Do You Really Need an RFP? IS THIS A STRATEGIC SYSTEM? HOW MANY BUSINESS UNITS MAY BE BY A CHANGE?
AFFECTED
TS BE ABLE WILL EACH OF THOSE BUSINESS UNI ECTION AND TO DEDICATE RESOURCES TO THE SEL R/SOLUTION? IMPLEMENTATION OF THE NEW VENDO t’]
[See ‘Internal Stakeholder Managemen
IS THERE A HIGH RISK IF YOU CHOOSE THE WRONG SOLUTION?
• Is the current cost of not having this new system higher than the cost of having to make a second decision?
• If the risk is localized to an individual department or does not have potential knock-on effects, a full evaluation may not be necessary.
• Is the new solution potentially complicated
• Term of agreement with solution (month to month has lower risk)
to replace?
TIP: If ramping up and ramping down the system can be done relatively painlessly, there is less long-term risk to mitigate through a more involved evaluation process.