Politecnico di Milano LM in Architecture and Urban Design, AA 2019-20, 2nd semester Architectural Design Studio

Intergenerational Dialogues in the Milanese Peripheries

Final submission

Arcitectural Design

Teachers: Pierre-Alain Croset, Elena Fontanella, Deborah Briccola

House of Sound A1_ Trotter group 01 Gaia Delepine


Table of contents 1. The urban design 1.1 Diagrams -Pedestrian and vehicular streets -Public transportation -Public spaces -Public buildings 1.2 Urban plan -The materials of the ground for the public spaces -The trees in the public spaces 2. The urban promenade 2.2 The new pedestrian path 3. A user journey 3.1 Isabel, urban 3.2 Mario, urban 4. The design process 4.1 The concept 4.3 The evolution of the building 4.4 The evolution of the image 5. The architectural design 5.1 Urban situation 5.2 Plans and sections 5.3 Perspectives 6.The structural design 6.1 Background 6.2 Concept 6.3 Developement 6.4 Optional developement


1. The urban design


Urban diagrams In the urban project developed as a group, we propose a series of individual buildings, each in a dialogue with eachother in order to encourage the interaction between the different age classes in the area (elders, children,...) The “dialogue� between buildings takes place through the creation of a sequence of public spaces (gardens, squares, network of protected pedestrian paths. As shown in the various diagrams, most of the welfare infrastrucutre is maintained

1 - Pedestrian and vehicular streets

2 - Public transportation Scale 1:3500

Scale 1:3500 0

15

30

0

3 - Public spaces Scale 1:3500 0

15

15

30

70m

70m

30

4 - Public buildings Scale 1:3500

70m

0

15

30

70m

1.1 Diagrams

demolished.

4


Urban Master Plan

school and middle school programs are

zone 1, with an introduced music school. 1 urban paths.

2

A

The leisure center and residence for dependent elders is planned for zone 4, acting as a buffer zone between the lowrise and high rise buildings on each side.

3

6

C

4

2

1 kindergarten and music school 2 school - existing 3 4 5 leisure building - new The system of protected pedestrian paths:

1.2 Urban plan

B

C

2 D

B

4

2

A Piazzale del Governo Provvisorio B Via Angelo Mosso C Via Giovanni Pontano D Parco Trotter The materials of the ground for the pavement - project green - project green - parcs

5


revitalize a semi abandoned industrial area. It will improve the connection also proposes a space for children to eat. The new school will rise instead of an old one. It offers new public spaces as the 2 music school

The new leisure centre will add value available inside of it. pavilion in the park context's

The new co-living residence replaces an existing damaged building, and dialogues with the Angelo Mosso Garden.

The new park of Turro will dialogue with the future station that will take place on the other side of Via Padova.

6


2. The urban promenade


Zone 1 Through the Piazza del Governo Provvisorio.

8


Zone 1 Through the Piazza del Governo Provvisorio, with view on the new urban spaces.

and Via Eleonora Fonseca Pimentel with its religious facilities.

2.2 The new pedestrian path

in order to open the parc to the public. Through this site the two historical streets of

9


3. A user journey


Isabel, 5 years old

to go to school, and her parents are more available to take care of her. This

with her parents to the cafĂŠ under the

back to eat some cake and drink their fruit juice.

the friends decide to head back home. Isabel and her parents however are going

parents decide to call the center the next

back to the Valtorta 32 residence, and have aperitivo on the terrace overlooking the piazza. From there, Isabel sees her

go alone, so both fathers decide to while their father look over them, Isabel the parc in front of the house of sound. leaves, Isabel and her father head back upstairs to prepare the food, eat, and sit in front of the TV to watch a movie and 11


