SMART MOVING KAMPALA Design of NMT-zone in Namirembe Road and Luwum Street 3 february 2014
Client Title
Iganga Foundation Smart Moving Kampala, Design of NMT-zone in Namirembe Road and Luwum Street
Date publication Status Projectteam Move Mobility and
3 february 2014 Concept Tonny Bosch, Hans van der Stok, Jeroen Kuijpers and Marco Aarsen
Goudappel Coffeng Reference
2
Smart Moving Kampala
IGG021/Asm/0010
Š Copyright Goudappel Coffeng
Smart Moving Kampala
3
Content
1 Introduction 1.1
NMT-pilot for Kampala
1.2
National NMT-policy
1.3
NMT as part of Kampala Physical Development Plan
1.4
The contents of this report
6
2 NMT as a part of the future traffic system
2.1
Commuting into Kampala
2.2
Traffic policy for Kampala
2.3
Comprehensive traffic planning
3 Assessment: Benefits of NMT 3.1
Objectives of NMT
3.2
Economic and other problems caused by traffic
3.3
Benefits of Introduction of NMT
3.4
How will Kampala benefit?
12
22
4 Design for the NMT-zone
4.1
Design principles
4.2
Traffic structure around Namirembe Road and Luwum Street
4.3
Basic profiles
4.4
Basic profiles translated into the disign
4.5
Artist impressions
5 Materialization and costs
5.1 Materialization
5.2 Costs
Appendix 1: Objectives and program requirements
4
Smart Moving Kampala
34
74
86
Smart Moving Kampala
5
6
Smart Moving Kampala
1
Introduction
Smart Moving Kampala
7
8
Smart Moving Kampala
Smart Moving Kampala
9
1.1
NMT-pilot for Kampala
1.2
National NMT-policy
The concept of non-motorized transport (NMT) was introduced in
In may 2013 a national NMT-policy was launched by the Minister of Works
Kampala some years ago. Of course, the majority of the trips in Kampala
and Transport,
have always been made by foot and some by bicycle. But the use
Key elements of the policy are:
of private cars and matatus has been growing the last decades. This
▪▪
augmented mobility of people contributed to the economic growth of the city. But at the same time the intensification of traffic has led to congestion of the main roads and centre of the city, air pollution and traffic accidents. In a way, motorized traffic has become prey to its own
Increase the recognition of walking and cycling in transport, planning, design and infrastructure provision.
▪▪ ▪▪ ▪▪
Provide safe infrastructure for pedestrians and cyclists. Mainstream resources for walking and cyclists. Develop and adopt universal design standards that provide
success. This has been happening in many cities around the world. A
for access of all categories of people inthe community and
more sustainable way of organizing urban transport had to be found.
improve regulation and enforcement to enhance safety for
Many cities, facing this kind of problems, found improvement of both
pedestrians and cyclists.
traffic circulation and economic prosperity by introduction of areas with less or no cars, accessible for pedestrians and cyclists only. The concept
The recent launch of this policy indicates that the national government
is generally known as NMT.
of Uganda is recognising the important yet vulnerable position of pedestrians and cyclists on the road.
In 2011, a first investigation of possibilities for Sustainable Urban Transport in Kampala was made. This has been the basis for the Pilot
As it is a national policy, no local projects have been defined as part
Project for Kampala City Centre. Part of this pilot project was a first
of it. However, some goals are set and some intentions have been put
design for the NMT-zone along Namirembe Road and Luwum Street,
forward: In general the policy states that “Infrastructure for pedestrians
prepared with the assistance from Goudappel Coffeng and Goudappel
and cyclists should be included in all major works for road upgrading and
Africa. With help of the Iganga foundation this year, Goudappel Coffeng
strengthening”.
is able to prepare the next step. Furthermore the following statements have been made, amongst many others:
▪▪
Government will require the relevant authorities in Kampala and other large urban areas, to plan for through cycle routes between high density residential areas and major places of employment.
▪▪
Government will support the pedestrianisation of certain urban roads, provided this is for the overall public good. In all cases, adequate planning and attention must be undertaken to understand and address the consequences of the changes to infrastructure.
▪▪
Government will provide guidance to the Uganda Road Fund to finance specific projects, in line with its mandate, that are part of approved NMT plans.
10
Smart Moving Kampala
1.3
NMT as part of Kampala Physical
1.4
The contents of this report
Development Plan
This report shows the results of the designing process that has been undertaken in 2013. It builds on the conclusions drawn by ROM by making
The recently completed Physical Development Plan (PDP) for the KCCA
new traffic arrangements for the surroundings of the NMT-zone. An
recommended a significant investment in NMT facilities. One of these
assessment of the advantages of NMT is presented, and finally a detailed
facilities is a pilot corridor designed for NMT modes only. Successful
design will be presented for the whole NMT-zone.
implementation of such a pilot corridor can lead to increased investment in similar facilities and a strengthening of the share of NMT trips in the
The following items will be covered in separate reports or have to be
KCCA area.
addressed in the next phase of the project:
In 2012 an investigation was done by ROM Transportation Engineering
▪▪ ▪▪
into the traffic effects of implementation of the NMT-project.
Communication and marketing aspects. The findings of the consultation of stakeholders and (potential) users.
▪▪
Technical engineering and construction details including drainage and hydrological designs.
▪▪
Tender documents for the actual construction and implementation of the plan.
Smart Moving Kampala
11
12
Smart Moving Kampala
2
NMT as a part of the future traffic system
Smart Moving Kampala
13
2.1
Commuting into Kampala
In many ways Kampala is the capital of Uganda. It is a metropolitan
Congestion in the city centre
area, with 1.5 million inhabitants and more than 1.5 million commuters
In the centre of Kampala, many roads are congested most of the day.
traveling into the city every day. Car ownership is higher than in the rest
Streets are very busy and filled with cars, buses and motorcycles. In
of Uganda, 15 cars for every 100 inhabitants (2.4 is average for Uganda).
Kampala, each day 24.000 man hours are lost by commuters due to traffic jams.
Many of these commuters travel into Kampala by foot, some by bicycle. From all people traveling into Kampala by motorized transport, more than
In the area near the Old Taxi Park many streets are blocked by matatus
80% use 14-seater matatus. Private cars, have a modal share of 37% of
waiting to enter the taxi park. This happens every day and makes flow
all motorized transport, but transport less than 10% of the people. The
of traffic impossible in the nearby streets. As a result the theoretic road
number of private cars is expected to grow even further in the coming
capacity is not available during most hours of the day.
years. BodaBoda’s have a modal share of over 40%, but carry only 9% of commuters to the city. The large numbers of people traveling into Kampala on a daily basis, combined with the absence of a well organized system of roads, lead to problems of congestion.
‘‘In Kampala, each day 24.000 man hours are lost by commuters due to traffic jam.’’
100 %
21 %
42 %
82 %
50 %
37 % 0%
% trips 14-seater Matatu Boda - Boda Private car
Share of motorized transport
14
Smart Moving Kampala
9% 9%
% persons
Traffic Safety At this moment, the situation on Kampala roads is not as safe as desired. Improvement is imperative and possible. The position of pedestrians in Kampala is pathetic: Half of the fatalities in traffic are pedestrians. The road network is not categorized, i.e. there is no real distinction between main roads and residential streets in either geometric design or usage of the street plan. Most roads have no safe sidewalks for pedestrians, except for some streets in the city centre.
Pollution Pollution is a big problem in Kampala. Due to heavy traffic, congestion and the use of lead-containing fuels, air quality is poor. Due to the numerous challenges faced by the National Environment Management Authority (NEMA), the urban street air pollution caused by road transport is still not monitored. Circumstances are a threat to the health of all the people staying and visiting the city centre.
Smart Moving Kampala
15
2.2 Traffic policy for Kampala 2.2.1
Traffic planning for the near future
KCCA has developed goals for traffic planning in Kampala for short, medium and long term. On the short term efforts are concentrated in building the organization and professional capacity, and extending the field of traffic planning by introduction of:
▪▪ ▪▪ ▪▪
traffic management/signalization parking policy NMT
A system of Bus Rapid Transit (BRT) is already being planned. Implementation is expected in 3-5 years. These new areas of work have to be integrated in a comprehensive Mobility Plan, in which all modes will be organized as part of a well designed and sustainable concept.
Facilities by mode of travel 2010
16
Smart Moving Kampala
Congestion in the city centre In the centre of Kampala many roads are congested during large parts of the day. Streets are very busy and filled with cars buses and motorcycles.
In Report 2, the BRT concept for Kampala was defined as along with the scop pilot project. The main characteristics are summarised below.
The BRT concept aims at introducing an attractive highcapacity transport sy minimising land acquisition and minimising the need for subsidising the oper capacity system is ensured by using 18m long articulated buses operating at h A Bus Rapid Transit system will be built in Kampala in the coming years. A plan has been made containing a network of BRT-lines to be developed of up to 60 vehicles per hour per direction. The need for subsidy or state aid i in the coming three years. At this moment detailed designs for the first minimised by running an efficient system that minimises to the extent possibl BRT-corridors are in the final preparation stage. In the city centre these operating costs while still providing sufficient capacity to satisfy demand. Th corridors will be built on Jinja Road – Kampala Road – Bomb Road and on achieved by maintaining a high operating speed throughout the BRT network Entebbe Road. minimises rolling stock requirements, lost time (and nonrevenue generating The way the BRT-project deals with traffic will influence the ways operation) and losses resulting from fuel inefficiencies in congested and stop/ the NMT-zone can or will be designed.and might thus lead to (minor) A high operating speed is to be achieved by having dedicated lanes over the f alterations to the presented plans. BRT corridor, introducing a limited number of stops (thereby minimising dw still maintaining an appropriate level of accessibility by applying an average s On the longer run the BRT-system is due to take over a major part of the and by minimising delays at junctions. Key junctions along the pilot co current public transport. Matatus will serve less in the city centre and800m, be transferred into feeder-services to the BRT-system, that will bring people redesigned; traffic signals with priority for the BRT will be introduced and, w into the city centre. and is warranted, separate lanes for right turns will be provided. 2.2.2 BRT-project
This will lead to minimization of the space used by matatu’s in the city centre, especially in the Old Taxi Park and above all, the streets leading to the Old Taxi Park, resulting in less congestion and less in efficient use of public space.
“Network: BRT, bus and taxi will play complementary roles in an integrated network. The BRT will have a dominant role in the central part of Greater Kampala and the taxi and bus industry is invited to expand their business to the fast growing suburbs. This will be supported by the relocation of taxi parks to the periphery” 1
proposed network BRT, phase 1
1
Bus Rapid Transit for Greater Kampala, Report 4: Interim Design, draft, ROM, April 2013
Report 3: Demand and Operations version 3
Smart Moving Kampala
17
2.3 Comprehensive traffic planning
2.3.2
As stated before the NMT-zone will have to be part of a comprehensive
The BRT-network has been designed in detail. Interaction with other
way of looking at mobility. This implies that a pedestrian area and bicycle
traffic has been dealt with for the main corridors. The 3 pilot-lines of the
lanes must not be isolated objects but part of a network of facilities for
BRT will run through Kampala Road and Entebbe Road and take the main
NMT. All modes have to be accommodated in the system in a way that
roads from suburban areas to the city centre ( Jinja Road, Bombo Road,
the whole system will operate at its best. This means that a network
Entebbe Road). Once this network is augmented, other corridors will be
for motorized traffic can not be designed without considering public
added.
transport, walking and cycling. This idea of comprehensive planning has led to a process of planning the NMT-zone, in which proper operation of
2.3.3
BRT network
Bicycle network
all modes is to be addressed. The cycle network is practically non-existent at this moment. Bicycles
2.3.1
have to join the general traffic and blend with cars, buses and lorries.
Car network
This is a very unsafe situation. There are already thousands of cyclists To start off with the car system: At this moment there is no attractive
entering the city on a daily basis. A network has to be created, using the
route around the city centre, but the centre itself is congested most of
main arteries of BRT and other radial roads to enter the city and reach the
the day. The cut-through traffic has to be diverted around the centre in
centre. On these roads, cycle lanes will make cycling much safer.
order to create room for cars with their destination in the centre of the city. Cut-through traffic will also have to be diverted from those routes
In the design for BRT a choice has been made not to have cycle lanes
where the BRT will be laid out. For this reason a ring road structure has to
along the main BRT-corridors. We would recommend using these roads
be adopted and designed. This doesn’t necessarily mean that new road
for cyclists as well. Where there is no room for facilities for cyclists, a
infrastructure will be created , but a combination of existing roads around
parallel corridor should be developed, as long as this parallel corridor is
the centre that will be transformed into this ring. Our proposal is that this
safe, fast and leads directly to the centre.
ring will be formed by Yusufu Lule Road - Haji Kasule Road - Makerere
SMART MOVING KAMPALA Road - Old Kampala Road (western branch) - Mwanga II Road - Mutesa
Road - Entebbe Road - Jinja Road. The main radial roads, like Jinja Road, Bombo Road etcetera will be the entrances to the city. The ring will
accommodate the traffic to the area they want to be. Towards integrated networks for all modes
+ Car network
+ BRT network
18
=
clear po
Part of bicycle network
Separating
Smart Moving Kampala
P
P
center ring car network
NMT pilot
BRT-network
Clear position of bicycles in traffic Separating car and bicycle infrastructures. Bicycle combined with BRT network. Smart Moving Kampala
19
BRT-network
NMT pilot Namirembe Road Taxi TAXI
Luwum Street
Market
center ring car network
20
Smart Moving Kampala
BRT-network
before
before
BRT
BRT after 0
5
10 meter
BRT route in combination with bicycle, walking and green after 0
5
10 meter
BRT route in combination with bicycle, walking and green
Center ring. Main network for cars, but also space for bicycles, walking and green
Center ring. Main network for cars, but also space for bicycles, walking and green
0
0
5
5
10 meter
10 meter
Possible profiles for the center ring for the cars and for the BRT network. The bicycle is implemented in both of the profiles.
Smart Moving Kampala
21
22
Smart Moving Kampala
3
Assessment: Benefits of NMT
Smart Moving Kampala
23
3.1
Objectives of NMT
3.2 Economic and other problems
NMT-policy has been launched as a way to improve not only the traffic
caused by traffic
system in Kampala and the rest of the country. It is about the way the public space and mobility in cities and rural areas. That is why for the
Urban areas have been growing for decades, thanks to the availability of
case of Kampala, the main objective of development of the NMT-zone is:
motorized transport. As earlier mentioned, motorized transport comes with congestion, accidents, pollution etcetera. These disadvantages have
“To improve the urban quality of the central area of Kampala by
been known in many of the cities all over the world where the number
introduction of an NMT-zone, and by so doing, improve the economic
of private cars has been high. Many of these cities have implemented
prosperity of Kampala and its inhabitants.’’
policies to reduce the negative impact of motorized traffic.
There are some secondary objectives as well, adding to the benefit of
The notion to focus not only on car-oriented planning has been adapted
introduction of NMT.
by many unilateral institutions such as the WHO, UNEP and UN-Habitat and has resulted in initiatives such as Share the Road.
▪▪ ▪▪ ▪▪ ▪▪
Encourage the use of bicycles in Kampala. Improve air quality in a central area of Kampala. Lowering of the number of fatalities in traffic. Set an example of a well functioning NMT-area in Uganda and Africa.
24
Smart Moving Kampala
Scheme with the main problems caused by motorised transport in urban areas
3.3 Benefits of Introduction of NMT 3.3.1 General A scheme of NMT is expected to have positive effects in several fields, effects that have been seen in several other cities all over the world. The main advantages of introduction of NMT are
▪▪ ▪▪ ▪▪ ▪▪ ▪▪
Economic attractiveness of inner city Quality of public space Road safety Decrease of pollution Promotion of cycling and walking
The attractiveness of the inner city has its effect on the functioning of shops and businesses. The main shopping area in the inner city of Kampala is situated around Namirembe Road and Luwum Street. The daily congestion makes it very hard to reach a destination in this area
The overall assessment of these elements can best be illustrated by collecting data (through simulation (chapter 3.4 ROM-report) and questionnaires (chapter 3.5) in or nearby the location where the altered infrastructure is introduced. In the following paragraph more general findings on the benefits on NMT are presented.
3.3.2
A general assessment of NMT-introduction
In the NMT planning policy brief East Africa (produced by MOVE Mobility for UNEP, June 2013) and overview of the Cost-effectiveness of integral planning, which forms the basis for this NMT pilot, was presented. It was concluded that both implemented integral planning schemes and individual projects had positive cost benefits ratios. In many assessment studies significant benefits were presented even though not all benefits were properly covered by the evaluation studies, which mostly had a transport economic focus.
by car. On the other hand the massive numbers of vehicles crowding the streets is making the streets less attractive to stay or shop. A street with less space for cars or completely without cars is a far more attractive place to stay. This will have a positive economic effect on shops and companies. Pedestrians and cyclists are the most probable victims of traffic accidents. By dedicating an area to pedestrians and cyclists only, and reducing the number and speed of cars in other parts, the number of accidents is due to fall dramatically. The unsafe situation, missing facilities for cyclists in the traffic system and bad air quality discourage people from cycling into the city centre. Only a small percentage of commuters into Kampala use a bicycle to travel. Creation of cycle lanes will encourage people to cycle and cause a growth in the number of cyclists.
Smart Moving Kampala
25
plazas, and commercial areas. In most instances the public space had been lost either to invasions from informal traders or from parked vehicles. The reclamation process typically included several policy elements, such as new infrastructure development, area beautification, and enforcement of usage restrictions. The areas chosen for analysis include some of the most notable transformations of urban space. In the city centre, Avenue Jimenez has been Bogota, Colombia1recovered through the renewal of Plaza San Victorino and the establishment of a public A high degree of political will in transit/pedestrian the city of Bogota, Colombia contributed corridor. This corridor now to dramatic changes in several areas; Bogotáaachieved significant includes small water canal, improved street synergies by simultaneously addressing several topics: lighting, brick-textured street and pedestrian surfaces, vegetation, and wider pedestrian space 1. Reclamation of public(Figure space 1). The area was previously a focus of 2. Improvement of public transport much criminal activity. 3.3.3 Examples
3.
Promotion of non-motorised transport
4.
Implementation of auto measures Therestriction city’s “Carrera
15” (Avenue 15)Thewas revitalisation of Avenue Jimenez in Bogotá has helped to create a Figure 1 The revitalisation of Avenue previously reminiscent of a North American more dynamic public space Jimenez in Bogotá has helped to create The near simultaneous application of these policies has produced strip mall, a collection of shops along a street a more dynamic public space. quantifiable benefits to the quality of life of cityby residents. Research Walking along Carrera dominated car parking. 15 with wasurban a wholly unpleasant experience due to noise, traffic, and a narrow uneven walking shows that property values in areas upgrades have space. to Today, 15 hosts an attractive, wide pedestrian space featuring trees, appreciated considerably when compared a controlCarrera group of similar benches, and improved street properties. Additionally, the research shows employment benefits from lighting. Two lanes of traffic and on-street parking have been removed in order to this transformation possible. the city’s Sunday “ciclovía” (closing of streets to motorised vehicles)make is significantly greater than week-day auto-related employment along the
In the more affluent northbyof same corridors. Air quality monitoring shows emission reductions
the city, several dining and entertainment districts have been through pedestrian as much as 40 per cent for somerenovated pollutants. Social indicators related to improvement schemes. The “Zona Rosa T” (Pink Zone T) project involved closing two streets to traffic and thus forming a pedestrianised “T” shape accidents, crime levels, and equity are also quite positive. Traffic deaths along rows of restaurants and boutiques. The attractive area has become a focal point for have been reduced from over 1,300 in 1995 to less than 700 in 2002. nightlife in the city. Finally, one of the most ambitious projects in terms of reclaimed space is still underway in Bogotá. The creation of the Third Millennium Park in the city centre has ambitiously sought to convert one of the most crime-ridden areas into a vast array of open space, recreational grounds, and educational centres. Improvement of public transport Like so many cities in the developing world, the provision of public transport had traditionally been left to a disparate group of private sector operators. With uncoordinated
1
Reclaiming public space. The economic, environmental, and social impacts of Bogotá’s transforma-tion. Lloyd Wright, University
College London, Ricardo Montezuma, Human City Foundation, 2004
26
Smart Moving Kampala
The Hague, The Netherlands In the city centre of The Hague the Traffic Circulation Plan has been implemented in 2010. The city centre has been turned into an area with less cars and more space for pedestrians and cyclists. The program started shortly after 1990 and took a process of change that took about 20 years. In that years the inner city slowly moved towards pedestrianisation. The actual car-free area consists of more than 20 streets. The main objectives have been:
▪▪ ▪▪ ▪▪ ▪▪
Less cut-through traffic in city centre Good accessibility of city centre for cars Better air quality, less pollution Better quality of urban space for pedestrians and cyclists
An evaluation scheme in 2011 shows us that most objectives have been achieved.
▪▪
Factually cut-through traffic through the city centre has been
Grote Marktstraat, The Hague, before and after turning it into a NMT-zone
made impossible in The Hague; all cars should use the Ring Road around the city centre. Nevertheless accessibility by cars has not deteriorated since introduction of the scheme.
▪▪
Air quality has been measured before and after introduction of the scheme. Air quality has improved. For example, measured decrease of NO2-concentration since introduction has been 6,5 μg/m3 on one of the streets concerned.
▪▪
Quality of public transport and quality for pedestrians and cyclists are judged “very good” by the visitors of The Hague.
NMT-area and Parking-route around city centre, The Hague Smart Moving Kampala
27
Traffic Calming in San Francisco Valencia Street in San Francisco (USA) has been redesigned to a street with more space for pedestrians and cyclists, and less room for vehicles. Traffic calming is the combination of mainly physical measures that reduce the negative effects of motor vehicle use, alter driver behaviour, and improve conditions for non-motorized street users. It is part of a new movement in transportation engineering that is more multimodal in focus (buses, bikes, pedestrians, etc.) and less auto-centric than previous engineering trends. Common traffic calming techniques and tools include speed bumps, crosswalk narrowing for pedestrians, better signals or signs, new street trees or landscaping, bike lanes, removing a lane of auto traffic, and reconfiguring or narrowing streets. Valencia Street is located in a very dynamic part of the Mission District, and integrates with pedestrian, bus, bike, and car activity along its length. Prior to the installation of the bike lanes, Valencia Street had two auto traffic lanes in each direction. The street was converted to one traffic lane and bike lane in each direction, with a turning lane down the middle of the road. Twenty-seven merchants located in the Mission District of San Francisco were interviewed about what impact the Valencia Street bicycle lanes have had on their businesses. Four and a half years after the bike lanes were built, the vast majority of the interviewees expressed support for the bike lanes. Sixty-six percent of the merchants believe that the bike lanes have had a generally positive impact on their business and/or sales, and the same percentage would support more traffic calming on Valencia Street.
28
Smart Moving Kampala
Valencia Street, San Francisco
Copenhagen, Denmark Until 1962, all streets in the medieval city centre of Copenhagen were filled with cars and all the squares were used as car parks. As car traffic increased, conditions for pedestrians were rapidly deteriorating. As the streets and squares in the city centre have been pedestrianized and improved, the area has become more attractive yet also less accessible for the motorist. The city authority has adopted an integrated traffic management strategy (below), for the city centre:
▪▪ ▪▪
Limiting the number of parking spaces. Reducing the number of lanes on several main routes into the city and using the space for bus and cycle lanes instead.
▪▪
Restricting through traffic while developing the suburban train, bus and bicycle networks.
Car traffic in the city core has been reduced and congestion is not a problem. This marked the beginning of a gradual transformation that has continued ever since. Today Copenhagen has a vibrant city centre that attracts visitors throughout the year. The key to the success of these inner city transformations was undoubtedly the gradual way these rather drastic changes were made. This incremental approach has given residents time to adapt, to change from driving and parking their cars to walking, using bicycles and public transport.
Smart Moving Kampala
29
Economic attractiveness
3.4 How will Kampala benefit? The analysis in the ROM-report showed that it is possible to mitigate the negative impacts of the NMT corridor by applying a set of traffic
Decrease of pollution
management measures, including the following: 1.
On-street parking adjacent to the pilot corridor should be professionally managed. Paid parking should be
Quality of public space
implemented, parking duration should be limited to 2-3 hours, and taxi parking should be removed. On-street parking should be allowed only on street sections where
Road safety
traffic is not affected (i.e. at least 12 meters before the intersection). 2.
Most intersections in the downtown area should be signalized using modern controllers and managed centrally
Promotion of cycling and walking
from a professional traffic control centre. Signal phasing should be based on actual demand on each intersection leg. 3.
Geometric design of intersections outside the pilot corridor should be changed. It is recommended that the size of intersections be narrowed, thus lowering intersection clearance times. It is also recommended to signalize pedestrian crossings so that pedestrian movements will not slow down vehicles. In some cases, roundabouts were found to be better than classic at-grade intersection.
4.
It is recommended to consider new traffic arrangements on the main streets surrounding the corridor to specifically include the exploration of a one-way traffic scheme. This arrangement is also recommended by the BRT detailed design study.
5.
It is strongly recommended that the pilot corridor itself be paved and attractive street furniture be installed. The corridor should also include enough parking facilities for bicycles.
Mukwanu Centre; attractive and car-free
30
Smart Moving Kampala
3.5
Interviews
These recommendations show that the NMT-pilot should be part of a
As proposed in the project plan the beliefs, attitudes and opinions of
comprehensive plan for more than the NMT-zone itself.
the general public, stakeholders and potential users of the altered
Combined introduction of NMT, BRT and traffic management will cause a
infrastructure will be investigated by conducting road site interviews and
more positive effect than each of these plans alone.
questionnaires. A total number of 300-400 persons will be interviewed both before and after the implementation of the project.
As far as road capacity is concerned, a remark can be made out of observation on the street: The constant state of congestion of Namirembe Road during daytime causes a very low number of cars that are actually using the central parts of the NMT-zone in the current situation. As a consequence, the loss of road capacity by introduction of a pedestrianized
The interviews will generate insight in the overall appraisal of
▪▪ ▪▪ ▪▪
the traffic modes/traffic flow situation and conditions Environmental conditions (air pollution/noise) Business attractiveness
street will be small. This task is organized by Goudappel Africa.
Smart Moving Kampala
31
3.6 Conclusion A number of aspects have been mentioned on how Kampala will benefit from the NMT-zone. The main advantages being:
▪▪
When the current plans for NMT and BRT are implemented in an integral way, more people are drawn towards the centre. Businesses and shops will profit from this, as will real estate owners.
▪▪
Congestion and heavy traffic will no longer be a source of pollution and noise.
▪▪
The central area of Kampala will be a much more attractive place to stay.
▪▪
Road sharing, with separated areas for motorized and nonmotorized traffic will help improve road safety a lot.
▪▪
As a result of more attractive and safer roads, pedestrians and cyclists will use the city centre more easily.
32
Smart Moving Kampala
Smart Moving Kampala
33
34
Smart Moving Kampala
4
Design for the NMT-zone
Smart Moving Kampala
35
4.1
Design principles
Cyclist is leading
Speed-reducing measures for cars
The basis of the design for the NMT zone is an optimal integration of the
To slow down the cars, the road gets a couple of curves in the design.
bicycle in the street. The design is such that the cyclist has a safe place in
In this way we prevent a long straight road with higher speeds. The
the whole. The cyclist is leading. The design meets the Dutch standards
locations of the curves in the road create natural places for zebra
regarding traffic safety and is very recognisable.
crossings for the pedestrians.
The cyclist has priority at crossroads and is combined with the zebra
The curves in the road also provide a distribution of the parking spaces.
crossing for pedestrians. To make it more understandable to give way to
These are alternately located on both sides of the road. In this way we
a bicycle path we’ve chosen to make the zebra crossings green as well.
can optimally respond to local parking needs.
This combination of pedestrians and cyclists will help introducing the proper use and expected behaviour towards cyclists.
Plants and trees Plants and trees do have an important position in the design. It serves
Ready for the future
multiple purposes. Greenery provides the desired shade, it provides
The design takes into account future enlargement of the bicycle network.
filtering of the air and it provides an attractive and healthy environment.
The aim is to develop a network in the long term. The strongest basis for
In addition to these features, the greenery also has a conductive and
a bicycle network is a structure with bicycle paths on both sides of the
protective function. It conducts the cyclist, but also causes a physical
road. This avoids crossing movements and keeps the adjacent facilities
barrier between the bicycle path and the pedestrians and the vehicles.
and homes optimal accessible.
