B.
Non Residential 2. Hoods c. Hood fire suppression, per system $464.03 $520.95 i. Fire Protection Prince William Times | www.princewilliamtimes.com | March 23, 2023 Refunds 1. All requests for refunds must be made in writing to the Building Official. An administrative fee for processing the refund request will be deducted from the refund. Fire Protection $99.31 $105.89
18
LEGAL NOTICES Building Development Fee Schedule
Exceptions to the 6.0% Across-the-Board Increase (Continued) FY23 Adopted
FY24 Proposed
Amusement Devices (Carnival Rides) a. Kiddie Ride, each
Amusement Devices (Carnival Rides) a. Kiddie Ride or Moon Bounce, each (small mechanical ride or inflatable device)
b.
Adult Ride, each (circular ride, institutional trampoline, or flat-ride less than 20 feet in height) d. Roller coasters exceeding 30’ height d. Roller coasters exceeding 30’ height, each e. Generators, per event f. Generators, per event Exception: Small portable generators serving only cord and plug connected equipment loads are not subject to the fee 5. Smoke evacuation system 5. Smoke evacuation system iii. Per cubic foot 50,000-400,000 cubic feet plus above iii. Per cubic foot 50,001-400,000 cubic feet plus above fees <<add table-see separatefees Word/PDF Table document – Building Development Fee Schedule.pdf>>
6.
Adult Ride, each
b.
Consider Revisions to the Land Development Application Review, Inspection Fees and Land Use Applications (Zoning, Rezoning and Special Use Permit) Fee Schedule – The purpose of the public hearing is to consider revisions to the Land Development Application Review and Inspection Fees and Land Use Applications (Zoning, Rezoning and Special Use Permit) Fee Schedule as part of the Fiscal Year 2024 budget adoption process, pursuant to §15.2-107, §15.2-1427, and §15.2-2286 VA Code Ann. The Department of Development Services recommends a 10.0% across-the-board increase in fees, with exceptions as noted in the table below.*
Land Development Fee Schedule Exceptions to the 10.0% Across-the-Board Increase FY23 Adopted Fee
FY24 Proposed Fee
$93 $307 $504 $63 $128 $85 $750 $128
$102 $337 $554 $69 $140 $93 $825 $140
New Certification $215 Re-Certification applied for in less than or equal to two years from last certification date $62 Re-Certification applied for more than two years from last certification date $114 Zoning/Proffer/Special Use Permit - Determination or Interpretation $478 Zoning Verification (submitted by other than the homeowner) (DMV, DEQ, HUD) $93 11. Fire Lane Plan Review $303.41 12. Fire Lane Plan Inspection $246.99 Part V - Nonresidential Subdivision/Site Plan Review Fees 2. Final Site Plan OR no proposed building(s) Percentage of total bond or escrow whichever is higher for up to the first $2M 0.0% Percentage of total bond or escrow whichever is higher for over $2M 0.0% Note: The higher of the two calculations is required to be used for the calculation of the supplemental fee.
$236 $68 $125 $525 $102 $327.68 $266.75
Fee Type Home Occupation Certificate - Family Day Home Home Occupation Certificate Appeal Variance to the Board of Zoning Appeals Re-Advertisement/Re-Notification (standard case) Re-Advertisement/Re-Notification (expanded notification area) Re-Posting/Replacement Sign (of 10 or more signs) Appeal to the Board of Zoning Appeals (BZA)/Board of County Supervisors (BOCS) Non-conforming Lot or Structure Non-conforming Use
0.15% 0.01%
Site Development/Site Preparation Permit Fees 1. Final Site/Subdivision Plan Nonresidential Site Plan OR no proposed building(s) Percentage of total bond or escrow whichever is higher for up to the first $2M Percentage of total bond or escrow whichever is higher for over $2M <<add table-see separate Table documentis–required Land Development Feecalculation Schedule.pdf>> Note: TheWord/PDF higher of the two calculations to be used for the of the supplemental fee.
FY23 Adopted
0.0% 0.0%
0.15% 0.01%
FY24 Proposed
Part IX - Miscellaneous Fees Camera Van Inspections
CCTV Storm Sewer / Underdrain Inspections
Camera Van Re-Inspections
CCTV Storm Sewer / Underdrain Re-Inspections
Special Use Permit Fees Category C - Agricultural uses not related to farming or permitted agricultural uses; temporary public facilities; other limited uses not necessarily commercial in nature • Craft brewery
Category C - Agricultural uses not related to farming or permitted agricultural uses; temporary public facilities; other limited uses not necessarily commercial in nature
Category D - Non-commercial and commercial uses of minimal impact or intensity. • Agritourism on a private street • Arts related use on a private street
Category D - Non-commercial and commercial uses of minimal impact or intensity.
Category E - Commercial uses with intensity that is semicompatible with surrounding uses with relatively few design mitigation measures • Outdoor storage
Category E - Commercial uses with intensity that is semicompatible with surrounding uses with relatively few design mitigation measures • Outdoor/outside storage and display goods 1
Category G - Greater intensity commercial activities, and activities of potentially greater off-site impacts (traffic, noise, lighting, etc.)
Category G - Greater intensity commercial activities, and activities of potentially greater off-site impacts (traffic, noise, lighting, etc.) • Assisted living 1
1. In addition to existing bullets.