Mario, 68 years old Mario is an inhabitant of the co-living residence. He shares the apartment with

in the small semi-independent room. That daughter as her parents go to work. window. Even if it is too cold to be on views on the next-door garden give him the impression to be sitting in nature. son and step-daughter go to work, he takes his granddaughter with him to the

sometimes wakes up to the sound of a dog barking or a bird chipping: this is paced and through the pedestrian streets of Turro. Mario stops at the coffee place. There, he meets with old friends and chit-chats about life. His grand-daughter starts to wake up with the smell of baked cakes. so the two head back to the apartment. After lunch, both Mario and his granddaughter nap before heading back again, this time towards the leisure center on a bench, his granddaughter goes up

the other side of the parc, for a couple game.

grand-daughter still seems to have back to his room for the night. 12


Isabel, 5 years old Isabel lives with both her parents in the new housing development in via Valtorta 32. She wakes up at 7h30, and grabs breakfast with her father while her mother drop her to school, in the house of sound, just below her apartment. There, she meets her friends, Chiara and Matteo, for the doors of the school open. As it gets closer to 8:30, her father brings her to the door of the kindergarten on the second

had learned how plants grow, and are now putting their knowledge to practice. where a large cantine is shared with the After lunch is nap time – each group of kid regains their classrooms, and while

at 16h30, then start after school care activities. Some pupils are part of the painting group that goes to the garden meet the students of the Casa del Sole

schools, in the amphitheatre space. The workshop shop lasts for around an hour.

The path home is safe, as there are no workshop, Isabel brought home berries.

13


Mario, 68 years old his granddaughter to the House of Sound kindergarten. From the co-living through the pedestrian network, from the Via Angelo Mosso to the parc of the kindergarten. Because he brings her in a stroller,

for a minute on the terrace to observe people working in the music school from and knows most of them. However, the ramp to the entrance terrace of the kindergarten, to wait for the teachers to open the doors. Soon, he leaves his granddaughter to the hands of the to her through the glass as she goes to This morning, the children do not have

heads downstairs, in the auditorium, to he meets the music professors, that are responsible for composing the music of an hour, he will help the kids learn their After this, he will take some time to drink a coffee and read his book, in the garden of the cafĂŠ at the foot of the ramp. He will then head back home for lunch. Later of sound to pic up his granddaughter.

with her friends, and Mario can discuss with other parents and grandparents. living residence through the protected pedestrian network. 14


Summary Throughout the neighbourhood, people can interact both in the designed spaces cars, without being disconnected from the

of new infrastructure, but a sewing

large pedestrian streets. Places that used public spaces network. This project is a project for children, for elders, and for all the ages in between.

Isabel, 5 years old

Mario, 68 years old

15


4. The design process


4.1 The concept The house of sound is an institution located in a parc, in the Turro neighbourhood in North East Milan. age of 2 to 6, it hosts students of all ages

17


4.1 The concept 1 - existing situation and demolition

2 - urban void and connections

3 - insertion of volume

As a replacement for a previous kindergaten, to be demolished, its new music school and performance center.

18


4.1 The concept


Week 11

Week 12

Week 12 part 2

understanding the building in its urban environment

integrating the structural approach to the development of the building creation of the urban passage through the building

development of the structural approach insertion of the promenade through and along the building

insertion of green spaces on the roof

facade

4.4 The evolution of the image

Week 10

26


5. The architectural design


It is located in a parc, between numerous residences on south and north, the Via Eleonora Fonseca Pimentel on the west, and the pedestrian Via del Governo provisorio.

8 5 5

for pedestrian from both sides, and all paths converge towards an by the building, where the entrances are located and through which it is possible to link the different urban spaces.

5.1 Urban situation

4

parc, where children and

6

3

1

1

2 4

7

5 0

10

20

35m

1 access to covered area 2 access to ramp 3 main access road 4 main pedestrian road 5 residences 6 7 pedestrian path car routes

28


Underground 1 Amphitheatre 2 Stage 3 Storage 4 Toilet 5 Bakstage 6 Classroom

3

2

5

6

5

6

1

4

0

5

5.2 Plans and sections

3

10m

main route to the main spaces public spaces private spaces semi-public spaces

7 6

service spaces

8 5 9

6

4

4

2

1 2 3 4 5 6 7 8 9 10

Main entrance music venue Main entrance music school Main entrance cafe Toilet Amphitheatre Technical spaces Cloakroom Cafe

