OUR PERFORMANCE
Key capital works Carss Bush Park Foreshore Naturalisation Project Stages 2 and 3 The final two stages of the Carss Bush Park foreshore has resulted in one of the best examples of foreshore eco-engineering in Australia. This project is the culmination of ongoing research and development into seawall construction with the intent of increasing foreshore habitat through innovative design. This foreshore enhancement project will not only yield benefits to the environment, but increase the aesthetic, social, educational, and cultural value of the Carss Park foreshore.
Myles Dunphy Boardwalk Construction of an elevated boardwalk in Myles Dunphy Reserve has improved accessibility to the reserve while minimising impacts on remnant natural wetland. This boardwalk enables walkers to enjoy even more of the natural beauty of lower Myles Dunphy Reserve while improving movement in Oatley.
Dover Park East pontoon Dover Park East pontoon is used by boaters, including disabled sailors of Sailability NSW. Pontoon slope and water depth issues due to sedimentation resulted in boaters being unable to regularly use the infrastructure. We installed a longer gangway and moved existing infrastructure outside the impact zone.
172
Georges River Council // Annual Report 2019/20