Design Journal Documentation

Page 1

DESIGN JOURNAL DOCUMENTATION PROCESS & CONCEPTUAL STAGES

goh peinncheg caleb

1


PROJECT INVOLVED

2 FINAL SUBMISSION 1.0

FINAL SUBMISSION 2.0

STIMULI RESEARCH

INTERIM 1.0

DS4

INTERIM 2.0

STIMULI RESEARCH

MODULES:

DESIGN ITERATION

PROJECT INVOLVED

construction

fabrication

documentation

analysis

detailed design

conceptual design

programming

PROJECT STAGES

URBAN DESIGN ANALYSIS

MODULES:

PROJECT INCEPTION

CONTENT

DS3


programming PROJECT INCEPTION URBAN DESIGN ANALYSIS STIMULI RESEARCH

conceptual design detailed design analysis documentation fabrication construction

3


programming PROJECT INCEPTION

PROJECT DESIGN BREIF

THE PROJECT CALL FOR FILLING THE CULTURAL VOID THROUGH ADITION OF CULTURAL CENTRE. UNLIKE AN COMMUNIT lenght

site area

width

existing building

conserved building existing tree existing bushes

height

4


programming URBAN DESIGN ANALYSIS

GROUP COMPONENT (SUB DIVISION 4)

THE PROJECT TASK WAS TO CARRY OUT A COMPHREHENSIVE DOCUMENT INVESTIGATION ON SITE AND ITS SURRONDINGS WITH A GROUP 6-7 MEMBERS WHICH WAS SPLIT INTO 4 DIVISION TO TACKLE THE CHINATOWN DISTRINT

CHINATOWN ANALYSIS DIVISION OF SITE

5


6


programming STIMULI RESEARCH REVISTING THE EMPTY PLOT OF LAND, THE SELECTED SITE IS SITED IN BETWEEN CONSERVATED GAZETTED BUILDING, KONG CHOW CULTURAL CENTRE (KCCC) AND JEAN YIP LOFT. THE SITE IS ALONG NEW BRIDGE ROAD WITH NUMBER OF LANDMARK SUCH AS LOWER BARRACK, THE PEOPLE PARK COMPLEX AND SHOPHOUSES LOCATED AROUND THE SITE.

INDIVIDUAL COMPONENT

SITE AREA 687m²

THE PROPSED DESIGN WILL AIDED THE CONTEXTUALLY OF THE SITE BY FILLED UP THE CULTURAL VOID FOR THE COMMUNITY OF CHINATOWN

LOCATION MAP

THE FOLLOWING PAGES PORTRAY VARIOUS ARCHITECTURAL RESPONSES THROUGH DIAGRAM FROM SITE ANALYSIS FINDING

(ILLUTRATION PURPOSES)

7


architectural response

0m m

26 00 0m Je m an L o Yip ft

Sri Layan Sithi Vinayagar Temple

73

Ne w

25

00

Br i dg e

site condition

Ro

Eu

ad

To

ng S

en

St

SITE AREA

m 25

00

0m

ow Ch o n ng K o Ko u i W

25

69

00

0m

m

55

St

1D

ad

To

73

Ne w

Br

id g e

Ro

Eu

Je an L o Yip ft 687.5m²

69 ow Ch on ng Ko Ko u i W

design response

ng

Se n

Sri Layan Sithi Vinayagar Temple

PROGRAMME DEVELOPMENT 150 m²

B BUILDING FOOTPRINT = 687.5 m² PK PARKING (10 CARS + 2 HANDICAP) = 115.2M + 34.56 M (150 m² ESTIMATED) S SERVICE AREA (M&E ROOMS & VERTICAL RISERS) = 3360 m² DO DROP OFF POINT AREA (BACK OF HOUSE SERVICES) = 32 m² C/P PLAY AREA = 150 m²

1D

8

55


architectural response

en

St

SETBACK/EASEMENT

N -

AT IO

IS

73

Ne w R

C OA AT D EG C O ATE R Y GO 3 R

Br i dg e

Ro

Eu

BRIDGE TO CONNECTION KONG CHOW CULTURAL CENTRE

Sri Layan Sithi Vinayagar Temple

Je an Lo Yip ft SHARED BOUNDARY WALL

69 EXTENSION OF CITYPARK ONTO SITE

ow Ch o n ng K o Ko u i W

site condition

PARKING ALLOCATION

ad

To

ng S

EXTENDING CREEK INTO SITE SHELTERED WALKWAY

BRIDGE TO CONNECTION DUXTON PLAIN PARK

55

St

1D

ad

To

73

Ne w

Br

id g e

Ro

Eu

Je an Lo Yip ft

69 ow Ch on ng Ko Ko u i W

design response

ng

Se n

Sri Layan Sithi Vinayagar Temple

AREA IN THE SETBACK ZONE • parking spaces • extension of city park onto the site • extending to creek into site • landscape buffer

PROGRAMME DEVELOPMENT 150 m²

55 1D

9


architectural response

St

CONTOUR

Je an Lo Yip ft

73

Ne w

Br i dg e

site condition

Ro

Eu

ad

To

ng S

en

Sri Layan Sithi Vinayagar Temple

69 ow Ch o n ng K o Ko u i W

EXISTING TOPO (CHANGE IN LEVEL)

55

9.6 grade 12

tanx = 12/130 = 1:9

St

130

1D

Sri Layan Sithi Vinayagar Temple

ad

To

73

Ne w

Br

id g e

Ro

Eu

Je an Lo Yip ft

beyond horizon background middle ground foreground vision frame

69 ow Ch on ng Ko Ko u i W

design response

ng

Se n

building high use site as foreground from duxton plain park

building low use site as background from duxton plain park

55 1 storey building footprint

1D 2nd storey building foot print integrate function (interior & exterior)

10


architectural response

en

St

TREES

ng S

ad

To

relocate/reused ?

Je an Lo Yip ft

Ro

Eu

73

Ne w

Br i dg e

site condition

Sri Layan Sithi Vinayagar Temple

existing tree on site

69 ow Ch o n ng K o Ko u i W

55

St

1D

ad

To

Br

id g e

Ro

Eu

Je an Lo Yip ft

73

Ne w

sunpath direction show shading & direct sunlight

69 ow Ch on ng Ko Ko u i W

design response

ng

Se n

Sri Layan Sithi Vinayagar Temple

55 1D

11


architectural response

St

PEDESTRAIN CIRCULATION

Je an Lo Yip ft

73

Ne w

Br i dg e

site condition

Ro

Eu

ad

To

ng S

en

Sri Layan Sithi Vinayagar Temple

69 ow Ch o n ng K o Ko u i W

55

Se n

St

1D

ng

ad

To

73

Ne w

Br

id g e

Ro

Eu

Je an Lo Yip ft

69

additional path access (accessibility)

ow Ch on ng Ko Ko u i W

design response

Sri Layan Sithi Vinayagar Temple

meeting space step space

55 1D

12


architectural response

St

VEHICULAR CIRCULATION

Je an Lo Yip ft

73

Ne w

Br i dg e

site condition

Ro

Eu

ad

To

ng S

en

Sri Layan Sithi Vinayagar Temple

69 ow Ch o n ng K o Ko u i W

55

St

1D

Se n ng

ad

To

Br

id g e

Ro

Eu

Je an Lo Yip ft

73

Ne w

loading & unloading bay located near the driveway

69 ow Ch on ng Ko Ko u i W

design response

Sri Layan Sithi Vinayagar Temple

carlift create more space compare to ramp

55 1D

13


PROGRAMMING

conceptual design SPATIAL PROGRAMMING STIMULI CONCEPT

detailed design analysis documentation fabrication construction

14


conceptual design spatial programming

15


1

2

1

Duxton Plain Park View

NEWNew BRIDGE ROAD Bridge Road View

1

2

3

2

Duxton Plain Park DUXTON PLAIN PARKView

4

New Bridge Road View

16


conceptual design stimuli concept

Utilitarian Space & Ritual

Shared Experience Community

create a condusive learning space for the community

performing arts

cultural academy

1. chinese classical & eth-

17


private

public transition of privacy

1

private

2&3 semi-private 4 public Duxton Plain Park View

1

2

3

4

New Bridge Road View

private - 1

18


semi-private - 3

semi-private - 2

19


PROGRAMMING CONCEPTUAL DESIGN

detail design BUILDING PLANS

analysis documentation fabrication construction

detail drawing interim submission

20


Room Legend

4

3

1

Gallery

2

Management Office

3

M&E Space* (REF Tec dwg)

4

M&E Corridor

5

Storage

6

Lift Lobby

7

Corridor 1

8

Media & Library Centre 1

6 5 7

8

1

2

Basement 1

Room Legend

4 8 5

6

1

1

Outdoor Cultural Performance

2

Outdoor Exhibition

3

Corridor 2

4

Retail & F&B

5

Communal Meeting Space

6

Foyer

7

Lift Lobby

8

F&B Extension

3 7

2

Level 1

21


Room Legend

6

1

Viewing Deck

2

Indoor Cultural Performance

3

Communal Garden

4

Lift Lobby

5

Media & Library Resources 1

6

Multipurpose Space 1

4

2

5

1 3

Level 2

Room Legend

6 3 4 1 5 2

Level 3

22

1

Learning Centre Space 1

2

Learning Centre Space 2

3

Media & Library Resources 2

4

Lift Lobby

5

Media & Library Resource 3

6

Design Studio


Room Legend

6 3

1

Cultural Performance Extension

2

Learning Centre Space 3

3

Media & Library Resources 4

4

Amphitheatre

5

Lift Lobby

6

Corridor 3

7

Multi Purpose Space 2

5

2

4

1

Level 4 Room Legend 1

Viewing Deck

1

Level 5

23


PROGRAMMING CONCEPTUAL DESIGN DETAIL DESIGN

analysis sustainable design

documentation fabrication construction

analysis diagram sustainable strategy (tbc)

24


ANALYSIS FORM GENERATION - spatial verbs implementation of concept from primer project of spatial verb to derived massing form form site constraints

SITE AREA (CARPARKS)

SUBTRACT (VOIDS & PUBLIC SPACES)

EXTRUDE (HEIGHT)

NESTING (STAIRCASE & LIFT)

SPLIT & ADDITION ( DEMARCATION & OVERHANG)

CARVE (PITCH ROOF)

DESIGN STRATEGY CONCEPTUAL MASSING

25


PROGRAMMING CONCEPTUAL DESIGN DETAIL DESIGN ANALYSIS

documentation BUILDING PLANS

fabrication construction

technical drawing building plan submision ds4 interium submision

26


A05-07

NORTH

A

B

12

13

A11

A12

C

D

E

25000 9550 5900

15450 3650

9550

5900

1

SITE BOUNDARY LINE

6

1

7

8

2

6100

SITE BOUNDARY LINE

4

2 3850

4

9

16050

UP

3

3 14

A13

5 4 6100

1

26000

WEST

10

3

6

4

2350

4

SUPPLY

5

7

EXHAUST

A06-09

5

WC EXHAUST

121 m2

-

1 STANDBY GENERATOR ROOM

10m2

SITE BOUNDARY LINE

3 CSR ROOM

11 m2 7 m2

9 WATER TANK

LIST M&E CORE PROVIDED

GFA: 0 m2

N

16050

A12

D

47 m2

16 m2 4 m2 4 m2 4 m2

ROOM LEGEND

AREA

1

GALLERY

56 m2

2

MANAGEMENT OFFICE

34 m2

3

M&E SPACES*

4

M&E CORRIDOR

5

E

44 m2

STORAGE

29 m2

LIFT LOBBY

34 m2

7

CORRIDOR 1

45 m2

8

MEDIA & LIBRARY CENTRE 1

86 m2

9

CORES (STAIRCASE, LIFT, TOILET)

6

2

A05-08

2 ESCAPE STAIRCASE 2

5 UNIVERSAL TOILET

A11

12 m2

19 m2

CARGO LIFT ication is submitted in the form of an electronic record which is signed with a 4 digital signature.

13

Project Ref No:

SOUTH

M 5M 1 2ESCAPE STAIRCASE 1

1M

3 PASSENGER LIFT

12

19 m2 12 m2

BASEMENT 1 FLOOR 10 HOSE REEL TANK PLAN & PUMP ROOM 03 SCALE 1:100

6

DESIGN STUDIO 4 FILLING THE CULTURAL VOID (CULTURAL CENTRE)

9 m2

6 SUMP PUMP ROOM

1

2

SUSTAINABLE URBAN PLANNING & NDARY LINE SITE BOU ENGINEERING (N89)

13 m2

5 MDF ROOM

- 0M

NGEE ANN POLYTECHNIC

20 m2

4 LAN ROOM

8 SPRINKLER TANK & PUMP ROOM

NORTH

LAN

ELETRICAL

8 m2 1

7 EJECTOR PUMP ROOM

A05-07

DRY

8

TELECOM

2 FAN ROOM

2.