Since bicycle paths are a new phenomenon in Kampala, the odds are big that pedestrians are going to walk on the bicycle path. There is also a big
Different zones
chance that cars and boda bodas are going to ride on the bicycle paths.
The design has different zones. The areas which are still accessible for
That is why we make it physically impossible. With the plants and the
the car have bicycle paths on both sides of the road. This way we create
trees we create a partition between the bicycle path and the rest of the
a safe situation for the cyclists. The central area of the city centre is
area. This way the bicycle path can not be blocked by other road users.
car-free. Here the cyclists are able to use a bicycle path in two directions
At the same time, the plants and the trees make the bicycle path even
situated in the middle.
more attractive.
The middle area will be car-free, but should still allow (slow and limited)
On the locations where the curves in the road and the zebra crossings
access for suppliers. Further design and traffic management measures
are, there is extra space for plants and trees. With the plants these
will be needed to make the system function smoothly and according to
locations are further highlighted in the whole streetscape.
the design principles.
36
Smart Moving Kampala
BRT-network
NMT pilot Namirembe Road Taxi TAXI
Luwum Street
Market
center ring car network
BRT-network
Smart Moving Kampala
37
P before
before
P after
P
P
after
3,0
2,0
1,0 3,0
2,5 2,0
before
before
after
after
P before
before
after
after
P 1,0
3,5 2,5
1,0
2,0 3,5
1,0 3,0
2,0meters 3,0
meters
0
Namirembe Namirembe road road
05
5 meter 10
4,0
2,04,0
2,0 5,0
5,02,0
4,02,0
meters 4,0
10 meter
meters
0
Namirembe-Luwum Namirembe-Luwum street street
05
5 meter 10
10 meter
Luwum Luwum street street
labye
To Na
Regency Hotel
ed
nc
ye
To Naku
Fenced Parking
kulab
Basic profiles
g
in
rk
Pa
To Ga que dd dafi Mos To Gadafi
Fe
S.L
E.P E.P
Power house
She
She ll Fu el llstFuel atio stat n io
n
Power house
S.L
House
ING
S.L
Station
d oa aR alig Road a ak ligW
Fuel
TRINITY PARK TRINITY pARKING
E.P E.P
Waka
Total
t
Bakuli Marke
Murram Road
Baku li Tra Bakuli Traffic Junction ffic Junc Baku tion li Tra ffic S.L Junc tion S.L
Ci
ty
E.P
oil
E.P
n
Fu
City oil Fuel statio
el
E.P E.P E.P E.P
sta
tio
n Jaga
E.P E.P
ur pa
rking
Jaga
a P.S
E.P E.P
M.H
a Ba
r E.P
E
Fuel
r Prid
e The
atre
fence/tree
nt
S.L
statio
M.H
n
Club
t End
rtin
Road
stu
M.H
Ma
Build
ing
de
r Cons
tructi
on
scale 1:5000
Mwanga Road
Ro
ad
a
ng
wa
M
Ro
Containers E.P
House
House
E.P Available space can be used to give more small houses room for pedestrians and greenery. small houses
M.H
M.H
Not enough space available to fit in the profile with parking. Expanding toward the North side looks possible?
Further design measures for this crossing will be needed.
M.H
M.H E.P M.H
M.H
E.P
M.H
E.P
M.H
E.P E.P
E.P
E.P
M.H
New Taxi Park
Hoarding
E.P E.P
E.P
M.H
M.HE.P E.P
E.P E.P
tre
niture
's Fur
Queen
E.P E.P
stairs
Not enough space available to fit in the profile with parking. Expanding toward the North side looks possible?
M.HE.P
Pham
Buildin
Park
Smart Moving Kampala
M.H
g with
M.H
M.H
ng cen
Lion's
shoppi
Plot 16
Plot
14
njaro
Kilima
Guest
House
use
zi Ho
Maken
lding
K.K Bui
M.H
arket
Ricetex
Superm
M.H E.P E.P
Conta
iners
Further design measures for this crossing will be needed.
To Bus
L
for measures ed. design need Further ing will be this cross M.H E.P E.P
derga
s Kin
iou Victor
M.H
ad
A
G
A UB
Re
Pri
unde
d g neede n of buildin of the the design Exact locatio to fit in to be able intersection
tten
ra
M.H
Eas
ers
38
Mosque
fit in the the ble to availa toward gh space Expanding Not enou parking. with arcy ble? possi Pham profile with side glooks arcy North Buildin
24.7
PLAC
Forme
M.H E.P E.P
To Kam
M.H
Kobil
pala
To
E.P
S.L
BAGA
17.8
r
Gad
a Ba
Churc
daf
i
Florin
RU
To be able to temporarily close off this street.
To Kisenyi Bus Park
The curre known. nt cross-secti To be design, able to on is not make we've a made an indica tion.
ann
ddafi
E.P
Florin
rist
Loh
To Ga
Cla s Classsic ic IN IN N
Th kn e cu de own. rre sign To nt , w be cros e've ab s-se m le to ctio ad e mak n is an no indi e a t ca tio n.
rking
h of Ch
ur pa
Nakivubo Stadium
P
P
P
P
before
P 4,0
2,0
5,0
2,0
4,0
after
meters
0
5
2,0
1,0
3,5
2,5
1,0
2,0
3,0
meters
0
10 meter
5
10 meter
Luwum street
e hous
Mpoza
Plaza
M.H
sa
M.H
City house
JBK Hotel
se
ou
yh
Cit
Kampala Road ,Bata shop
S.L
k
E.P Luwumu Street
oad eR bb
s
ics
Un ion
irit
ram
sp
ce
&
of
es
M.H M.H
M.H
To Ch
am To
wers
tern
Win
Ho use
da
we
S.L
Wes
MM Plaza
an
ers/ sm tain
M.H M.H M.H M.H Parking When House Universal side street will be used for either motorised traffic or cyclists the disign needs to be changed. For example implementing cyclist crossing. a
Con
MM Plaza
Kamu Kamu Plaza
Ug
all
co
bu
ild
mpl
ex
ings
za
15.5086
Pla
H
da
E
City
lid
Ho
ag an
ay
E
AC
PL
s
s To be able to temporarily re close off this street. xp
Nam
BO
Further design measures forte o this crossing will be needed.
S.L
E.P
Generators/transformers
l
The Arcade
Bam
KIVU
M.H
ing
S.L
Bar
E.P
M.H
En te
NA
Ban
M.H
M.H
Zebra Cross
Barclays bank
da aro
17.8802
Available space can be used to give more room for pedestrians and greenery.
E.P
0.1649
sb an
M.H
Zai Plaza
clay
0.2508
fB
Pio ne 0.7635
Jemba Plaza
Bank of Baroda
Mar
Avemar house
ko
Bata shop
M.H
e
22.3441
M.H M.H
iring
M.H
90째
Barclays Bank
Kib
M.H
fali
M.H
Ja
Fabaah plaza
M.H
ns
M.H
so
M.H
H & B Towers Yamaha Centre
man
E.P
Jesco Beauty Centre
er
Old Taxi park entrance
Total Fuel station
Kalita Bus park
8
M.H
Old Taxi park entrance
plot
EET
a
taxi Old
Kaf
aa
Mut
STR
leri
UMU
park
office structures Small commercial
fero
er
Kizito Tow
LUW Old taxi park Police
Gal
M.H
ia's
M.H M.H M.H
M.H M.H M.H
Transformer
Passage
Ben
Majestic Plaza
Gaza land Park View Restaurant Building
M.H
M.H
Transformer
M.H
office
M.H
rner
Str uka M.H
Police
M.H
Co
eet M.H
Kikuubo
park
bus
M.H
To old bus
park
Money center house
Sky light shopping Arcade To old
Kiwan
To old bus park To old bus park
Ben Kiw
anuka
Street
street
3,0
Kamu Kamu Plaza
Smart Moving Kampala 0
10
20
30
40
50m
Sustainable Urban transport Cycling infrastructure Overview Namirembe Road & Luwum Street
CON
Goudappel Africa & Goudappel Coffeng
39
4.2 Traffic structure around Namirembe Road and Luwum Street
40
Smart Moving Kampala
As mentioned, the lay out of the BRT-system is in the final stages of
The general idea of introduction of a ring road structure around the city
the designing process. The current proposal contains a one-way loop
centre as proposed in chapter 2 is that, on the long run, this one-way
for vehicles, This loop will lead vehicle-traffic clockwise, using Kampala
loop will attract less traffic and will no longer serve for cut-through
Road, Entebbe Road and Ben Kiwanuka Street.
traffic.
Ben Kiwanuka Street intersects the proposed NMT-zone. As a two lane
A design for the intersection of Ben Kiwanuka Street with Luwum Street
corridor doesn’t fit in very well with a pedestrianized street we assume
has been made, based on these assumptions.
that the street profile can be reduced to one lane, as part of the traffic calming proposed in the BRT-report.
BRT
BRT
The traffic structure with a one-way loop for vehicles. The cars on Ben Kiwanuka Street intersect with the proposed NMT-zone
Smart Moving Kampala
41
treet
B
rne r Co
u wan i K en
B
hou
se
uk a S n a w i en K
t
tree S a k
Kikuubo
Gaza land Park View Restaurant Building
M.H
M.H M.H M.H
M.H
Transformer
olice office Small comme
Old taxi park P
Old
ta
xi
pa
rk
Po
lic
e
of
fic
e
Transformer
Old Taxi park entrance
The design with a one-way loop for vehicles. The cars on Ben Kiwanuka Street intersect with the proposed NMT-zone
42
Smart Moving Kampala
4.3 Basic profiles
P before
before
Majestic Plaza P M.H
M.H
M.H after
3,0
2,0
1,0
2,5
3,5
1,0
2,0
3,0
after
meters
s
ercial structure
Namirembe road
0
5
10 meter
Namirembe-
Smart Moving Kampala
43
P before
after
0
5
before
4,0
10 meter
Namirembe-Luwum street
44
Smart Moving Kampala
2,0
5,0
2,0
4,0
after
meters
0
5
10 meter
Luwum street
P
P
P
before
P after
5
10 meter
3,0
2,0
1,0
3,5
2,5
1,0
2,0
3,0
meters
0
5
10 meter
Luwum street
Smart Moving Kampala
45
ING
TRINITY PARK
pARKING
4.4 Basic profiles translated into the design
E.P E.P
g
ann
afi
a P.
E.P
S
E.P E.P
M.H
na B
ar E.P
urch
ar
E.P
la Ch
na B
M.H
il Fu
el s
Form
er P
M.H E.P E.P
t an
M.H
Club
M.H
Eas
d
t En
ders
rtin
Ma unde
r Co
Roa
e
rid
ction
rious
Victo
A
G
rg
Kinde
Bu
es for measur ed. design need Further ing will be ss this cro M.H E.P E.P
Ro
M.H
ad
a
ng
Ro
M.H
Containers E.P
stairs
House
House
E.P Available space can be used to give more small houses room for pedestrians and greenery. small houses
re
urnitu
n's F
Quee
E.P E.P
M.H
E.P E.P
Park
M
wa
M.H M.HE.P
am
h Ph
ng wit
Buildi
M.H
ad
BA
Re
P
nstru
LU
ur
st
M.H
atten
the to fit in d the ailable ar ace av panding tow ough sp Ex Not en th parking. y e? wi ssibl amarc Phpo profile e loo ks h sid ng wit arcy North ildi
To Bus
needed building n of the ation of Exact loc to fit in the desig le to be ab n intersectio
Smart Moving Kampala
tre
S.L
n
ing
46
Thea
ee
tatio
Build
scale 1:2000
ride
fence/tr
Mwanga Road
Kob
To K ampa
S.L
24.7
Flori
17.8
Flori
rist
Loh
add
of Ch
To G
Th kn e c de own urre sig . T nt n, o cro we be ss 've ab -se m le to ctio ad e ma n is an ke n ind a ot ica tio n.
Cl as Clas sic sic IIN NN N
afi
g
dd
arkin
Ga
ur p
To
Jaga
Lion's
ping
shop
e
centr
Plot 16
E.P
Not enough space available to fit in the profile with parking. Expanding toward the North side looks possible?
Further design measures for this crossing will be needed.
M.H
M.H E.P M.H
M.H M.H
E.P
M.H
Hoarding
To old bus park To old bus park
E.P E.P
E.P
E.P
New Taxi Park
ark
E.P
Kili
ro manja
Guest
House
ld b
ouse
nzi H
Make
g
uildin
K.K B
M.H
ket
rmar
pe ex Su
M.H E.P E.P
Con
tain
Ricet
M.H
To o
14
Sky light shopping Arcade
us p
M.HE.P E.P
Plot
Money center house
E.P E.P
M.H
ers
Further design measures for this crossing will be needed. To be able to temporarily Nakivubo close off this street.
Kikuubo
M.H
park
M.H
M.H
To old bus
Not enough space available to fit in the profile with parking. Expanding toward the North side looks possible?
M.H
M.H
Transformer
M.H
M.H Transformer
Stadium
To Kisenyi Bus Park
Total Fuel station
Kalita Bus park Jesco Beauty Centre The cu rre known. nt cross-se cti To be design, able to on is not make we've a made an ind ication.
6
Mosque
O
UB
KIV
NA E
AC
PL
P
P
P before
before
P
before
P
P after
Namirembe road
3,0
2,0
1,0
2,5
P
3,5
1,0
2,0
3,0
after
meters
0
5
4,0
10 meter
Namirembe-Luwum street
2,0
5,0
2,0
4,0
after
meters
0
5
10 meter
3,0
2,0
1,0
3,5
2,5
1,0
2,0
3,0
meters
0
Luwum street
Smart Moving Kampala
47
5
10 me
E.P
ark
Sky light shopping Arcade
ld b M.H
Con
tain
M.H
Further design measures for this crossing will be needed. To be able to temporarily Nakivubo close off this street.
Total Fuel station
Kalita Bus park The cu rre known. nt cross-se cti To be design, able to on is not make we've a made an ind ication.
