DESIGN JOURNAL DOCUMENTATION PROCESS & CONCEPTUAL STAGES
goh peinncheg caleb
1
PROJECT INVOLVED
2 FINAL SUBMISSION 1.0
FINAL SUBMISSION 2.0
STIMULI RESEARCH
INTERIM 1.0
DS4
INTERIM 2.0
STIMULI RESEARCH
MODULES:
DESIGN ITERATION
PROJECT INVOLVED
construction
fabrication
documentation
analysis
detailed design
conceptual design
programming
PROJECT STAGES
URBAN DESIGN ANALYSIS
MODULES:
PROJECT INCEPTION
CONTENT
DS3
programming PROJECT INCEPTION URBAN DESIGN ANALYSIS STIMULI RESEARCH
conceptual design detailed design analysis documentation fabrication construction
3
programming PROJECT INCEPTION
PROJECT DESIGN BREIF
THE PROJECT CALL FOR FILLING THE CULTURAL VOID THROUGH ADITION OF CULTURAL CENTRE. UNLIKE AN COMMUNIT lenght
site area
width
existing building
conserved building existing tree existing bushes
height
4
programming URBAN DESIGN ANALYSIS
GROUP COMPONENT (SUB DIVISION 4)
THE PROJECT TASK WAS TO CARRY OUT A COMPHREHENSIVE DOCUMENT INVESTIGATION ON SITE AND ITS SURRONDINGS WITH A GROUP 6-7 MEMBERS WHICH WAS SPLIT INTO 4 DIVISION TO TACKLE THE CHINATOWN DISTRINT
CHINATOWN ANALYSIS DIVISION OF SITE
5
6
programming STIMULI RESEARCH REVISTING THE EMPTY PLOT OF LAND, THE SELECTED SITE IS SITED IN BETWEEN CONSERVATED GAZETTED BUILDING, KONG CHOW CULTURAL CENTRE (KCCC) AND JEAN YIP LOFT. THE SITE IS ALONG NEW BRIDGE ROAD WITH NUMBER OF LANDMARK SUCH AS LOWER BARRACK, THE PEOPLE PARK COMPLEX AND SHOPHOUSES LOCATED AROUND THE SITE.
INDIVIDUAL COMPONENT
SITE AREA 687m²
THE PROPSED DESIGN WILL AIDED THE CONTEXTUALLY OF THE SITE BY FILLED UP THE CULTURAL VOID FOR THE COMMUNITY OF CHINATOWN
LOCATION MAP
THE FOLLOWING PAGES PORTRAY VARIOUS ARCHITECTURAL RESPONSES THROUGH DIAGRAM FROM SITE ANALYSIS FINDING
(ILLUTRATION PURPOSES)
7
architectural response
0m m
26 00 0m Je m an L o Yip ft
Sri Layan Sithi Vinayagar Temple
73
Ne w
25
00
Br i dg e
site condition
Ro
Eu
ad
To
ng S
en
St
SITE AREA
m 25
00
0m
ow Ch o n ng K o Ko u i W
25
69
00
0m
m
55
St
1D
ad
To
73
Ne w
Br
id g e
Ro
Eu
Je an L o Yip ft 687.5m²
69 ow Ch on ng Ko Ko u i W
design response
ng
Se n
Sri Layan Sithi Vinayagar Temple
PROGRAMME DEVELOPMENT 150 m²
B BUILDING FOOTPRINT = 687.5 m² PK PARKING (10 CARS + 2 HANDICAP) = 115.2M + 34.56 M (150 m² ESTIMATED) S SERVICE AREA (M&E ROOMS & VERTICAL RISERS) = 3360 m² DO DROP OFF POINT AREA (BACK OF HOUSE SERVICES) = 32 m² C/P PLAY AREA = 150 m²
1D
8
55
architectural response
en
St
SETBACK/EASEMENT
N -
AT IO
IS
73
Ne w R
C OA AT D EG C O ATE R Y GO 3 R
Br i dg e
Ro
Eu
BRIDGE TO CONNECTION KONG CHOW CULTURAL CENTRE
Sri Layan Sithi Vinayagar Temple
Je an Lo Yip ft SHARED BOUNDARY WALL
69 EXTENSION OF CITYPARK ONTO SITE
ow Ch o n ng K o Ko u i W
site condition
PARKING ALLOCATION
ad
To
ng S
EXTENDING CREEK INTO SITE SHELTERED WALKWAY
BRIDGE TO CONNECTION DUXTON PLAIN PARK
55
St
1D
ad
To
73
Ne w
Br
id g e
Ro
Eu
Je an Lo Yip ft
69 ow Ch on ng Ko Ko u i W
design response