2 14 ________sheet of ________ 9950

AREA

LIST M&E SPACES PROVIDED 2

7600

GENERAL NOTES 1.

1.

GENERAL NOTES

AREA

LIST M&E SPACES PROVIDED

121 m2

General Notes

1 STANDBY GENERATOR ROOM 2 FAN ROOM

10m2 8 m2

3 CSR ROOM 20 m2 1. Contractor to verify all site dimensions 2. Contractor is responsible for notifying architect if confusion LAN ROOMand for details are missing 13 m2 arises on site or 4if dimensions from drawing set5before proceeding at site. MDF ROOM 9 m2 3. All wood grain on movable and built-in furniture is to run in the direction as indicated arrows on the drawings. 6 SUMPby PUMP ROOM 11 m2 4. No part of this work may be reproduced or used in any form EJECTOR PUMP ROOM from the publisher. 7 m2 or by any means7without written permission 5. All prints specifications and their copyright are the property of 8 SPRINKLER TANK & PUMP ROOM 19 m2 architect and shall be returned at the completion of the work. 6. All dimensions shall be checked on site before commencing any 9 WATER TANK 12 m2 work or shop drawings. Any discrepancies occurring in the 10referred HOSE to REEL TANK & PUMP ROOM 12 m2 drawings must be office before the commencement of any work or the contractor shall bear the full responsibility. 7. Do not scale drawings. 2. the LIST M&E CORE PROVIDED 47 m2 8. Figured dimensions shall be taken in preference to 1 ESCAPE STAIRCASE 1 19 m2 scaled dimensions 2 ESCAPE STAIRCASE 2 4 Date CARGO LIFT 5 UNIVERSAL TOILET

4 m2 4 m2

15450 5900

14

A13

6

7

SITE BOUNDAR

3

1 1 2

SUSTAIN E

FILLI (

Project Ref No:

4 m2

Description

25000 9550

NGEE

16 m2

3 PASSENGER LIFT

Rev.

2 ______

ROOM LEGEND

AREA

GALLERY

56 m2

General No

1. Contractor to verify 2. Contractor is respo arises on site or if d from drawing set be 3. All wood grain on m the direction as ind 4. No part of this work or by any means w 5. All prints specificati

27


2. -

A05-07

NORTH

A

B

C

D

E

12

13

A11

A12

25000 9550

15450

5900

3650

9550

5900

1

SITE BOUNDARY LINE

4

6100

SITE BOUNDARY LINE

2 5

3850

UP

RETAIL + F&

5

COMMUNAL

6

FOYER

7

LIFT LOBBY

8

F&B EXTEN

6100

26000

6

14

FLOOR ABOVE

CORRIDOR

4

3 A13

WEST

3

8

FLOOR ABOVE

3

FLOOR ABOVE

4

5

3

2350

A06-09

OUTDOOR C

OUTDOOR E

16050

1

ROOM LEGE 1 2

4

5

SITE BOUNDARY LINE

FLOOR ABOVE

2M

9

1M

2

NGEE ANN POLYTECHNIC SUSTAINABLE URBAN PLANNING & ENGINEERING (N89) DESIGN STUDIO 4 FILLING THE CULTURAL VOID (CULTURAL CENTRE)

4 m2

5M

6

NDARY LINE

SITE BOU

SOUTH

A05-08

N

GFA: 0 m2

8

1ST STOREY FLOOR PLAN 04 SCALE 1:100

7

4 m2

6

4 m2

4 CARGO LIFT

5

8

3 PASSENGER LIFT

3 14 ________sheet of ________ 4

7

16 m2

3

6

2 ESCAPE STAIRCASE 2

2

5

19 m2

1

4

1 ESCAPE STAIRCASE 1

UP

3

47 m2

5 UNIVERSAL TOILET

18 17 16 15 14 13 12 11 10

2

AREA

1 LIST M&E CORE PROVIDED

FLOOR ABOVE

0M

1

9

-

18 17 16 15 14 13 12 11 10

2.

