Portfolio: Field House Design

Page 1


Field House Design

Smarter Places for Learning

Fanning Howey is an integrated architecture, interiors, and engineering firm specializing in learning environments. We use the power of design to create smarter, happier learners, more successful educators and stronger communities.

From our offices in Ohio and Indiana, we have designed K-12 and Higher Education learning environments throughout the Midwest and across the country. Our team is devoted to finding ways to conceive and build inspirational places for teaching and learning.

WE ARE LEADERS IN:

• Architecture

• MEP Engineering

• Interior Design

• Landscape Architecture

• Technology Design

• Construction Administration

• Master Planning

• Educational Visioning

• Bond Issue/Referendum Assistance

950K+

students attend Fanning Howeydesigned schools each day

31 new or renovated field houses

15M

square feet of space planning for educational communities

60+ years of expertise creating impactful spaces

2,850

K-12 school designs in 37 states since 1961

110+

professionals focused on improving learning environments

Badger Fieldhouse

Carmel, IN

A partnership between Carmel Dads' Club and Clay Township brought new athletic opportunities to Carmel, Indiana.

Clay Township and Carmel Dads Club collaborated with Fanning Howey to design a new fieldhouse. The new building has four basketball courts and one full-sized synthetic turf field lined for football and soccer. There are also three batting cages for baseball and softball.

The fieldhouse is funded by Clay Township and is operated by Carmel Dads Club. The partnership supports the 12 athletic programs offered by Carmel Dads' Club, as well as after-hours use by the public.

CLIENT Carmel Dads' Club

SCOPE 152,229 New SF

COST

$12.0 M

COMPLETION DATE 2021

CONTACT

Jack Beery President 317.846.1663

Center Grove Student Activity Center

Greenwood, IN

Designed to benefit as many students and community members as possible, the new Center Grove Student Activity Center (SAC) has something for everyone.

Flexible design concepts allow the SAC to support a limitless range of activities—from track, weight training and fitness programs to band practice, robotics competitions and community recreation. The facility features four basketball/volleyball courts, a weight room and the first 200-meter indoor track in an Indiana K-12 school

CLIENT Center Grove Community School Corporation

SCOPE

61,003 New SF 7,233 Renovated SF

COST

$8.7 M

COMPLETION DATE 2017

CONTACT

William Long Superintendent (317) 881-9326 x1606 longw@centergrove.k12.in.us

Warsaw Student Activity Center

Warsaw, IN

The new Student Activity Center at Warsaw High School is a catalyst for health and wellness for students and the entire Warsaw community.

The multi-sport venue supports a wide range of fitness and recreational activities, from basketball and volleyball to tennis and field events.

A 200-meter indoor track with four full cross courts brings fitness amenities to a new level for students, staff and local residents. The design also incorporates flexible classrooms, childcare facilities for students and teachers and an on-site community health clinic.

CLIENT Warsaw Community Schools

SCOPE 65,000 New SF

COST

$9.2 M

COMPLETION DATE 2019

CONTACT

David Hoffert

Superintendent 574.371.5098 dhoffert@warsaw.k12.in.us

Zionsville High School - New Fieldhouse

Zionsville, IN

When Zionsville Community Schools wanted to expand its high school to include a new field house, Fanning Howey designed an addition that is more than a place for recreation.

The expansion space includes a large commons area and a learning center to support the new field house, weight and fitness facilities. The commons is ideal for group meetings, athletic team gatherings and surge space for athletic events. A new entrance provides students with direct access to the Activity Center.

The use of a very economical load bearing insulated concrete wall panel system yielded additional budget flexibility. Fanning Howey designers used these savings to develop targeted renovations to convert underutilized interior space within the high school into a lecture hall, vocal and instrumental studios and additional classroom space within the overall project budget.

CLIENT Zionsville Community Schools

SCOPE

56,159 New SF 15,937 Renovated SF

COST

$7.4 M

COMPLETION DATE 2015

Spartan Student Activity Center

Connersville, IN

The new Spartan Student Activity Center provides new recreational opportunities for students while dramatically increasing safety and security at Connersville High School.