ng
Se n
Sri Layan Sithi Vinayagar Temple
AREA IN THE SETBACK ZONE • parking spaces • extension of city park onto the site • extending to creek into site • landscape buffer
PROGRAMME DEVELOPMENT 150 m²
55 1D
9
architectural response
St
CONTOUR
Je an Lo Yip ft
73
Ne w
Br i dg e
site condition
Ro
Eu
ad
To
ng S
en
Sri Layan Sithi Vinayagar Temple
69 ow Ch o n ng K o Ko u i W
EXISTING TOPO (CHANGE IN LEVEL)
55
9.6 grade 12
tanx = 12/130 = 1:9
St
130
1D
Sri Layan Sithi Vinayagar Temple
ad
To
73
Ne w
Br
id g e
Ro
Eu
Je an Lo Yip ft
beyond horizon background middle ground foreground vision frame
69 ow Ch on ng Ko Ko u i W
design response
ng
Se n
building high use site as foreground from duxton plain park
building low use site as background from duxton plain park
55 1 storey building footprint
1D 2nd storey building foot print integrate function (interior & exterior)
10
architectural response
en
St
TREES
ng S
ad
To
relocate/reused ?
Je an Lo Yip ft
Ro
Eu
73
Ne w
Br i dg e
site condition
Sri Layan Sithi Vinayagar Temple
existing tree on site
69 ow Ch o n ng K o Ko u i W
55
St
1D
ad
To
Br
id g e
Ro
Eu
Je an Lo Yip ft
73
Ne w
sunpath direction show shading & direct sunlight
69 ow Ch on ng Ko Ko u i W
design response
ng
Se n
Sri Layan Sithi Vinayagar Temple
55 1D
11
architectural response
St
PEDESTRAIN CIRCULATION
Je an Lo Yip ft
73
Ne w
Br i dg e
site condition
Ro
Eu
ad
To
ng S
en
Sri Layan Sithi Vinayagar Temple
69 ow Ch o n ng K o Ko u i W
55
Se n
St
1D
ng
ad
To
73
Ne w
Br
id g e
Ro
Eu
Je an Lo Yip ft
69
additional path access (accessibility)
ow Ch on ng Ko Ko u i W
design response
Sri Layan Sithi Vinayagar Temple
meeting space step space
55 1D
12
architectural response
St
VEHICULAR CIRCULATION
Je an Lo Yip ft
73
Ne w
Br i dg e
site condition
Ro
Eu
ad
To
ng S
en
Sri Layan Sithi Vinayagar Temple
69 ow Ch o n ng K o Ko u i W
55
St
1D
Se n ng
ad
To
Br
id g e
Ro
Eu
Je an Lo Yip ft
73
Ne w
loading & unloading bay located near the driveway
69 ow Ch on ng Ko Ko u i W
design response
Sri Layan Sithi Vinayagar Temple
carlift create more space compare to ramp
55 1D
13
PROGRAMMING
conceptual design SPATIAL PROGRAMMING STIMULI CONCEPT
detailed design analysis documentation fabrication construction
14
conceptual design spatial programming
15
1
2
1
Duxton Plain Park View
NEWNew BRIDGE ROAD Bridge Road View
1
2
3
2
Duxton Plain Park DUXTON PLAIN PARKView
4
New Bridge Road View
16
conceptual design stimuli concept
Utilitarian Space & Ritual
Shared Experience Community
create a condusive learning space for the community
performing arts
cultural academy
1. chinese classical & eth-
17
private
public transition of privacy
1
private
2&3 semi-private 4 public Duxton Plain Park View
1
2
3
4
New Bridge Road View
private - 1
18
semi-private - 3
semi-private - 2
19
PROGRAMMING CONCEPTUAL DESIGN
detail design BUILDING PLANS
analysis documentation fabrication construction