Jesco Beauty Centre
O
UB
KIV
NA E
AC
PL
48
Smart Moving Kampala
Transformer
Po
Stadium
To Kisenyi Bus Park
scale 1:2000
M.H M.H M.H
M.H
Transformer
M.H
li
ers
M.H
tax
E.P E.P
M.H
rk
M.H
arket
perm
ex Su
Ricet
M.H
i pa
g
uildin
K.K B
M.H
Gaza
M.H
Old
ouse
nzi H
Make
To o
ouse
est H
Money center house
us p
M.HE.P E.P
Co rne r ho use
et Stre
To old bus park
E.P E.P
E.P
ro Gu
nuka
Hoarding To old bus park
E.P E.P
iwanuk
t a Stree M.H
E.P
New Taxi Park
Kiwa
M.H
E.P
Ben
M.H E.P M.H
Kikuubo
E.P
Not enough space available to fit in the profile with parking. Expanding toward the North side looks possible?
Further design measures for this crossing will be needed.
M.H
M.H
park
M.H
To old bus
gh space available to fit in the h parking. Expanding toward the e looks possible?
Ben K
e
Majestic Plaza
Mpoza
Ka
M
STR
M.H
City house JBK Hotel
u
Fabaah plaza
ho
ty
,Bata shop
M.H
90째
22.3441
Barclays Bank M.H M.H
Bata shop
Ma
M.H
s
M.H
Ci
M.H
on
M.H
ns
M.H
M.H
H & B Towers Yamaha Centre
se
ma
E.P
ne
er
M.H
Old Taxi park entrance Old Taxi park entrance
ria
EET
lle
UMU
e office l structures Small commercia
Old taxi park Polic
ffe
sa
a uta
Pio
Avemar house 0.7635
Jemba Plaza
Zai Plaza
E.P
0.1649
M.H
M.H
M.H
Generators/transformers
l
before
before
after
Namirembe road
2,0
1,0
2,5
x
ild
in
ple
bu
om
all
yc
sm
ma
rs/ ine
P
before
P
P 3,0
nta
P
Co
P
P
Cit
E
lid
Ho
P
laz aP
15.5086
nd
ay
a
Further design measures forte Ho this crossing will be needed. ss To be able to temporarily re close off this street. xp
ga
The Arcade
Na
ice
ro
wer
Kizito To
LUW off
Plaza
M.H
Ga
M.H
's
M.H M.H M.H
ria
Park View Restaurant Building
Passage
ice
land
3,5
1,0
2,0
3,0
after
meters
0
5
4,0
10 meter
Namirembe-Luwum street
2,0
5,0
2,0
4,0
after
meters
0
5
10 meter
3,0
2,0
1,0
3,5
2,5
1,0
2,0
3,0
meters
0
5
10 meter
Luwum street
Smart Moving Kampala
49
t a Stree
r ho rne
Park View Restaurant Building
M.H
M.H M.H M.H
M.H
UMU
M.H Transformer
e office l structures Small commercia
Old taxi park Polic
off lice
aff
aK
as
ta Mu
STR
M.H
EET
Old
tax
i pa
rk
o
er
wer
Kizito To
LUW
M.H
Po
Plaza
M.H
Transformer
M.H
Mpoza
M.H M.H M.H
Passage
Co
Kiwa
Majestic Plaza
Gaza land
ice
M.H
M.H
Ben
Kikuubo
park
us p ld b To o
M.H
M.H
To old bus
ark
Money center house
Sky light shopping Arcade
use
iwanuk
et Stre
Ben K
nuka
To old bus park To old bus park
M.H
Old Taxi park entrance Old Taxi park entrance
JBK Hotel
E.P
Total Fuel station
ark
M.H
Jesco Beauty Centre
M.H
H & B Towers Yamaha Centre
M.H 90째
Barclays Bank
Avemar house
KIV
NA
P
P
P
P
O
UB
P PL E AC
before
before
before
P
P after
3,0
2,0
1,0
2,5
3,5
1,0
2,0
3,0
after
meters
4,0
2,0
5,0
2,0
4,0
after
meters
3,0
2,0
1,0
3,5
2,5
1,0
2,0
3,0
meters
scale 1:2000
Namirembe road
50
Smart Moving Kampala
0
5
10 meter
Namirembe-Luwum street
0
5
10 meter
0
Luwum street
5
10 meter
F
City house
u
Kampala Road ,Bata shop
S.L
ns
M.H
E.P
M.H
k an
M.H
E.P Luwumu Street
oa be R teb
S.L
To C
En
M.H M.H
M.H
ham
Tow
ers
ter
We s
ou eH mw Ba
ine
of
MM Plaza
s&
ce
ram
ics
When House Universal side street will be used for either motorised traffic or cyclists the disign needs to be changed. For example implementing cyclist crossing. a
sp irit s nU nio n
Parking
Ug an da W
M.H M.H
se
din uil ll b ma rs/ s ine
M.H
Co
nta
M.H
MM Plaza
d
gs
x ple om Cit yc
aP laz nd ga ma
E
15.5086
Na
ay
lid
Ho
a
l
Further design measures forte Ho this crossing will be needed. ss To be able to temporarily re close off this street. xp
S.L
E.P
Generators/transformers
The Arcade
S.L
Ba
M.H
rcl
0.1649
Ba
Zai Plaza
ossing
sb
Ba of
Available space can be used to give more room for pedestrians and greenery.
nk
Ja
M.H
Bank of Baroda
da ro
Kib
17.8802
fali
t8 plo 0.2508
E.P
ay
ma Pio
ne
er
Ma
0.7635
Jemba Plaza
Zebra Cr
Barclays bank
on
s
Ga 's
Bata shop
M.H
ria
M.H M.H
ge
M.H
22.3441
irin
M.H
ho
ria
ty Ci
lle
Fabaah plaza
M.H
se
Kamu Kamu Plaza
Kamu Kamu Plaza
0
10
20
30
40
50m
Sustainable Urban transport Cycling infrastructure Overview Namirembe Road & Luwum Street 51 Smart Moving Kampala
Date
27-01-2014
Version
3
CONCEP
Goudappel Africa & Goudappel Coffeng
To G
Loh
a
add
afi
E.P E .P E.P M.H
Bar
a dd
fi
E.P
G o T
a
E.P
S.L
M.H
Kob
il Fu
el s
tatio
M.H .P E.P
S.L
n
Club
Eas
t En
ders Buil
ding
que
She
She ll Fu el llstFuel atio stat n io
n
ING
TRINITY PARK TRINITY pARKING
E.P E.P
E.P
Fuel station
E.P E.P
sta
E.P E.P
tio
tru
B U L
n
M.H
Club
ra
M.H
Eas
t End
ers
rtin
Road
stu
M.H
Build
Ma ing
de
r Cons
tructi
on
for measures ed. design need Further ing will be this cross M.H E.P E.P M.H
g with
Ro
ad
a
ng
Ro
Containers E.P
stairs
House
House
E.P Available space can be used to give more small houses room for pedestrians and greenery. small houses
E.P
M.H
Hoarding
To old bus park
Money center house
E.P E.P
M.HE.P E.P
E.P
tre ng cen
niture
's Fur
Lion's
shoppi
Plot 16
Plot
14
njaro
Kilima
Guest
House
use
Ma
Ho kenzi
K.K
g Buildin
M.H
arket
Ricetex
Superm
M.H
Sky light shopping Arcade
E.P E.P
Conta
iners
M.H
M.H
To be able to temporarily close off this street.
M.H
e
Majestic Plaza
Gaza land Park View Restaurant Building
M.H
M.H
M.H M.H M.H
M.H
M.H
M.H
Transformer
M.H Transformer
Old taxi park Police
office structures Small commercial
Old T Old Taxi park entrance
Nakivubo Stadium Total Fuel station
Kalita Bus park Jesco Beauty Centre
BO E AC
PL
Smart Moving Kampala
M.H
Further design measures for this crossing will be needed.
To Kisenyi Bus Park
KIVU NA
52
scale 1:5000
M.H
hous
eet
New Taxi Park
To old bus park
E.P E.P
E.P
E.P
Ben Kiw
anuka M.H E.P M.H
M.H
rner
Not enough space available to fit in the profile with parking. Expanding toward the North side looks possible?
Further design measures for this crossing will be needed.
M.H
M.H
E.P
M.H
Queen
E.P E.P
M.H E.P
M.H
E.P
Park
wa
M
Not enough space available to fit in the profile with parking. Expanding toward the North side looks possible?
M.HE.P
Pham
Buildin
To Bus
A
G
BA
n
rgatte
Kinde
M.H
ad
LU
ious
Victor
Pri
unde
d g neede n of buildin of the the design Exact locatio to fit in to be able intersection
Re
M.H
office
nt
S.L
n
M.H
M.H
Police
statio
fit in the the ble to availa toward gh space Expanding Not enou parking. with arcy ble? possi Pham profile with side glooks arcy North Buildin
Str uka
atre
park
Fuel
e The
taxi
E
r Prid
fence/tree
Old
PLAC
Forme
M.H E.P E.P
pala
M.H
Kobil
Mwanga Road
BAGA
bus
RU
To Kam
S.L
24.7
E.P
Mosque
Churc
r
Co
E.P
a Ba
Kiwan
r
Ben
E.P E.P
M.H
a Ba
Florin
Kikuubo
E.P
Florin
park
a P.S
To old bus
ann
ddafi
park
Loh
To Ga
rist
Cla s Classsic ic IN IN N N
h of Ch
rking
Th kn e cu de own. rre sign To nt , w be cros e've ab s-se m le to ctio ad e mak n is an no indi e a t ca tio n.
ur pa
To old
Jaga
The curre known. nt cross-secti To be design, able to on is not make we've a made an indica tion.
rking
Street
scale 1:500
E.P E.P
ur pa
17.8
Jaga
i
el
daf
Fu
To
oil
ons
E.P
oil
Gad
ty
er C
eeded uilding n of the b f o n catio ign Exact lo to fit in the des le to be ab n tio intersec
Gadd dafi Mos afi o Gad
Ci
und
ann
Th kn e c de own urre sig . T nt n, o cro we be ss 've ab -se m le t ctio ad o e ma n is an ke n ind a ot ica tio n.
a P.
S
Form
er P
fenc
ride
The
atre
e/tre
e
t n a
M.H
M.H
n
rti Ma
d Roa
r
u st
M.H
de
Vict
i r P
ucti
on M.H
ad
Ro
d
Mwanga Road
A
AG
B
Re
ga
M
n a w
a Ro
E.P E.P
Containers
E.P
stairs
House
House
E.P
Available space can be us ed to give mosma re ll h room for pedestrians and greenery. small houses
Smart Moving Kampala
53
Th kn e c de own urre sig . T nt n, o cro we be s 've ab m le ad e
ide
The
atre
d
oa tin R
M
e
rid
s e R
n
ur
t
M.H
ar
t n a us o i r o t Vic
te t a g r inde
K
P
M.H
M.H
E.P E.P
Containers
E.P
E.P
stairs
Available space can be us ed to give mosma re ll houses room for pedestrians and greenery. small houses
House
House
To Ga que dd dafi Mos To Gadafi
She
She ll Fu el llstFuel atio stat n io
n
ING
TRINITY PARK TRINITY pARKING
E.P E.P
E.P
Fuel station
E.P E.P E.P E.P
sta
tio
n
scale 1:500
E.P E.P
rking
M.H
Club
ra
M.H
Eas
t End
ers
rtin
Road
stu
M.H
Build
Ma ing
de
r Cons
tructi
on
for measures ed. design need Further ing will be this cross M.H E.P E.P M.H
g with
Ro
ad
a
ng
Ro
Containers E.P
stairs
House
House
E.P Available space can be used to give more small houses room for pedestrians and greenery. small houses
E.P
M.H
eet
Hoarding
To old bus park
Money center house
E.P E.P
M.HE.P E.P
E.P
tre ng cen
niture
's Fur
Lion's
shoppi
Plot 16
Plot
14
njaro
Kilima
Guest
House
use
Ma
Ho kenzi
K.K
g Buildin
M.H
arket
Ricetex
Superm
M.H
Sky light shopping Arcade
E.P E.P
Conta
iners
M.H
M.H
To be able to temporarily close off this street.
Total Fuel station
Kalita Bus park Jesco Beauty Centre
E AC
PL
scale 1:5000
M.H
e
Gaza land Park View Restaurant Building
M.H
M
M.H M.H M.H
M.H
Transformer
M.H Transformer
Old taxi park Police
office structur Small commercial
Old Taxi park entrance
Nakivubo Stadium
BO
Smart Moving Kampala
M.H
Further design measures for this crossing will be needed.
To Kisenyi Bus Park
KIVU NA
54
M.H
hous
New Taxi Park
To old bus park
E.P E.P
E.P
E.P
Ben Kiw
anuka M.H E.P M.H
M.H
rner
Not enough space available to fit in the profile with parking. Expanding toward the North side looks possible?
Further design measures for this crossing will be needed.
M.H
M.H
E.P
M.H
Queen
E.P E.P
M.H E.P
M.H
E.P
Park
wa
M
Not enough space available to fit in the profile with parking. Expanding toward the North side looks possible?
M.HE.P
Pham
Buildin
To Bus
A
G
BA
n
rgatte
Kinde
M.H
ad
LU
ious
Victor
Pri
unde
d g neede n of buildin of the the design Exact locatio to fit in to be able intersection
Re
M.H
office
nt
S.L
n
M.H
M.H
Police
statio
fit in the the ble to availa toward gh space Expanding Not enou parking. with arcy ble? possi Pham profile with side glooks arcy North Buildin
Str uka
atre
park
Fuel
e The
taxi
E
r Prid
fence/tree
Old
PLAC
Forme
M.H E.P E.P
pala
M.H
Kobil
Co
BAGA
bus
RU
To Kam
S.L
24.7
E.P
Mosque
Churc
r
Kiwan
E.P
a Ba
Ben
r
Kikuubo
E.P E.P
M.H
a Ba
Florin
park
E.P
Florin
To old bus
a P.S
park
ann
ddafi
rist
Loh
To Ga
h of Ch
Cla s Classsic ic IN IN N N
17.8
rking
Th kn e cu de own. rre sign To nt , w be cros e've ab s-se m le to ctio ad e mak n is an no indi e a t ca tio n.
ur pa
Street
Jaga
To old
ur pa
The curre known. nt cross-secti To be design, able to on is not make we've a made an indica tion.
