flexibility.

Concept-Development Models.

15


02.

Programme.

16


17


02.

18


GROUND FLOOR 01. READING AREA 02.YOGA/ EXERCISE ROOM 03.PHYSIO 04.CAFE 05. KITCHEN 06. EATING AREA 07.STORAGE/SERVICE 08.FLEXIBLE ROOM (A) OR (B) 09.RECEPTION 10.WAITING AREA

19


02.

FIRST FLOOR 01. TERRACE 02.FLEXIBLE ROOM (A)OR(B) 03.LITTLE GARDEN 04.FLEXIBLE BEDROOM

20


SECOND FLOOR 01. FLEXIBLE BEDROOM 02.LIVING ROOM 03.BALCONY 04.GAME ROOM 05.LAUNDRY 06.TOILET

21


“Such programme,will be a massive help for the homeless community. We don’t feel safe among one another but being able to see that people within the community care about us will mean so much”

02. Flexible Bedroom with moving panel.

Flexible Classroom(A)/(B).

22


23


02.

24


Exploded Axo/Construction Drawing.

25


02.

Vertical Section -Community Building.

26


27


MICROHOME. 3RD YEAR STUDIO. TYPE: RESIDENTIAL. LOCATION:MANCHESTER,UK. DEC 2016 - JAN 2017.

Michrohime’s a sub-project taken ahead of Homemaking, to understand the house requirement. This Micro home was designed to focus on a small flexible place for someone to spend some time alone. It’s got an area of 8 sqm but has a very big potential as it’s flexible to be opened for guest to come along. The main component in this little house is a partition shelf which can be moved front and backward to create spaces for the tenant.

The loft will be able to create a cosy little space for the individual to sleep at night time and look outside the window. This Micro home it’s environmentally friendly as it not connected to the grid but uses solar powers and a composting toilet.

03.

28


GROUND FLOOR 29


03.

LOFT FLOOR

ROOF FLOOR ROOF FLOOR 30


Microhome.

31


03.

(Top Left).Hiden Toilet ,(Top Right).Closed-Up Window.(Bottom Left).Loft , (Bottom Right), Loft Window

32


Exploded Axo.

Exploded Iso.

33


EXPLODED ISO/AXO. 3RD YEAR STUDIO.

03.

Conflict&Asylum.Exploded Iso.

Conflict&Asylum.Exploded Axo.

34


DOMUM.

RESIDENTIAL SECTION-MODEL

35


DOMUM.

CONCEPTUAL-MODEL

04.

36



Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.