detail drawing interim submission
20
Room Legend
4
3
1
Gallery
2
Management Office
3
M&E Space* (REF Tec dwg)
4
M&E Corridor
5
Storage
6
Lift Lobby
7
Corridor 1
8
Media & Library Centre 1
6 5 7
8
1
2
Basement 1
Room Legend
4 8 5
6
1
1
Outdoor Cultural Performance
2
Outdoor Exhibition
3
Corridor 2
4
Retail & F&B
5
Communal Meeting Space
6
Foyer
7
Lift Lobby
8
F&B Extension
3 7
2
Level 1
21
Room Legend
6
1
Viewing Deck
2
Indoor Cultural Performance
3
Communal Garden
4
Lift Lobby
5
Media & Library Resources 1
6
Multipurpose Space 1
4
2
5
1 3
Level 2
Room Legend
6 3 4 1 5 2
Level 3
22
1
Learning Centre Space 1
2
Learning Centre Space 2
3
Media & Library Resources 2
4
Lift Lobby
5
Media & Library Resource 3
6
Design Studio
Room Legend
6 3
1
Cultural Performance Extension
2
Learning Centre Space 3
3
Media & Library Resources 4
4
Amphitheatre
5
Lift Lobby
6
Corridor 3
7
Multi Purpose Space 2
5
2
4
1
Level 4 Room Legend 1
Viewing Deck
1
Level 5
23
PROGRAMMING CONCEPTUAL DESIGN DETAIL DESIGN
analysis sustainable design
documentation fabrication construction
analysis diagram sustainable strategy (tbc)
24
ANALYSIS FORM GENERATION - spatial verbs implementation of concept from primer project of spatial verb to derived massing form form site constraints
SITE AREA (CARPARKS)
SUBTRACT (VOIDS & PUBLIC SPACES)
EXTRUDE (HEIGHT)
NESTING (STAIRCASE & LIFT)
SPLIT & ADDITION ( DEMARCATION & OVERHANG)
CARVE (PITCH ROOF)
DESIGN STRATEGY CONCEPTUAL MASSING
25
PROGRAMMING CONCEPTUAL DESIGN DETAIL DESIGN ANALYSIS
documentation BUILDING PLANS
fabrication construction
technical drawing building plan submision ds4 interium submision
26
A05-07
NORTH
A
B
12
13
A11
A12
C
D
E
25000 9550 5900
15450 3650
9550
5900
1
SITE BOUNDARY LINE
6
1
7
8
2
6100
SITE BOUNDARY LINE
4
2 3850
4
9
16050
UP
3
3 14
A13
5 4 6100
1
26000
WEST
10
3
6
4
2350
4
SUPPLY
5
7
EXHAUST
A06-09
5
WC EXHAUST
121 m2
-
1 STANDBY GENERATOR ROOM
10m2
SITE BOUNDARY LINE
3 CSR ROOM
11 m2 7 m2
9 WATER TANK
LIST M&E CORE PROVIDED
GFA: 0 m2
N
16050
A12
D
47 m2
16 m2 4 m2 4 m2 4 m2
ROOM LEGEND
AREA
1
GALLERY
56 m2
2
MANAGEMENT OFFICE
34 m2
3
M&E SPACES*
4
M&E CORRIDOR
5
E
44 m2
STORAGE
29 m2
LIFT LOBBY
34 m2
7
CORRIDOR 1
45 m2
8
MEDIA & LIBRARY CENTRE 1
86 m2
9
CORES (STAIRCASE, LIFT, TOILET)
6
2
A05-08
2 ESCAPE STAIRCASE 2
5 UNIVERSAL TOILET
A11
12 m2
19 m2
CARGO LIFT ication is submitted in the form of an electronic record which is signed with a 4 digital signature.
13
Project Ref No:
SOUTH
M 5M 1 2ESCAPE STAIRCASE 1
1M
3 PASSENGER LIFT
12
19 m2 12 m2
BASEMENT 1 FLOOR 10 HOSE REEL TANK PLAN & PUMP ROOM 03 SCALE 1:100
6
DESIGN STUDIO 4 FILLING THE CULTURAL VOID (CULTURAL CENTRE)
9 m2
6 SUMP PUMP ROOM
1
2
SUSTAINABLE URBAN PLANNING & NDARY LINE SITE BOU ENGINEERING (N89)
13 m2
5 MDF ROOM
- 0M
NGEE ANN POLYTECHNIC
20 m2
4 LAN ROOM
8 SPRINKLER TANK & PUMP ROOM
NORTH
LAN
ELETRICAL
8 m2 1
7 EJECTOR PUMP ROOM
A05-07
DRY
8
TELECOM
2 FAN ROOM
2.
