GUILHERME FERRAZ DESIGN PORTFOLIO
EPHEMERAL ARCHITECTURE Graduate Thesis Project Savannah College of Art and Design Winter - Spring 2017
CHELSEA LIVING TOWER Graduate Design Studio 2 and 3 Savannah College of Art and Design Winter - Spring 2016
CULTURAL PARK PARANGABA LAGOON Final Undergraduate Thesis Project Federal University of Cearรก 2014.2
SAVANNAH CULTURAL CENTER Undergraduate Design Studio 4 Savannah College of Art and Design Fall 2012
SAVANNAH WEST TERMINAL Undergraduate Design Studio 3 Savannah College of Art and Design Spring 2012
PROFESSIONAL WORKS Corporate and Residential Towers Multiple Firms 2011 - 2018
EPHEMERAL ARCHITECTURE Graduate Thesis Project Savannah College of Art and Design Winter - Spring 2017
The challenges of an architecture that fits in the constantly changing urban environments are to create a building that can be flexible in uses. Another approach is to create a building that can phisically change itself.
movable expandable reusable
The concept of this work was to create an architectural design solution that would be movable, expandable and reusable. Which means that it could adjust to the needs of its urban environments.
rlake
This would make this design to be adaptable to any kind of density and urban scenario, including in the situation of urban decay, where the building would not be needed anymore.
tects
rlake
LEFT CONCEPT DIAGRAMS DOWN DENSITY FLEXIBILITY
low density
high density
varied density
90 degrees framework simpler installation less variation in facade 2 main balcony models stackable easily no side openings allowed
72 degrees framework high module count in edges high variation in facade balconies facing building centers openings allowed on all sides waste negative space in circulation interior modules spots overlap
60 degrees framework high module count in edges high variation in facade balconies facing outside openings allowed on all sides waste negative space in circulation large circulation module dimension residential module used for circulation To better achieve these concepts, an approach through the use of off-site fabrication modules was elaborated.
On a framework consisting of hexagonal shaped modules, it was created diversity of use, spaces and dimensions through the use of simple rectangular modThrough studies of mate- ules. rials constructions and case studies of removable architecture, it was decided for basic shapes modules of primarily steel structure.
UP
MODULE ANGLE STUDY
wc
27.2’
kitchen
13.5’
SETUP 1 | SIMPLE MODULE
13.7’
studio
11.5’
4.5’ 16’
SETUP 2 | BALCONY MODULE
17.7’
13.5’
kitchen
w/d 27.2’
living room 9.7’
wc
9.5’
bedroom
11.5’
4’
closet 4.5’ 16’
SETUP 3 | DOUBLE STACKED MODULE
27.2’
living room
18.2’
kitchen
3’
closet bedroom
bedroom
4.5’
9.4’
9’
wc
wc
11.5’
4.5’
11.5’
16’
16’
5’
SETUP 4 | DOUBLE STACKED SLANTED MODULE
WC
wc
KITCHEN
’
4.5
LIVING
22.2’
27.2’
BEDROOM
’
7.5
bedroom 16’ ’
11.5
8.5’
’
19.7
’
27.2
7.5’ 16’
UP RESIDENTIAL MODULE STUDIES RIGHT CIRCULATION BASIC MODULES
ON-SITE INSTALLATION DIAGRAMS
CHELSEA LIVING TOWER Graduate Design Studio 2 and 3 Savannah College of Art and Design Winter - Spring 2016
In response to the growing urban density in New York, the increasing demand for affordable housing in Manhattan and the expansion of the urban perimeter, we developed a urban farming tower in the city of Manhattan. A mixed use building of urban vertical farm, housing and public space, adressing the issues presented while bringing an improvement for the chelsea district as a whole. Although the three uses are connected between them, there needs to be a clear division between all of them, due to accessibility and environmental conditions. Also, the public area is intended to connect directly to the highline for increased interaction with the urban environment.
Initial Moment
UP CONCEPT DIAGRAMS DOWN EXPANSION DIAGRAMS RIGHT FLOOR PLAN GROUND LEVEL
Expanded Moment
Single Profile Expanded Double Profile Expanded Triple Profile
N
10th Avenue
19th West Street
18th West Street
2 A110
A1
A2
A3
A4
AA UP
AB UP
AC
DA
DN
DB
DC
DD
1 A110
DE
DF
AD
UP
AE
AF
D3
D1
DX4 A5
DX1 DX2
DX3
D2
LEFT HIGH LINE LEVEL UP VIEW FROM THE HIGHLINE DOWN PLAZA VIEW
As a solution for the housing issue, to create affordable housing, it was decided to create compact shoebox housing to accomodate the millenials. For this kind of housing, some conditions need to be taken care of, like use of shared spaces, open areas on entrance and other conditions. But, to also accomodate future changes in housing scenario, the housing is expandable by nonstructural divisions. Creating possibility of accomodating diverse profiles of families.
DOWN RIGHT
Shared Space
DIAGRAM SHARED AREAS TYPICAL FLOOR PLAN
Expandability
2 A110
A1
A2
A3
A4
AA
AB
AC
DA
DB
DC
DD
1 A110
1 A111
DE
DF
AD
AE
AF
D3
D1
DX4 A5
DX1 DX2
DX3
D2
GREYWATER TREATMENT
GEOTHERMAL WATER TANK
WATER PUMP
GEOTHERMAL WATER PUMPING SKIN CONCEPT
CO2 FILTERING RADIANT FLOORING AND CEALING SYSTEM
UP FARMING LEVEL VIEW DOWN VOID VIEW RIGHT SUSTAINABILITY SOLUTIONS
CULTURAL PARK PARANGABA LAGOON Final Undergraduate Thesis Project Federal University of Cearรก 2014.2
As part of an urban initiative proposed, this project intends to work as a catalyst for the urban renewal of the currently abandoned region. The idea is to use a currently abandoned area with high density of trees as a park with a cultural center on it, containing a library, a theater, gallery and educational buildings, other than other small uses such as cafĂŠs and administrative.
LEFT DISTRIBUTION DIAGRAM DOWN GALLERY BUILDING RIGHT FLOOR PLAN GALLERY
GALLERY GROUND LEVEL 1. Circulation 2. Exposition Space 1 3. Exposition Space 2 UNDERGROUND 1. Reception 2. Scullery 3. Secretary 4. Curator Room 5. Bathroom 6. Financial Room 7. General Director 8. Circulation 9. Meeting Room
LIBRARY GROUND LEVEL 1. Reception 2. Circulation 3. Group Study 4. Locker Room 5. Kid’s Library 6. Bathrooms 7. Computer Lab 8. Study Room
EDUCATIONAL GROUND LEVEL 1. Reception 2. Multiuse 3. Sculpture Room 4. Bathroom 5. Administration
LEFT UP DOWN
FLOOR PLANS EDUCATIONAL BUILDING CAFE AND THEATER
SAVANNAH CULTURAL CENTER Undergraduate Design Studio 4 Savannah College of Art and Design Fall 2012
Circulation | 3rd Floor 1 : 60
Private / Public | 3rd Floor 1 : 60
Circulation | 2nd Floor 1 : 60
Private / Public | 2nd Floor 1 : 60
Circulation | 1st Floor 1 : 60
LEGEND SAVANNAH ARCHIVES PUBLIC THEATER AREA STAFF THEATER AREA CLASSROOMS AND STUDIOS SAVANNAH CULTURAL AFFAIRS
LEGEND PUBLIC AREA PRIVATE AREA
Private / Public | 1st Floor 1 : 60
Proposed as a gateway building for the city of Savannah, the cultural center is a collective of different uses to serve the population of the city in a way of potencializing the use of the public space while promoting art in any of its form. While working as a path for the pedestrians going downtown and a gateway for the city, the center invites the population to experience art, either through expositions, classes or presentations.
1
2
3
UP MAIN PLAZA DOWN UNDER PASSAGE RIGHT SECTIONS
2 1
3
SAVANNAH WEST TERMINAL Undergraduate Design Studio 3 Savannah College of Art and Design Spring 2012
On the development of a building with urban relevance, it was proposed the removal of a highway ramp that causes segregation in the urban mesh of Savannah. The concept behind this project is to replace the ramp for a multimodal terminal to create integration of the different methods of transportation. The creation of a plaza for interaction between people while connecting buses, trains, bikes and other methods of transportation.
LEFT UP DOWN
N
LOCATION SKIN DIAGRAMS EXTERIOR VIEW
UP LOWER LEVEL DOWN TOP LEVEL RIGHT SITE PLAN
Prendergast Street
N
Berrien Street
Berrien Street
Purse Street
Acess Pedestrian 1st Floor
Acess Pedestrian 2nd Floor
Acess Pedestrian 1st Floor Acess Pedestrian 1st and 2nd Floor
Taylor Street
Way Out Buses Parking Area
Acess Pedestrian 1st Floor
et
Acess Buses Parking Area
tre aS
Wayne Street
et
rts be
re St
Ro
Gaston Street
Martin Luther King, Jr. Boulevard
Se
lm
Alice Street
PROFESSIONAL WORKS Corporate and Residential Towers Multiple Firms 2011 - 2018
Corporate Tower Lobby L2Partridge Design Development Proposal A Modeling and Design
Corporate Tower Lobby L2Partridge Design Development Proposal B Modeling and Design
Corporate Office Front of House L2Partridge Design Development Proposal Modeling, Documentation and Design
LISTAGEM DAS PRANCHAS - PAV. TÉRREO NÚMERO
NOME
TER - 0300 TER - 0301 TER - 0302 TER - 0303
CAPA PL. DE INSTRUÇÃO PL. DE ALVENARIA PL. DE ACAB. DE PAREDE PL. DE ACAB. DE PISO PL. DE FORRO PL. DE LEGENDA
TER - 0304 TER - 0305 TER - 0306
- DESCRIÇÃO DAS PRANCHAS: PLANTA INSTRUÇÃO---------------------------- PLANTA GERAL COM INDICAÇÃO DE CORTES, FACHADAS E DETALHES PLANTA DE ALVENARIA------------------------ INDICAÇÃO DOS VÃOS DE ABERTURA NA ALVENARIA PLANTA DE ACABAMENTO DE PAREDE-- ESPECIFICAÇÃO DOS REVESTIMENTOS DAS PAREDES PLANTA DE ACABAMENTO DE PISO ------ ESPECIFICAÇÃO DOS REVESTIMENTOS DE PISO + LOCAÇÃO E INDICAÇÃO DO TIPO DE RODAPÉ PLANTA DE FORRO----------------------------- ESPECIFICAÇÃO DE REVESTIMENTOS DE TETO E DETALHAMENTO PLANTA DE ARMADORES - ------------------ INDICAÇÃO DA LOCAÇÃO DOS ARMADORES INDICAÇÃO DE ESQUADRIAS, BANCADAS, PLANTA DE LEGENDAS ----------------------- FILETES, CHAPINS E GUARDA-CORPO
- INDICAÇÃO DE FACHADA: NÚMERO DO DESENHO NA PRANCHA NOME DO DESENHO NÚMERO DA PRACHA DO DESENHO
X X-XX
X
- INDICAÇÃO DE CORTE:
NÚMERO DO DESENHO NA PRANCHA NOME DO DESENHO NÚMERO DA PRACHA DO DESENHO
X
- INDICAÇÃO DE CHAMADA DE DETALHE: NÚMERO DO DESENHO NA PRANCHA
X X-XX
NÚMERO DA PRACHA DO DESENHO
REGIÃO À SER DETALHADA
- INDICAÇÃO DE TÍTULO:
X
NÚMERO DO DESENHO NA PRANCHA
TÍTULO ESCALA
LEGENDAS:
VISTAS DE LOCALIZAÇÃO:
BLOCO GESSO DE 7 BLOCO CERÂMICO DE 9 (MURETAS) BLOCO CERÂMICO DE 14
- SHAFT HIDRÁULICA / INCÊNDIO
BLOCO CERÂMICO DE 19
- GÁS
CONTENÇÃO 30
INDICAÇÃO DE INÍCIO
LEGENDA DE SIGLA: LEGENDA REVESTIMENTO: ARREMATE DE ACABAMENTOS DISTINTOS RX ? REVESTIMENTOS DE PAREDES PX REVESTIMENTOS DE PISOS E TETO
LEGENDA PROJEÇÃO DE VIGA: PROJEÇÃO DE VIGA
VISTA DE VIGA
COTA PISO EM OSSO
TOPO EDIFICAÇÃO
- SHAFT ELÉTRICA / SISTEMAS
BLOCO CERÂMICO DE 9
LEGENDA INÍCIO DE PAGINAÇÃO:
COTA PISO ACABADO
LEGENDA SHAFT:
R- REVESTIMENTO DE PAREDE P- REVESTIMENTO DE PISO F- REVESTIMENTO DE FORRO PP- PEITORIL COM ACABAMENTO EM PEDRA PR- PEITORIL COM ACABAMENTO DO REVESTIMENTO EXTERNO SA- SOLEIRA DE ALUMÍNIO SP- SOLEIRA COM ACABAMENTO EM PEDRA SS- SEM SOLEIRA B- BANCADA B ESP- BANCADA ESPELHADA
CO- COBOGÓ CH- CHAPINS GCO- GUARDA-CORPO FL- FILETE JA- JANELA DE ALUMÍNIO JB- JANELA BLINDADA PA- PORTA DE ALUMINIO PM- PORTA DE MADEIRA PV- PELE DE VIDRO PCF- PORTA CORTA FOGO GA- GRADIL DE ALUMÍNIO GV- GRADIL DE VIDRO
COBERTA 20º PAV. - TIPO I 19º PAV. - TIPO I 18º PAV. - TIPO I 17º PAV. - TIPO I 16º PAV. - TIPO I 15º PAV. - TIPO I 14º PAV. - TIPO I 13º PAV. - TIPO I 12º PAV. - TIPO I 11º PAV. - TIPO I 10º PAV. - TIPO I 9º PAV. - TIPO I 8º PAV. - TIPO I 7º PAV. - TIPO I 6º PAV. - TIPO I 5º PAV. - TIPO I 4º PAV. - TIPO I 3º PAV. - TIPO I 2º PAV. - TIPO I
REVISÃO
DATA
EMITIDO POR
Revisão Atual
DESCRIÇÃO
Data de emissão 03/24/15
Empreendimento:
ED. MIRANTE PLUS Endereço do Empreendimento Biblioteca 02
1º PAV. - LAZER TÉRREO SUBSOLO 01 SUBSOLO 02
Realização
.CORTE CHAVE - PAV. TIPO
MILÊNIO
TER - 0300 CAPA
DATA:
17/04/2015 17:27:22
PROJ.:
12-047
PE
LEGENDA ALVENARIA: RODAPÉ H=10CM
- INDICAÇÃO DE NÍVEL: PAVIMENTO (P.A) PAVIMENTO (P.O)
C:\Users\santos.NASSERHISSA\Documents\12-047_MILÊNIO_ED.MIRANTE PLUS_PE_CENTRAL-16.04.15_santos.rvt
NASSER HISSA
ARQUITETOS ASSOCIADOS www.nasserhissa.com.br Av. Barão de Studart, 215
e-mail: tecnica@nasserhissa.com.br
Fortaleza Ce. BRASIL 60120-000 Informações.:Biblioteca 02
Residential Tower Nasser Hissa Final Submittal Modeling and Documentation
VAZIO P/ VENTILAÇÃO E ILUMINAÇÃO DOS SUBSOLOS
1 COR - 0701
TORRE MURETA H=1.60M(P.A.)
MURETA H=1.60M(P.A.)
VAZIO P/ VENTILAÇÃO E ILUMINAÇÃO DOS SUBSOLOS
PROJ./LAZER
ESTACIONAMENTO/CIRCULAÇÃO A=686,15 m² +0,04P.A 0,00P.O
PROJ./LAZER
C FA 01 081
VAZIO P/ VENTILAÇÃO E ILUMINAÇÃO DOS SUBSOLOS
MEDIDORES A=2,40 m²
D RUA VILEBALDO AGUIAR TE-17
.PLANTA CHAVE
+0,06P.A 0,00P.O
TE-12
TE-13
ESCADA A=16,39 m²
TE-22
D.M.L. A=4,20 m² +0,06P.A 0,00P.O
WC FUNC. A=3,20 m² +0,04P.A 0,00P.O TE-11
TE-21
COPA A=9,86 m² +0,04P.A 0,00P.O
HALL SERVIÇO A=25,02 m²
ANTEC. A=2,16 m²
HALL A=11,51 m²
O1 OL BS SU
TE-20
S
W.C. ACESSÍVEL 1 A=3,69 m² +0,04P.A 0,00P.O
SHAFT A=2,44 m²
TE-10
SALÃO DE FESTAS A=99,52 m² +0,06P.A 0,00P.O TE-08
RAMPA DE ACESSO AO SUBSOLO 1 INC. = 19%
IT
TE-14
TE-19
C FA 03 081
LIM
O ED
TE-15
TE-18
ADM. A=5,01 m² +0,06P.A 0,00P.O
RAMPA INC. = 10%
TE-16
TOPO EDIFICAÇÃO COBERTA 20º PAV. - TIPO I 19º PAV. - TIPO I 18º PAV. - TIPO I 17º PAV. - TIPO I 16º PAV. - TIPO I 15º PAV. - TIPO I 14º PAV. - TIPO I 13º PAV. - TIPO I 12º PAV. - TIPO I 11º PAV. - TIPO I 10º PAV. - TIPO I 9º PAV. - TIPO I 8º PAV. - TIPO I 7º PAV. - TIPO I 6º PAV. - TIPO I 5º PAV. - TIPO I 4º PAV. - TIPO I 3º PAV. - TIPO I 2º PAV. - TIPO I
S
TE-09 ESTAR FUNCIONÁRIOS A=11,66 m² +0,06P.A 0,00P.O APOIO CHURRASQUEIRA
TE-07 W.C. A=1,95 m² +0,04P.A 0,00P.O
HALL SOCIAL A=49,83 m² +0,06P.A 0,00P.O TE-05
TE-06
W.C. ACESSÍVEL 2 A=2,59 m²
1
S TE-04
2
TE-03
4
TÉRREO SUBSOLO 01 SUBSOLO 02
PISCINA INFANTIL
5
.CORTE CHAVE - TÉRREO
+0,29P.A +0,25P.O
1C FA 02 08
TE-02
C FA1 04 08
TE-01
3
DECK +0,89P.A +0,85P.O
DEPÓSITO A=1,99 m² +0,06P.A 0,00P.O
1 COR - 0701
1º PAV. - LAZER
+0,88P.A +0,85P.O
+0,04P.A 0,00P.O
REPOUSO A=17,87 m² +0,91P.A +0,85P.O
PRAINHA +0,59P.A +0,55P.O
SAUNA A=10,65 m² +0,89P.A +0,85P.O
+0,04P.A 0,00P.O
-0,20P.A -.25P.O
RAMPA INC. = 11%
C. DE GÁS 2 A=4,61 m² +0,04P.A 0,00P.O C. DE GÁS 1 A=4,60 m²
S
PISCINA ADULTO
6 5 4 3 2 1
W.C. GUARITA A=1,70 m² +1,08P.A +1,05P.O
MÁQUINAS A=0,71 m² +0,89P.A +0,85P.O
EMITIDO POR
DESCRIÇÃO
Data de emissão
Empreendimento:
ED. MIRANTE PLUS Endereço do Empreendimento
PROJ./MARQUISE
Biblioteca 02
+0,03P.A 0,00P.O
PASSEIO
MILÊNIO
PAV. TÉRREO - INSTRUÇÃO
1 ACESSO VEÍCULOS
Realização
+0,09P.A +0,03P.O
ESC.: 1 : 125
ACESSO SOCIAL
TER - 0301
DATA:
17/04/2015 17:27:27
PROJ.:
12-047
PL. DE INSTRUÇÃO
NASSER HISSA
PE
-0,30P.A -0.33P.O
DATA
03/24/15
ECLUSA A=7,31 m² +0,04P.A 0,00P.O
GUARITA A=5,44 m² +1,09P.A +1,05P.O
LIXEIRA A=7,05 m² +0,04P.A 0,00P.O
REVISÃO
Revisão Atual
PISCINA -0,20P.A -.25P.O
-0,20P.A -.25P.O
S
ARQUITETOS ASSOCIADOS www.nasserhissa.com.br Av. Barão de Studart, 215
e-mail: tecnica@nasserhissa.com.br
Fortaleza Ce. BRASIL 60120-000
C:\Users\santos.NASSERHISSA\Documents\12-047_MILÊNIO_ED.MIRANTE PLUS_PE_CENTRAL-16.04.15_santos.rvt
Informações.:Biblioteca 02
QUADRO DOS VÃOS DAS PORTAS NAS ALVENARIAS - PAV. TÉRREO
VAZIO P/ VENTILAÇÃO E ILUMINAÇÃO DOS SUBSOLOS
47,87
1 COR - 0701
0,35
0,48
0,35
0,48
5,61
MURETA H=1.20M(P.A.)