UP

2

GENERAL NOTES

7600

9950

7

Project Ref No:

d certification is submitted in the form of an electronic record which is signed with a digital signature.

General Notes

2 D

16050

3850

6100

1

13

28 15450

A12

3

ROOM LEGEND

AREA

1

OUTDOOR CULTURAL PERFORMANCE

89 m2

2

OUTDOOR EXHIBITION

31 m2

3

CORRIDOR 2

46 m2

4

RETAIL + F&B

71 m2

5

COMMUNAL MEETING SPACE

41 m2

6

FOYER

53 m2

7

LIFT LOBBY

45 m2

8

F&B EXTENSION

41 m2

E

1. Contractor to verify all site dimensions 2. Contractor is responsible for notifying architect if confusion arises on site or if dimensions and for details are missing from drawing set before proceeding at site. 3. All wood grain on movable and built-in furniture is to run in the direction as indicated by arrows on the drawings. GENERAL NOTES AREA 4. No part of this work may be reproduced or used in any form 2. LIST M&Ewithout COREwritten PROVIDED 47 m2 or by any means permission from the publisher. 5. All prints specifications and their copyright are the property of 1and ESCAPE 19 m2 architect shall be STAIRCASE returned at the1completion of the work. 6. All dimensions shall be checked on site before commencing any 2 ESCAPE STAIRCASE 2 16 m2 work or shop drawings. Any discrepancies occurring in the drawings must be referred to office before the commencement 3 PASSENGER LIFT 4 m2 of any work or the contractor shall bear the full responsibility. 7. Do not scale the drawings. 4 CARGO LIFT 4 m2 8. Figured dimensions shall be taken in preference to scaled dimensions 5 UNIVERSAL TOILET 4 m2

3 ______

NGEE

SUSTAIN E

FILLI (

Rev.

Date

Description Project Ref No:


A05-07

NORTH

A

B

C

D

E

12

13

A11

A12

25000 9550

15450

5900

3650

9550

5900

FLOOR ABOVE

FLOOR ABOVE

FLOOR ABOVE

1

FLOOR ABOVE

SITE BOUNDARY LINE

6100

SITE BOUNDARY LINE

VIEW

INDO

3

COMM

4

LIFT L

5

MEDI

6

MULT

2 3850

6

16050

FLOOR ABOVE

3

Xref F:\Recent Project\NP ( Ngee Ann Polytechnic )\Sustainable Urban Design & Engineering (N89)\Academic\Tutorial\3.1_Design Studio 3\Resources\Combine DWG\Caleb_S10175651E_DS3 Primer Project_2018-Floor Plan - B1 lv.dwg

6100

26000

WEST

14

A13

A06-09

ROOM 1 2

UP

4 3

2350

4

5

4

2

5

1

9950

5

1

3

5

4

6

5

7

6

8

7

9

8 9

10 11

10 11 12

SITE BOUNDARY LINE

2

21 20 19 18 17 16 15 14 13 12

4

-

1 ESCAPE STAIRCASE 1

19 m2

2 ESCAPE STAIRCASE 2

16 m2

NDARY LINE

SITE BOU

NGEE ANN POLYTECHNIC

3

3 PASSENGER LIFT

4 m2

4 CARGO LIFT

4 m2

N

GFA: 0 m2

7600

3

21 20 19 18 17 16 15 14 13

47 m2

5 UNIVERSAL TOILET

4 14 ________sheet of ________ 6 2

AREA

LIST M&E CORE PROVIDED

2ND STOREY FLOOR PLAN 04 SCALE 1:100

1

D23N 22

2

D23N 22

1

GENERAL NOTES 2.

SUSTAINABLE URBAN PLANNING & ENGINEERING (N89) DESIGN STUDIO 4 FILLING THE CULTURAL VOID (CULTURAL CENTRE)

4 m2

SOUTH

A05-08

Project Ref No:

tification is submitted in the form of an electronic record which is signed with a digital signature.

General Notes

1 6100

ROOM LEGEND

H

2D 3850

16050

1

VIEWING DECK

48 m2

2

INDOOR CULTURAL PERFORMANCE

55 m2

3

COMMUNAL GARDEN

4

LIFT LOBBY

36 m2

5

MEDIA & LIBRARY RESOURCES 1

50 m2

6

MULTI-PURPOSE SPACE 1

57 m2

E 13 A12

AREA

- m2

1. Contractor to verify all site dimensions 2. Contractor is responsible for notifying architect if confusion arises on site or if dimensions and for details are missing GENERAL AREA from drawing set beforeNOTES proceeding at site. 3. All wood grain on movable and built-in furniture is to run in 2. LIST CORE 47 m2 the direction as M&E indicated by PROVIDED arrows on the drawings. 4. No part of this work may be reproduced or used in any form 1 ESCAPE STAIRCASE 1 19 m2 or by any means without written permission from the publisher. 5. All prints specifications their copyright are the property16ofm2 2 ESCAPE and STAIRCASE 2 architect and shall be returned at the completion of the work. 6. All dimensions shall be checked on site before commencing4any 3 PASSENGER LIFT m2 work or shop drawings. Any discrepancies occurring in the 4 CARGO LIFTto office before the commencement 4 m2 drawings must be referred of any work or the contractor shall bear the full responsibility. 5 the UNIVERSAL 4 m2 7. Do not scale drawings. TOILET 8. Figured dimensions shall be taken in preference to scaled dimensions

Rev.

Date

Description

4 ______

NGEE

SUSTAI

FILL

Project Ref No:

29


2

A05-07

NORTH

A

B

C

D

E

12

13

A11

A12

25000 9550

15450

5900

3650

9550

5900

1

SITE BOUNDARY LINE

1

3

6100

SITE BOUNDARY LINE

LEARNI

LEARNI

3

MEDIA &

4

LIFT LO

5

MEDIA &

6

DESIGN

2 3850

16050

6

3

Xref F:\Recent Project\NP ( Ngee Ann Polytechnic )\Sustainable Urban Design & Engineering (N89)\Academic\Tutorial\3.1_Design Studio 3\Resources\Combine DWG\Caleb_S10175651E_DS3 Primer Project_2018-Floor Plan - B1 lv.dwg

4

6100

26000

WEST

14

A13

A06-09

ROOM L 1 2

3

4

2350

4

5 2

9950

5

7600

5

1

2

6

SITE BOUNDARY LINE

NDARY LINE

SITE BOU

GENERAL NOTES 2. -

AREA

LIST M&E CORE PROVIDED 1 ESCAPE STAIRCASE 1

19 m2

2 ESCAPE STAIRCASE 2

16 m2

3 PASSENGER 3RD STOREY FLOOR PLAN LIFT 05 SCALE 1:100

SOUTH

N

4 CARGO LIFT

GFA: 0 m2

5 UNIVERSAL TOILET

14 5 ________sheet of ________

47 m2

NGEE ANN POLYTECHNIC SUSTAINABLE URBAN PLANNING & ENGINEERING (N89)

4 m2 4 m2

A05-08

DESIGN STUDIO 4 FILLING THE CULTURAL VOID (CULTURAL CENTRE)

4 m2

E

Project Ref No:

ification is submitted in the form of an electronic record which is signed with a digital signature.

5900

General Notes

6100

SITE BOUNDARY LINE

1

H

2

D 3850

16050

6

30

1. Contractor to verify all site dimensions 2. Contractor is responsible for notifying architect if confusion AREA GENERAL NOTES arises on site or if dimensions and for details are missing

drawing set CORE before proceeding at site. 2. fromLIST M&E PROVIDED

13 A12

E

ROOM LEGEND

AREA

1

LEARNING CENTRE SPACE 1

45 m2

2

LEARNING CENTRE SPACE 2

84 m2

3

MEDIA & LIBRARY RESOURCES 2

83 m2

4

LIFT LOBBY

50 m2

5

MEDIA & LIBRARY RESOURCES 3

45 m2

6

DESIGN STUDIO

72 m2

Rev.