2 14 ________sheet of ________ 9950
AREA
LIST M&E SPACES PROVIDED 2
7600
GENERAL NOTES 1.
1.
GENERAL NOTES
AREA
LIST M&E SPACES PROVIDED
121 m2
General Notes
1 STANDBY GENERATOR ROOM 2 FAN ROOM
10m2 8 m2
3 CSR ROOM 20 m2 1. Contractor to verify all site dimensions 2. Contractor is responsible for notifying architect if confusion LAN ROOMand for details are missing 13 m2 arises on site or 4if dimensions from drawing set5before proceeding at site. MDF ROOM 9 m2 3. All wood grain on movable and built-in furniture is to run in the direction as indicated arrows on the drawings. 6 SUMPby PUMP ROOM 11 m2 4. No part of this work may be reproduced or used in any form EJECTOR PUMP ROOM from the publisher. 7 m2 or by any means7without written permission 5. All prints specifications and their copyright are the property of 8 SPRINKLER TANK & PUMP ROOM 19 m2 architect and shall be returned at the completion of the work. 6. All dimensions shall be checked on site before commencing any 9 WATER TANK 12 m2 work or shop drawings. Any discrepancies occurring in the 10referred HOSE to REEL TANK & PUMP ROOM 12 m2 drawings must be office before the commencement of any work or the contractor shall bear the full responsibility. 7. Do not scale drawings. 2. the LIST M&E CORE PROVIDED 47 m2 8. Figured dimensions shall be taken in preference to 1 ESCAPE STAIRCASE 1 19 m2 scaled dimensions 2 ESCAPE STAIRCASE 2 4 Date CARGO LIFT 5 UNIVERSAL TOILET
4 m2 4 m2
15450 5900
14
A13
6
7
SITE BOUNDAR
3
1 1 2
SUSTAIN E
FILLI (
Project Ref No:
4 m2
Description
25000 9550
NGEE
16 m2
3 PASSENGER LIFT
Rev.
2 ______
ROOM LEGEND
AREA
GALLERY
56 m2
General No
1. Contractor to verify 2. Contractor is respo arises on site or if d from drawing set be 3. All wood grain on m the direction as ind 4. No part of this work or by any means w 5. All prints specificati
27
2. -
A05-07
NORTH
A
B
C
D
E
12
13
A11
A12
25000 9550
15450
5900
3650
9550
5900
1
SITE BOUNDARY LINE
4
6100
SITE BOUNDARY LINE
2 5
3850
UP
RETAIL + F&
5
COMMUNAL
6
FOYER
7
LIFT LOBBY
8
F&B EXTEN
6100
26000
6
14
FLOOR ABOVE
CORRIDOR
4
3 A13
WEST
3
8
FLOOR ABOVE
3
FLOOR ABOVE
4
5
3
2350
A06-09
OUTDOOR C
OUTDOOR E
16050
1
ROOM LEGE 1 2
4
5
SITE BOUNDARY LINE
FLOOR ABOVE
2M
9
1M
2
NGEE ANN POLYTECHNIC SUSTAINABLE URBAN PLANNING & ENGINEERING (N89) DESIGN STUDIO 4 FILLING THE CULTURAL VOID (CULTURAL CENTRE)
4 m2
5M
6
NDARY LINE
SITE BOU
SOUTH
A05-08
N
GFA: 0 m2
8
1ST STOREY FLOOR PLAN 04 SCALE 1:100
7
4 m2
6
4 m2
4 CARGO LIFT
5
8
3 PASSENGER LIFT
3 14 ________sheet of ________ 4
7
16 m2
3
6
2 ESCAPE STAIRCASE 2
2
5
19 m2
1
4
1 ESCAPE STAIRCASE 1
UP
3
47 m2
5 UNIVERSAL TOILET
18 17 16 15 14 13 12 11 10
2
AREA
1 LIST M&E CORE PROVIDED
FLOOR ABOVE
0M
1
9
-
18 17 16 15 14 13 12 11 10
2.
