1 minute read

Applications of over-/under-/off- set/logic/probability/statistics

Amplitude may be, for example, the 'number of hours' an employee works, while phase is the 'quality' of his work. Two employees may work the same number of hours, but the quality of one of them may be higher that the quality of the other. The phase can be any attribute of the amplitude.

Applications of over-/under-/offset/logic/probability/statistics

Advertisement

To Narmada Devi Real life applications of over-/under-/off- set / logic / probability / statistics are many. Normally there is a NORM to do, but some people do extra-work above that norm: - for example in a factory the norm of a worker is to make 100 pieces per month; but he produces 110 pieces; so his effectivity is 110/100 = 1.1 > 1; - the maximum grade for a student is "A"; but some students who do extra-study may get "A+"; - the normal working time for a worker is 40 hours/week; but some work overtime, for example 42 hours per week; so 42/40 = 1.05 > 1; - or a worker misses the whole week of work {so his contribution is 0 (zero)}, and in addition to absences he destroys several machineries into the factory, so now his contribution to the factory is NEGATIVE}. And so on.

This article is from: