Case Study Refinery Tower Transport

Page 1


Refinery Tower Transport

Project & Break Bulk Solutions

A towering achievement in freight

A global engineering, procurement, and construction company had a cargo challenge – moving a 228.18 metric ton refinery tower from its current location in India to a U.S. port. The company invited multiple freight forwarders to submit proposals, but only Gebrüder Weiss was able to develop a solution to ensure a safe and efficient transport of the tower across the globe. In addition to managing the freight, Gebrüder Weiss offered white glove service throughout the process.

The challenge

The challenge

Shipping specialized plant equipment is no small task. The sheer size of it limits vessel availability, the logistics are extensive, and the cargo must arrive free of damage. The weight of the 228.18 metric ton tower compounded these factors.

The requirements/challenges:

 Securing vessels capable of transporting the freight

 Coordinating extensive logistics with detailed planning and collaboration across multiple shareholders

 Guaranteeing damage-free delivery through robust packaging and meticulous handling procedures

 Addressing weight complications and ensuring safe handling with specialized equipment and trained personnel

 Resolving technical issues and maintaining flexibility to adapt to changing conditions

The solution

The solution

Gebrüder Weiss secured a suitable vessel for the tower's weight, addressed technical issues with an engineering team, and collaborated with local experts, including a marine surveyor.

 Vessel Securing: Identified and secured an optimal vessel, involving detailed coordination with the shipping carrier to ensure all specifications were met.

 Technical Solutions: Engaged engineers for transit security and custom solutions for bracing and securing the tower against potential transit stresses.

 Local Expertise: Partnered with a local logistics provider for support and supervision, ensuring that engineering solutions were implemented accurately and effectively on the ground.

 Constant Communication: Provided hourly updates during operations which allowed immediate adjustments if necessary.

The benefits

The benefits

On-Time, Safe Delivery

Gebrüder Weiss ensured the tower's timely and secure arrival, exceeding client expectations. Our team meticulously managed all logistics, from direct supervision during loading and unloading to handling every step with precision, minimizing delays and ensuring efficiency.

Comprehensive Logistics Management

Every detail was managed, from selecting the optimal vessel to conducting thorough preloading surveys. Coordination included engaging engineers for method statement reviews, ocean transport, marine surveyor attendance, and efficient delivery with heavy haulers and port officials.

Cost-Efficiency and Sustainability

Our planning minimized delays and safe arrival, resulting in significant savings. Implementing sustainable practices like efficient routing and reducing carbon footprint demonstrated our commitment to environmental responsibility and our business values.

Gebrüder Weiss left no detail unturned to deliver the tower safely and on time. We provided handson service from start to finish, keeping the client informed throughout the journey.

Michael Ruediger

Director of Industrial Projects & Energy Transport Solutions

Gebrüder Weiss North America

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.