1 minute read

private bool _scaleWhenClose 20

vivo Shenzhen Headquarters

Project Year: 2019-2020 Project Location: Shenzhen, China On Project Stages: Schematic Design, Design Development, Construction Document Review. Project Status: Approved for Construction. Role on the Team: Architect, Design Computation Lead, BIM Coordinator. Responsibility: Facade design, BIM content crafting, BIM model management. Contribution: Developed facade design into details that aligned with Shenzhen local requirements (which is notoriously complicated). Crafted various useful Revit families for team members. Crafted detailed curtain wall families that covered all the corner and edge conditions. Drafted curtain wall details. Established and managed drawing set.

Advertisement

This article is from: