iCare

Page 1

General

Key Features

iCARE is an innovative and planned approach to after sales support of your farm assets. Planned action will assist to keep your equipment and your farming operation running smoothly and identify any potential problems before they occur.

◼ ◼ ◼ ◼ ◼ ◼ ◼

Any remedial work can be planned for, preventing loss of productivity caused by unnecessary downtime.

Reduced breakdowns Better animal health Reduced teat complications and mastitis Optimised performance Increased profitability Peace of mind Friendly, helpful expert advice

The Program Consists of 3 Key Aspects:

PLAN Planned Planned Service and and Service Certifi cation Certification

Planned Maintenance Contracts

Planned Consumable Replacements

Milfos strongly recommends an iCARE program be implemented

A Planned Approach Milfos have developed a planned approach for after sales support of your farm assets. The iCARE program brings together the Servicemen, Technicians and the Operators. Each party performs an agreed level of inspection, detection or correction to the equipment to maintain optimum performance.

CARE MAINTENANCE DAY VAC LEVEL PULSE RATE PULSE RATIO LINER TYPE CLAW TUBE MILK TUBE PULSE TUBE FILTER SLEEVE CARE CARE

SERVICE CHECKLIST

28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27

Section

Coupler alignment Coupler condition Shaft end play Vibration & noise Rotary Vane Pump(s)

ISO Test Mini Test

Water Ring Pump(s)

Platform Rotary Lobe Pump(s)

Oil level Oil condition Oil leaks

Vacuum Interceptor

Hygiene Correct installation Seal condition Auto drain

MAINTENANCE

MILK PUMPING SYSTEM Suction test head 1 Diaphragm Pump Suction test head 2 Suction test head 3 Suction test head 4 Suction test head 5 Suction test head 6

Plant ACR & DF

Gearbox oil height Gearbox oil condition Belt condition Belt tension Belt alignment End play Diaphragm condition

OPERATOR

The farm manager can easily keep track of service carried out in the past and planned for in the coming months. SERVICE

SECTION 11.2

Oil wick Lubricator contaminants Lubrication reservoir Water discharge flow rate Reservoir contamination Suction hose condition

Hygiene

Platform

At the heart of the program is the visual planning board. The board is a visual prompt of services that need to be carried out or when future service or maintenance will occur.

Item

VACUUM SECTION Pump Drive System(s) Belt condition Belt tension Belt alignment Guards fitted

SERVICE

Clusters & Pulsation

Back plate Conrod measurement Vibration & noise

Wash System Liner Change Centrifugal

Chemical Drums ACR Ropes

Coupling condition Suction leaks / bubble test Non return valve condition Rubber component condition Motor direction Auto drain condition Seals & pipeline connections Variable speed control operation

Receiver & Sanitary Trap Filter Body Filter Sleeves

Plate Heat Exchanger

Pipes and Drains Hot Water Vacuum Pump Compressor Milk Recovery

Rotary Running Gear Safety Switch

On/off controls operation Float, stem & seal condition Required milk flow rate (litre/hr) Required water flow rate (litre/hr) Min. distance between plates (mm)

MILK FILTERING Milk Filter(s)

Section PULSATION Pulsation

Diaphragm condition Valve seals Filter condition Wiring condition Wiring connections Operation Filter connections

CLUSTERS Claw

Air admission <.8, .9, 1.0 or >1.0 Pulsation block Claw base Alignment to cow

Bowls

Condition / cracks Seals Valves

Shell / Liner

Compatibility Alignment Mouthpiece Tail

Shell

Condition Nipples Liner / pulse tube / claw alignment

RUBBERWARE Pulse Tubes

Condition Length Diameter

Long Milk Tube

Condition Length Diameter

Long Pulse Tube

Condition Length Diameter Condition

Long Tail Bends AIR SUPPLY(S) INCLUDING TEAT SPRAY Belt condition Compressor Belt tension Belt alignment Guards fitted Regulator setting Oil level Oil condition Tank drain MILK & AIRLINES Milkline

Valve condition Valve seals / o’rings Seals & pipeline connections

Filtered Airline

Notes

Item

Section CIP SYSTEM Jetters

Required flow rate Measured flow rate Individual jetter function Rubber cup / seal condition

Diameter Seals & pipeline connections

Settings & operation Ram Actuator Milkline Settings & operation Hot valve function / seal condition Plant Autowash Cold valve function / seal condition Seals & pipeline connections Tub floats condition Tub floats operation Tub floats wiring Pickup valve function / seal condition Recirc valve function / seal condition

Chemical lines Mechanical frame condition Tub integrity / leaks

Hot Water Cylinders

RECEIVER GROUP Receiver

Manual Wash Valve Sanitary Trap

Variable Speed Control AUTO DRAINS Drain Valves

Transducer connection Installed as per manufacturers specs Condition Operation

Cylinder condition Cylinder operation Safety / support bracket Thermostat setting / operation

Wiring condition ACR Cylinders

Condition Contamination Individual operation Ram seal condition Ram filters Signal tube condition

ACR Cords

Sensors / Meters

Condition Length Claw connections Installed as per manufacturers specs Operation

Vacuum Shutoff Valve Condition Contamination Individual operation Diaphragm condition Control Valves

Vacuum tube condition Condition Contamination Individual operation Seals / diaphragm condition Wiring condition / connections

Claw Attachment TEAT SPRAYING Spray Pump

Quick release clip condition Condition Pressure Seals & pipeline connections Operation

Rubber seals Correct installation Perspex lid conditions Seals & pipeline connections

Manual Guns

ROTARY COUPLINGS Main Gland

Condition Seals & pipeline connections Cover seal O’rings Pin set Pin track condition Electrical connections

BAIL RESTRAINTS (CRS) Condition Restraint Cylinders Contamination Individual operation

Greaser operation Correct mounting (floating) & support Secondary Glands

Alignment Condition Length Connection to straps

Operation Sensor & reflector condition Spray pattern Correct coverage Leaks / pipe work / valves Nozzle filter

Drain hose condition

Ram seal condition Ram filters Signal tube condition

Operation Dropper condition Spray pattern

Auto Sprayer

Rubber seals Correct installation Perspex lid conditions Vacuum shut off valve

ACR GUIDES / DROP DOWN SYSTEM Mechanical installation Guides Spring / pulley condition IR gun / drop down operation Controls

CRS Cords

Notes

I te m

AUTOMATED CLUSTER REMOVERS Condition Push Buttons Individual operation

Control valve signal tubes Chemical pump operation Chemical pump squeeze tube condition Wash Tub

Condition O’rings Seals & pipeline connections

EXTRA CHECKS

Condition Operation Lubrication

Hinges

GATES

SORTING Gate Hardware

Filters Bracketing VACUUM REGULATION Mechanical Regulator(s) Condition Filters Installed as per manufacturers specs

Section

Air filter Seals & pipeline connections Signal tubes & connections

Drain points Bracketing Diameter Seals & pipeline connections

Notes

Cover(s) Feed rubber condition Air Injectors

Milkline fall Diameter Inlet position Seals & pipeline connections Drain points Bracketing

Pulsator Airline

Condition Filter cage Filter holder Filter seal(s) Filter drain Seals & pipeline connections

Item

VACUUM INDICATION Location Gauge Condition Setting

Measured flow rate (litre/hr) Measured minimum distance (mm) Gasket condition Seals & pipeline connections Water leaks / pipework / valves

Settings & operation Coalescing filter element condition Coalescing filter / drain Purge pressure 45 PSI

Cooler

Notes

Rams

Controls

Condition Pipe work Grease / lubrication Condition Operation Leakage Manual control Auto control Valve set Air pressure Water drain Wiring condition

w w w. m i l f o s . c o m

SERVICE AND CERTIFICATION

RESP DATE

OPERATOR

RESP DATE

MAINTENANCE

iCARE


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
iCare by GEA Farm Technologies GmbH - Issuu