1 minute read

private Renderer _render

Hana Headquarters

Project Year: 2020-2021 Project Location: Cheongna, South Korea On Project Stages: Design Development. Project Status: Construction Document Review. Role on the Team: Architect, Design Computation Lead, BIM Coordinator. Responsibility: Feature Ramp Design Optimization, Feature Wall Design Optimization, BIM content crafting, BIM model management. Contribution: Optimized exterior feature ramp design to align with local regulations. Optimized feature lobby wall design to be composed with all developable surfaces. Designed paneling and details of the feature lobby wall. Created BIM model based on SD Rhino design model and aided the team to further develop 3D details using Revit. Drafted documentations of feature ramp and feature lobby wall.

This article is from: