STATUS REPORT
TA 2025
JANUARY 2025
DAYS TO TA 2025
KEY HIGHLIGHTS:
40 NOS OF POS ISSUED FOR 13 NOS OF MANPOWER/EQUIPMENT
PRS AND FR MEMOS ALEADY ISSUED FOR 11 NOS OF PRS WHICH ARE AWAITING FOR BUDGET ALLOCATION/COMPLETION
TA MODIFICATION & CAPEX DASHBOARD
TA PR DASHBOARD
TA MAINTENANCE WORK ORDER DASHBOARD
![](https://assets.isu.pub/document-structure/250206084002-d192353ae18b7331182aad689c3d6368/v1/02ec3c4be270ac49935b9a803972af1c.jpeg)
ACTIVITY STATUS
Completed Activities:
TA Readiness Assessment #03.
Plant Reliability Assessment (Bow-tie) #2
Issuance of Major Jobs Bar Charts (Rev-01).
Conducted Audit #07
Started Proposing Manpower to be Seconded to Maintenance
Prepared Pre-Turnaround Fabrication Activities
Issuance of Vendor (Spare Parts) PRs: 15 PRs routed to Procurement; 13 POs issued while 2 POs are pending.
Issuance of Equipment Release Schedule by Plants Operation
Completed Reservation of Consumable Items
Started Document Submission by Contractor for all type of services [RA/MS/Schedules/CVs]
Ongoing Activities:
Blocking of Stock Materials is in progress 91% completed
Major machines spare parts checking by vendor/OEM is in progress. 80% completed
Detailed assessment for Critical/Major Jobs is in progress
Technical evaluation & issuance of final recommendation memos for manpower/equipment services is in progress: 24 final recommendation memos issued to procurement; 40 POs issued by Procurement for 13 PRs
Technical evaluation & issuance of final recommendation memos for package contracts services is in progress: 25 final recommendation memos issued to procurement; 3 POs issued by Procurement for 3 PRs.
Technical evaluation & issuance of final recommendation memos for vendor services (FSEs) is in progress: 31 final recommendation memos issued to procurement 2 POs issued by Procurement for 2 PRs
Material reservation for PM orders and CM orders is in progress: 91% and 82% completed respectively
Turnaround CM order assessment is in progress: 88% completed.
![](https://assets.isu.pub/document-structure/250206084002-d192353ae18b7331182aad689c3d6368/v1/00b8882ef50b9f55bc05696279435c94.jpeg)
ACTIVITY STATUS
PlannedActivities-February2025:
Meetings&CoordinatingforHotelarrangementforVendors&TALogisticswithHR&Logistics Section
ListofCritical&NoneCriticalValvesforGlandpacking(byPlantsOperation)
StartMajor/CriticaljobsSchedulesReviewmeetings&Finalization.
IssuanceofJoblist(Rev-05)
MeetingwithProcurement&WarehouseTeam
Concerns:
DelayinthedeliveryofnewUreaStripper
ReroutingofthebalancePRsforManpower&PackageswiththeadditionalfundsManpower(1)& Packages(5).
MaterialreservationforPMWorkOrders:91%completed
MaterialreservationforCMWorkOrders:82%completed
![](https://assets.isu.pub/document-structure/250206084002-d192353ae18b7331182aad689c3d6368/v1/00b8882ef50b9f55bc05696279435c94.jpeg)
ROADMAP S-CURVE
Cause of Slippage:
Final recommendation for Hiring of Manpower: 19/22 manpower FRs issued
Final recommendation for Package Contracts: 28/42 issued
Final recommendation for Vendor Services: 31/39 issued.
Issuance of POs for Manpower: 35 POs issued for 11 PRs, POs to be issued for another 11 PRs
Issuance of POs for Equipment: 5 POs issued for 2 PRs, POs to be issued for another 3 PRs.
Issuance of Package Contracts Services POs: 3 POs issued for 3 PRs, POs to be issued for another 39 PRs.