UP
2
GENERAL NOTES
7600
9950
7
Project Ref No:
d certification is submitted in the form of an electronic record which is signed with a digital signature.
General Notes
2 D
16050
3850
6100
1
13
28 15450
A12
3
ROOM LEGEND
AREA
1
OUTDOOR CULTURAL PERFORMANCE
89 m2
2
OUTDOOR EXHIBITION
31 m2
3
CORRIDOR 2
46 m2
4
RETAIL + F&B
71 m2
5
COMMUNAL MEETING SPACE
41 m2
6
FOYER
53 m2
7
LIFT LOBBY
45 m2
8
F&B EXTENSION
41 m2
E
1. Contractor to verify all site dimensions 2. Contractor is responsible for notifying architect if confusion arises on site or if dimensions and for details are missing from drawing set before proceeding at site. 3. All wood grain on movable and built-in furniture is to run in the direction as indicated by arrows on the drawings. GENERAL NOTES AREA 4. No part of this work may be reproduced or used in any form 2. LIST M&Ewithout COREwritten PROVIDED 47 m2 or by any means permission from the publisher. 5. All prints specifications and their copyright are the property of 1and ESCAPE 19 m2 architect shall be STAIRCASE returned at the1completion of the work. 6. All dimensions shall be checked on site before commencing any 2 ESCAPE STAIRCASE 2 16 m2 work or shop drawings. Any discrepancies occurring in the drawings must be referred to office before the commencement 3 PASSENGER LIFT 4 m2 of any work or the contractor shall bear the full responsibility. 7. Do not scale the drawings. 4 CARGO LIFT 4 m2 8. Figured dimensions shall be taken in preference to scaled dimensions 5 UNIVERSAL TOILET 4 m2
3 ______
NGEE
SUSTAIN E
FILLI (
Rev.
Date
Description Project Ref No:
A05-07
NORTH
A
B
C
D
E
12
13
A11
A12
25000 9550
15450
5900
3650
9550
5900
FLOOR ABOVE
FLOOR ABOVE
FLOOR ABOVE
1
FLOOR ABOVE
SITE BOUNDARY LINE
6100
SITE BOUNDARY LINE
VIEW
INDO
3
COMM
4
LIFT L
5
MEDI
6
MULT
2 3850
6
16050
FLOOR ABOVE
3
Xref F:\Recent Project\NP ( Ngee Ann Polytechnic )\Sustainable Urban Design & Engineering (N89)\Academic\Tutorial\3.1_Design Studio 3\Resources\Combine DWG\Caleb_S10175651E_DS3 Primer Project_2018-Floor Plan - B1 lv.dwg
6100
26000
WEST
14
A13
A06-09
ROOM 1 2
UP
4 3
2350
4
5
4
2
5
1
9950
5
1
3
5
4
6
5
7
6
8
7
9
8 9
10 11
10 11 12
SITE BOUNDARY LINE
2
21 20 19 18 17 16 15 14 13 12
4
-
1 ESCAPE STAIRCASE 1
19 m2
2 ESCAPE STAIRCASE 2
16 m2
NDARY LINE
SITE BOU
NGEE ANN POLYTECHNIC
3
3 PASSENGER LIFT
4 m2
4 CARGO LIFT
4 m2
N
GFA: 0 m2
7600
3
21 20 19 18 17 16 15 14 13
47 m2
5 UNIVERSAL TOILET
4 14 ________sheet of ________ 6 2
AREA
LIST M&E CORE PROVIDED
2ND STOREY FLOOR PLAN 04 SCALE 1:100
1
D23N 22
2
D23N 22
1
GENERAL NOTES 2.
SUSTAINABLE URBAN PLANNING & ENGINEERING (N89) DESIGN STUDIO 4 FILLING THE CULTURAL VOID (CULTURAL CENTRE)
4 m2
SOUTH
A05-08
Project Ref No:
tification is submitted in the form of an electronic record which is signed with a digital signature.