1 3

4 4 10

0

5

10m

30


8

8

8

9

8

9 5

5 1

4

7

Main entrance

7

7 2

7 3

6

Toilet Storage

6

10

Music room Classroom Group room 0

Terrace

5

10m

main route to the main spaces public spaces private spaces

5.2 Plans and sections

1 2 3 4 5 6 7 8 9 10 11

4

semi-public spaces service spaces

0

5

10m 31


4

2

5

12 8

1

9 3 4

7

10

6 11

Main entrance Terrace 12

5

8

5

Toilet Group spaces Kitchen Cloakroom Administration Storage Lightwell Gardens

0

5

10m

3

main route to the main spaces public spaces private spaces

5.2 Plans and sections

1 2 3 4 5 6 7 8 9 10 11 12

semi-public spaces service spaces

0

5

10m 32


2 1

1

0

5

10m

main route to the main spaces public spaces private spaces

2

5.2 Plans and sections

1 2

semi-public spaces service spaces

0

5

10m 33


on different levels, through a porous (+_0,000) that allows visitors to cross the building from the parc to the street. Under this are located the main entrances to the different public functions.

5.3 Perspectives

The 28x35m volumetric composition

The ramp creates a promenade between were the kindergarten is located. Placed between the building and the parc, it ensures closeness to the structure while connecting it to its urban context. The structure is evident. The wall bearing

communicates between the elements, while the envelope walls made out of wood add warmth to the building.

34


5.3 Perspectives notice the kindergarten, which follows a different form in comparison to the house that aim at gathering light inside the spaces. 35


5.3 Perspectives mother brings her children to their piano class

36


5.3 Perspectives covered space in between classes

37


5.3 Perspectives the sleeping room

38


6.The structural design

39


43

6.2 Concept


6.2 Concept

load transfer through bending

44


Structural plan

7000

7000

7000

6.3 Development

7000

28000

28000 3500

A

3500

B

3500

C

3500

D

3500

E

3500

F

3500

G

3500

H

I

47


6

5

4

3

2

1

Structural sections

+14,000

+9,000

Demonstrating the dimensioning of elements from +6,000

+3,000

-3,000

6.3 Development

+/_0,000

GSEducationalVersion GSPublisherVersion 298.2.2.100

6

5

4

3

2

1

Floor system: 1 Concrete waffle slab 400mm 2 Concrete slab 50mm 3 Impact sound insulation 50mm 4 Separating plastic layer 1mm 5 Screed with underfloor heating 60mm 6 Separation 7 Floor covering

48 Floor system:


Structural 9 sections

8

7

6

5

4

3

2

1

+14,000

+9,000

Demonstrating the dimensioning of elements from +6,000

+3,000

-3,000

9

8

7

6

5

4

3

2

6.3 Development

+/_0,000

1

Roof system: 1 Sloped waffle slab 300mm 2 Steam barrier 3 Component for thermal insulation 4 Waterproof anti-root covering 5 DAKU FSD 20 [82 mm] 6 DAKU STABILFILTER SFI [1,47 mm] 7 DAKU ROOF SOIL 1 [200 mm] 8 Vegetation 9 Sprinkler system

49


Structural detailling

Structural model

Demonstrating the dimensioning of the ramp

around the building

structural wall

reinforcement

6.3 Development

Moment diagram concrete

17cm Shear diagram

Deformation diagram

50


Structural detailling

Structural model Demonstrating the dimensioning of the ramp Supported ramp

Moment diagram reinforcement

supporting steel column

concrete

17cm

6.3 Development

spaced 4,5m.

Shear diagram

Deformation diagram

51


Structural calculation

7000

7000

7000

7000

calculated according to the dedaload of the slab itself, the liveloads according to the spaces and The calculations were performed on a section of 1m depth of the building.

6.4 Optional Development

Slab

52


Group 01

Gaïa Delépine