1 minute read
Stores result of raycast
Jamsil Olympic Stadium Renovation
Project Year: 2018, 2020 Project Location: Seoul, South Korea On Project Stages: Concept Revision, Schematic Design. Project Status: Construction Document by NOW. Role on the Team: Architect, Design Computation Lead, BIM Coordinator. Responsibility: Sports planning, BIM content crafting, BIM model management. Contribution: Created BIM model of existing condition based on 1988’s original drawings and recent 3D scan data. Created BIM contents for new construction design. Planned athlete program based on modern sports guidelines.
Advertisement