General Notes
1 6100
ROOM LEGEND
H
2D 3850
16050
1
VIEWING DECK
48 m2
2
INDOOR CULTURAL PERFORMANCE
55 m2
3
COMMUNAL GARDEN
4
LIFT LOBBY
36 m2
5
MEDIA & LIBRARY RESOURCES 1
50 m2
6
MULTI-PURPOSE SPACE 1
57 m2
E 13 A12
AREA
- m2
1. Contractor to verify all site dimensions 2. Contractor is responsible for notifying architect if confusion arises on site or if dimensions and for details are missing GENERAL AREA from drawing set beforeNOTES proceeding at site. 3. All wood grain on movable and built-in furniture is to run in 2. LIST CORE 47 m2 the direction as M&E indicated by PROVIDED arrows on the drawings. 4. No part of this work may be reproduced or used in any form 1 ESCAPE STAIRCASE 1 19 m2 or by any means without written permission from the publisher. 5. All prints specifications their copyright are the property16ofm2 2 ESCAPE and STAIRCASE 2 architect and shall be returned at the completion of the work. 6. All dimensions shall be checked on site before commencing4any 3 PASSENGER LIFT m2 work or shop drawings. Any discrepancies occurring in the 4 CARGO LIFTto office before the commencement 4 m2 drawings must be referred of any work or the contractor shall bear the full responsibility. 5 the UNIVERSAL 4 m2 7. Do not scale drawings. TOILET 8. Figured dimensions shall be taken in preference to scaled dimensions
Rev.
Date
Description
4 ______
NGEE
SUSTAI
FILL
Project Ref No:
29
2
A05-07
NORTH
A
B
C
D
E
12
13
A11
A12
25000 9550
15450
5900
3650
9550
5900
1
SITE BOUNDARY LINE
1
3
6100
SITE BOUNDARY LINE
LEARNI
LEARNI
3
MEDIA &
4
LIFT LO
5
MEDIA &
6
DESIGN
2 3850
16050
6
3
Xref F:\Recent Project\NP ( Ngee Ann Polytechnic )\Sustainable Urban Design & Engineering (N89)\Academic\Tutorial\3.1_Design Studio 3\Resources\Combine DWG\Caleb_S10175651E_DS3 Primer Project_2018-Floor Plan - B1 lv.dwg
4
6100
26000
WEST
14
A13
A06-09
ROOM L 1 2
3
4
2350
4
5 2
9950
5
7600
5
1
2
6
SITE BOUNDARY LINE
NDARY LINE
SITE BOU
GENERAL NOTES 2. -
AREA
LIST M&E CORE PROVIDED 1 ESCAPE STAIRCASE 1
19 m2
2 ESCAPE STAIRCASE 2
16 m2
3 PASSENGER 3RD STOREY FLOOR PLAN LIFT 05 SCALE 1:100
SOUTH
N
4 CARGO LIFT
GFA: 0 m2
5 UNIVERSAL TOILET
14 5 ________sheet of ________
47 m2
NGEE ANN POLYTECHNIC SUSTAINABLE URBAN PLANNING & ENGINEERING (N89)
4 m2 4 m2
A05-08
DESIGN STUDIO 4 FILLING THE CULTURAL VOID (CULTURAL CENTRE)
4 m2
E
Project Ref No:
ification is submitted in the form of an electronic record which is signed with a digital signature.
5900
General Notes
6100
SITE BOUNDARY LINE
1
H
2
D 3850
16050
6
30
1. Contractor to verify all site dimensions 2. Contractor is responsible for notifying architect if confusion AREA GENERAL NOTES arises on site or if dimensions and for details are missing
drawing set CORE before proceeding at site. 2. fromLIST M&E PROVIDED
13 A12
E
ROOM LEGEND
AREA
1
LEARNING CENTRE SPACE 1
45 m2
2
LEARNING CENTRE SPACE 2
84 m2
3
MEDIA & LIBRARY RESOURCES 2
83 m2
4
LIFT LOBBY
50 m2
5
MEDIA & LIBRARY RESOURCES 3
45 m2
6
DESIGN STUDIO
72 m2
Rev.