Jaga
Mwanga Road
el
i
Fu
daf
City oil
E.P
oil
Gad
ty
To
Ci
ist a Ch urch of Ch r
24.7
To K ampa l
M.HE.P
ing Build
res for u s a e nm d. r desig neede Furthe sing will be os this cr M.H E .P E.P
M.H M.H
8
E.P .P E
17.
iture
Furn s ' n e e
Qu
Plot 16
tre g cen
ppin
sho ion's
L
Park
Majestic Plaza Mpoza
Plaza
M.H
fero
er
Kizito Tow
sa
Kaf
aa
Mut
STR
M.H
City house
JBK Hotel
se
ou
Kampala Road ,Bata shop
S.L
's
M.H
Ban
E.P E.P
M.H
M.H
Barclays bank
S.L
be Ro ad teb
s irit
ram
sp &
of ce
Un ion
S.L M.H M.H
M.H
To Ch
am To
tern
Win es
Ho use
da
we Bam
Wes
MM Plaza
an
M.H M.H M.H M.H Parking When House Universal side street will be used for either motorised traffic or cyclists the disign needs to be changed. For example implementing cyclist crossing. a
Kamu Kamu Plaza
Ug
MM Plaza
ics
E.P Luwumu Street
ings ild bu all
15.5086
ers/ sm
H
mpl ex
E
tain
ay
lid
Ho
co
s
s To be able to temporarily re close off this street. xp
City
Further design measures forte o this crossing will be needed.
ing
E.P
Generators/transformers
l
The Arcade
Zebra Cross
S.L
Bar
M.H
En
0.1649
an k
Available space can be used to give more room for pedestrians and greenery. M.H
Zai Plaza
clay sb
da aro
17.8802
fali
0.2508
Ja
plot
0.7635
Jemba Plaza
Bank of Baroda
Kib
ne
8
Pio
Avemar house
ko fB
Mar ia
e
Bata shop
M.H
iring
22.3441
M.H M.H
ns
M.H
90째
Barclays Bank
so
yh
Cit
M.H
man
M.H
er
Fabaah plaza
M.H
Con
M.H
leri a
M.H
Gal
E.P
H & B Towers Yamaha Centre
za
M.H
Old Taxi park entrance
Pla
EET
an da
UMU
ag
LUW
Nam
M.H M.H M.H
Passage
res
M.H
To Bus
M.H
e fit in th the o t e l ailab ard ace av panding tow p s h g ou Ex Not en ith parking. y le? w rcsib profile e glowoithksPhpamoas siddin arcy North Buil Pham with
Kamu Kamu Plaza
wers
Smart Moving Kampala
55
Mosque
Not enough space available to fit in the profile with parking. Expanding toward the North side looks possible?
M.H
M.H
M.H
M.H
E.P E.P
ot 16
Plot
14
se
Hou t s e u
n
Make
aro G j n a m
Kili
que o Ga dd dafi Mos To Gadafi
She
She ll Fu el llstFuel atio stat n io
n
ING
TRINITY PARK TRINITY pARKING
E.P E.P
E.P
Fuel station
E.P E.P E.P E.P
sta
tio
n
scale 1:500
E.P E.P
rking
M.H
Club
ra
M.H
Eas
t End
ers
rtin
Road
stu
M.H
Build
Ma ing
de
r Cons
tructi
on
for measures ed. design need Further ing will be this cross M.H E.P E.P M.H
g with
Ro
ad
a
ng
Ro
Containers E.P
stairs
House
House
E.P Available space can be used to give more small houses room for pedestrians and greenery. small houses
anuka E.P
M.H
Hoarding
To old bus park
Money center house
E.P E.P
M.HE.P E.P
E.P
tre ng cen
niture
's Fur
Lion's
shoppi
Plot 16
Plot
14
njaro
Kilima
Guest
House
use
Ma
Ho kenzi
K.K
g Buildin
M.H
arket
Ricetex
Superm
M.H
Sky light shopping Arcade
E.P E.P
Conta
iners
M.H
M.H
To be able to temporarily close off this street.
M.H
e
Majestic Plaza
Gaza land Park View Restaurant Building
M.H
M.H
M.H M.H M.H
M.H
M.H
M.H
Transformer
M.H Transformer
Old taxi park Police
office structures Small commercial
Ol Old Taxi park entrance
Nakivubo Stadium Total Fuel station
Kalita Bus park Jesco Beauty Centre
BO E AC
PL
Smart Moving Kampala
M.H
Further design measures for this crossing will be needed.
To Kisenyi Bus Park
KIVU NA
56
scale 1:5000
M.H
hous
eet
New Taxi Park
To old bus park
E.P E.P
E.P
E.P
rner
M.H E.P M.H
M.H
Ben Kiw
Not enough space available to fit in the profile with parking. Expanding toward the North side looks possible?
Further design measures for this crossing will be needed.
M.H
M.H
E.P
M.H
Queen
E.P E.P
M.H E.P
M.H
E.P
Park
wa
M
Not enough space available to fit in the profile with parking. Expanding toward the North side looks possible?
M.HE.P
Pham
Buildin
To Bus
A
G
BA
n
rgatte
Kinde
M.H
ad
LU
ious
Victor
Pri
unde
d g neede n of buildin of the the design Exact locatio to fit in to be able intersection
Re
M.H
office
nt
S.L
n
M.H
M.H
Police
statio
fit in the the ble to availa toward gh space Expanding Not enou parking. with arcy ble? possi Pham profile with side glooks arcy North Buildin
Co
atre
park
Fuel
e The
taxi
E
r Prid
fence/tree
Old
PLAC
Forme
M.H E.P E.P
pala
M.H
Kobil
Str uka
BAGA
bus
RU
To Kam
S.L
24.7
E.P
Mosque
Churc
r
Kiwan
E.P
a Ba
Ben
r
Kikuubo
E.P E.P
M.H
a Ba
Florin
park
E.P
Florin
To old bus
a P.S
park
ann
ddafi
rist
Loh
To Ga
h of Ch
Cla s Classsic ic IN IN N N
17.8
rking
Th kn e cu de own. rre sign To nt , w be cros e've ab s-se m le to ctio ad e mak n is an no indi e a t ca tio n.
ur pa
Street
Jaga
To old
ur pa
The curre known. nt cross-secti To be design, able to on is not make we've a made an indica tion.
Jaga
Mwanga Road
el
i
Fu
daf
y oil
E.P
oil
Gad
ty
To
Ci
Not enough space available to fit in the profile with parking. Expanding toward the North side looks possible?
Further design measures for this crossing will be needed.
M.H
M.H E.P M.H
M.H
E.P
M.H
E. EP.P
E.P
E.P
use
New
E. EP.P
g
o nzi H
ildin u B .K
M.H
arket
K
perm ex Su
M.H E.P .P E
Con
Ricet
Further design this crossing w To be able to t close off this s
a Mpoza
Plaza
fero
er
Kizito Tow
sa
Kaf
aa
Mut
STR
M.H
City house
JBK Hotel
se
ou
Kampala Road ,Bata shop
S.L
's
Ban
M.H
E.P
0.1649
E.P
M.H
M.H
Barclays bank
be Ro ad teb
s
S.L M.H M.H
M.H
To Ch
am To
tern
Un ion
irit
ram
sp &
of ce
Win es
Ho use
da
we Bam
Wes
MM Plaza
an
M.H M.H M.H M.H Parking When House Universal side street will be used for either motorised traffic or cyclists the disign needs to be changed. For example implementing cyclist crossing. a
Kamu Kamu Plaza
Ug
MM Plaza
ics
E.P Luwumu Street
ings ild bu all ers/ sm
15.5086
tain
H
mpl ex
E
co
ay
lid
Ho
City
s
s To be able to temporarily re close off this street. xp
za
Further design measures forte o this crossing will be needed.
ing
E.P
Generators/transformers
l
The Arcade
Zebra Cross
S.L
Bar
M.H
En
Zai Plaza
an k
Available space can be used to give more room for pedestrians and greenery.
ko fB
M.H
Jemba Plaza
clay sb
da 17.8802
fali
0.2508
Ja
plot
0.7635
aro
Kib
ne
8
Pio
Avemar house
Bank of Baroda
Mar ia
e
Bata shop
M.H
iring
22.3441
M.H M.H
ns
M.H
90째
Barclays Bank
so
yh
Cit
M.H
man
M.H
er
Fabaah plaza
M.H
Con
M.H
leri a
M.H
Gal
E.P
H & B Towers Yamaha Centre
Pla
M.H
ld Taxi park entrance
an da
EET
ag
UMU
Nam
LUW
Passage
M.H M.H
Kamu Kamu Plaza
wers
S.L
The cu rr known ent cross-s ec .T design o be able to tion is not , we've make a made an ind ication .
To Kisenyi Bus Park
Smart Moving Kampala
57
in the oward the
New Taxi Park
Hoarding
E. EP.P
M.HE E.P .P
M.H
M.H E.P .P E
Con
tain
ers
Further design measures for this crossing will be needed. To be able to temporarily Nakivubo close off this street.
Stadium
To Kisenyi Bus Park
Kalita Bus park
e curr known ent cross-s ec .T design o be able to tion is not , we've make a made an ind ication .
Jesc To Ga que dd dafi Mos To Gadafi
She
She ll Fu el llstFuel atio stat n io
n
E.P
Fuel station
sta
E.P E.P E.P E.P
tio
n
scale 1:500
E.P E.P
rking
ers
rtin
Road
stu
M.H
Build
Ma ing
de
r Cons
tructi
on
n
rgatte
Kinde
for measures ed. design need Further ing will be this cross M.H E.P E.P M.H
g with
ad
a
ng
Ro
Containers E.P
stairs
House
House
E.P Available space can be used to give more small houses room for pedestrians and greenery. small houses
M.H
tre ng cen
niture
To old bus park
M.HE.P E.P
's Fur
Lion's
shoppi
Plot 16
Plot
14
njaro
Kilima
Guest
House
use
Ma
Ho kenzi
K.K
g Buildin
M.H
arket
Ricetex
Superm
M.H
Money center house
Sky light shopping Arcade
E.P E.P
Conta
iners
M.H
M.H
To be able to temporarily close off this street.
M.H
e
Majestic
Gaza land Park View Restaurant Building
M.H
M.H
M.H M.H M.H
M.H
Transformer
M.H Transformer
Old taxi park Police
office structures Small commercial
Old Taxi park entrance
Nakivubo Stadium Total Fuel station
Kalita Bus park Jesco Beauty Centre
BO E AC
PL
Smart Moving Kampala
M.H
Further design measures for this crossing will be needed.
To Kisenyi Bus Park
KIVU NA
58
scale 1:5000
M.H
hous
Hoarding
E.P E.P
rner
eet
New Taxi Park
To old bus park
E.P E.P
E.P
Ben Kiw
anuka E.P
E.P
Co
M.H E.P M.H
M.H
E.P
Queen
E.P E.P
Not enough space available to fit in the profile with parking. Expanding toward the North side looks possible?
Further design measures for this crossing will be needed.
M.H
M.H
E.P
M.H
Park
wa
M
M.H E.P
M.H
E.P
To Bus
Mwanga Road
Ro
Not enough space available to fit in the profile with parking. Expanding toward the North side looks possible?
M.HE.P
Pham
Buildin
M.H
ad
A
G
BA
LU
ious
Victor
Pri
unde
d g neede n of buildin of the the design Exact locatio to fit in to be able intersection
Re
office
t End
Police
ra
M.H
Eas
park
M.H
Club
M.H
taxi
nt
S.L
n
M.H
M.H
Old
statio
fit in the the ble to availa toward gh space Expanding Not enou parking. with arcy ble? possi Pham profile with side glooks arcy North Buildin
Str uka
atre
Kiwan
Fuel
e The
Ben
E
r Prid
fence/tree
bus
PLAC
Forme
M.H E.P E.P
pala
M.H
Kobil
To Kam
S.L
24.7
E.P
Mosque
Churc
r
Kikuubo
E.P
a Ba
park
E.P E.P
M.H
r
rist
E.P
a Ba
Florin
To old
a P.S
The curre known. nt cross-secti To be design, able to on is not make we've a made an indica tion.
ann
ddafi
Florin
RU
BAGA
Loh
To Ga
h of Ch
Cla s Classsic ic IN IN N N
17.8
rking
Th kn e cu de own. rre sign To nt , w be cros e've ab s-se m le to ctio ad e mak n is an no indi e a t ca tio n.
ur pa
Street
Jaga
park
ur pa
To old bus
Jaga
i
el
daf
Fu
Gad
City oil
E.P
oil
To
ty
ING
TRINITY PARK TRINITY pARKING
E.P E.P
Ci
M.H
To old bus park
To old bus park
ld
park
Sky light shopping Arcade
To o
M.H
M.H
M.H
To old bus
pa s u b
rk
Money ce
M.H
Total Fuel station
co Beauty Centre
c Plaza Mpoza
Plaza
fero
er
Kizito Tow
sa
Kaf
aa
Mut
STR
M.H
City house
JBK Hotel
se
ou
Kampala Road ,Bata shop
S.L
's
Ban
M.H
E.P
0.1649
E.P
M.H
M.H
Barclays bank
S.L
be Ro ad teb
s
S.L M.H M.H
M.H
To Ch
am To
tern
Un ion
irit
ram
sp &
of ce
Win es
Ho use
da
we Bam
Wes
MM Plaza
an
M.H M.H M.H M.H Parking When House Universal side street will be used for either motorised traffic or cyclists the disign needs to be changed. For example implementing cyclist crossing. a
Kamu Kamu Plaza
Ug
MM Plaza
ics
E.P Luwumu Street
ings ild bu all ers/ sm
15.5086
tain
H
mpl ex
E
co
ay
lid
Ho
City
s
s To be able to temporarily re close off this street. xp
za
Further design measures forte o this crossing will be needed.
ing
E.P
Generators/transformers
l
The Arcade
Zebra Cross
S.L
Bar
M.H
En
Zai Plaza
an k
Available space can be used to give more room for pedestrians and greenery.
ko fB
M.H
Jemba Plaza
clay sb
da 17.8802
fali
0.2508
Ja
plot
0.7635
aro
Kib
ne
8
Pio
Avemar house
Bank of Baroda
Mar ia
e
Bata shop
M.H
iring
22.3441
M.H M.H
ns
M.H
90째
Barclays Bank
so
yh
Cit
M.H
man
M.H
er
Fabaah plaza
M.H
Con
M.H
leri a
M.H
Gal
E.P
H & B Towers Yamaha Centre
Pla
M.H
Old Taxi park entrance
an da
EET
ag
UMU
Nam
LUW
Passage
M.H M.H M.H
Kamu Kamu Plaza
wers
Smart Moving Kampala
59
NA
ee
use
ka Str u n a iw Ben K
t M.H
rne Co
nu
M.H
B
Kikuubo
iwa K n e
Money center house
M.H
r ho
r ee t S ka
park
Gaza land
M.H M.H M.H
M.H
Transformer
M.H
Old
ta
xi
pa
rk
Po
lic
e
of
fic
e
Transformer
que o Ga dd dafi Mos To Gadafi
She
She ll Fu el llstFuel atio stat n io
n
ING
TRINITY PARK TRINITY pARKING
E.P E.P
E.P
Fuel station
E.P E.P E.P E.P
sta
tio
n Jaga
E.P E.P
ur pa
rking
ers
rtin
Road
stu
M.H
Build
Ma ing
de
r Cons
tructi
on
for measures ed. design need Further ing will be this cross M.H E.P E.P M.H
g with
Ro
ad
a
ng
Ro
Containers E.P
stairs
House
House
E.P Available space can be used to give more small houses room for pedestrians and greenery. small houses
M.H
To old bus park
M.HE.P E.P
E.P
tre ng cen
niture
's Fur
Lion's
shoppi
Plot 16
Plot
14
njaro
Kilima
Guest
House
use
Ma
Ho kenzi
K.K
g Buildin
M.H
arket
Ricetex
Superm
M.H
Money center house
Sky light shopping Arcade
E.P E.P
Conta
iners
M.H
M.H
To be able to temporarily close off this street.