MURETA H=1.20M(P.A.) 0,65
1,25
4 2,6
0,45
8 7,2 PV04
PM02 SP2 7 0,9
3,25 2,43
- SHAFT HIDRÁULICA / INCÊNDIO
BLOCO CERÂMICO DE 19
- GÁS
12,03
R- REVESTIMENTO DE PAREDE P- REVESTIMENTO DE PISO F- REVESTIMENTO DE FORRO PP- PEITORIL COM ACABAMENTO EM PEDRA PR- PEITORIL COM ACABAMENTO DO REVESTIMENTO EXTERNO SA- SOLEIRA DE ALUMÍNIO SP- SOLEIRA COM ACABAMENTO EM PEDRA SS- SEM SOLEIRA B- BANCADA B ESP- BANCADA ESPELHADA
CO- COBOGÓ CH- CHAPINS GCO- GUARDA-CORPO FL- FILETE JA- JANELA DE ALUMÍNIO JB- JANELA BLINDADA PA- PORTA DE ALUMINIO PM- PORTA DE MADEIRA PV- PELE DE VIDRO PCF- PORTA CORTA FOGO GA- GRADIL DE ALUMÍNIO GV- GRADIL DE VIDRO
COBERTA 20º PAV. - TIPO I 19º PAV. - TIPO I 18º PAV. - TIPO I 17º PAV. - TIPO I 16º PAV. - TIPO I 15º PAV. - TIPO I 14º PAV. - TIPO I 13º PAV. - TIPO I 12º PAV. - TIPO I 11º PAV. - TIPO I 10º PAV. - TIPO I 9º PAV. - TIPO I 8º PAV. - TIPO I 7º PAV. - TIPO I 6º PAV. - TIPO I 5º PAV. - TIPO I 4º PAV. - TIPO I 3º PAV. - TIPO I 2º PAV. - TIPO I
1,65
0,97
0,85 0,62
5,85
1,48
0,65
PA19 SP1 PV08
1,44
0,92
REVISÃO
14,98
2,94
DESCRIÇÃO
Data de emissão
Empreendimento:
3,97
ED. MIRANTE PLUS Endereço do Empreendimento Biblioteca 02
4,02
23,10
Realização
2,00
2,14
EMITIDO POR
03/24/15
0,98
0,59
DATA
Revisão Atual
0,97
5,19
0,35 0,95
PA17 SP1
0,14
2,15
2,01
JB02 PP1 0,10
JB01 PP1 2,88
.CORTE CHAVE - TÉRREO
1,88
0,65
1,27
JA03 PR
2,13
1,25
0,67
2,55
2,76
JB01 PP1
0,09
4,47
S
PA16 SP1
2,55
0,16
0,53
4,06
1,35 6 5 4 3 2 1
97
1,19
1,59 0,75
TÉRREO SUBSOLO 01 SUBSOLO 02
1,89
2,35
0,39
PV07 7,25
R 9,
JA03 PR
PA09 SR1
3,60
MURETA H=1.20M(P.A.)
PM05 SP2
2,05 PA18 SP1 4,68
7 2,7
PM02 SP2
0,54 0,65
5
2,05
1,72
4
0,19
1C FA 02 08
3 1,4
3 1,6
1º PAV. - LAZER
2,81
3
PRO./MARQUISE
2
2,65
1
5,57
2,30
3 1,6
1,01
1,00
1 ACESSO SOCIAL
MILÊNIO
PAV. TÉRREO - ALVENARIA ESC.: 1 : 125
TER - 0302 PL. DE ALVENARIA
DATA:
17/04/2015 17:27:32
PROJ.:
12-047
PE
1,69
MURETA H=1.20M(P.A.)
PA14 SP1
0,36
2,16
0,95
PA15 SP1 1,05
0,34
5,00
ACESSO VEÍCULOS
BLOCO CERÂMICO DE 14
LEGENDA DE SIGLA:
1,09
2,98 2,87 2,34 1,50 RAMPA INC. = 11%
1,65
2,76 3,00 2,00
1,00
- SHAFT ELÉTRICA / SISTEMAS
BLOCO CERÂMICO DE 9 (MURETAS)
MURETA COM H=1.20M EM RELAÇÃO AO NÍVEL DO JARDIM
0 1,6
6,09
BLOCO GESSO DE 7 BLOCO CERÂMICO DE 9
1,91 5 4,1 S
0 0,4 0,4
2,43
0,95
1,28
LEGENDA SHAFT:
LEGENDA ALVENARIA:
MURETA H=0,30cm(P.A.)