Date
Description
4 ______
47 m2
3. All wood grain on movable and built-in furniture is to run in as indicated by arrows on 1 ESCAPE STAIRCASE 1 the drawings. 19 m2 - the direction 4. No part of this work may be reproduced or used in any form or by 2anyESCAPE means without written permission from the publisher. STAIRCASE 2 16 m2 5. All prints specifications and their copyright are the property of architect and shall be returned 3 PASSENGER LIFTat the completion of the work.4 m2 6. All dimensions shall be checked on site before commencing any work or shop drawings. Any discrepancies occurring in the 4 CARGO LIFT 4 m2 drawings must be referred to office before the commencement of any work or the contractor shall bear the full responsibility. 5 UNIVERSAL TOILET 4 m2 7. Do not scale the drawings. 8. Figured dimensions shall be taken in preference to scaled dimensions
NGEE
SUSTAI
FILL
Project Ref No:
A05-07
NORTH
A
B
C
D
E
12
13
A11
A12
25000 9550
15450
5900
3650
9550
5900
25000
1
SITE BOUNDARY LINE
3 2
6100
SITE BOUNDARY LINE
2 3850
3
MEDI
4
AMPH
5
LIFT L
6
CORR
7
MULT
3
Xref F:\Recent Project\NP ( Ngee Ann Polytechnic )\Sustainable Urban Design & Engineering (N89)\Academic\Tutorial\3.1_Design Studio 3\Resources\Combine DWG\Caleb_S10175651E_DS3 Primer Project_2018-Floor Plan - B1 lv.dwg
6100
26000
WEST
14
A13
5
A06-09
CULT
LEAR
16050
6
ROOM 1 2
3
4
5
4
2350
1
5
7600
9950
4
1
2
6
SITE BOUNDARY LINE
NDARY LINE
SITE BOU
GENERAL NOTES 2.
AREA
LIST M&E CORE PROVIDED
-
1 ESCAPE STAIRCASE 1
19 m2
2 ESCAPE STAIRCASE 2
16 m2
3 PASSENGER LIFT 4 CARGO LIFT 4TH STOREY FLOOR PLAN
06 SCALE 1:100
5 UNIVERSAL TOILET
N
GFA: 0 m2
14 6 ________sheet of ________
47 m2
NGEE ANN POLYTECHNIC SUSTAINABLE URBAN PLANNING & ENGINEERING (N89)
4 m2 SOUTH
A05-08
4 m2
DESIGN STUDIO 4 FILLING THE CULTURAL VOID (CULTURAL CENTRE)
4 m2
E
Project Ref No:
tification is submitted in the form of an electronic record which is signed with a digital signature.
5900
General Notes
ROOM LEGEND
6100 3850
16050
SITE BOUNDARY LINE
1
2
D 13 A12
E
AREA
1
CULTURAL PERFORMANCE EXTENSION
43 m2
2
LEARNING CENTRE SPACE 3
22 m2
3
MEDIA & LIBRARY RESOURCES 4
57 m2
4
AMPHITHEATRE
55 m2
5
LIFT LOBBY
50 m2
6
CORRIDOR
35 m2
7
MULTI-PURPOSE SPACE 2
74 m2
1. Contractor to verify all site dimensions 2. Contractor is responsible for notifying architect if confusion arises on site or ifNOTES dimensions and for details are missing AREA GENERAL from drawing set before proceeding at site. movable and built-in furniture is to run in 2. 3. All wood LIST grain M&EonCORE PROVIDED 47 m2 the direction as indicated by arrows on the drawings. 4. No part of this work may be reproduced or used in any form ESCAPE STAIRCASE 1 19 m2 - or by1any means without written permission from the publisher. 5. All prints specifications and their copyright are the property of 2 ESCAPE 2 completion of the work. 16 m2 architect and shall STAIRCASE be returned at the 6. All dimensions shall be checked on site before commencing any PASSENGER LIFT work3or shop drawings. Any discrepancies occurring in the 4 m2 drawings must be referred to office before the commencement 4 work CARGO of any or theLIFT contractor shall bear the full responsibility.4 m2 7. Do not scale the drawings. 5 UNIVERSAL 4 m2 8. Figured dimensions shallTOILET be taken in preference to scaled dimensions
Rev.
Date
4 ______
NGEE
SUSTAI
FILL
Description
Project Ref No:
31
PROGRAMMING CONCEPTUAL DESIGN DETAIL DESIGN ANALYSIS documentation
fabrication physical models rendering views construction
32
FABRICATION PHYSICAL MODEL massing models from conceputal to final
STUDY MODEL - CONCEPT GENERATION
33
exterior view from new bridge road
34
exterior view from duxton plain park
35
aerial view final model of cultural centre
note: render images go to my issues website for more information about the project i undertaken
36
GOH PEINNCHEG CALEB +65 98877008 caleb.goh@gmail.com https://issuu.com/gohcaleb
37