M.H
e
Majestic Plaza
Gaza land Park View Restaurant Building
M.H
M.H
M.H M.H M.H
M.H
M.H
M.H
Transformer
M.H Transformer
Old taxi park Police
office structures Small commercial
Ol Old Taxi park entrance
Nakivubo Stadium Total Fuel station
Kalita Bus park Jesco Beauty Centre
BO E AC
PL
Smart Moving Kampala
M.H
Further design measures for this crossing will be needed.
To Kisenyi Bus Park
KIVU NA
60
scale 1:5000
M.H
hous
Hoarding
E.P E.P
rner
eet
New Taxi Park
To old bus park
E.P E.P
E.P
Ben Kiw
anuka E.P
E.P
Co
M.H E.P M.H
M.H
Str uka
Not enough space available to fit in the profile with parking. Expanding toward the North side looks possible?
Further design measures for this crossing will be needed.
M.H
M.H
E.P
M.H
Queen
E.P E.P
M.H E.P
M.H
E.P
Park
wa
M
Not enough space available to fit in the profile with parking. Expanding toward the North side looks possible?
M.HE.P
Pham
Buildin
To Bus
A
G
BA
n
rgatte
Kinde
M.H
ad
LU
ious
Victor
Pri
unde
d g neede n of buildin of the the design Exact locatio to fit in to be able intersection
Re
office
t End
Police
ra
M.H
Eas
park
M.H
Club
M.H
taxi
nt
S.L
n
M.H
M.H
Old
statio
Mosque
fit in the the ble to availa toward gh space Expanding Not enou parking. with arcy ble? possi Pham profile with side glooks arcy North Buildin
Kiwan
pala atre
Ben
Fuel
e The
Kikuubo
E
r Prid
fence/tree
park
PLAC
Forme
M.H E.P E.P
To Kam
M.H
Kobil
bus
E.P
S.L
BAGA
24.7
r
Churc
a Ba
RU
To old bus
E.P
park
r
To old
a P.S
a Ba
Florin
The curre known. nt cross-secti To be design, able to on is not make we've a made an indica tion.
ann
ddafi
E.P E.P
M.H
rist
Loh
To Ga
E.P
Florin
h of Ch
Cla s Classsic ic IN IN N N
17.8
rking
Th kn e cu de own. rre sign To nt , w be cros e've ab s-se m le to ctio ad e mak n is an no indi e a t ca tio n.
ur pa
Street
Jaga
Mwanga Road
el
i
Fu
daf
y oil
E.P
oil
Gad
ty
To
Ci
Majestic Plaza Park View Restaurant Building
Mpoza
.H MM.H M.H
M.H
M.H
LUW
UMU
lice office ial structures Small commerc
o Old taxi park P
STR
EE
Old Taxi park entrance Old Taxi park entrance
scale 1:500
a Mpoza
Plaza
fero
er
Kizito Tow
sa
Kaf
aa
Mut
STR
M.H
City house
JBK Hotel
se
ou
Kampala Road ,Bata shop
S.L
's
Ban
M.H
E.P
0.1649
E.P
M.H
M.H
Barclays bank
S.L
be Ro ad teb
s
S.L M.H M.H
M.H
To Ch
am To
tern
Un ion
irit
ram
sp &
of ce
Win es
Ho use
da
we Bam
Wes
MM Plaza
an
M.H M.H M.H M.H Parking When House Universal side street will be used for either motorised traffic or cyclists the disign needs to be changed. For example implementing cyclist crossing. a
ics
E.P Luwumu Street
MM Plaza
Kamu Kamu Plaza
Ug
ild bu all ers/ sm
15.5086
ings
za
H
mpl ex
E
tain
ay
lid
Ho
co
s
s To be able to temporarily re close off this street. xp
City
Further design measures forte o this crossing will be needed.
ing
E.P
Generators/transformers
l
The Arcade
Zebra Cross
S.L
Bar
M.H
En
Zai Plaza
an k
Available space can be used to give more room for pedestrians and greenery.
ko fB
M.H
Jemba Plaza
clay sb
da 17.8802
fali
0.2508
Ja
plot
0.7635
aro
Kib
ne
8
Pio
Avemar house
Bank of Baroda
Mar ia
e
Bata shop
M.H
iring
22.3441
M.H M.H
ns
M.H
90째
Barclays Bank
so
yh
Cit
M.H
man
M.H
er
Fabaah plaza
M.H
Con
M.H
leri a
M.H
Gal
E.P
H & B Towers Yamaha Centre
Pla
M.H
ld Taxi park entrance
an da
EET
ag
UMU
Nam
LUW
Passage
M.H M.H
P
Kamu Kamu Plaza
wers
Smart Moving Kampala
61
laza
P Mpoza
ro
er
ow Kizito T
e aff
K
a as
ta
UMU
Mu
STR
M.H
Passage
EET M.H
e
E.P M.H
H & B Towers Yamaha Centre 90째
Barclays Bank
Avemar que
addadafi Mos Gad fi
She
She ll Fu el llstFuel atio stat n io
n
E.P
E.P
Fuel station
E.P E.P E.P E.P
sta
tio
n Jaga
E.P E.P
ur pa
rking
ers
rtin
Road
stu
M.H
Build
Ma ing
de
r Cons
tructi
on
for measures ed. design need Further ing will be this cross M.H E.P E.P M.H
g with
ad
a
ng
wa
M
Ro
Containers E.P
stairs
House
House
E.P Available space can be used to give more small houses room for pedestrians and greenery. small houses
M.H
eet To old bus park
M.HE.P E.P
E.P
tre ng cen
niture
's Fur
Lion's
shoppi
Plot 16
Plot
14
njaro
Kilima
Guest
House
use
Ma
Ho kenzi
K.K
g Buildin
M.H
arket
Ricetex
Superm
M.H
Money center house
Sky light shopping Arcade
E.P E.P
Conta
iners
M.H
M.H
To be able to temporarily close off this street.
M.H
e
Majestic Plaza
Gaza land Park View Restaurant Building
M M.H
M.H
M.H M.H M.H
M.H
M.H
M.H
Transformer
M.H Transformer
Old taxi park Police
office structures Small commercial
Old Ta Old Taxi park entrance
Nakivubo Stadium Total Fuel station
Kalita Bus park Jesco Beauty Centre
BO E AC
PL
Smart Moving Kampala
M.H
Further design measures for this crossing will be needed.
To Kisenyi Bus Park
KIVU NA
62
scale 1:5000
M.H
hous
Hoarding
E.P E.P
rner
New Taxi Park
To old bus park
E.P E.P
E.P
Ben Kiw
anuka E.P
E.P
Str uka
M.H E.P M.H
M.H
Co
Not enough space available to fit in the profile with parking. Expanding toward the North side looks possible?
Further design measures for this crossing will be needed.
M.H
M.H
E.P
M.H
Queen
E.P E.P
M.H E.P
M.H
E.P
Park
Mwanga Road
Ro
Not enough space available to fit in the profile with parking. Expanding toward the North side looks possible?
M.HE.P
Pham
Buildin
To Bus
A
G
BA
n
rgatte
Kinde
M.H
ad
LU
ious
Victor
Pri
unde
d g neede n of buildin of the the design Exact locatio to fit in to be able intersection
Re
office
t End
Police
ra
M.H
Eas
park
M.H
Club
M.H
taxi
nt
S.L
n
M.H
M.H
Old
statio
Mosque
fit in the the ble to availa toward gh space Expanding Not enou parking. with arcy ble? possi Pham profile with side glooks arcy North Buildin
Kiwan
pala atre
Ben
Fuel
e The
Kikuubo
E
r Prid
fence/tree
park
PLAC
Forme
M.H E.P E.P
To Kam
M.H
Kobil
bus
E.P
S.L
BAGA
24.7
r
Churc
a Ba
RU
To old bus
E.P
park
r
To old
a P.S
a Ba
Florin
The curre known. nt cross-secti To be design, able to on is not make we've a made an indica tion.
ann
ddafi
E.P E.P
M.H
rist
Loh
To Ga
E.P
Florin
h of Ch
Cla s Classsic ic IN IN N N
17.8
rking
Th kn e cu de own. rre sign To nt , w be cros e've ab s-se m le to ctio ad e mak n is an no indi e a t ca tio n.
ur pa
Street
Jaga
i
el
daf
Fu
Gad
oil
To
oil
ING
TRINITY PARK TRINITY pARKING
E.P E.P
ity
JBK Hotel M.H
e s u
Fabaah plaza M.H
o h y
t i C
M.H
M.H
,Bata s
M.H M.H M.H
M.H
r house
Jemba Plaza
Zai Plaza
scale 1:500 Mpoza
Plaza
fero
o Tower
Kizit
sa
Kaf
aa
l
Mut
STR
M.H
City house
JBK Hotel
se
ou
Kampala Road ,Bata shop
's
M.H
E.P
0.1649
E.P
M.H
M.H
Barclays bank
be Ro ad teb
s irit
ram
sp &
of ce
Un ion
S.L M.H M.H
M.H
To Ch
am To
tern
Win es
Ho use
da
we Bam
Wes
MM Plaza
an
M.H M.H M.H M.H Parking When House Universal side street will be used for either motorised traffic or cyclists the disign needs to be changed. For example implementing cyclist crossing. a
ics
E.P Luwumu Street
MM Plaza
Kamu Kamu Plaza
Ug
ild bu all
15.5086
ings
za
H
ers/ sm
E
tain
ay
lid
Ho
mpl ex
s
s To be able to temporarily re close off this street. xp
co
Further design measures forte o this crossing will be needed.
ing
E.P
Generators/transformers
l
The Arcade
Zebra Cross
S.L
Bar
M.H
En
Zai Plaza
City
Jemba Plaza
Ban
M.H
an k
Available space can be used to give more room for pedestrians and greenery.
clay sb
da aro
17.8802
fali
0.2508
Ja
plot
0.7635
Bank of Baroda
Kib
ne
8
Pio
Avemar house
ko fB
Mar ia
e
Bata shop
M.H
iring
22.3441
M.H M.H
ns
M.H
90째
Barclays Bank
S.L
so
yh
Cit
M.H
man
M.H
er
Fabaah plaza
M.H
Con
M.H
leri a
M.H
Gal
E.P
H & B Towers Yamaha Centre
Pla
M.H
an da
EET
ag
UMU
axi park entrance
Nam
LUW
Passage
M.H M.H
Kamu Kamu Plaza
wers
S.L
The Arcade
Further design measures forte Ho this crossing will be needed. ss To be able to temporarily e r close off this street. xp Smart Moving Kampala
lid
ay
E63
City house
e s u
o h y
t i C
lle Ga
22.3441
Bata shop
M.H
Ma ria 's
M H.H
0.1649
M.H
M.H
M.H
n
ING
TRINITY PARK TRINITY pARKING
E.P E.P
E.P
yc
E.P
Fuel station
E.P E.P E.P E.P
sta
tio
n Jaga
E.P E.P
ur pa
rking
rtin
Road
stu
M.H
Build
Ma ing
de
r Cons
tructi
on
for measures ed. design need Further ing will be this cross M.H E.P E.P M.H
g with
ad
a
ng
wa
M
Ro
Containers E.P
stairs
House
House
E.P Available space can be used to give more small houses room for pedestrians and greenery. small houses
E.P
M.H
To old bus park
M.HE.P E.P
E.P
tre ng cen
niture
's Fur
Lion's
shoppi
Plot 16
Plot
14
njaro
Kilima
Guest
House
use
Ma
Ho kenzi
K.K
g Buildin
M.H
arket
Ricetex
Superm
M.H
Money center house
Sky light shopping Arcade
E.P E.P
Conta
iners
M.H
M.H
To be able to temporarily close off this street.
M.H
e hous
Majestic Plaza
Gaza land Park View Restaurant Building
M M.H
M.H
M.H M.H M.H
M.H
M.H
M.H
Transformer
M.H Transformer
Old taxi park Police
office structures Small commercial
Old Ta Old Taxi park entrance
Nakivubo Stadium Total Fuel station
Kalita Bus park Jesco Beauty Centre
BO E AC
PL
Smart Moving Kampala
M.H
Further design measures for this crossing will be needed.
To Kisenyi Bus Park
KIVU NA
64
scale 1:5000
M.H
rner
Hoarding
E.P E.P
Ben Kiw
New Taxi Park
To old bus park
E.P E.P
E.P
E.P
Co
M.H E.P M.H
M.H
eet
Not enough space available to fit in the profile with parking. Expanding toward the North side looks possible?
Further design measures for this crossing will be needed.
M.H
M.H
E.P
M.H
Queen
E.P E.P
M.H E.P
M.H
E.P
Park
Mwanga Road
Ro
Not enough space available to fit in the profile with parking. Expanding toward the North side looks possible?
