2 minute read
BID GROUP
BID to partner with GeorgiaPacific to modernize Pineland, Texas Lumber Complex
BID Group to increase its Production Facility in Mirabel, QC
BID Group recently announced it has received an order from Georgia-Pacific to deliver a new sawmill at its Pineland, TX operation which will replace the existing stud mill. The investment will also include the addition of new debarking, log processing line, a continuous dry kiln, and a new high-speed planer. Through its industry-leading wood processing technologies and integrated solutions offering, BID will manage, design, build, equip, and provide full start-up services for the project.
“We are excited to partner with the BID team again to continue expanding our manufacturing capacity and modernizing our lumber facilities in the U.S. South,” Georgia-Pacific Lumber President Fritz Mason said. “This project will employ the best complement of modern technologies to meet our growing consumer demand for the highest quality product, in a facility that has been a premier operation since the early 1900’s. Working with an industry leader like BID provides the confidence that this major project to further enhance our vertical integration will be done right and delivered on time.”
The new operation will incorporate BID’s best-in-class wood processing technologies including equipment, software, automation systems, and AIenabled optimization. BID’s Integrated Solutions Team will provide the design, engineering, Alistair Cook, President and CEO of BID Group
Georgia-Pacific Lumber President Fritz Mason
planning, fabrication, and installation services for this Turnkey project.
“We would like to thank Georgia-Pacific for their continuing trust in BID, gained through a series of ventures together, to deliver this project. We are humbled and honored that they have chosen to partner with us for their next major growth investment and ongoing operational excellence” said Alistair Cook, President and CEO of BID Group.
Work on site will begin early in 2022 and startup of the sawmill is scheduled for the fourth quarter of 2022.
BID Group, the North American leader in sawmill equipment manufacturing, installation, and life cycle service announces it will invest over $1.5 million dollars at its existing facility in Mirabel to grow production capacity. The company will add 5,000 ft2 to its existing footprint, increasing production capacity over 50%.
“Digital Technologies continue to be a key driver in the transformation of the Wood Processing Industry and a differentiator in the performance of Comact equipment. This investment will allow us to expand production capabilities to continue providing our customers the assurance of leading-edge solutions built with the highest quality workmanship in the industry. This project is part of our long-term manufacturing strategy and we are pleased to announce this investment in our future.” Simon Potvin, President, Wood Processing. Simon Potvin, President, Wood Processing