The new addition enclosed the 1970s, U-shaped floor plan, creating a new main entrance and with adjacent administration offices. In addition to improved security, the student activity center creates a comprehensive recreational facility for students and provide the district with much-needed flexibility for activities. The space supports basketball, volleyball, track and field (including pole vault and long jump), tennis, football, baseball, softball and golf activities. The facility is designed for community-use and to be accessible after school hours.

CLIENT Fayette County School Corporation

SCOPE

26,000 New SF

COST

$5.0 M

COMPLETION DATE 2020

CONTACT

Scott Collins

Superintendent scollins@msddecatur.k12.in.us

Penn High School Fieldhouse

Mishawaka, IN

The 80,000 SF Penn Field House is designed as a flexible facility to serve a wide variety of athletic groups, educational opportunities and community needs.

The design creates a free-standing building with four multipurpose courts, a 200-meter track and runways for long jump and pole vault. Support spaces include concessions, locker rooms, dressing rooms, family restrooms and an athletic training facility. A wrestling room and dance room were designed as alternates and be constructed in the future. The second floor of the field house features a commons, a large observation area, additional locker rooms and dressing rooms, and community meeting rooms. The flexible design of the field house will allow it to support events ranging from basketball, volleyball and baseball to track, tennis and robotics competitions.

CLIENT Penn-Harris-Madison School Corporation

SCOPE

80,000 New SF

COST

$15.9 M

COMPLETION DATE 2025

CONTACT

Aaron Leniski

Chief Operating Officer 574.258.9522 aleniski@phm.k12.in.us

Carmel High School Greyhound Activities Center

Carmel, IN

The new Greyhound Activities Center includes a fullsized football field with artificial turf to serve a wide range of athletics, performing arts and student groups.

The centerpiece of the new center is a full-size indoor football field with artificial turf, offering year-round training and practice opportunities for student-athletes. The facility also includes modern locker rooms, a dedicated band tower, and a large storage room to accommodate the needs of Carmel's award-winning band program. This innovative space is designed to enhance the student experience, bringing together various activities under one roof and providing the resources needed to support Carmel High School's tradition of excellence.

CLIENT Carmel Clay Schools

SCOPE

90,000 New SF

COST

$15.3 M

COMPLETION DATE 2024

CONTACT

Todd Fenoglio

Director of Facilities & Transportation 317.815.3962 tfenoglio@ccs.k12.in.us

Hicksville Athletic Complex

Hicksville, OH

A new athletic complex gives Hicksville Schools muchneeded space for community resources and additional practice facilities.

To reduce practice times and get students home sooner, the design of the new athletic complex needed to support as many programs as possible. The layout includes two practice basketball courts and two practice volleyball courts. Netting can be lowered to separate the courts, allowing multiple practices to occur at once.

Other amenities include two batting/golf cages, a two-lane track, a wrestling room, a weight room and locker rooms. The complex also includes four preschools rooms to support the district's growing student population.

CLIENT Hicksville Exempted Village School District

SCOPE 27,345 New SF

COST

$5.5 M

COMPLETION DATE 2021

CONTACT Keith Countryman Superintendent 419.542.7665 countrymank@hicksvilleschools.org

Wellness Center Addition

Lakeside-Marblehead, OH

The Danbury school facility has been added onto and renovated many times, leading to a very puzzling facility.

It was determined that something needed to be done as their facility was not serving all of their needs. After community engagement sessions, a master facility plan was established to correspond with the district's strategic plan.

Phase I involves a new free-standing wellness center which includes two courts, a 2-lane walking track, fold-out bleachers for 240 spectators, a large weight/fitness room with three overhead doors that open to the courts, four locker rooms (accessible from the outside), restrooms, small ticket office/window, and a concession area with three sinks and space for various pieces of equipment. Also, adding an elementary gymnasium to the existing building includes a rock climbing wall. Sitework consists of a new playground with a monolithic play surface close to the gym addition, a tennis/pickleball court close to the new wellness center, and an expansion of the current parking lot.

CLIENT Danbury Local Schools

SCOPE

32,208 New SF 3,300 Renovated SF

COST

$14.8 M

COMPLETION DATE 2024

CONTACT

Cari Buehler Superintendent 419.798.5185 buehlerc@danburyschools.org

Newton Field House

Pleasant Hill, OH

As criteria architect, Fanning Howey set the stage for a cost-effective field house project with maximum impact for the Pleasant Hill community.

The field house includes a full-size court with Mondo flooring, a threelane track, two basketball goals, suspended baseball netting curtains and portable bleachers. The design also includes a multi-purpose physical education room with rubber athletic flooring, a community room with a kitchenette, two locker rooms and a storage room.

CLIENT Newton Local School District

SCOPE 15,000 New SF

COST

$2.6 M

COMPLETION DATE 2019

CONTACT

Pat McBride

Superintendent 937.676.3271 pat_mcbride@newton.k12.oh.us

Field House Projects

Penn High School Fieldhouse

Penn-Harris-Madison Sch. Corp., Mishawaka, IN

• $15.9 Project - In Design

• This is a free-standing building with four multipurpose courts, a 200-meter track and runways for long jump and pole vault. Support spaces include concessions, locker rooms, dressing rooms, family restrooms and an athletic training facility. A wrestling room and dance room were designed to be constructed in the future. The second floor of the field house features a commons, a large observation area, additional locker rooms and dressing rooms, and community meeting rooms.

Copley-Fairlawn New Fieldhouse

Copley-Fairlawn City Schools, Copley, OH

• Part of a $13.7 Project - Under Construction

• Includes a new 16,000 SF fieldhouse containing restrooms, concession area, locker rooms, offices, and storage areas.

Tippecanoe Valley High School Additions

Tippecanoe Valley School Corporation, Akron, IN

• Part of a $20.1 Project - Under Construction

• Includes a new field house with wrestling room.

Stadium Field House Addition

West Holmes Local Schools, Millersburg, OH

• $2.1 M Project - Uner Construction

• Addition to include fi tness/weigjt room, classrom, batting cages, storage. Upgrades being designed for the locker rooms, training room, meeting rooms, concessions area, and restrooms.

Greyhound Activities Center

Carmel Clay Schools, Carmel, IN

• $15.3 M Project - Under Construction

• 90,000 SF facility with an artificial turf and second story locations for observations. Also includes storage, locker rooms, and restrooms.

Danbury Wellness Cneter

Danbury Local Schools, Lakeside-Marblehead, OH

• Part of a $14.7 M Project - Under Construction

• New 25,000 SF wellness center which includes two courts, a 2-lane walking track, fold out bleachers for 240 spectators, weight/fi tness room, 4 locker rooms, restrooms, ticket office, and concessions area.

Logan Elm Fieldhouse

Logan ELm Local Schools, Circleville, OH

• $1.0 M Project - Completed in 2023

• 9,000 renovation of an existing facility into a field house

Student Health & Activity Center

Rolling Hills Local Schools, Byesville, OH

• $5.0 M Project - Design Complete

• Auxiliary gym with 2 courts, weight room, training room, locker room, coach’s office, restrooms, concession area, and 2 classrooms on the second floor which can also be used as the football pressbox

New Knoxville Auxiliary Gymnasium

New Knoxville Local Schools, New Knoxville, OH

• $2.0 M Project - Completed in 2022

Pre-engineered metal building to house a gymnasium

Badger Fieldhouse

Carmel Dad’s Club, Carmel, IN

• $11.9 M Project - Completed in 2021

• Full-size synthetic turf soccer field, four basketball courts and additional training and support areas

Hicksville Athletic Complex

Hicksville Exempted Village School District, Hicksville, OH

• $5.4 M Project - Completed in 2021

• Large fieldhouse area with 2 full-size courts and a 2-lane track, locker rooms, wrestling room, weight room and 4 classrooms for prekindergarten classes and general use

Newton Field House

Newton Local School District, Pleasant Hill, OH

• $2.0 M Project - Completed in 2019

• Full-size court with Mondo flooring and 3-lane track, PE room, community room with kitchenette and locker rooms

Alexandria Junior/Senior High School Addns/Renovs

Alexandria Community School Corp., Alexandria, IN

• Part of a $9.5 M Project - Completed in 2020

New field house as part of addition/renovation project

Spartan Activity Center Connersville High School

Fayette County School Corporation, Connersville, IN

• $5.0 M - Completed in 2020

• Includes 3 courts with a 2-lane track, long jump and pole vault activities

Northview High School and Clay Jr/Sr High School

Clay Community Schools, Brazil, IN

• $14.4 M Project - Completed in 2019

• Field house additions to two high schools

Warsaw High School Student Activity Center

Warsaw Community Schools, Warsaw, IN

• $9.2 M Project - Completed in 2019

• 65,000 SF addition to high school, which includes four full cross courts, a 200-meter track with field events, flexible classrooms, childcare facility and community health clinic

Batesville High School Addition/Renovation

Batesville Community School Corporation, Batesville, IN

• Part of a $9.0 M Project - Completed in 2018

• 17,000 SF field house with two full-size competition basketball and volleyball courts, 2-lane running track, a wrestling room and a fi tness/weight center

Center Grove High School Student Activity Center

Center Grove Community School Corp., Greenwood, IN

• $8.7 M Project - Completed in 2017

• 61,000 New SF addition to high school, with 4 full-size courts, 200-meter 6-lane track and weight room

Zionsville High School Student Activity Center

Zionsville Community Schools, Zionsville, IN

• $7.3 M Project - Completed in 2015

• Addition to high school with full-size court with rubber floor, 3-lane track, weight room and commons area

Barnitz Strength and Agility Center

Middletown City School District, Middletown, OH

• $2.0 M Project - Completed in 2014

11,000 SF field house, which includes 5,200 SF of field turf,

a 3,500 SF strength/agility room, a training room, an exam room and 2 offices

Sports Facility

Greene County Tech School District, Paragould, AR

• $4.1 M Project - Completed in 2014

• 45,500 field house as part of middle/high school

South Gallia High School and River Valley High School

Gallia County School District, Gallipolis, OH

• $2.6 M Project - Completed in 2012

• Field houses designed at two high schools

Lowell High School Additions & Renovations

Tri-Creek School Corporation, Lowell, IN

• Part of a $40.3 M Project - Completed In 2005

• New field house served as swing space while the existing high school classrooms were renovated

St. Joseph High School Addition & Renovation

St. Joseph Public Schools, St. Joseph, MI

• Part of a $14.0 M Project - Completed In 2004

• Addition includes field house with a maple hardwood floor, a two-story main lobby, an elevated jogging track and a fi tness room

Lakeland High School Additions & Remodeling

Huron Valley Schools, Highland, MI

• Part of a $13.0 M Project - Completed In 2004

• 40,180 SF field house includes a 3 court area of 19,250 SF; a 5,400 SF running track, 3 locker rooms (men’s, women’s, family), 1500 SF storage room, 6350 SF lobby, and 6 offices (shared with natatorium)

Field House Projects, continued

Milford High School Additions & Remodeling

Huron Valley Schools, Highland, MI

• Part of a $13.3 M Project - Completed In 2004

• 40,180 SF field house with seating capacity of 2,200 includes a 3 court area of 19,250 SF; a 5,400 SF running track, 3 locker rooms (men’s, women’s, family), 1500 SF storage room, 6350 SF lobby, and 6 offices (shared with natatorium)

Huntington North High School Addn/Renovation

Huntington County Community School Corp., Huntington, IN

• Part of a $5.7 M Project - Completed In 2003

Pickerington High School North

Pickerington Local School Dist., Pickerington, OH

• Part of a $43.9 M Project - 17,003 SF field houseCompleted In 2003

• Includes 3 courts and portable seating for 420

Medina High School Campus

Medina City Schools, Medina, OH

• Part of a $64.9 M Project - Completed In 2002

• The city of Medina invested $7.5 million to incorporate a new recreational center at the high school, including a field house with 4 courts, running track, fi tness center, 2 aerobic/dance rooms, locker rooms and community room

Greensburg Community High Sch - Field House

Greensburg Community Schools, Greensburg, IN

• $1.8 M Project - Completed In 2002

• Field house is constructed from pre-fabricated materials and includes 3 full-size courts with a 2-lane track, fi tness room, wrestling room and locker rooms

Chesterton High School

Duneland School Corporation, Chesterton, IN

• Part of a $66.4 M Project - Completed In 2000

• Field house is 33,500 square feet and includes a gymnastics area, four cross courts, and an indoor running track

4930 Bradenton Ave Dublin, OH 43017

614.764.4661

128 West Market St Celina, OH 45822

419.586.7771

350 East New York St

Suite 300 Indianapolis, IN 46204

317.848.0966 fhai.com

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.