M.HE.P
Pham
Buildin
To Bus
A
G
BA
n
rgatte
Kinde
M.H
ad
LU
ious
Victor
Pri
unde
d g neede n of buildin of the the design Exact locatio to fit in to be able intersection
Re
office
ers
Police
t End
park
ra
M.H
Eas
taxi
M.H
Club
M.H
Old
nt
S.L
n
M.H
M.H
Be
statio
Mosque
fit in the the ble to availa toward gh space Expanding Not enou parking. with arcy ble? possi Pham profile with side glooks arcy North Buildin
Str uka
pala atre
an n Kiw
Fuel
e The
Kikuubo
E
r Prid
fence/tree
park
PLAC
Forme
M.H E.P E.P
To Kam
M.H
Kobil
bus
E.P
S.L
BAGA
24.7
r
Churc
a Ba
RU
To old bus
i
E.P
park
r
To old
a P.S
a Ba
Florin
The curre known. nt cross-secti To be design, able to on is not make we've a made an indica tion.
ann
ddafi
E.P E.P
M.H
rist
Loh
To Ga
E.P
Florin
h of Ch
Cla s Classsic ic IN IN N N
17.8
rking
Th kn e cu de own. rre sign To nt , w be cros e've ab s-se m le to ctio ad e mak n is an no indi e a t ca tio n.
ur pa
Street anuka
Jaga
daf
el
To
Fu
Gad
oil
Cit
ma g
She ll Fu el llstFuel atio stat n io
Na
She
om ple
da an
E
y da
x
Pla
15.5086
i
l o H
que
addadafi Mos Gad fi
ity
za
l
Further design measures forte Ho this crossing will be needed. s To be able to temporarily es r close off this street. xp
Arcade
oil
ria
,Bata shop
s on ns
rin
ge
ma er
Available space ca n be used to give more room for pedestria ns and greenery.
0.2508
M.H
Ja
plo
fal
t8
iK
ibi
ne Pio 0.7635
M.H
E.P E.P
uil
din
gs
Generators/transformers
Co
nta
ine
rs/
sm
all b
MM Plaza
Mpoza
scale 1:500
Plaza
fero
er
Kizito Tow
sa
Kaf
aa
STR
Mut M.H
City house
JBK Hotel
se
ou
Kampala Road ,Bata shop
S.L
's
Ban
E.P E.P
M.H
M.H
Barclays bank
S.L
be Ro ad teb
s sp &
Un ion
S.L M.H M.H
M.H
To Ch
am To
tern
Win es da
Wes
we Bam
irit
ram of ce
Ho use
MM Plaza
an
M.H M.H M.H M.H Parking When House Universal side street will be used for either motorised traffic or cyclists the disign needs to be changed. For example implementing cyclist crossing. a
ics
E.P Luwumu Street
MM Plaza
Kamu Kamu Plaza
Ug
ild bu all ers/ sm
15.5086
ings
za
H
mpl ex
E
tain
ay
lid
Ho
co
s
s To be able to temporarily re close off this street. xp
City
Further design measures forte o this crossing will be needed.
ing
E.P
Generators/transformers
l
The Arcade
Zebra Cross
S.L
Bar
M.H
En
0.1649
an k
Available space can be used to give more room for pedestrians and greenery. M.H
Zai Plaza
Bank of Baroda
M.H
Jemba Plaza
clay sb
da 17.8802
fali
0.2508
Ja
plot
0.7635
aro
Kib
ne
8
Pio
Avemar house
ko fB
Mar ia
e
Bata shop
M.H
iring
22.3441
M.H M.H
ns
M.H
90째
Barclays Bank
so
yh
Cit
M.H
man
M.H
er
Fabaah plaza
M.H
Con
M.H
leri a
M.H
Gal
E.P
Pla
M.H
H & B Towers Yamaha Centre
an da
EET
axi park entrance
ag
UMU
Nam
LUW
Passage
M.H M.H
Kamu Kamu Plaza
wers
Smart Moving Kampala
65
s on ns
rin
ge
ma er
Available space ca n be used to give more room for pedestria ns and greenery.
Ja
plo
fal
t8
iK
ibi
ne Pio
17.8802
0.2508
M.H
M.H
E.P E.P
E.P
din g
s
Generators/transformers
bu il
M.H
rs/ ine
n Jaga
MM Plaza
ers
rtin
Road
stu
M.H
Build
Ma ing
de
r Cons
tructi
on
for measures ed. design need Further ing will be this cross M.H E.P E.P M.H
g with
Ro
ad
a
ng
Ro
Containers E.P
stairs
House
House
E.P Available space can be used to give more small houses room for pedestrians and greenery. small houses
M.H E.P M.H
M.H
E.P
M.H
eet
New Taxi Park
Hoarding
To old bus park To old bus park
E.P E.P
E.P
E.P
Money center house
E.P E.P
M.HE.P E.P
E.P
tre ng cen
niture
's Fur
Lion's
shoppi
Plot 16
Plot
14
njaro
Kilima
Guest
House
use
Ma
Ho kenzi
K.K
g Buildin
M.H
arket
Ricetex
Superm
M.H
Sky light shopping Arcade
E.P E.P
Conta
iners
M.H
M.H
To be able to temporarily close off this street.
M.H
M.H
Majestic P
Gaza land Park View Restaurant Building
M.H
M.H
M.H M.H M.H
M.H
Transformer
M.H Transformer
Old taxi park Police
office structures Small commercial
Old Taxi park entrance
Nakivubo Stadium Total Fuel station
Kalita Bus park Jesco Beauty Centre
BO E AC
PL
Smart Moving Kampala
M.H
Further design measures for this crossing will be needed.
To Kisenyi Bus Park
KIVU NA
66
scale 1:5000
Str uka
Not enough space available to fit in the profile with parking. Expanding toward the North side looks possible?
Further design measures for this crossing will be needed.
M.H
M.H
E.P
M.H
Queen
E.P E.P
M.H E.P
M.H
E.P
Park
wa
M
Not enough space available to fit in the profile with parking. Expanding toward the North side looks possible?
M.HE.P
Pham
Buildin
To Bus
A
G
BA
n
rgatte
Kinde
M.H
ad
LU
ious
Victor
Pri
unde
d g neede n of buildin of the the design Exact locatio to fit in to be able intersection
Re
Police
t End
park
ra
M.H
Eas
M.H
taxi
M.H
Club
M.H
M.H
Old
nt
S.L
n
Mosque
fit in the the ble to availa toward gh space Expanding Not enou parking. with arcy ble? possi Pham profile with side glooks arcy North Buildin
Kiwan
statio
anuka
rist pala
atre
Ben
Fuel
e The
Kikuubo
E
r Prid
fence/tree
park
PLAC
Forme
M.H E.P E.P
To Kam
M.H
bus
E.P
Kobil
Mwanga Road
BAGA
24.7
r
Churc
a Ba
S.L
RU
To old bus
E.P
park
r
To old
a P.S
a Ba
Florin
The curre known. nt cross-secti To be design, able to on is not make we've a made an indica tion.
ann
ddafi
E.P E.P
M.H
h of Ch
Loh
To Ga
E.P
Florin
17.8
Cla s Classsic ic IN IN N N
Th kn e cu de own. rre sign To nt , w be cros e've ab s-se m le to ctio ad e mak n is an no indi e a t ca tio n.
rking
i
ur pa
daf
Jaga
Gad
rking
Street
E.P E.P
ur pa
office
E.P E.P
tio
e
E.P E.P
sta
To
el
nta
Fu
Co
City oil
E.P
Fuel station
hous
ING
TRINITY PARK TRINITY pARKING E.P
oil
rner
n
E.P E.P
Ben Kiw
She ll Fu el llstFuel atio stat n io
Co
She
ty
When House Universal side street will be use motorised traffic or cyclists th to be changed. Fo r example cyclist crossing.
sm all
To Ga que dd dafi Mos To Gadafi
Ci
MM Plaza
M.H
M.H
M
Kam
Zebra C
ay
sb
an
k
Barclays bank
rossing
S.L
Ba
rcl
Ba
nk
of
Ba
ro
da
Bank of Baroda
S.L
M.H
E.P
teb
S.L
Kamu Kamu Plaza
be Ro ad teb M.H
En
s Un ion
irit
ram
sp &
M.H M.H
To Ch
am To
tern
Win es da
Wes
an
we Bam
S.L
Kamu Kamu Plaza
Ug
MM Plaza
of ce
M.H M.H M.H M.H Parking When House Universal side street will be used for either motorised traffic or cyclists the disign needs to be changed. For example implementing cyclist crossing. a
Ho use
MM Plaza
ics
E.P Luwumu Street
ings ild
15.5086
bu
H
all
E
ers/ sm
ay
lid
Ho
tain
s
s To be able to temporarily re close off this street. xp
ing
S.L
E.P
Generators/transformers
l
Further design measures forte o this crossing will be needed.
Zebra Cross
Barclays bank
an k
da aro
17.8802
Available space can be used to give more room for pedestrians and greenery.
ko fB
M.H
Bank of Baroda
e iring Kib
0.2508
E.P
M.H
The Arcade
be R
Un ion
so man er ne
8
0.7635
M.H
clay sb
M.H
rn
We ste
Kampala Road
Bar
0.1649
ham
Kamu Kamu Plaza
Ban
Zai Plaza
To C
scale 1:500
Con
Jemba Plaza
M.H
S.L
Pio
Avemar house
M.H M.H
fali
Ug
22.3441
Bata shop
M.H
Ja
leri a
,Bata shop
M.H M.H
plot
yh
Cit
M.H
M.H
mpl ex
M.H
S.L
ns
se
ou
Fabaah plaza
M.H
co
M.H
an da
JBK Hotel
M.H
90째
Barclays Bank
City
E.P
H & B Towers Yamaha Centre
City house
Gal
M.H
's
Kaf
M.H
EET
Mar ia
sa
aa
Mut
STR
Passage
UMU
za
Kizit
LUW
Old Taxi park entrance
Pla
fero
o Tower
an da
Plaza
ag
Mpoza
M.H M.H
Nam
Plaza
M.H
Ba mw eH
ou
Wi ne
se o
s&
fc
sp
era m
ed for either he disign needs implementing a
irit s
ics
Parking
En
M.H M.H
oa d
E.P Luwumu Street
Kamu Kamu Plaza
wers
Smart Moving Kampala
67
Tow
er
4.5 Artist impressions
68
Smart Moving Kampala
Namirembe Road Smart Moving Kampala
69
70
Smart Moving Kampala
Namirembe-Luwum street
Smart Moving Kampala
71
72
Smart Moving Kampala
Luwum street
Smart Moving Kampala
73
74
Smart Moving Kampala
5
Materialization and costs
Smart Moving Kampala
75
5.1 Materialization For the design we choose high-quality materials to achieve the desired look and image. The place of the various road users become recognizable because of its own materials. The area of the car is clear and it is obvious that the pedestrians and cyclists have a prominent role.
5.1.2. Pavement Bicycle: green asphalt The bicycle route is well recognizable by the green colour asphalt. The asphalt itself provides extra comfort for the cyclist.
76
Smart Moving Kampala
Car: black asphalt The roadway for the car consists of black asphalt. This is clearly recognizable for motorists.
Smart Moving Kampala
77
Pedestrians: pavement The area for the pedestrian consists of element pavement. This has a more upmarket appearance than asphalt. An additional advantage is that it is better for the water infiltration into the area. It also has a positive effect on the new trees. The roots are better provided with sufficient water and oxygen.
78
Smart Moving Kampala
5.1.2. Planting Lower plantings The planting in the design consists of suitable species. These plantings should do well in this climate and in these circumstances. The maximum height of the plantings is about 50 cm, so that there is sufficient visibility at all times. This related to social security in the streets. It is preferred that the planting has an attractive inflorescence. We leave the choice for the exact plant species to the municipality of Kampala itself. They have the best knowledge about which planting is most suitable in this climate and these circumstances. Only in this way we create a green and sustainable atmosphere.
Trees The design has a total of 105 trees. These trees provide an attractive and green atmosphere for the NMT zone. They also provide conduction of the cyclist and they provide the necessary shadow. The exact tree species is also selected by the municipality of Kampala.
Smart Moving Kampala
79
Rough&Ready Topseats
FSC hardhouten zitrand. Deze zitrand in Rough&Ready uitvoering is prachtig gedetailleerd waarbij de houten balken zijn ingesloten. Deze banken kunnen van heesters, bamboe of klimplanten
5.1.3
Street furniture
voorzien worden. De banken zijn uiterst solide maar blijven verplaatsbaar. Het is mogelijk de banken met open bodem (OB versie) te leveren zodat heesters of bomen in de volle grond
wortelen. Eveneens geschikt voor bamboe of klimplanten voor Planters with seating areas gevelbegroeiing. The planting in the middle part of the NMT zone is situated into ascending Minimale afname 2 stuks. Levertijd 12-14 weken.
edges. These edges can be made out of concrete elements or from
corton steel. These edges have multiple functions. They provide physical protection of the cyclists, so there will be no motorists and pedestrians Maatvoering 250 x 90 xso45that cm; it met R&R zitrand D = 40 cm on the bicycle path. Also the plantings are lifted, becomes extra Maatvoering 300 x 90 x 45 cm; met R&R zitrand D = 50 cm
R&R-Curve-Top 200, re Lengte: ca. 200 cm, zit Hoogte inclusief kamm
prominent. It also conducts the cyclists and it allows for seating on the
Afwijkende maatvoering en uitvoeringen in overleg.
edges. This seating on the edges is especially desirable on the side of the In CorTen staal of dubbel gepoedercoat staal.
pedestrian area. The height and width is about 60 cm. The height is such that it is pleasant to sit here.
Ontwerp: Streetlife
R&R-Curve-Top 200 Lengte: ca. 200 cm, zit De buitenstraal van de
e, blokhagen, klimplanten zijn goede groenopties voor de Big Green Benches.
De Big Green Benches zijn gemaakt van CorTen staal met een FSC hardhouten zitrand. Deze zitrand in Rough&Ready uitvoering is prachtig gedetailleerd waarbij de houten balken zijn ingesloten. Deze banken kunnen van heesters, bamboe of klimplanten voorzien worden. De banken zijn uiterst solide maar blijven
Beschermd door Int. Model Depots en Patenten
R&R Big Green Benches
BGB-R&RD-150 x 1 BGB-R&RD-180 x 1
BGB-R&R40-250 x BGB-R&R50-300 x
verplaatsbaar. Het is mogelijk de banken met open bodem
MON-R&R, montage set R&R balken R&R 5-Top 2340, zitdiepte is ca. 50 cm wortelen. Eveneens voor bamboe of klimplanten voor R&R 6-Top 2340,geschikt zitdiepte is ca. 60 cm gevelbegroeiing. R&R 6-Top 3000, zitdiepte is ca. 60 cm Minimale afname 2 stuks. Levertijd 12-14 weken. Lengtes: 234 & 300 cm.