9 3,8
4 0,9 5 0,8 JA02 PR
4 0,7
2,42
PA14 SP1
3,06 3,24 4,40 4,40 4,40 2,99 2,99
39,67
JA03 PR
8 5,9
PM04 SP2 ,44 70 0,7
8 0,4
S
ALTURA (ACABADO)
15,19 2,51 7,19 1,26 1,55 5,52 2,07
5 0,6
C FA1 04 08
0,74
LARGURA (ACABADO)
PV01 PV02 PV04 PV05 PV06 PV07 PV08
TOPO EDIFICAÇÃO 2,94
8 7,2 PV04
MURETA H=0,20cm(P.A.)
1,60 1,60 1,95 0,05 1,80 1,60 1,60 1,60
CONTENÇÃO 30
S
9 1,2
6 7,3
6 7,3
1 COR - 0701
ALTURA DO PEITORIL ACABADO (VALOR APROX.)
0,65 0,65 0,85 0,85 0,65 0,65 0,65 0,65
6,31
0,85 0,30
2,26
2,30
7 0,6 PM05 SP2
5 1,1 5 1,1
Nº ESQ.
4,48
PV06 6 2,7
PV05
8 1,6
2,42
4 0,2
4 1,0
39,97
S
2 4,3
4,50
ALTURA (OSSO)
0,85 0,65 0,85 0,85 0,65 1,25 2,05 1,25
,65 50 0,4
,67 40 0,6
1,39
5 5,0
7 0,8 PM03 SP2
2 7,1
6 3,1
4,55
0,37 1,40
PM04 SP2
7 0,8
JA11 PR1
RAMPA DE ACESSO AO SUBSOLO 1 INC. = 19%
2,05
LARGURA (OSSO)
QUADRO PELES DE VIDRO
5,58 D
1,20
2,50 3,30
0 2,0
3 2,1
PM03 SP2 PM03 SP2 7 0,8
PM05 SP2
1,15
O TIP
6 1,3
JA02 PR
V. /PA
7 0,7
PM02 SP2
2,59
JA12 PR
PM03 SP2 7 0,8
PM03 SP2 7 0,8
4 2,5
2,76
OJ. PR
3 1,2 7 0,9
2,84
JA13 PR1
0 2,6
5 1,9
4 2,8
2,78
2,13 2,13 1,53 2,13 2,14 2,14 2,14 2,14
JA02 JA03 JA06 JA07 JA08 JA11 JA12 JA13
MURETA H=1.20M(P.A.)
2,52
3 0,4
JA06 PR
5 0,9 PCF SS
O TIP
1,98
9 0,4
5 1,2
V. /PA OJ. PR
JA07 PR
5 0,8
4,50
7 0,8 PM03 SP2
5 0,8
4,55
5 0,9 PCF SS
2,83
5 2,2
3,45
2,55
5 0,9
0 0,9
PCF SS
4,83
0 2,5
JA08 PR
RAMPA INC. = 10%
4,53
ALTURA (OSSO)
0,95 1,05 2,05 0,95 0,97 0,87 0,77 0,67
Nº ESQ
NORTE
4,55
4,55
5,09
LARGURA (OSSO)
PA14 PA15 PA18 PCF PM02 PM03 PM04 PM05
QUADRO DOS VÃOS DAS JANELAS NAS ALVENARIAS - PAV. TÉRREO
MURETA H=1.60M(P.A.)
5,19
MURETA H=1.60M(P.A.)
Nº ESQ
C:\Users\santos.NASSERHISSA\Documents\12-047_MILÊNIO_ED.MIRANTE PLUS_PE_CENTRAL-16.04.15_santos.rvt
NASSER HISSA
ARQUITETOS ASSOCIADOS www.nasserhissa.com.br Av. Barão de Studart, 215
e-mail: tecnica@nasserhissa.com.br
Fortaleza Ce. BRASIL 60120-000 Informações.:Biblioteca 02
L et ’ s t a l k . C o n t a c t m e.
g u i l h er m ef er r a z a r q @ g m a i l . c o m l i n k ed i n . c o m / i n / g u i f er r az 912.342.3067