Date

Description

4 ______

47 m2

3. All wood grain on movable and built-in furniture is to run in as indicated by arrows on 1 ESCAPE STAIRCASE 1 the drawings. 19 m2 - the direction 4. No part of this work may be reproduced or used in any form or by 2anyESCAPE means without written permission from the publisher. STAIRCASE 2 16 m2 5. All prints specifications and their copyright are the property of architect and shall be returned 3 PASSENGER LIFTat the completion of the work.4 m2 6. All dimensions shall be checked on site before commencing any work or shop drawings. Any discrepancies occurring in the 4 CARGO LIFT 4 m2 drawings must be referred to office before the commencement of any work or the contractor shall bear the full responsibility. 5 UNIVERSAL TOILET 4 m2 7. Do not scale the drawings. 8. Figured dimensions shall be taken in preference to scaled dimensions

NGEE

SUSTAI

FILL

Project Ref No:


A05-07

NORTH

A

B

C

D

E

12

13

A11

A12

25000 9550

15450

5900

3650

9550

5900

25000

1

SITE BOUNDARY LINE

3 2

6100

SITE BOUNDARY LINE

2 3850

3

MEDI

4

AMPH

5

LIFT L

6

CORR

7

MULT

3

Xref F:\Recent Project\NP ( Ngee Ann Polytechnic )\Sustainable Urban Design & Engineering (N89)\Academic\Tutorial\3.1_Design Studio 3\Resources\Combine DWG\Caleb_S10175651E_DS3 Primer Project_2018-Floor Plan - B1 lv.dwg

6100

26000

WEST

14

A13

5

A06-09

CULT

LEAR

16050

6

ROOM 1 2

3

4

5

4

2350

1

5

7600

9950

4

1

2

6

SITE BOUNDARY LINE

NDARY LINE

SITE BOU

GENERAL NOTES 2.

AREA

LIST M&E CORE PROVIDED

-

1 ESCAPE STAIRCASE 1

19 m2

2 ESCAPE STAIRCASE 2

16 m2

3 PASSENGER LIFT 4 CARGO LIFT 4TH STOREY FLOOR PLAN

06 SCALE 1:100

5 UNIVERSAL TOILET

N

GFA: 0 m2

14 6 ________sheet of ________

47 m2

NGEE ANN POLYTECHNIC SUSTAINABLE URBAN PLANNING & ENGINEERING (N89)

4 m2 SOUTH

A05-08

4 m2

DESIGN STUDIO 4 FILLING THE CULTURAL VOID (CULTURAL CENTRE)

4 m2

E

Project Ref No:

tification is submitted in the form of an electronic record which is signed with a digital signature.

5900

General Notes

ROOM LEGEND

6100 3850

16050

SITE BOUNDARY LINE

1

2

D 13 A12

E

AREA

1

CULTURAL PERFORMANCE EXTENSION

43 m2

2

LEARNING CENTRE SPACE 3

22 m2

3

MEDIA & LIBRARY RESOURCES 4

57 m2

4

AMPHITHEATRE

55 m2

5

LIFT LOBBY

50 m2

6

CORRIDOR

35 m2

7

MULTI-PURPOSE SPACE 2

74 m2

1. Contractor to verify all site dimensions 2. Contractor is responsible for notifying architect if confusion arises on site or ifNOTES dimensions and for details are missing AREA GENERAL from drawing set before proceeding at site. movable and built-in furniture is to run in 2. 3. All wood LIST grain M&EonCORE PROVIDED 47 m2 the direction as indicated by arrows on the drawings. 4. No part of this work may be reproduced or used in any form ESCAPE STAIRCASE 1 19 m2 - or by1any means without written permission from the publisher. 5. All prints specifications and their copyright are the property of 2 ESCAPE 2 completion of the work. 16 m2 architect and shall STAIRCASE be returned at the 6. All dimensions shall be checked on site before commencing any PASSENGER LIFT work3or shop drawings. Any discrepancies occurring in the 4 m2 drawings must be referred to office before the commencement 4 work CARGO of any or theLIFT contractor shall bear the full responsibility.4 m2 7. Do not scale the drawings. 5 UNIVERSAL 4 m2 8. Figured dimensions shallTOILET be taken in preference to scaled dimensions

Rev.

Date

4 ______

NGEE

SUSTAI

FILL

Description

Project Ref No:

31


PROGRAMMING CONCEPTUAL DESIGN DETAIL DESIGN ANALYSIS documentation

fabrication physical models rendering views construction

32


FABRICATION PHYSICAL MODEL massing models from conceputal to final

STUDY MODEL - CONCEPT GENERATION

33


exterior view from new bridge road

34


exterior view from duxton plain park

35


aerial view final model of cultural centre

note: render images go to my issues website for more information about the project i undertaken

36


GOH PEINNCHEG CALEB +65 98877008 caleb.goh@gmail.com https://issuu.com/gohcaleb

37


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.