80
Beschermd door Int. Model Depots en Patenten
(OB versie) te leveren zodat heesters of bomen in de volle grond
Maatvoering 250 x 90 x 45 cm; met R&R zitrand D = 40 cm Maatvoering 300 x 90 x 45 cm; met R&R zitrand D = 50 cm Afwijkende maatvoering en uitvoeringen in overleg. BGB-R&RD-150 x 150 (150 x 190) BGB-R&RD-180 x 180 (180 x 220)
Smart Moving Kampala BGB-R&R40-250 x 90 (250x100) BGB-R&R50-300 x 90 (300x110)
In CorTen staal of dubbel gepoedercoat staal.
T +31(0)71 524 68 46
R&R-Curve-Top - 40 / 5 Voor speciale projecten Streetlife adviseert u h
www.streetlife.nl
x 90 (250x100) x 90 (300x110)
De Big Green Benches zijn gemaakt van CorTen staal met een
Ontwerp: Streetlife
150 (150 x 190) 180 (180 x 220)
R&R Big Green Benches
39A
Heesters, bamboe
Ook de CorTen onderconstructie kan anders uitgevoerd worden. Voor dakterrassen en binnengebruik is een Aluminium onderconstructie een mooie oplossing om het gewicht van de bak te verlagen.
Bento Tree Boxes
rische ijn niet alleen verkrijgbaar met FSC van ronde vloeiende eilandvormen kan de inrichter erde R&Rofen All Black Snow White R&R zitrand. en voor een meer geometrische een diepte van terughoudende structie kan anders uitgevoerd worden. ng: de ‘Bento Tree Boxes’. De geïntegreerde R&R treetlife. nengebruik is een Aluminium n van deze eilanden zijn recht en hebben een diepte van e Emmeloord. oie oplossing om het gewicht van de bak cm. Overige maatvoering in overleg met Streetlife. en.
R&R Big Green Bench Beschermd door Int. Model Depots en Patenten
an de inrichter
Ontwerp: Streetlife
Bento Tree Boxes
Ontwerp: Streetlife
Minimale afname 2 stuks. Levertijd 12-14 weken.
40A
www.streetlife.nl
Beschermd door Int. Model Depots en Patenten T +31(0)71 524 68 46
40A
www.streetlife.nl
www.streetlife.nl
T +31(0)71 524 68 46
Beschermd door Int. Model Depots en Patenten
T +31(0)71 524 68 46
d is een rechthoekig Bento Boomeiland te Emmeloord. . Levertijd 12-14 weken. e afname 5 modules. Levertijd 12-14 weken.
41A
Smart Moving Kampala
81
Lighting To create sufficient safety there are several lighting masts in the design. These have a mutual distance of about 25 meters and a height of approximately 10 meters. The lighting masts are not yet taken in the draft. In total there are approximately 125 lighting masts.
82
Smart Moving Kampala
Ontwerp: Streetlife
CorTen Seat Strips Met de CorTen Seat Strips is het mogelijk een lange CorTen band van 47 cm hoogte in het maaiveld op te nemen. Meerdere functies, zoals zitbank, prullenbak, fietsparkeren en groen kunnen tot één stripvormig element gereduceerd worden. Door het traditioneel losstaande straatmeubilair tot één lange lijn terug te brengen creëert men een opgeruimd en krachtig straatbeeld, terwijl het
Bicycle parking
onderhoud minder is.
Ontwerp: Streetlife
Een bijzondere toepassing is bescherming van kwetsbare gevels, When we give the cyclist a prominent place in the design, it is very
important to think about ways and places to park the bikes. An
CorTen Seat Strips
die gevoelig zijn voor ramkraken, zoals bij geldautomaten, entrees van banken, juweliers e.d. De CorTen Seat Strip kan dus ook als sympathiek ogende ‘Road Barrier’ dienst doen en kan zonodig
attractive option is to integrate the parking places, just like the benches, verzwaard worden met beton. Beschermd door Int. Model Depots en Patenten
de CorTen Seat Strips is het mogelijk een lange CorTen band De bovengrondse doorsnede is 47x47 cm. Wij adviseren with the planting boxes. So for example, the bicycleMet parking places are een maaiveld afschot over de lengte van de Strip van minder
van 47 cm hoogte in het maaiveld op te nemen. Meerdere functies, part of the corton steel elements. This creates a high-quality and unique dan 10 cm, gezien de ondergrondse diepte van ca. 20 cm. Minimale afname 12 m . Levertijd 10-12 weken. zoals zitbank, prullenbak, fietsparkeren en groen kunnen tot één
identity for the NMT zone.
1
Ontwerp: Streetlife
stripvormig element gereduceerd worden. Door het traditioneel
CorTen Seat Strips
losstaande straatmeubilair tot één lange lijn terug te brengen
Met de CorTen Seat Strips is het mogelijk een lange CorTen band
creëert men een opgeruimd en krachtig straatbeeld, terwijl het van 47 cm hoogte in het maaiveld op te nemen. Meerdere functies, zoals zitbank, prullenbak, fietsparkeren en groen kunnen tot één
onderhoud minder is.
stripvormig element gereduceerd worden. Door het traditioneel
straatmeubilair tot één lange lijn terug te brengen Een bijzondere toepassing is bescherming van kwetsbarelosstaande gevels,
creëert men een opgeruimd en krachtig straatbeeld, terwijl het
die gevoelig zijn voor ramkraken, zoals bij geldautomaten, entrees onderhoud minder is.
Een bijzondere toepassing is bescherming van kwetsbare gevels,
van banken, juweliers e.d. De CorTen Seat Strip kan dus ook als die gevoelig zijn voor ramkraken, zoals bij geldautomaten, entrees sympathiek ogende ‘Road Barrier’ dienst doen en kan zonodig verzwaard worden met beton.
De fietsparkeer module heeft een lengte van 300 cm en is
dan 10 cm, gezien de ondergrondse diepte van ca. 20 cm. een maaiveldvoorzien afschot over de voor lengte vanvan deeenStrip van 6 uitsparingen het voorwiel 6-tal van minder
fietsen. Separaat worden 3 stuks CorTen fietsbeugels geplaatst
T +31(0)71 524 68 46
1 slot gezet12 kan m worden. . Levertijd 10-12 weken. Minimale afname 45A
www.streetlife.nl
T +31(0)71 524 68 46 www.streetlife.nl
Minimale afname 12 m1. Levertijd 10-12 weken.
dan 10 cm, gezien de ondergrondse diepte van ca. 20 cm. waar telkens aan 2 zijden een fiets afgesteund en met ketting op
45A
45A
De bovengrondse doorsnede is 47x47 cm. Wij adviseren
De bovengrondse doorsnede is 47x47 cm. Wij adviseren een maaiveld afschot over de lengte van de Strip van minder www.streetlife.nl
Beschermd door Int. Model Depots en Patenten
300 cm module voor het fietsparkeren van 6 fietsen. verzwaard worden met beton. CSS-300-Bike + 3x CorTen fietsbeugels 35 cm.
Beschermd door Int. Model Depots en Patenten
T +31(0)71 524 68 46
van banken, juweliers e.d. De CorTen Seat Strip kan dus ook als sympathiek ogende ‘Road Barrier’ dienst doen en kan zonodig
300 cm module voor het fietsparkeren van 6 fietsen. CSS-300-Bike + 3x CorTen fietsbeugels 35 cm.
De fietsparkeer module heeft een lengte van 300 cm en is voorzien van 6 uitsparingen voor het voorwiel van een 6-tal fietsen. Separaat worden 3 stuks CorTen fietsbeugels geplaatst waar telkens aan 2 zijden een fiets afgesteund en met ketting op slot gezet kan worden.
300 cm module voor het fietsparkeren van 6 fietsen. CSS-300-Bike + 3x CorTen fietsbeugels 35 cm.
De fietsparkeer module heeft een lengte van 300 cm en is voorzien van 6 uitsparingen voor het voorwiel van een 6-tal fietsen. Separaat worden 3 stuks CorTen fietsbeugels geplaatst waar telkens aan 2 zijden een fiets afgesteund en met ketting op slot gezet kan worden. Smart Moving Kampala
83
5.3 Costs An estimate has been made of the total costs of this project. The cost estimate is based on global Dutch standard prices. Since we don’t have enough understanding of the prices prevailing in Kampala, we devide the Dutch total amount by two. Like this we give a global indication. The calculation doesn’t consider costs for the sewage system, as we are not able to judge the necessity of changing or renewing of the current rainwater system. The calculation is based on
▪▪ ▪▪ ▪▪ ▪▪ ▪▪
84
2014 prices. Exclusive of VAT. Exclusive of land acquisition. Based on the design of the corridor, presented in chapter 4. Based on the quantities and indicative costs per unit.
Smart Moving Kampala
Quantity
Unit
Price per unit
Total price
Pavement green asphalt (bicycle)
8500 m2
€ 90
€
765.000
7000 m2
€ 50
€
350.000
11000 m2
€ 50
€
550.000
7500 m2
€ 20
€
150.000
105 pieces
€ 1500
€
157.500
650 m1
€ 300
€
195.000
125 pieces
€ 750
€
93.750
€
2.261.250
Total investment costs excluding VAT in the Netherlands
€
3.500.000
Total investment costs excluding VAT in Kampala
€
Including foundation and labor
black asphalt (car) Including foundation and labor
element pavement (pedestrians) Including foundation and labor
Plantings lower plantings Including soil improvement
trees diameter 18-20 cm Including soil improvement
Street furniture planters with seating areas The middlepart of the NMT zone has four rows of planters per m1. Four times € 75 per m1 is € 300 per m1 in total.
lighting including light column and fixture
Total price 15% to be determined 3% costs for construction site 8% general costs 5% profit and risk 0,3% RAW and research 10% unforeseen
rounded amount
3.500.000 /2=
€
1.750.000
rounded amount An estimated budget of 2.350.000 US dollars (USD) will be needed (rounded amount) Based on exchange rate of 3 february 2014 All amounts are based on Dutch unit prices. These prices include all the necessary preparations, material costs and labour costs Costs for sewage and acquisition of land/properties are not included
Smart Moving Kampala
85
86
Smart Moving Kampala
A
Appendix Objectives and program requirements
Smart Moving Kampala
87
Functional requirements; traffic network
Functional requirements; NMT-zone
▪▪
Namirembe Road-Luwum street
The NMT-project will provide not only a design for a NMT-zone, but also a way traffic can be reorganized in other streets.
▪▪
The NMT-street (Namirembe Road- LuwumStreet) will be
▪▪
divided in several areas in which a a specified mix of traffic is allowed.
▪▪ ▪▪
▪▪
less ore no parking and by less traffic lanes, possibly one-
The NMT will provide in safe and well kept area in the inner
directional traffic.
▪▪
BodaBodas are treated in the same way as cars. BodaBodas are not allowed in the same parts where cars are not allowed.
The current function as central artery for traffic will be diverted
▪▪
Rainwater drainage is essential; current (or possible) position
All side streets will have to be reorganized as part of the
of manholes and gullies have to be observed as fixed points in
introduction of NMT.
street lay-out; streets have to have a gradient in the direction
The use of the Old Taxi Stand will be organized from the south
of gullies.
▪▪
Trade is allowed along the NMT-streets; shop displays are
street.
allowed within 1 meter of the alignment; no stalls are allowed
The BRT will use the Ben Kwanuka Street which will be
in the street.
allowed to cross Namirembe street.
88
The lateral parts of Namirembe Street – Luwum Road will
and cyclists.
side; the Taxi Stand will not be attainable from Namirembe
▪▪
▪▪
provide less space for cars; this can be achieved by allowing
to other roads, to stimulate the traffic to use other roads
▪▪
completely car-free.
The NMT-zone will provide in facilities for at least pedestrians
city of Kampala.
▪▪
A central part of Namirembe Street – Luwum Road will be
Smart Moving Kampala
Street Lay-out NMT-zone
Entrance to NMT-zone with limited car-traffic
General
▪▪
All streets ara at any time available for -
Fire brigade
- Police
▪▪ ▪▪
Trees, street benches, light posts and other objects are
means to make a good street lay out.
▪▪
Street paving with durable and high-quality appearance is
-
Emergency unit/first aid
Limited entrance will be available for suppliers -
Restricted areas: designated load/unload spots
applied.
▪▪
Street in cycle lanes will be asphalted to ensure a smooth
Enforcement
ride.
▪▪
Lanes for cyclists and cars are visibly and materially
▪▪
separated.
▪▪
Lanes for cyclists and pedestrian area are visibly and materially separated.
▪▪
etc have to be used.
▪▪ ▪▪
Parking cars will not have to cross a cycle lane. In NMT-area with limited traffic a reduced parking space will
Entrance to car-free NMT-zone
Police will enforce use of NMT-zone in a proper way.
Technical specifications ▪▪
be available.
▪▪
Regulations have to be prepared so NMT is enforcable.
The entrance of the NMT-zone is clearly and physically marked.
▪▪ ▪▪
NMT will be arranged in a self-explaining way, so little barriers
All streets ara at any time available for -
Fire brigade
Width of cycle lane: 2,0 m (one direction) and 5,0 m (bidirectional).
▪▪ ▪▪ ▪▪ ▪▪ ▪▪
Width of car lane: > 3,0 (one direction). Width of parking-space: 2,5 m. Width of load-unload space: 2,5 m. Gradient of pavement < 2% (?). Whole surface of the street will drain into gullies in the street.
- Police
▪▪
-
Emergency unit/first aid
Limited entrance will be available for suppliers
-
Restricted areas
-
Restricted time slots
▪▪
Limited but specially arranged entrance for Cash-suppliers (ATM, Bank)
▪▪
Carts allowed to supply shops
Smart Moving Kampala
89
Deventer Snipperlingsdijk 4 7417 BJ Deventer T +31 (0)570 666 222 F +31 (0)570 666 888 Postbus 161 7400 AD Deventer The Netherlands
www.goudappel.nl goudappel@goudappel.nl
90
Smart Moving Kampala