Kick-off Meeting with Manpower & Equipment Suppliers and Package Contractors (Technical)
Confirmation to be shared with all Contractors regarding the exact TA Commencement Date [If date changed]
CM MATERIAL STATUS
Major Rotary Reservation Status
Minor Rotary Reservation Status
78%
PR STATUS
Concerns&ActionPlan:
FinalizetheissuanceofremainingPOsforSparePartsInspection ExpediteissuanceofPOsforDirectManpower&EquipmentHiring.
TA AUDIT REPORT
CAPEX PROJECTS TIMELINE
Mode of Transport By Road* By Sea (Red Sea)*** M/s OLR to Update Route December 2024 By Sea (Around Africa)** By Air**** 2 0 2 4 2 0 2 5 T A Expected to be delivered on 03.12.2025
HIMA ESD System* PO Incl FSE (Material Received)
42 Fans for Air Cooler ** PO Incl FSE
E-8601 E-8602A/B/C E-8604* Inhouse Installation
Methanol PG Cooler E-1201** PR#7236 (AO)
E-0704* D-1501** Inhouse Installation
33kV SWBD 61MS5-1** PO Includes FSE (20/04/2025)
Passivation Air Compressor** PO Includes FSE
E-0003** PR#7216 (TE)
Super Cup Trays R-8201** PR#7244 (AO)
Urea ESD**** ENG PR Includes FSE
PV-52201/351 & PV52401/402**** In-House Installation
MD-6102 PLC* PR Includes FSE
Urea 2200 MTPDMOV-82003**** In-House Installation
Honeywell DCS* PO Includes FSE
E-0001B** PR#7216 (TE)
LV-08009** Routine
PSV-5253****
HV-82009 ** Inhouse Installation
LV-82011 HV-82005 HV-82008**** Inhouse Installation
Electronic Governor MT-0701 & MR-1401* PO Includes FSE
HSV-52236 & HSV-52336*
Ammonia PG Cooler E-0301** PR#7241 (AO)
Trip Solenoid for Synth & Mug Turbines**** PR Includes FSE B-5203 ESD ****
Urea Stripper E-8201*** PR#7244 (AO)
Ammonia Plant
CONFIRMED MAJOR JOBS
Methanol Plant
CONFIRMED MAJOR JOBS
Urea Plant
Utilites Plant
BOW-TIE Session: Evaluating the possibilities of shifting TA from November 2025 to April 2026
![](https://assets.isu.pub/document-structure/250206084002-d192353ae18b7331182aad689c3d6368/v1/4b2016b5bc205eb58c81ee284e5e4613.jpeg)
![](https://assets.isu.pub/document-structure/250206084002-d192353ae18b7331182aad689c3d6368/v1/477e22113688234b1faed402310defa2.jpeg)
BOW-TIE Session : To discuss the High Discharge pressure of 3rd stage of K-8101
![](https://assets.isu.pub/document-structure/250206084002-d192353ae18b7331182aad689c3d6368/v1/60f8864a377bedc6f073a27b6ccb14e9.jpeg)
Meeting#7 with Procurement and Warehouse
![](https://assets.isu.pub/document-structure/250206084002-d192353ae18b7331182aad689c3d6368/v1/be750db4903a1a00d5ddc026d0aaa674.jpeg)
Meeting to discuss all Fabrication/Welding Jobs for Ammonia Plant
![](https://assets.isu.pub/document-structure/250206084002-d192353ae18b7331182aad689c3d6368/v1/557b3a5976b09b0d768df3c70b5b41ad.jpeg)
![](https://assets.isu.pub/document-structure/250206084002-d192353ae18b7331182aad689c3d6368/v1/04bb9d67f539bd70147db860b58e58c8.jpeg)
Meeting to discuss GT Shutdown Complete Scope along with the other associated jobs
![](https://assets.isu.pub/document-structure/250206084002-d192353ae18b7331182aad689c3d6368/v1/c50766eec0a7023c64522652f65f862e.jpeg)
![](https://assets.isu.pub/document-structure/250206084002-d192353ae18b7331182aad689c3d6368/v1/fedc9a54159331b1689b781408587760.jpeg)
![](https://assets.isu.pub/document-structure/250206084002-d192353ae18b7331182aad689c3d6368/v1/73201a6fe962f7304c2f7d4667426736.jpeg)