Florida Water Resources Journal - March 2022

Page 28

Test Yourself

What Do You Know About the Lead and Copper Rule Revisions? Donna Kaluzniak

1. P er Title 40, Part 141 of the Code of Federal Regulations (40 CFR 141), Subpart I, Control of Lead and Copper, the requirements of this subpart are effective on what date? a. b. c. d.

J uly 1, 2020 Dec. 16, 2021 J uly 1, 2022 Dec. 31, 2022

2. P er 40 CFR 141, Subpart I, to which water systems does this subpart apply? a. A ll water systems b. Community water systems only c. C ommunity water systems and noncommunity, nontransient water systems d. Community water systems and transient water systems 3. P er 40 CFR 141, Subpart I, when must water systems comply with the requirements of this subpart? a. b. c. d.

D ec. 31, 2022 Dec. 31, 2023 O ct. 16, 2023 Oct. 16, 2024

4. P er 40 CFR 141, Subpart I, the lead trigger level is exceeded if the 90th percentile concentration of lead is greater than a. b. c. d.

µg/L. 5 8 µg/L. 1 0 µg/L. 1 5 µg/L.

5. P er 40 CFR 141, Subpart I, the copper action level is exceeded if the 90th percentile concentration of copper is greater than a. b. c. d.

1.0 mg/L. 1.3 mg/L. 1 .8 mg/L. 2.0 mg/L.

6. P er 40 CFR 141, Subpart I, by what date must water systems develop a lead service line inventory and replacement plan? a. b. c. d.

Dec. 31, 2023 Dec. 31, 2024 O ct. 16, 2023 Oct.16, 2024

7. P er 40 CFR 141, Subpart I, all water systems with lead service lines must begin the first standard monitoring period on January 1 or July 1 in the year following a. b. c. d.

Dec. 31, 2023, whichever is sooner. Dec. 31, 2024, whichever is sooner. O ct.16, 2024, whichever is sooner. June 30, 2024, whichever is sooner.

8. P er 40 CFR 141, Subpart I, water systems that serve more than 10,000 persons whose 90th percentile lead level from tap samples is above the lead trigger level, but at or below the lead action level, must conduct a. a revised lead service line inventory. b. goal-based full lead service line replacement. c. m andatory full lead service line replacement. d. partial lead service line replacement.

28 March 2022 • Florida Water Resources Journal

9. P er 40 CFR 141, Subpart I, all community water systems must conduct directed public education and lead monitoring at the schools and child care facilities they serve if those schools or child care facilities were constructed prior to the date the state adopted leadfree standards or a. b. c. d.

J an. 1, 2014. Jan. 1, 2000. J an. 1, 1996. Jan. 1, 1989.

10. P er 40 CFR 141, Subpart I, what percentage of elementary schools and child care facilities must be sampled each year until all facilities have been sampled? a. b. c. d.

percent 5 10 percent 2 0 percent 25 percent Answers on page 62

References used for this quiz: • « Code of Federal Regulations, Title 40 Part 141 (40 CFR 141) h ttps://www.ecfr.gov/current/title-40/ chapter-I/subchapter-D/part-141

Send Us Your Questions Readers are welcome to submit questions or exercises on water or wastewater treatment plant operations for publication in Test Yourself. Send your question (with the answer) or your exercise (with the solution) by email to: donna@h2owriting.com


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

News Beat

4min
page 61

Pharmaceuticals Found in Florida Fish

2min
page 57

Securing Your Water Storage Tank—Erin

2min
page 55

New Products

5min
page 56

FWPCOA Region IV Short School

3min
pages 53-54

FWEA Focus—Ronald R. Cavalieri

2min
page 52

FSAWWA "Last Splash" Campaign

1min
pages 49-50

Evaluation of Mixing, Mass Transfer Operation and Maintenance, Energy, and Material Requirements for Hydrogen

10min
pages 40-42

Let’s Talk Safety: Energized Electric Equipment and Overhead Power Lines Can Be Deadly

3min
page 48

FSAWWA Fall Conference Call for Papers

1min
page 39

CEU Challenge

2min
page 37

Water Authority Hosts Unique Preserve Hike and Creek Viewing

2min
page 36

AWWA ACE22

1min
page 35

2021 FSAWWA Awards

1min
page 33

Reader Profile—Elisa 'Elsa' Williams

2min
page 34

Celebrate 2022 National Drinking Water Week!

4min
pages 30-31

C Factor—Patrick “Murf” Murphy

7min
pages 20-21

It’s Coming: Water Conservation Month and Water Conservation Awards for Excellence

2min
pages 4-5

Test Yourself—Donna Kaluzniak

2min
pages 28-29

Host Site Established for OSHA Training Institute Education Center

3min
page 22

Sea Change: Desalination and the Water Energy Nexus—Scott Moore

16min
pages 24-27

Florida Utility, High School, and Marine Center Among Award Recipients for AWWA Water Equation Youth STEAM Programs

1min
pages 6-7

FSAWWA Speaking Out—Emilie Moore

2min
page 32
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.