1 minute read

Curtain Wall

Next Article
FACADE STUDY

FACADE STUDY

Taking response for curtain wall design coordination from concept to construction administration, I reviewd and marked up every version of CTF curtain wall drawing package of tower portion. I also discussed with consultants such as KPF, SUPER POTATO, ALT, ARUP, PBA and PLA about the aesthetical and technical issues to solve each problem from the beginning to the end.

Advertisement

As the chief designer of L5L6 terrace private dinning room, I coordinated with ALT, ARUP, PBA, PLA and water feature specialist, finished the whole package of detail drawings.

I was also in charge of the L5L6 terrace dinning room design issue. I together with consultants studied and finished every details including curtain wall, water feature, landscape and overlapped areas.

Details of Movement Joint & Drain Chanal Beside Curtain Wall

Details

This article is from: