Thu Tiem Master Plan Report

Page 1

Thu Thiem

Ho Chi Minh City, Vietnam

1:2000 Master Plan Adjustment, 2012

THU THIEM MASTER PLAN ADJUSTMENT - 2012

Final Report.indd 1

1

2/16/2012 2:16:58 PM


Contents Prologue 04 1.0 Introduction 05

- Purpose and Goals - The Vision - Sustainability - The Client, Consultants, and Process - Stakeholder Engagement

2.0 The Site 17

- National and Regional Context - Evolution of the Site since 2005

3.0 2005 Master Plan 27

- 2005 Site Analysis - 2005 Master Plan - Key Initiatives since 2005

4.0 2011 Master Plan Adjustment 49

- Key Refinements - Conceptual Strategies - The Master Plan - Development Summary - Urban Design Framework Diagrams - Integration of Sustainability - Design Studies

5.0 Thu Thiem Neighborhoods 105 6.0 Public Realm 159

- Open Space Typologies and Framework - Street Sections

7.0

Urban Design Guidelines - Overview

183

Appendix

190

Prepared for the Investment and Construction Authority for Thu Thiem Urbanized Area (I.C.A.)

- Intentions and Contents - Sample Guidelines

THU THIEM MASTER PLAN ADJUSTMENT - 2012

Final Report.indd 2-3

3

2/16/2012 2:16:58 PM


1.0

Introduction Prologue During its 300 year history, Ho Chi Minh City has evolved from a small riverbank settlement north of the Mekong Delta into a thriving metropolis of over 6 million people. Today, Ho Chi Minh City continues to be defined by its relationship with the water. Where the Saigon River once formed an edge of the city, the development of Thu Thiem – an existing 657-hectare peninsula of mangroves and canals located across from the historic city center – will transform the river into the heart of the city. Over the past 8 years the city has overseen a number of critical initiatives that have set the course for the realization of Thu Thiem - In 2003, an international design competition was held by the master developer of Thu Thiem – the Investment and Construction Authority of Thu Thiem New Urban Area (ICA) – for a plan that would create a bold, new mixed-use district for Ho Chi Minh City. Sasaki Associates of Boston, Massachusetts submitted the winning scheme which focused on a sustainable framework of transportation, land use, and public spaces that integrated the site’s existing ecological conditions. Sasaki’s plan for The Thu Thiem represented the contemporary evolution of the city’s extraordinary bond with the Saigon River. Today, the Master Plan continues to serve as a model for the long-term sustainable growth of Ho Chi Minh City. - In 2004 and 2005, the ICA and Sasaki embarked on a collaborative and detailed design process, including seminars with key stakeholders and agencies, which culminated in the approved 1:2000 Thu Thiem Master Plan and Urban Design Guidelines. - In 2008, Sasaki managed and juried an international design competition for the Central Plaza, Crescent Park, and Saigon River Pedestrian Bridge elements of the project. Important “10% Infrastructure Planning” also took place in 2008, with a focus on overall Thu Thiem utility facilities and networks to support the Sasaki Master Plan. - In 2011, the ICA hired Sasaki to prepare a 1:2000 Master Plan “Adjustment” to incorporate new development proposals and strategies since the approved Master Plan of 2005. The year-long process included a series of seminars with stakeholders and agencies to review and confirm all Master Plan and Urban Design Guideline refinements. The following report is a comprehensive summary of the 1:2000 Master Plan Adjustment work prepared by Sasaki Associates in 2011-2012 for the Investment and Construction Authority of Thu Thiem.

THU THIEM MASTER PLAN ADJUSTMENT - 2012

Final Report.indd 4-5

5

2/16/2012 2:17:05 PM


1:2000 Master Plan Adjustment: Purpose and Goals Since the creation of the approved 2005 Master Plan, numerous developers and investment groups have come forward with plans to develop key parcels at Thu Thiem. In a response to these varied proposals – and to create a more detailed plan and program for Thu Thiem that maintains the core principles of the original Master Plan - the ICA created an RFP for services to prepare a “1:2000 Master Plan and Urban Design Guidelines Adjustment”. Based on a “Statement of Services” dated July 2, 2009 and submitted to the Ho Chi Minh City’s People’s Committee by the ICA, the adjustment effort addresses the following key topics: - Respond to evolving market conditions in HCMC - Facilitate the development process at Thu Thiem - Clarify and refine the Urban Design Guidelines - Integrate the Master Plan updates with infrastructure planning - Adjust land uses and blocks to meet current socio-economic conditions - Adjust density, FAR, heights, landmarks, roads and block structure in Core Area - Integrate public facilities such as police and firefighting, hospital, Opera House, and a “Children’s Museum” - Prepare a conceptual underground design for a retail environment in the Core Area - Integrate public transit via underground Metro currently being planned for HCMC - Update key “in-process” developments: VIJA Knowledge Park, Thu Thiem Software Park, GS E&C Group project, Eastern Residential Area, International Hotel parcel - Reflect an increase in the Right of Way (ROW) widths of the Crescent Boulevard and North/South Road - Integrate the winning competition scheme for the Central Plaza, Crescent Park, and Saigon River Pedestrian Bridge - Refine the landscape design and programming of the Central Lake - Refine the plan for the Southern Delta area to balance development and public space - Maintain all elements of transportation, vegetation, and public space from the 2005 Master Plan

THU THIEM MASTER PLAN ADJUSTMENT - 2012

Final Report.indd 6-7

7

2/16/2012 2:17:08 PM


The Vision Thu Thiem is one of the most important development projects in Ho Chi Minh City, if not all of Vietnam. Recognizing the need to accommodate significant population growth and economic development in the city (and country) over the next 15 to 20 years, Thu Thiem responds to these factors by providing a new heart and focus of urban and commercial life in HCMC.

The vision for Thu Thiem is a sustainable, 21st Century urban district that attracts residents and visitors, provides new parks and public spaces for all, allows for diverse contemporary development, and creates a world-class skyline, while preserving the existing historic scale and neighborhoods of greater Ho Chi Minh City. Sasaki’s Master Plan is based on the following key principles: (1) (2)

- Framework of transportation, land use, and public spaces that integrates the existing ecological conditions of the lower Saigon River

(13)

(3)

- Response to the climate of southern Vietnam (4)

(11)

(12)

- Focus on connections to the riverfront, linkages to the historic city center, and a compact, flexible urban form - Promotion of density and integrated public transit (water and land-based)

(5) (10)

- Appropriate street and building orientation that encourages cross-ventilation and passive cooling

(9)

- Incorporation of the natural delta landscape into the urban fabric and preservation of native vegetation - Key ecological strategy that maintains Thu Thiem as an“open system”– one that accommodates tidal regimes and high-water events through natural and man-made canals, lakes, and mangrove areas

(6) (7)

(8)

Over the next 20 years, Thu Thiem will accommodate 148,000 new residents and several hundred thousand employees and visitors. Since 2005, three major infrastructure linkages have been built to accommodate this new population, based on Sasaki’s planning work:

(16)

(14)

Thu Thiem Bridge: This bridge as proposed by Sasaki in the original Master Plan opened in 2007 and spans the Saigon River at the northern end of the project. For the first time in Ho Chi Minh City’s history, the bridge connects Thu Thiem directly with the existing city.

(15)

East/West Boulevard: This multi-lane “boulevard” transforms how the Thu Thiem peninsula will be used over the next 100 years. The alignment follows the specific recommendation by Sasaki in the original award-winning plan. The roadway connects Thu Thiem to new residential and commercial districts to the east and opens up access to the diverse development opportunities embedded in Sasaki’s Master Plan.

0

(1) Museum

(9)

(2) Conference Center

(10) City Hall

(3) Mixed-Use Hotel

(11) International Hospital

(4) Opera House

(12) Marina Complex

(5) Visitors Center

(13) Urban Resort Hotel

(6) Observation Tower Complex

(14) Southern Delta Resort

(7) Sports Arena

(15) Aquatic Park

(8) Sports Stadium

(16) Southern Delta Research

Children’s Museum

Illustrative Master Plan Final Report.indd 8-9

100 200

400 m

East / West Tunnel: As an extension of the East/West Boulevard, the tunnel passes below the Saigon River and connects historic District 1 and Thu Thiem. Officially opened in November 2011, the tunnel provides the primary western route onto Thu Thiem. Three additional vehicular bridges are slated to be built according to Sasaki’s plan over the next 50 years. In the future, an iconic pedestrian bridge will connect Thu Thiem’s future Central Plaza – one of the biggest public spaces in all of Vietnam – with Me Linh Square. The tallest building in Vietnam is also proposed in the Sasaki Master Plan. At 86-stories and currently in the concept design stage with a private HCMC developer, this mixed-use tower sits at a crucial visual axis and will be a landmark in Thu Thiem’s skyline of buildings.

THU THIEM MASTER PLAN ADJUSTMENT - 2012

9

2/16/2012 2:17:19 PM


Sustainability at Thu Thiem

Sustainability at All Levels of Planning and Design Countries around the world are developing sustainability standards for green building codes. Governments and developers are recognizing the critical need and benefit of conserving resources and enhancing local environments for the health, safety, and welfare of its citizens. At Thu Thiem, environmental sustainability must be acknowledged and built into every facet of the project. Elements of street orientation, building orientation, wind flow, water receiving landscapes, minimization of cut and fill operations, and enhancement of the existing Thu Thiem delta area have been incorporated at the Master Plan level. Every developer must examine sustainability components at the building level, including active and passive strategies to reduce energy consumption, use alternatives energies, increase water recycling, utilize local materials, pursue solid waste strategies, and engage in a whole range of other approaches that set the current standard for sustainability. Strategies explored should address the following components: - Passive Strategies - Active Strategies (Energy Use and Generation) - Water Management - Drainage and Run-off Filteration - Health and Wellness - Transportation - Social and Community Support and Infrastructure

Integrated Sustainability Strategies Final Report.indd 10-11

THU THIEM MASTER PLAN ADJUSTMENT - 2012

11

2/16/2012 2:17:25 PM


The Client, Consultants and Process The client for the Thu Thiem New Urban Area is the “Investment and Construction Authority for Thu Thiem” also known as the ICA. The ICA is a government created agency and has been the leader for Thu Thiem’s creation since the project was conceived in the early 2000s. ICA is responsible for the hiring, oversight and management of Thu Thiem’s Urban Design and infrastructure planning; investor and developer interaction during the implementation processes; and enforcer of the Urban Design Guidelines. ICA is the client for the Thu Thiem 1:2000 Master Plan Adjustment project. Sasaki Associates is the Master Planner of the Thu Thiem New Urban Area. Sasaki’s involvement in the project spans the course of 9 years, from the original winning scheme in the 2003 international design competition to the Master Plan adjustment work in 2011. Sasaki is a multi-disciplinary Urban Design, Planning, Architecture and Landscape Architecture firm of 250 people located in Boston, Massachusetts, USA. The Thu Thiem 1:2000 Master Plan Adjustment project lasted between January 2011 and January 2012 and included a series of five (5) key working sessions. Three of these worksession occurred in Ho Chi Minh City and were coordinated by the ICA, with presentations by Sasaki Associates and feedback from numerous stakeholders and city agencies. Two of the worksessions were held as online meetings between Ho Chi Minh City and Boston. Refinements to the Master Plan and Urban Design Guidelines were reviewed and approved leading to the final 2011 Master Plan, which is fully described in Chapter 4 of this report.

Stakeholder Engagement: Seminars and Workshops In addition to the Investment and Construction Authority, numerous agencies participated in the 1:2000 Master Plan Adjustment worksessions. They include the following: HCMC Urban Planning Institute, HCMC Department of Urban Planning and Architecture (DUPA), HCMC Department of Construction, HCMC Department of Natural Resources and Environment, HCMC Department of Transportation and Public Works, HCMC Department of Tourism, Urban Construction Authority, Urban Railway Management Unit, Urban Waterways, Urban Highway Management Company, East/West Boulevard Management Authority, HCMC Department of Water Transport, HCMC Department of Firefighting, DESO Architects Worksession #1 – January 18, 2011 (online meeting): This meeting was the project kick-off to confirm goals and objectives, existing site information, ongoing project and city initiatives, missing information, GFA, and next steps. The key outcome of this worksession was that the GFA (gross floor area) for Thu Thiem should be increased by 40% from the 2005 figure of 5.4 million square meters. The new GFA target was therefore set at 7.56 million square meters. Worksession #2 – February 16, 17, 18 2011 (HCMC): Sasaki presented the Worksession #2 material to an audience of approximately 60 key stakeholders and covered adjustments to the Thu Thiem Master Plan related to land use and character; building heights and GFA; circulation and public transit; and the Central Plaza and public space. Key outcomes of this worksession were the disposition of key building programs (Museum, Opera House, Visitor’s Center, City Hall) and that unlimited building heights and GFA are not possible at Thu Thiem. Worksession #3 – April 5 and 6, 2011 (HCMC): Sasaki presented the Worksession #3 material to an audience of approximately 60 key stakeholders covering the incorporated revisions and comments from Worksession #2. Key outcomes of the meeting were that the adjusted Master Plan meets the demands of the ICA with some final revisions to be done; the adjusted Master Plan exhibits better planning since Worksession #2 and will be more effective for developers; and the landscape proposal for the Central Lake is quite reasonable and should be included in the final Master Plan. Worksession #4 – October 25, 2011 (online meeting): An online meeting occurred between ICA, DUPA, the Departments of Transportation and Construction, and Sasaki to review critical Master Plan Adjustment refinements and to review an initial draft of the Urban Design Guidelines (neighborhood 3). Final refinements were discussed, as were next steps and scheduling of the final worksession. Worksession #5 – December 5, 6, 7 2011 (HCMC): The final worksession focused on the final draft of the Urban Design Guidelines which are critical to the accurate implementation of the Master Plan during construction. Several key refinements were made with the overall understanding that the Guidelines were appropriately detailed and de-

Stakeholder Seminars and Discussions in Ho Chi Min City Final Report.indd 12-13

THU THIEM MASTER PLAN ADJUSTMENT - 2012

13

2/16/2012 2:17:28 PM


THU THIEM MASTER PLAN ADJUSTMENT - 2012

Final Report.indd 14-15

15

2/16/2012 2:17:29 PM


2.0

Site and Context

THU THIEM MASTER PLAN ADJUSTMENT - 2012

Final Report.indd 16-17

17

2/16/2012 2:17:33 PM


Regional / National Context Thu Thiem sits at a strategic location in the broader context of Ho Chi Minh City. Largely cut off from development due to the large port facilities nearby, the Thu Thiem peninsula is now a desirable investment target as the large ports are being removed and relocated much farther to the south (and closer to the East Sea). Thu Thiem is also seen as a “gateway� into HCMC from points to the east, including a future airport location and connections to an Airport Express subway system. Thu Thiem is also located at the terminus of National Highway 1 which is the corridor that connects the entire country from north to south, Hanoi to HCMC.

Existing Site The 657-hectare site for Thu Thiem is a broad, flat expanse of existing land comprised of informal settlement housing, mangrove forest, and navigable and non-navigable canals. In the past 6 years, the site has been transformed in key zones, with the implementation of the Thu Thiem Bridge #1, the first portion of the North/South Connector Road (to the intersection with the East/West Boulevard), the East/West Boulevard itself, and the East/West Tunnel underneath the Saigon River. New public housing is underway in the far eastern part of the site, while certain development parcels have been cleared of vegetation, setting the stage for future development. These changes are clearly seen in a review of aerial photographs over the past 6 years.

Historic Map showing District 1 and part of Thu Thiem

Regional Context Historic Image - Le Loi Boulevard

THU THIEM MASTER PLAN ADJUSTMENT - 2012

Final Report.indd 18-19

19

2/16/2012 2:17:34 PM


THU THIEM MASTER PLAN ADJUSTMENT - 2012

Final Report.indd 20-21

21

2/16/2012 2:17:38 PM


Site Conditions - 2005 Final Report.indd 22-23

Site Conditions - 2012

THU THIEM MASTER PLAN ADJUSTMENT - 2012

23

2/16/2012 2:17:50 PM


Existing Site Conditions - 2012 Final Report.indd 24-25

THU THIEM MASTER PLAN ADJUSTMENT - 2012

25

2/16/2012 2:17:53 PM


3.0

2005 Master Plan

THU THIEM MASTER PLAN ADJUSTMENT - 2012

Final Report.indd 26-27

27

2/16/2012 2:17:55 PM


2005 Site Analysis Key site features were analyzed during the initial Master Planning process in 2005 that remain applicable today. An analysis of relative land elevations determined that the higher elevations occurred in the north, west, and central portions of the site and that these lands would be most conducive to future development. It was further determined at that time – based on extreme high and low tides, projected tidal fluctuations, hydrological predictions, and climate change – that a minimum elevation of +2.5 meters should be established for all development at Thu Thiem. Further site analysis included vegetation, waterways, orientation, and views which were all influential in the creation of the 2005 Master Plan.

2005 Master Plan The 2005 Thu Thiem Master Plan presented a comprehensive, 20-year vision for the peninsula as a dynamic, mixed-use urban district of housing, commercial, office, cultural, institutional, and public space uses. The following key principles were established in 2005 and carried through to the 2011 Master Plan Adjustment: - Create a new CBD and walkable, mixed-use neighborhoods for 21st Century Ho Chi Minh City - Create a sustainable new city district that incorporates the natural landscape condition of Thu Thiem - Create active streets and public spaces defined by strong building edges typical of Ho Chi Minh City - Create a central plaza and waterfront park for HCMC that is free and open to all - Promote density and compact urban form punctuated by landmark towers - Promote public transit in the form of underground subway, buses, water taxis, and ferries - Promote sustainable public spaces that serve an urban and ecological purpose - Create a memorable skyline of diverse building heights - Create a skyline that will be viewed from many different angles and be an exciting “façade” for HCMC - Allow for flexibility of density and form within each neighborhood, while achieving an overall urban character - Locate key amenities – museums, community centers, schools, hospitals – throughout the plan for proximity to all The 2005 Master Plan set the CONCEPTUAL framework and layout for Thu Thiem, comprised of distinct neighborhoods and public landscapes including the Central Plaza, Crescent Park, and Central Lake. Development blocks and parcels were clearly defined and the “Core Area” was established directly opposite the historic District 1 area of HCMC. A clear roadway network was designed with primary, secondary, and tertiary roadways. The “Crescent Boulevard” was designed as a high spine, raised slightly and accommodating the tallest buildings at Thu Thiem, with descending heights of buildings as one moves towards the waterways on either side. This critical principle allows for expansive views from most buildings to the water. The GFA (gross floor area) of the 2005 Master Plan was targeted at 5.4 million square meters with a permanent residential population of 130,000 people.

0

Site Analysis - 2005 Final Report.indd 28-29

100 200

400 m

THU THIEM MASTER PLAN ADJUSTMENT - 2012

29

2/16/2012 2:17:57 PM


0

Existing Topography - 2005 Final Report.indd 30-31

100 200

400 m

0

Existing Elevation Analysis - 2005

100 200

400 m

THU THIEM MASTER PLAN ADJUSTMENT - 2012

31

2/16/2012 2:17:59 PM


0

Existing Vegetation and Water Analysis - 2005 Final Report.indd 32-33

100 200

400 m

0

Flood Elevation Plan - 2005

100 200

400 m

THU THIEM MASTER PLAN ADJUSTMENT - 2012

33

2/16/2012 2:18:00 PM


Legend: 1 - New City Center 2 - Residential District 3 - Public Institution District 4 - Urban Neighborhood 5 - Commercial Center 6 - Convention Center 7 - Arena 8 - Museum 9 - Sports Center 10 - Research Institution 11 - Cultural Center 12 - Neighborhood Center 13 - Central Plaza 14 - Riverfront Promenade 15 - Crescent Park 16 - City Park 17 - Aquatic Park 18 - Entertainment 19 - Resort Hotel 20 - Botanical Gardens 21 - Delta Research Institute 22 - Marina 23 - Preserved Wetland 24 - Observation Tower 25 - Amphitheatre 26 - Historic Structure 27 - Subway Transit Station

Illustrative Master Plan Final Report.indd 34-35

THU THIEM MASTER PLAN ADJUSTMENT - 2012

35

2/16/2012 2:18:03 PM


Sample Urban Design Guidelines - 2005 Final Report.indd 36-37

THU THIEM MASTER PLAN ADJUSTMENT - 2012

37

2/16/2012 2:18:07 PM


THU THIEM MASTER PLAN ADJUSTMENT - 2012

Final Report.indd 38-39

39

2/16/2012 2:18:08 PM


Key Initiatives since 2005

District 2

District 1

` Eastern Residential

Thu Thiem Central Plaza

District 1 Master Plan: The District 1 Master Plan is a comprehensive land use and massing study for the historic core of Ho Chi Minh City, extending westward from the Saigon River to Dien Bein Phu Boulevard and roughly south to the existing canal bordering the Cholon District. Key strategies in the plan include burying Ton Duc Thang Road and creating a new waterfront park on top of this roadway, opening up public access to the water. The park would be a perfect mirror image of the Crescent Park being created at Thu Thiem and frame the Saigon River with public space. A development pattern of high towers is proposed nearby, however, given the limits on economic growth and competitive investment environment, the higher density development should be encouraged and directed towards Thu Thiem in the future. This would encourage preservation of the unique, humane scale of existing District 1. District 2 Planning: An extensive Master Plan process has been ongoing for the areas to the north and east of Thu Thiem. The general boundary of these plans is the Saigon River to the west, the East/West Boulevard to the south and east, and the National Highway 1 to the north. Initial schemes show areas of very high, mixed-use density surrounded by pockets of lower density within a framework of landscape and canals. FARs range between 2.0 and 10.0 and building heights from 2 to 60 stories. Moving forward, the schemes for this area should be clarified in relation to Thu Thiem so that programmatic hierarchy and development priorities can be set. Eastern Residential District: The Eastern Residential District is located in the easternmost area of Thu Thiem and borders the East/West Boulevard. The district is intended as public resettlement housing for the existing Thu Thiem population. The Investment and Construction Authority has been working with private development companies to design and construct this critical development component at Thu Thiem. The district is characterized by 25 story residential apartment blocks, retail on the ground floor, a clear grid of streets, public spaces, and civic and educational amenities. Central Plaza, Crescent Park, Saigon River Pedestrian Bridge Competition: A two-stage, open international ideas competition was held in 2008 on behalf of the Investment and Construction Authority to seek out the best plans for the Central Plaza, Crescent Park, and Saigon River Pedestrian Bridge. Approximately 160 schemes from around the world were submitted. The winning scheme was prepared by a French architecture firm named DESO. DESO was subsequently contracted to prepare conceptual schemes for the Plaza and Park based on their winning entry. That work is ongoing as of January 2012 and is reflected in Sasaki’s Master Plan Adjustment.

District 1 Master Plan Final Report.indd 40-41

THU THIEM MASTER PLAN ADJUSTMENT - 2012

41

2/16/2012 2:18:10 PM


District 2 Master Plan Final Report.indd 42-43

Eastern Residential District Master Plan

THU THIEM MASTER PLAN ADJUSTMENT - 2012

43

2/16/2012 2:18:12 PM


Central Plaza, Crescent Park, Saigon River Pedestrian Bridge Competition Final Report.indd 44-45

THU THIEM MASTER PLAN ADJUSTMENT - 2012

45

2/16/2012 2:18:15 PM


10% Infrastructure Works The 10% infrastructure work was based on the layout of the 2005 Master Plan and was intended to define the primary strategies for utilities as well as roadway design. Utilities were studied comprehensively, with concepts proposed for stormwater, sanitary sewer, water supply, solid waste, power, telecommunication, and gas supply. Below is a brief description of the approach for each utility: Stormwater: Collection via a combination of catch basins with deep sump for pre-treatment and a network of bioswales; system to be selected based on topography, roadway layout, waterway proximity, groundwater, and tides Sanitary Sewer: Total estimated sanitary flow of 80,000 cubic meters per day, primarily through gravity system and pump stations; early phase solutions are recommended Water Supply: Water demand is based on year 2020 targets of 200,000 permanent residents, 450,000 employees per day, and 200,000 visitors per day; design intent is to provide the population with sufficient volumes of potable water at adequate pressures to provide peak-hour demand or maximum day demand rate plus firefighting flows Solid Waste: Daily estimated waste generation for year 2020 is 400-500 tonnes/day along with construction and demolition (C&D) waste; system to include a range of waste containment systems, public litter bins, mechanized transfer of waste to vehicles or direct haul, at-source separation of recyclables, facilities for material recovery and waste transfer, remote composting, systems for medical waste collection and special, commercial, sludge or hazardous waste Power: Power to be sourced from Thu Duc substation via the An Khanh substation which was planned to be upgraded (needs confirmation); designed in loop circuits with transformer stations; load demand per block to be calculated in 30% Infrastructure work based on Master Plan Adjustment with specific GFA targets Telecommunication: Main distribution medium at time of report was Fiber Optic using FTTH and FTTD principles, 10Gigabit Ethernet bearers, Gigabit Passive Optical Network, Meshed WiFi and/or WiMax cells, and other technologies to be further detailed in the 30% work Gas: Assumed sources of petroleum in Bach Ho and Malay Tho Chu Basins, to be processed at Dinh Co Gas Plant, piped to Phu My Fertiliser Plant, and then to Thu Thiem; main distribution system within Thu Thiem to provide a loop and a connection to the source with branch pipelines within the tertiary roads

Grading Plan

10% Infrastructure Works - Typical Drawing Final Report.indd 46-47

THU THIEM MASTER PLAN ADJUSTMENT - 2012

47

2/16/2012 2:18:17 PM


4.0

2011 Master Plan Adjustment Key Refinements The core principles of the 2005 Master Plan are maintained in the 2011 Master Plan Adjustment. However, several strategic refinements have been made to achieve the ICA goals of updating the plan. The following issues have been addressed : - GFA - Streets and Blocks - Land Use - Vehicular Circulation - Parking - Landmark Building Locations - Skyline Studies

THU THIEM MASTER PLAN ADJUSTMENT - 2012

Final Report.indd 48-49

49

2/16/2012 2:18:23 PM


GFA

Since the beginning of the project, there have been three (3) totals for project GFA, as follows: 2005 (Master Plan Original) 2008 (Master Plan w/ Revised GFA) 2011 (Master Plan Adjustment)

6.2 million square meters (based on 737 ha site) 5.4 million square meters (based on 657 ha site) 7.56 million square meters (based on 657 ha site)

The 2011 Master Plan Adjustment reflects an increase of 2.16 million square meters over the 2008 Plan. This is an increase of 40% in the GFA over the 2008 Plan. This 40% maximum number was provided to Sasaki by ICA as a benchmark to reasonably increase density of the project, respond to critical developer and investor requests for the allowance of more GFA, to provide a stronger urban form and character to the skyline of Thu Thiem, and to incorporate approved “in-process” projects. The methods of the increase are explained as follows: - Increased GFA in Core Area 1 and 2 to make a stronger urban form and image for the city - Increased GFA in Core Area 1 and 2 to respond to development trends and requirements (included in above) - Increased GFA along Crescent Blvd. in District 3 to create strong urban form along increased ROW - Increased GFA in District 5 as a result of refined design of Children’s Museum - Increased GFA in District 6 to incorporate Software Park per ICA direction - Increased GFA in District 7 to match Resettlement Project exactly per developers plan - Added GFA from Southern Delta zone that was not included in 2005 GFA calculation - Added GFA from Special Programs that was not included in 2005 GFA calculation

Street and Blocks Plan

The Streets and Blocks at Thu Thiem have been slightly refined in the 2011 Master Plan Adjustment. In the 2005 plan, it was apparent that many of the blocks were too small for developers or not efficient for parking structures or other on-site amenities. Blocks shown are now approximately 80m x 120m in size. The streets were also carefully analyzed to ensure that they will fully support future traffic patterns in the build out of Thu Thiem. The streets and blocks have been adjusted based on the following key principles: - Larger development parcels in the Core Area are more attractive to investors - Larger developments parcels in the Core Area maximizes developable area and increases GFA - Larger development parcels allow taller buildings - Larger development parcels minimize infrastructure and costs - Larger development parcels allow construction of larger underground garages - Larger development parcels are in line with international standards of Core Areas in other international cities - In the Observation Tower district, combine the “Tower parcels” into one parcel for an integrated mixed-use district - In the Observation Tower district, modify the geometry of roadways west of the Crescent Boulevard to align cor rectly with the Tower parcel - In the Observation Tower district, combine two blocks on the west of the Crescent Boulevard into one block to create a more attractive development parcel for investors

Vehicular Circulation

The complete traffic report provided in the 10% Infrastructure work from 2008 includes a detailed discussion about the methodology and conclusions related to future traffic patterns at Thu Thiem. In the Master Plan Adjustment presentation, Sasaki summarized the 2008 traffic report findings, as follows: - Projected traffic at Thu Thiem was tested in 2008 during the 10% infrastructure study - Recommendation was made to widen the Crescent Boulevard and North/South Road (completed) - The Thu Thiem road hierarchy was tested against existing urban centers (Chicago and Singapore - The Thu Thiem road hierarchy is similar to these well functioning CBDs - The Thu Thiem road hierarchy is a connected grid, which provides options to move traffic - A fully functioning public transit system is critical to the success of an efficient traffic flow The plans and sections for the Crescent Boulevard and North/South Road have been widened in the Master Plan Adjustment to reflect the above recommendations. This has added approximately 10 hectares of additional driving lanes which will very much contribute to positive traffic flow. Additionally, Sasaki has taken extra traffic facilitation

measures as part of the 2011 Master Plan Adjustment to ease concerns on the part of ICA regarding future traffic flow. On-street parking lanes throughout the project have been switched to “mixed” traffic lanes for a mix of cars and motorbikes (although if future traffic patterns do not warrant this additional lane width, the areas could easily be switched back to parking lanes). At the same time, an additional moving traffic lane was added around the entire perimeter of the Central Plaza. These modifications have added approximately 4.4 hectares of additional driving lanes which will very much contribute to positive traffic flow. It is also important to note that site access design and traffic management will be a critical determinate of future traffic flow. Sasaki will incorporate design parameters in the Urban Design Guidelines for parking access and minimization of driveways near key street intersections. However, it will be imperative on the ICA to ensure that future developers implement the guidelines appropriately. Given the above information, it should be stated that a comprehensive traffic model has not been completed for Thu Thiem. This effort has been recommended on numerous occasions and would entail several months of analysis and a time consuming investigation of the larger existing and future traffic patterns of the entire city. Given this time frame and prohibitive fees – and the fact that reasonably similar conclusions would be reached as those provided in the Master Plan documentation – a traffic study of this kind is not warranted at this time. It is, however, predicted that the vehicular network designed for Thu Thiem – in combination with the implementation of critical public transportation systems (metro, bus, water taxi) – will eventually be an effective and adequate transportation network that will be similar to (or better than) other world class cities around the world.

Roads and Public Transit

The proposed public transit system at Thu Thiem is a critical component to the future functionality and accessibility of the entire urban district. A mix of underground Metro (currently under design and development by Ho Chi Minh City); an Airport Express hub (a proposal within this Master Plan to connect to the future new Ho Chi Minh City airport in the northeast of the city); a metropolitan bus system that links Thu Thiem to all surrounding districts; an internal circulator line that would be dedicated to Thu Thiem; new expanded ferry stops at key locations along the Saigon River; and numerous new water taxi stops. The implementation of this system is fundamental to mitigating the impact of automobiles and motorbikes on the proposed roadway system. The Street Typology or hierarchy for Thu Thiem comes out of a variety of factors: an understanding of block sizes and densities, a variety of land uses, and a logical and efficient approach to urban design. The road network has been compared favorably with other major metropolitan districts around the world – the primary circulation routes are the Crescent Boulevard, East/West Boulevard, and North/South Road. Secondary roads provide the structure for the various neighborhoods, while tertiary roads allow for finer grain accessibility and movement around and through the blocks. Streets have been designed with generous sidewalks to create a pedestrian-oriented environment throughout Thu Thiem. Extensive areas for tree planting, lighting, and site furnishings will create a sustainable, welcoming, comfortable, and context appropriate environment for pedestrians and drivers alike.

Parking

Parking considerations have also been studied in detail in the 2011 Master Plan Adjustment. All blocks in the Core Area were calculated in terms of site area, GFA, building type, and parking factors to determine the appropriate number of underground parking levels. Most blocks in the Core Area exhibit an underground parking requirement of 1 to 3 levels, while the two highest density blocks require 4 levels of underground parking. These parking areas would serve the private development blocks above as well as the nearby underground retail areas that are proposed. Quantitatively, a total number of 15,565 underground parking spaces for Core Area Neighborhood 1 has been calculated based on land use and other parking factors. These spaces are recommended to be placed underground within the private development blocks. A total number of 9,188 underground parking spaces has been calculated for Core Area Neighborhood 2. Even with the increased GFA of the Core Area, appropriate parking standards can be followed and an adequate number of parking spaces can be accommodated in the underground parking garages. Additionally, significant public underground parking was included in the 2011 Master Plan Adjustment in two key locations – beneath the Central Plaza and beneath the public zone areas near the proposed Visitor’s Center and Opera House. This parking will be extremely beneficial to numerous future visitors to the public amenities within the Core Area of Thu Thiem. This parking will be efficient and beneficial for Thu Thiem daily visitors and visitors for special celebrations and festivals, in addition to the planned metro, bus, and waterway public transportation systems.

THU THIEM MASTER PLAN ADJUSTMENT - 2012

Final Report.indd 50-51

51

2/16/2012 2:18:23 PM


Conceptual Strategies Development Areas: -Located along the natural “higher” land areas at Thu Thiem to minimize land filling Hydrology: -Thu Thiem is an open system that allows infiltration and fluctuation of tides from the Saigon River -Thu Thiem acts as a natural filtration system using water-receiving landscapes and enhanced plant species -Thu Thiem’s Southern Delta area is a focus of enhanced water filtration systems -Main roads (Crescent Boulevard) act as “high spines” with water draining towards the natural zones Storm Water Management: -Extreme high tides and flooding are handled through raising development areas to a minimum of +2.5m elevation and allowing surrounding landscapes to “receive” water (flood)

Development Areas

Hydrology

Spatial Spine: -The Crescent Boulevard is the high or “spatial spine” along which the primary activities take place, emphasizing views to the Saigon River and Central Lake; the Crescent Boulevard is Thu Thiem’s “main address” Civic Facilities: -Key Civic Facilities to the north and south embrace the Core Area of Thu Thiem and ensure an active and dynamic new CBD that goes beyond office use Accessibility and Transit: -Major streets define the organization of Districts, allowing for full accessibility into and through Thu Thiem; the underground Metro (and a comprehensive public transit system) are critical to ensuring access

Storm Water Management

Spatial Spine

Civic Facilities

Accessibility & Transit

Conceptual Strategies Final Report.indd 52-53

THU THIEM MASTER PLAN ADJUSTMENT - 2012

53

2/16/2012 2:18:36 PM


e dg Bri 1

(3)

e2

(13)

al 1

al 1

(2)

dg

(1)

al 3 Cannal 3 Ca

n Ca

n Ca

Bri

n

sce

Cre

d var ule

o tB

(4)

(11) ard lev

(5)

Pedestrian Bridge

Central Plaza

E/

(10)

Central Lake (9)

W

u Bo

d oa oRad iemR Thhiem huT TThu

(6) (7) 3

(16) (8) (14)

Saigon River

0

100 200

(15)

Bridge 4

ge

id Br

(12)

400 m

0

100 200

400 m

Project Site Boundary Amenities

(1) Museum

(9)

(2) Conference Center

(10) City Hall

(3) Mixed-Use Hotel

(11) International Hospital

(4) Opera House

(12) Marina Complex

Pedestrian Connections

(5) Visitors Center

(13) Urban Resort Hotel

Views

(6) Observation Tower Complex

(14) Southern Delta Resort

Vew Corridor to Observation Tower

(7) Sports Arena

(15) Aquatic Park

Observation Tower

(8) Sports Stadium

(16) Southern Delta Research

High Density Corridor Main Public Realm Central Plaza Municipal Subway and Stations

Integrated Conceptual Strategies Final Report.indd 54-55

Illustrative Master Plan

Children’s Museum

THU THIEM MASTER PLAN ADJUSTMENT - 2012

55

2/16/2012 2:18:50 PM


lvd

nt B

sce Cre

Saigon River

Central Plaza Central Lake

Illustrative Master Plan Detail Final Report.indd 56-57

EW

d

Blv

THU THIEM MASTER PLAN ADJUSTMENT - 2012

57

2/16/2012 2:19:01 PM


Overall Massing and Building Form Final Report.indd 58-59

THU THIEM MASTER PLAN ADJUSTMENT - 2012

59

2/16/2012 2:19:04 PM


Land Use Summary The Land Use plan has been strategically designed to accommodate larger commercial and commercial mixed-use development in the high density Core Area between the Saigon River and Central Lake. Lower density residential areas are located in the north and central areas, while the southern part of the peninsula is left as an ecological delta with minimal, sensitive development.

2011 e dg Bri

Land Use

2005

%

Area (Ha)

%

Commercial

49.1

7.5

46.6

7.1

Commercial Mixed-Use

29.5

4.5

22.0

3.3

Residential Mixed-Use

33.2

5.0

23.2

3.5

Residential- High Density

23.7

3.6

45.3

6.9

0

0

4.7

0.7

Residential- Low Density

26.1

4.0

24.0

3.7

Cultural Facilities

18.7

2.8

23.4

3.6

School

15.9

2.4

14.6

2.2

Software Park

9.7

1.5

0

0

Civic Facilities

3.5

0.5

17.1

2.6

Medical

3.9

0.6

0

0

Utilities

2.1

0.3

0

0

Public Park

86.1

13.1

86.1

13.1

Recreational/ Educational

29.5

4.5

27.3

4.2

Wetland

85.1

13.0

105.3

16.0

Road

175.8

26.8

152.2

23.2

Water

65.1

9.9

65.1

9.9

TOTALS

657

100

657

100

1

Area (Ha)

d var ule

n Ca

al 3

n sce Cre

n Ca

o tB

al 1

Bri

dg

e2

Residential- Medium Density

Pedestrian Bridge

E/

Central Lake

W

d var ule

Bo

m

hie

uT

Th d

a Ro

3

i

Saigon River

Bridge 4

Br

e dg

0

Project Site Boundary

Software Park

Central Plaza Boundary

Civic Facilities

Commercial

Medical

Commercial Mixed-Use

Utilities

Residential Mixed-Use

Public Parks

Residential-High Density

Recreational / Educational

Residential-Low Density

Wetland

Cultural Facilities

Central Plaza

School

Water

Land Use Plan Final Report.indd 60-61

100 200

400 m

2005 Land Use Plan

THU THIEM MASTER PLAN ADJUSTMENT - 2012

61

2/16/2012 2:19:11 PM


Development Summary 657

ha

Developable Site Area

2,142,178

sm

Developable Site Area

214.2

ha

Overall GFA (above ground)

7,563,750

sm

Overall GFA (underground)

2,536,371

sm

Residential Useable GFA

3,188,251

sm

Commercial Useable GFA

2,538,321

sm

Total Site Area

e dg Bri 1

al 3

n Ca

Residential Units

al 1

Bri

NET FAR

n Ca

n

sce

Cre

d var ule

o tB

dg

e2

Pedestrian Bridge

E/

Central Lake

W

3.53 23,693

units

Resident Population

146,745

people

Employee Population

215,965

people

The following definitions are provided for the above summary.

d var ule

Bo

Developable Parcel Area - In gross square meters and hectares, the total amount of land for development (the “developable area”) after subtracting the area for all public roads and public landscape zones. Overall GFA (above ground) - In gross square meters, the amount of built-up area (the Gross Floor Area) of all uses that are anticipated for the entire Thu Thiem project.

uT

Th m

hie

Overall GFA (underground) - In gross square meters, the amount of underground retail area (the Gross Floor Area) that is proposed in the Core Area. See Neighborhood Guidelines for definition of this zone.

d

a Ro

ge

NET FAR - FAR stands for “Floor Area Ratio”. It refers to the ratio between the built up area (GFA) and the developable site area in square meters.

3

Resident Population - The permanent resident population is based on a calculation of number of people per unit multiplied by the number of units. Number of people per unit is estimated based on typical international standards as well as local Vietnamese living patterns that are to be expected at Thu Thiem.

id Br

Residential Units - Total number of residential units is based on an assumption of 85 to 150 square meters per unit. Employee Population - This population is based on a standard number of employees per square meter of office area. The standard number used in this instance is 12 square meter per employee, based on international standards and other assumptions of the kinds of office spaces that will be implemented at Thu Thiem over time.

Bridge 4

Saigon River

0

Project Site Boundary

Software Park

Central Plaza Boundary

Civic Facilities

Commercial

Medical

Commercial Mixed-Use

Utilities

Residential Mixed-Use

Public Parks

Residential-High Density

Recreational / Educational

Residential-Low Density

Wetland

Cultural Facilities

Central Plaza

School

Water

Land Use Plan with Building Fabric Final Report.indd 62-63

100 200

400 m

Service Apartment - Service Apartments are 1-2 bedroom furnished apartments that are either managed by a hotel (in which case they are branded) or an external agency. Unit sizes typically range between 75 and 90 square meters.

THU THIEM MASTER PLAN ADJUSTMENT - 2012

63

2/16/2012 2:19:17 PM


Development Summary by Neighborhood

Neighborhood e dg Bri 1

al 1

1

/W

E

Pedestrian Bridge

d

a Ro

2c

8 Saigon River

0

Thu Thiem Neighborhoods Final Report.indd 64-65

2a

2b

2c

3

4

5

6

7

8

total

Developable Site Area (sm) 254,451

125,563

111,559

137,793

195,556

228,101

298,080

350,460

261,520

179,095

2,142,178

Developable Site Area (ha) 25.4

12.6

11.2

13.8

19.6

22.8

29.8

35.0

26.2

17.9

214.2

Above Ground GFA (sm)

1,765,000 971,500

730,000

133,000

794,620

735,936

438,860

1,170,044 764,790

60,000

7,563,750

Underground GFA (sm)

554,756

309,963

194,371

120,891

221,338

214,216

238,262

366,282

316,292

0

2,536,371

Residential %

30 %

38 %

65 %

44 %

95 %

83 %

70 %

25 %

-

-

-

Residential Useable GFA

372,540

289,940

380,920

31,152

589,711

466,856

210,760

216,365

-

-

3,188,251

Commercial %

70 %

62 %

35 %

56 %

5%

17 %

30 %

75 %

-

-

-

Commercial Useable GFA

949,960

479,260

203,080

39,648

29,985

95,078

90,840

650,470

-

-

2,538,321

NET FAR

6.94

7.74

6.54

0.97

4.06

3.23

1.47

3.34

2.92

0.34

3.53

Residential Units

3,725

2,899

2,831

312

4,527

1,989

787

422

6,200

0

23,693

Resident Population

14,902

11,598

19,733

1,246

30,260

23,827

11,241

9,139

24,800

0

146,745

Employee Population

81,713

39,985

16,923

3,501

2,545

8,109

7,875

54,646

360

307

215,965

m

3

hie

ge

uT

Th

5

2b id Br

B

6

Central Lake

2a

ard lev u o

Bridge 4

e2

al 3

4

n sce Cre

n Ca

3

n Ca

dg

7

ou

tB

Bri

ard lev

1

100 200

400 m

The Thu Thiem project has been divided into eight (8) unique and easily distinguished “neighborhoods”. Each neighborhood is characterized by a distinct mixed-use program and density range, as well as public spaces and frontages that will add value and provide an array of development types and opportunities. The “Core Area” of Thu Thiem is divided into two (2) neighborhoods known as 1 and 2a. In addition, Neighborhoods 2b and 2c are dedicated respectively to the Observation Tower Area and the Sport Complex Area. The northern residential neighborhoods are designated as 3 and 4, while the central neighborhoods along the East/West Highway are shown as 5 and 6 respectively. Neighborhood 7 includes the Eastern Residential development (and Urban Resort Hotel and Marina), while neighborhood 8 encompasses the entire Southern Delta area.

THU THIEM MASTER PLAN ADJUSTMENT - 2012

65

2/16/2012 2:19:28 PM


Integration of Building Form and Landscape Final Report.indd 66-67

THU THIEM MASTER PLAN ADJUSTMENT - 2012

67

2/16/2012 2:19:31 PM


Landmark Buildings Key landmark buildings are distributed throughout the 2011 Master Plan Adjustment in strategic neighborhood positions. All have been carefully placed based on proximity to key public spaces, gateways, or views. The fundamental concept is that these “amenity” buildings not be clustered all together in one area, but rather distributed in order to increase real estate value for developers throughout the plan. 1. Museum: The “Thu Thiem Museum of Vietnamese Art” has a prestigious location along two water bodies - the edge of Canal 1 and fronting onto the Saigon River – and will be very prominent when viewed from across the river. The Museum is in close proximity to the Conference Center, hotels, and residential neighborhoods, making it a magnet for activity and visitors. A water taxi stop is proposed at the canal entrance to the museum and the garden area will spill out into the riverfront park. 2. Conference Center: This 50,000sm facility is located directly on the Saigon River and will be a prominent feature in the Thu Thiem skyline. Lit at night, this contemporary building will be 21st Century Ho Chi Minh City’s great gathering and exhibition space, drawing thousands of visitors. It marks the northern terminus of the Core Area of Thu Thiem. 3. Mixed-Use Hotels: This substantial development of hotels, shopping, restaurants, and other commercial activities is strategically located across from the Conference Center, along Canal 1, and along the Crescent Boulevard. Its fourth façade faces an avenue that leads directly to the Central Plaza. At the same time, an underground retail environment anchors this parcel and leads back towards the underground Metro station in the south Core Area. This is a powerful and highly valuable development parcel. 4. Opera House: A new Symphony Center/Opera House is proposed at the foot of Bridge #2. Directly along the Saigon River, the Opera House will be the cultural icon in the foreground of the Thu Thiem Skyline. An active arts plaza opens directly in front of the Opera House and is part of the Central Plaza landscape. 5. Visitors Center: The Visitors Center also sits at a crucial corner location, where the Central Plaza turns the corner and opens out to the Saigon River and Opera House. At this location, the Visitors Center will be easily seen and accessed by all visitors coming to Thu Thiem. 6. Observation Tower Complex: The Observation Tower sits on a visual axis from the East/West Boulevard as well as from Ham Nghi Boulevard in District 1. As the focal point of an entire district of the Core Area, the 86-story Observation Tower will be the tallest building in Vietnam, an icon of the Thu Thiem skyline, and command stunning 360 degree views. The tower will act as a counterpoint to the recently opened 68-story Bitexco Tower across the river in District 1.

10. City Hall: The “City Hall” facility is strategically located at a crucial intersection of Thu Thiem – the intersection of the East/ West Boulevard and the North/South Road – thereby making it highly accessible to all visitors. The facility will also be served by a nearby underground Metro station. The City Hall will be easily visible and easy to find for travelers along these primary transportation routes. 11. International Hospital: Like any hospital, the International Hospital at Thu Thiem must be positioned on a primary transportation route, in order to be highly accessible in the event of emergencies. At the same time, it must be open as much as possible on all sides, not surrounded by the typical high density development found in an urban area. The hospital at Thu Thiem is therefore located directly on the East/West Boulevard, open on three sides, with multiple access points. 12. Marina Complex: The Marina Complex sits at the very southeastern corner of Thu Thiem at the recognizable bend in the Saigon River. The marina will welcome recreational craft of many shapes and sizes and be a focal point for the boating community. Surrounding commercial land uses – pavilions, shops, restaurants – may serve the nearby low rise residential community, as well as being a special place to visit at Thu Thiem away from the dense urban activity in the Core Area. 13. Urban Resort Hotel: The Urban Resort Hotel is located on its own island at the confluence of several canals that come together in the eastern zone of Thu Thiem. It will be a quiet, private facility nestled in the “urban landscape”. Dense green vegetation, palm trees, and waterways will surround this resort oasis, catering to a diverse clientele from Vietnam and abroad. 14. Southern Delta Resort: The Southern Delta Resort is one of three key programs in the very low intensity development in the Southern Delta. This area is established as a “mangrove preserve” where the natural waterways and landscape will be cleaned, enhanced, and preserved as a very special ecological area. The resort will feature sensitive “stilt-like” villas rising up out of the delta and be a sustainable, special getaway in the heart of HCMC. 15. Aquatic Park: One of three sensitive developments in the Southern Delta, the Aquatic Park will be the most highly visited as a paid attraction for families and children alike. Therefore it is located in proximity to the primary transportation route, the North/South Road, which runs through the Southern Delta. The park will include sensitively incorporated water rides, “lazy rivers”, and other features that are fully integrated within the natural landscape. 16. Southern Delta Research: This unique research facility is located in the quietest corner of Thu Thiem, away from the hustle and bustle of urban activity. Here, private researchers will explore the ecology of the delta, mangrove systems, water quality, and experimental plantings, among others. The research center may be affiliated with universities in HCMC or Vietnam, as well as international schools.

7. Sports Arena: The Sports Arena is part of a larger “sports district” south of the Observation Tower Complex. This sports district acts as the interface between the more urbanized Core Area and the Southern Delta district of mangroves and wetlands. The arena would be a 10,000 to 15,000 seat facility for indoor sporting events and shows. 8. Sports Stadium: The Stadium is also part of the sports district and will be an iconic facility along the Saigon River. It provides an “anchor” program to the very south of the Core Area (the Conference Center in the north is the other anchor) and would host very large, regional, or international sporting events of up to 30,000 people. An active “sports park” with outdoor fields for soccer, football, badminton, and numerous other activities is located nearby. 9. Children’s Museum: The Children’s Museum is strategically located on the Central Lake at the end of the visual axis that extends from Me Linh Square through the Central Plaza. As such, it is the symbolic heart of Thu Thiem, the “focus” of the development which is appropriately oriented towards a youthful generation that is the “future” of Ho Chi Minh City and Vietnam. The museum will have excellent access for tour groups and school groups of all kinds through a nearby underground Metro station, the East/West Boulevard, and the North/South Road.

THU THIEM MASTER PLAN ADJUSTMENT - 2012

Final Report.indd 68-69

69

2/16/2012 2:19:31 PM


Landmark Buildings and Amenities Parcel Number and Program

e dg Bri 1

al 3

3

e2

18

17 13

18

al 1

dg

n Ca

n Ca

2

17

Bo

s

Cre

1

Bri

t cen

17

d var ule

17 17 11

4

5 Pedestrian Bridge

Central Lake

E/

10

W

12

d var ule

Bo

9

17 17

Parcel Area (sm)

GFA (sm)

FAR

1-12 1-19 1-20 1-21

Commercial - Mixed Use Hotel Cultural Facility - Visitor Center Commercial - Conference Center Cultural Facility - Symphony Theater

32,069 6,000 51,114 10,030

250,000 5,000 50,000 10,000

7.80 0.83 0.98 1.00

2-10 2-22 2-24 2-28

School Cultural Facility- Arena Civic Facility - Administrative Center Cultural Facility - Sport Stadium

11,798 26,065 3,320 69,006

10,000 15,000 1,500 27,000

0.85 0.58 0.45 0.39

3-4 3-17

School Museum

13,539 17,975

10,000 10,000

0.74 0.56

4-1 4-2 4-6 4-9 4-10 4-15 4-27

School Utility - Fire Station School Cultural Facility - Community Facility Civic Facility - Administrative Center School Utility - Gas Station

20,124 4,525 21,032 4,737 4,737 9,474 654

10,000 500 15,000 1,500 1,500 5,000 50

0.50 0.11 0.71 0.32 0.32 0.53 0.08

5-1 5-2 5-3 5-19 5-20 5-29 5-32

Civic Facility - City Hall Cultural Facility - House for Children Utility - Gas Station Cultural Facility - Community Facility School Civic Facility - Administrative Center School

24,027 39,877 1,146 6,075 20,939 2,890 20,259

3,500 35,000 360 1,500 10,000 1,500 10,000

0.15 0.88 0.31 0.25 0.48 0.52 0.49

6-1 6-23 6-25

Medical - Hospital School Cultural Facility - Community Facility

39,354 19,486 6,401

75,000 10,000 1,500

1.91 0.51 0.23

486,653

570,410

17

hie

uT

Th

6

m

18

d

3

17

8

16

17

14

Saigon River

15

Bridge 4

ge

id Br

a Ro

7

TOTALS * refer to page 74 for location of parcel numbers within the master plan 0

(1) Museum

(10) City Hall

(2) Conference Center

(11) International Hospital

(3) Mixed-Use Hotel

(12) Marina Complex

(4) Opera House

(13) Urban Resort Hotel

(5) Visitors Center

(14) Southern Delta Resort

(6) Observation Tower Complex

(15) Aquatic Park

(7) Sports Arena

(16) Southern Delta Research

(8) Sports Stadium

(17) School

(9) Children’s Museum

(18) Cultural Facility

Landmark Buildings and Amenities Final Report.indd 70-71

100 200

400 m

THU THIEM MASTER PLAN ADJUSTMENT - 2012

71

2/16/2012 2:19:42 PM


Integration of Landmark Buildings Final Report.indd 72-73

THU THIEM MASTER PLAN ADJUSTMENT - 2012

73

2/16/2012 2:19:46 PM


7-5

2-4

5-7

2-17

2-20

e dg

3

i Br

2-15 2-18 2-21 2-23 2-24 2-25

5-15

5-20

2-22

5-23

6-23

5-31

o WB

6-24

6-25

6-27

6-29 6-28

5-24

5-25

5-26

8-3

5-27

5-28 5-30

5-29

2-26 2-27

E/

Central Lake

5-21

5-22

5-32

6-17

d var

ule

Pedestrian Bridge

5-18

5-19

5-16

6-20

6-15

6-31

5-13

5-14

6-19

6-21

6-30

6-16 6-18

oad

5-17

Bo

mR

5-12

2-13 2-14

5-11

d var 6-13 ule

6-26

5-9

5-10

6-12

6-3

6-14

6-22

5-6

5-5

W

7-2

6-2

e Thi

2-16

E/ 5-4

5-8

2-19

6-4

5-2

2-2

e2

Thu

2-6

2-8 2-12 2-10

6-5

6-6

6-7

6-8

5-1

2-1

2-3

3

2-5

al Can

2-7

dg

1

2-9

6-11

1-3

1-7

Bri

6-1

6-9

5-3

1-2

1-6

7-17

4-7

3-1

6-10

Central Lake 2-11

3-3

s Cre

7-14

al Can

1-11

Pedestrian Bridge

3-4

o tB cen

7-15

7-16

4-3

4-6

4-8

d

1-10

3-2

7-13 7-1

d var

ule

7-12

7-11 7-10

4-2

4-4

4-9 4-10

1-1

1-5

1-14

3-5

1-4

1-9

1-18 1-19 1-15

3-9

4-5

a Ro

1-17

3-8

1-8

1-13

3-6

m

1-16

3-7

4-14

4-15

4-1

al 3

t en3-13 3-12

sc Cre

1-12

1-21

u Bo

ie Th

e2

3-10

ard lev 3-11

u Th

al 1

dg

3-15

3-16

n Ca

n Ca

Bri

1-20

4-19

4-13

7-7

7-6

4-12

4-17

4-18

4-11

7-8

1

1 4-26 4-27

3-14

4-25

7-9

7-4 7-3

4-16

4-24

3-17

4-22

4-23

e dg Bri

e dg Bri

4-21 4-20

ge

3

id Br

2-28 8-1

Saigon River

0

100 200

400 m

Bridge 4

Saigon River

Bridge 4

8-2

0

100 200

400 m

Project Site Boundary Crescent Boulevard

ROW 55.0 m

Thu Theim Road

ROW 44.7 m

Project Site Boundary

Bridge Connection

ROW 36.2 m

Central Plaza Boundary

Central Lake Park Drive

ROW 29.2 m

Development Parcels

Waterfront Park Drive

ROW 28.1 m

Public Parks

Delta Road

ROW 11.6 m

Wetlands

Local Road - Urban

ROW 26.6 m

Recreation/ Education

Local Road - Residential ROW 22.6 m

Central Plaza

Central Plaza Road

Street and Block Structure Final Report.indd 74-75

Street Hierarchy

ROW 22.6 m

THU THIEM MASTER PLAN ADJUSTMENT - 2012

75

2/16/2012 2:19:57 PM


M

M

e dg Bri

e dg Bri

1

1

o

al Can 3

Bri

dg

M

1

e2

al Can

M

al 1

dg

s Cre

al 3

n Ca

Bri

o tB cen

M

n Ca

tB

n sce Cre

M

d var

ule

d var ule

e2

M M M

Pedestrian Bridge

E/

Central Lake

W

M

d var ule

M

Bo

M

d var

ule

Pedestrian Bridge

E/ Central Lake

M M AE

o WB

M

M AE

Thu e Thi

Th

M

m

oad

hie

mR

uT

M

d

a Ro

3

ge

3

id Br

M

M

M

Saigon River

Bridge 4

M

Saigon River

M

M

M

0

100 200

400 m

M

Project Site Boundary

Project Site Boundary

M

Municipal Subway and stations

M

Municipal Subway and stations

AE

Airport Express Station

AE

Airport Express Station

Circulator Bus Line and Stop

Circulator Bus Line and Stop

Bus Line and Stop

Bus Line and Stop

Ferry Line and Stop

Ferry Line and Stop

Water Taxi Line and Stop

Water Taxi Line and Stop

800 m / 10 minute Walking Radius 400 m / 5 minute Walking Radius

200 m / 2.5 minute Walking Radius

Integrated Multi-modal Transit Network Final Report.indd 76-77

Bridge 4

ge

id Br

0

100 200

400 m

The proposed public transit system at Thu Thiem is a critical component to the future functionality and accessibility of the entire urban district. A mix of underground Metro (currently under design and development by Ho Chi Minh City); an Airport Express hub (a proposal within this Master Plan to connect to the future new Ho Chi Minh City airport in the northeast of the city); a metropolitan bus system that links Thu Thiem to all surrounding districts; an internal circulator line that would be dedicated to Thu Thiem; new expanded ferry stops at key locations along the Saigon River; and numerous new water taxi stops. The implementation of this system is fundamental to mitigating the impact of automobiles and motorbikes on the proposed roadway system.

THU THIEM MASTER PLAN ADJUSTMENT - 2012

77

2/16/2012 2:20:08 PM


Existing Streets and Street Life in Ho Chi Min City

Typical Cross Section through Crescent Boulevard Final Report.indd 78-79

THU THIEM MASTER PLAN ADJUSTMENT - 2012

79

2/16/2012 2:20:19 PM


M

(3)

(4)

(2) (1) (3)

M

Pedestrian Bridge

(5) (3)

(2) (2)

(2)

(1) (1)

Central Lake (1)

(2) (3)

(5) (3) (2) M AE

(4) (3) (3)

(1)

(1) (1) (1) (1) (2) M (1) (2) (1) (1) d r (2) va (1) (1) ule Bo (1) W (1) / E (1) (1) (1) (1) M (1) (1) (1) (1) (1) (1) (1) (1) (1) (1) (1) (1) (1) (1) (1) (1) (1) (1) (1) (1) (1) (1) (1) (1) (1) (1) (1) (1) (1) (1) (1) (1) (1) (1) (1)

M

Bri

dg

e2

(1)

oad

(1)

3

mR

d

(1)

ge

(1)

i Br

3

id Br

(1)

M

o WB

e Thi

(2)

a Ro

e dg

(2)

m

(2) (1)

(2)

(2)

hie

(1)

uT

(2)

(1)

E/

Central Lake

Th

M

d var

ule

Pedestrian Bridge

Thu

(4)

(2)

(1)

(1) (1) (1) (1)

(2)

(3)

(1)

3

(3)

(1)

al Can

(1)

(1)

(3)

(3)

(1)

1

(1)

(1)

(1) (1)

(1)

(2)

al Can

(2)

s Cre

al 3

(3)

d var

ule

o tB cen

n Ca

e2

(1) (2)

1

1

al 1

(1)

dg

M

n Ca

Bri

e dg Bri

e dg Bri

(1) (2) (1) (1) vard e l (1) (2) u (2) o B (2) nt (2) (1) sce e r (2) C (1) (1) (2)

M

(1)

(1)

(1)

Saigon River

Bridge 4

Saigon River

Bridge 4

M

M

M

0

100 200

400 m

0

100 200

400 m

Project Site Boundary Project Site Boundary

4 Floors (16 m)

25 Floors (100 m)

Underground Garage

6 Floors (24 m)

30 Floors (120 m)

Underground Retail

10 Floors (40 m)

40 Floors (160 m)

M

Metro Line and Station

15 Floors (60 m)

50 Floors (200 m)

(1)

Levels of Underground Parking

20 Floors (80 m)

86 Floors (344 m)

Underground Plan Final Report.indd 80-81

Building Heights Plan

THU THIEM MASTER PLAN ADJUSTMENT - 2012

81

2/16/2012 2:20:31 PM


The Thu Thiem Skyline The new skyline of Thu Thiem will be a dynamic, undulating environment of high-rise, mid-rise and low rise buildings, providing Ho Chi Minh City with a new “postcard” view and image of a 21st Century city. Several key principles were established by the Master Planning team: - The skyline will be dramatic and memorable from many different angles

Saigon River

Central Lake Crescent Blvd

- The landmark Observation Tower will be seen from all viewpoints in HCMC - Building heights step up from the Saigon River to the Crescent Blvd. and become higher around the Central Plaza - All buildings in the Core Area will have views to the Parks, River, or Lake creating excellent real estate value - Cultural and Civic buildings are interspersed at key points throughout the plan – not just around the Central Plaza – creating amenities for all and a foreground for the towers behind - The Central Plaza axis is left open to the Central Lake and the Children’s Museum - The Observation Tower is on the axis of two critical view corridors - from the East/West Boulevard and from Ham Nghi Boulevard in District 1 - The skyline will continue to evolve over time and take on new characteristics as buildings are designed and constructed - Vehicular and Pedestrian bridges will also be a part of the dynamic Thu Thiem skyline

THU THIEM MASTER PLAN ADJUSTMENT - 2012

Final Report.indd 82-83

83

2/16/2012 2:20:35 PM


The Thu Thiem Skyline

View 1

View 1: From the North As seen from the Bao Son Port area, the Thu Thiem skyline is a dynamic composition of building heights and types. The Saigon River, Crescent Park, and key cultural buildings are in the foreground, while the skyline steps up and back, culminating in the landmark Observation Tower.

Observation Tower

A detailed view of the skyline from the north shows a rich spatial layering of buildings and building heights. All buildings are afforded views to the Crescent Park and Saigon River, adding immense value to the real estate. View 2: From Me Linh Square The skyline view from Me Linh Square focuses on the Central Plaza, in a composition with the nearby Observation Tower. The view from Me Linh Square to the Children’s Museum is maintained to emphasize this important iconic destination for all of Ho Chi Minh City. The skyline frames the Central Plaza with two major landmark towers. The axis is left open for views to the Children’s Museum. The Observation Tower punctuates the skyline.

Museum

Conference Center

Opera HouseVisitor Center

View 2

View 3: From the South The skyline from the south features the HCMC Stadium in the foreground. The skyline sweeps dynamically upward from the west and east towards the Observation Tower. Observation Tower Central Plaza

Museum

Conference Center

Opera House

Visitor Center Children’s Museum

View 3

1 Observation Tower

2

3 A Dynamic Skyline Final Report.indd 84-85

HCMC Stadium and Mixed-Use Sports Activity Area

Crescent Blvd

THU THIEM MASTER PLAN ADJUSTMENT - 2012

85

2/16/2012 2:20:45 PM


Block Structure and Tower Arrangement A fundamental requirement of the Thu Thiem Guidelines is that blocks should include a minimum 4-storey podium to frame the block and to provide a strong street frontage. This will form active street edges where a mix of uses can occur. Tall towers that stand along on blocks and are set well back from the street are not allowed. Tall building towers should be carefully arranged within the Core Area. They should be staggered on podiums in order to provide better views and to encourage natural wind movement. Taller buildings arrange along the Crescent Boulevard and gradually step down toward to the water in order to maximize the views to the river and green open space.

Wind

d

d

d

d = According to VN standards

View

A

Central Lake

Saigon River

Section A

Massing Principles - Tower Arrangement and Block Structure Final Report.indd 86-87

Crescent Blvd

THU THIEM MASTER PLAN ADJUSTMENT - 2012

87

2/16/2012 2:20:52 PM


Central Plaza

Cross Section through the Core Area and Central Plaza

Central Plaza

Cre

sce

Cross Section through the Core Area Final Report.indd 88-89

nt B

oule vard

THU THIEM MASTER PLAN ADJUSTMENT - 2012

89

2/16/2012 2:20:55 PM


Overall Massing and Building Form Final Report.indd 90-91

THU THIEM MASTER PLAN ADJUSTMENT - 2012

91

2/16/2012 2:20:59 PM


Sustainability Strategies Countries around the world are developing sustainability standards for green building codes. Governments and developers are recognizing the critical need and benefit of conserving resources and enhancing local environments for the health, safety, and welfare of its citizens. At Thu Thiem, environmental sustainability must be acknowledged and built into every facet of the project. Elements of street orientation, building orientation, wind flow, water receiving landscapes, minimization of cut and fill operations, and enhancement of the existing Thu Thiem delta area have been incorporated at the Master Plan level. Every developer must examine sustainability components at the building level, including active and passive strategies to reduce energy consumption, use alternatives energies, increase water recycling, utilize local materials, pursue solid waste strategies, and engage in a whole range of other approaches that set the current standard for sustainability. Passive Strategies - N-S building orientation minimizes West-East exposure, reducing heat gain and maximizing wind circulation - Shading devices and operable windows further reduce heat gain on E-W facades while allowing cross ventilation - A combination of green and white roofs reflect solar radiation and minimize heat gain - Building podiums with open ground level layout allow for well ventilated public realm - Atriums facilitate cross ventilation within towers - Building heights strategy maximizes daylight and views Energy Use / Generation (Active Strategies) - A task ambient strategy reduces lighting energy use by 46% - Chilled beams combined with other cooling strategies can reduce energy use by 50% - Underfloor air distribution provides improved air quality, energy savings and reduced building height - Photovoltaic cells to support energy demand Water Management - Recycling waste water on site and using it for flushing and irrigation reduces water demand - Green roofs capture rain water and reduce overall demand and stormwater runoff - Off-site Wastewater Treatment Plant - Rainwater Treatment Drainage and Run-off Filteration - Grading of districts designed to direct runoff from urban surfaces to river and lake - Canals lead into the Central Lake and Southern Delta, receiving landscapes in periods of high tide, as well as water filtration systems for water quality - Open spaces designed to detain and filter first-flush pollutants from stormwater and slow runoff Health and Wellness - Open Space and recreational amenities improve health and wellness Transportation - Provision of intermodal transportation creates walkable communities, reducing motorized trips - Subway (Gallery Access) - Water Taxi

THU THIEM MASTER PLAN ADJUSTMENT - 2012

Final Report.indd 92-93

93

2/16/2012 2:21:01 PM


Solar Orientation and Wind Circulation Final Report.indd 94-95

THU THIEM MASTER PLAN ADJUSTMENT - 2012

95

2/16/2012 2:21:05 PM


Integrated Sustainability Strategies Final Report.indd 96-97

THU THIEM MASTER PLAN ADJUSTMENT - 2012

97

2/16/2012 2:21:07 PM


Liveability Final Report.indd 98-99

THU THIEM MASTER PLAN ADJUSTMENT - 2012

99

2/16/2012 2:21:10 PM


The Thu Thiem Vision integrated into the larger Context of HCMC Final Report.indd 100-101

THU THIEM MASTER PLAN ADJUSTMENT - 2012

101

2/16/2012 2:21:20 PM


The Thu Thiem Master Plan integrated within Ho Chi Minh City Final Report.indd 102-103

THU THIEM MASTER PLAN ADJUSTMENT - 2012

103

2/16/2012 2:21:21 PM


5.0

Thu Thiem Neighborhoods The Neighborhoods The Thu Thiem project has been divided into eight (8) unique and easily distinguished “neighborhoods”. Each neighborhood is characterized by a distinct mixed-use program and density range, as well as public spaces and frontages that will add value and provide an array of development types and opportunities. The “Core Area” of Thu Thiem is divided into three (3) neighborhoods known as 1, 2a, and 2b. The northern residential neighborhoods are designated as 3 and 4, while the central neighborhoods along the East/West Boulevard are shown as 5 and 6 respectively. Neighborhood 7 includes the Eastern Residential development (and Urban Resort Hotel and Marina), while neighborhood 8 encompasses the entire Southern Delta area.

3

1

7

4 6

2a

5

2b 2c

8 THU THIEM MASTER PLAN ADJUSTMENT - 2012

Final Report.indd 104-105

105

2/16/2012 2:21:33 PM


Neighborhood 1 n Ca

Neighborhood 1 forms the northern half of Thu Thiem’s “Core Area” which is the high density mixed-use Central Business District. Surrounded on three (3) sides by water bodies – the Saigon River, Canal #1, and the Central Lake – and connected to HCMC District 1 by Thu Thiem Bridge #2, the neighborhood is a highly valuable and integrated area of Thu Thiem. In Neighborhood 1, the Crescent Boulevard is the main spine, with the highest towers clustered along the edge and decreasing in height towards the Saigon River and Central Lake.

al 1

1

The neighborhood is anchored by the 50,000 sm Conference Center which will attract thousands of visitors to exhibition and events on the Saigon River. A nearby mixed-use development of hotels, restaurants, and shop supports this major complex.

Bri

2

dg

e2

o

tB

n ce

rd va e l u

es Cr

A major new iconic cultural facility – the Opera House – is also located in Neighborhood 1 along the river and at the foot of Thu Thiem Bridge #2. A nearby Visitors Center and other mixed-use commercial towers form the northern boundary of the Central Plaza, which will become the largest public space of its kind in Vietnam. The entire neighborhood is wrapped on its western side by the Crescent Park, Thu Thiem’s new public landscape facing the historic city.

3

4 Saigon River

5 Pedestrian Bridge

Central Lake

rd leva

ou WB

E 1. Convention Center 2. Hotel Complex 3. Opera House 4. Visitor Center 5. Central Plaza

THU THIEM MASTER PLAN ADJUSTMENT - 2012

Final Report.indd 106-107

107

2/16/2012 2:21:46 PM


Development Summary Parcel Area:

254,451 sm

Parcel Area:

25.4 ha

GFA:

1,765,000 sm

Residential %

30 %

Residential Useable GFA

372,540 sm

Commercial %

70 %

Commercial Useable GFA

949,960 sm

NET FAR:

6.94

Units:

3,725

Residential Parking Spaces:

5,588

Commercial Parking Spaces:

9,850

Parking GFA:

385,943 sm

Underground GFA:

554,756 sm

Resident Population:

14,902

Employee Population

81,713

Neighborhood 1 - Core Area Final Report.indd 108-109

THU THIEM MASTER PLAN ADJUSTMENT - 2012

109

2/16/2012 2:21:49 PM


Conference Center Hotel Complex

nt

e sc

ard lev u o

B

e Cr

Bri

n Ca

dg

al 1

e2

Saigon River

Opera House

Crescent Park

Visitor Center

Central Plaza

Neighborhood 1 - Core Area Final Report.indd 110-111

Central Lake

THU THIEM MASTER PLAN ADJUSTMENT - 2012

111

2/16/2012 2:21:53 PM


Neighborhood 1 - Core Area integrated with the Central Plaza Final Report.indd 112-113

THU THIEM MASTER PLAN ADJUSTMENT - 2012

113

2/16/2012 2:21:56 PM


Neighborhood 2 Neighborhood 2 forms the southern boundary of the Core Area at Thu Thiem and is an exciting, high density, mixed-use zone of development. The neighborhood is actually divided into two zones of development – one is situated north of the East/West Boulevard and the other, to the south, defined by the 86-story Observation Tower Complex which will be the tallest building in Vietnam. Both sides of the development offer excellent opportunities for value creation, views, landmark buildings, cultural facilities, and integrated public spaces. In the central northern part of Neighborhood 2, a new underground Metro station is proposed, linking District 1 in a very direct way with Thu Thiem. As a part of this underground station, a new Airport Express facility is also proposed to tie into Ho Chi Minh City’s future airport to be built in the northeast region. Tall towers are aligned along the Crescent Boulevard, with building heights decreasing as they move away from the Boulevard towards the Saigon River and Central Lake. This maximizes all views and creates an interesting, memorable, and diverse skyline. The Observation Tower Complex commands an entire district of development that will be a mix of entertainment, shopping, restaurants, hotels, office, and residential uses. This district will be easily accessed through use of the Thu Thiem tunnel, the Central Lake Road, and water taxi and ferry services. This leads directly into the Sports Complex area, with national Stadium, Arena, and nearby Sports Park that will eventually be accessed by Thu Thiem Bridge #3. Taken together, Neighborhood 2 offers a stunning and exceptional zone of new development for Ho Chi Minh City.

Central Plaza

Pedestrian Bridge

Central Lake

Saigon River

rd leva

ou WB

E

1 1. School 2. Observation Tower Complex 3. SOHO Apartments 4. Arena 5. Stadium 6. Sports Fields 7. Administrative Center 8. Mixed Use Pavilion

2

Cr es

ce

nt

Bo

4

ul

ev ar d

6

7 8

3 5

THU THIEM MASTER PLAN ADJUSTMENT - 2012

Final Report.indd 114-115

115

2/16/2012 2:22:09 PM


Development Summary

Neighborhood 2 - Core Area and Observation Tower District Final Report.indd 116-117

2a

2b

2c

Parcel Area (sm)

125,563

111,559

137,793

Parcel Area (ha)

12.6

11.2

13.8

GFA (sm)

971,500

730,000

133,000

Residential %

38 %

65 %

44 %

Residential Useable GFA

289,940

380,920

31,152

Commercial %

62 %

35 %

56 %

Commercial Useable GFA

479,260

203,080

39,648

NET FAR

7.74

6.54

0.97

Units

2,899

2,831

312

Residential Parking Spaces

4,349

4,247

467

Commercial Parking Spaces

4,839

2,031

582

Parking GFA

229,709

156,935

26,232

Underground GFA (sm)

309,963

194,371

120,891

Resident Population

11,598

19,733

1,246

Employee Population

39,985

16,923

3,501

THU THIEM MASTER PLAN ADJUSTMENT - 2012

117

2/16/2012 2:22:13 PM


Central Plaza

Central Lake

Crescent Boulevard d evar

oul WB

E

Crescent Park

Saigon River

Neighborhood 2 - Core Area Final Report.indd 118-119

Observation Tower Complex

THU THIEM MASTER PLAN ADJUSTMENT - 2012

119

2/16/2012 2:22:18 PM


Observation Tower Complex Central Lake

Crescent Park

Cr es

ce

nt

Arena Bo

ul

ev ar d

Sports Fields

Saigon River

Stadium

Neighborhood 2 - Observation Tower District Final Report.indd 120-121

THU THIEM MASTER PLAN ADJUSTMENT - 2012

121

2/16/2012 2:22:25 PM


Media

Wall Retail

Cinema Tower Residential Mixed Use

Cre sce

Residential Mixed Use

Commercial Mixed Use Commercial Mixed Use

Tower Plaza

ark nt P

Hotel Residential Mixed Use Commercial Mixed Use

Residential Mixed Use

Retail Pavilion in the

Arena

Residential Mixed Use Special Park Water Related Retail F&B Pavilion

Views to Ho Chi Minh City

Sports Fields

Residential Mixed Use

Administrative Center

Lofts / Live Work Neighborhood

Stadium

Sports Related Retail and Activity Spaces

Observation Tower District - Massing Strategy

Neighborhood 2 - Observation Tower District Final Report.indd 122-123

Observation Tower District - Organizational Concept

THU THIEM MASTER PLAN ADJUSTMENT - 2012

123

2/16/2012 2:22:28 PM


Neighborhood 2 - Observation Tower District Final Report.indd 124-125

THU THIEM MASTER PLAN ADJUSTMENT - 2012

125

2/16/2012 2:22:32 PM


1. Cultural Museum 2. School

Neighborhood 3 Neighborhood 3 is a mixed-use neighborhood that sits along the northern edge of Thu Thiem where the existing Thu Thiem Bridge enters the site. Also defined by the Crescent Boulevard running through it, this community is characterized by taller mixed-use commercial space along the Boulevard, transitioning down to lower density residential and civic uses on either side.

Saigon River

To the north of the Boulevard, residential blocks command excellent views to the Saigon River and tie directly into the Crescent Park. The new Museum is situated strategically on Canal #1 at a prestigious location across from the Conference Center with excellent access by automobile, pedestrian promenade, or water taxi. To the south of the Crescent Boulevard, an integrated residential community with ground floor retail is efficiently organized within the urban fabric. A school is critically positioned along the southern edge, providing access to all school age children in this district. A substantial urban park is located parallel to the Thu Thiem Bridge and North/South Road, offering numerous opportunities for daytime and nighttime activities.

1

al 1

n Ca

nt

sce Cre

ard lev u o

B

2

THU THIEM MASTER PLAN ADJUSTMENT - 2012

Final Report.indd 126-127

127

2/16/2012 2:22:41 PM


Development Summary Parcel Area:

195,556 sm

Parcel Area:

19.6 ha

GFA:

794,620 sm

Residential %

95 %

Residential Useable GFA

589,711 sm

Commercial %

5%

Commercial Useable GFA

29,985 sm

NET FAR:

4.06

Units:

4,527

Residential Parking Spaces:

6,791

Commercial Parking Spaces:

347

Parking GFA:

179,260 sm

Underground GFA:

221,338 sm

Resident Population:

30,260

Employee Population

2,545

Neighborhood 3 - Massing Final Report.indd 128-129

THU THIEM MASTER PLAN ADJUSTMENT - 2012

129

2/16/2012 2:22:44 PM


Neighborhood 4 Like Neighborhood 3, the density of Neighborhood 4 is concentrated along the Crescent Boulevard. The neighborhood is characterized by three (3) key schools as well as a central community center and administrative center that are located on a central neighborhood green space. The Canal #3 is introduced as a linear element that connects the Saigon River to the central water networks of Thu Thiem, allowing the tidal fluctuations of the Saigon River to flow through in an open system. Along the canal, ground level shops and restaurants will spill out onto this neighborhood amenity.

Saigon River

1. School 2. Community Center 3. Administrative Center 4. Fire Station

Served by bus lines and a Thu Thiem “circulator� shuttle, Neighborhood 4 is comprised of residential uses which will lead to a quiet but lively, active community that is highly pedestrian oriented and well connected to both the Central Lake and areas beyond Thu Thiem to the north and east.

al 3

n Ca

ard lev u o

tB

n sce e r C

1

4

1 2

1

3

THU THIEM MASTER PLAN ADJUSTMENT - 2012

Final Report.indd 130-131

131

2/16/2012 2:22:53 PM


Development Summary

Neighborhood 4 - Massing Final Report.indd 132-133

Parcel Area:

228,101 sm

Parcel Area:

22.8 ha

GFA:

735,936 sm

Residential %

83 %

Residential Useable GFA

466,856 sm

Commercial %

17 %

Commercial Useable GFA

95,078 sm

NET FAR:

3.23

Units:

1,989

Residential Parking Spaces:

5,472

Commercial Parking Spaces:

1,106

Parking GFA:

164,471 sm

Underground GFA:

214,216 sm

Resident Population:

23,827

Employee Population

8,109

THU THIEM MASTER PLAN ADJUSTMENT - 2012

133

2/16/2012 2:22:56 PM


Neighborhood 4 - Massing Final Report.indd 134-135

THU THIEM MASTER PLAN ADJUSTMENT - 2012

135

2/16/2012 2:22:58 PM


Neighborhood 5 Neighborhood 5 is really two neighborhoods in one – the upper half along the East/West Boulevard which is characterized by special uses, and the lower half along the North/South Road which is primarily a low density residential environment. The special use buildings of the Children’s Museum and the “City Hall” are located in Neighborhood 5 at the crucial intersection of the primary roadways of Thu Thiem.

1. Children’s Museum 2. City Hall 3. Community Center 4. Administrative Center 5. School

An underground Metro station will be located at this crucial nexus of programs. Across the Boulevard, a commercial mixed-use development holds the edge, while behind it a quiet and lower density neighborhood of townhomes, shophouses, and villas extends southward towards the Southern Delta zone. Here, two key schools are located around a central green space and community facility. An administrative Center holds the very corner of the neighborhood while an efficient and very clear grid circulation system allows for traffic movement as well as comprehensive pedestrian sidewalks on all streets and blocks. Neighborhood 5 will be a quiet respite, a community hub of families and activities, in the heart of Ho Chi Minh City and only minutes away from the financial center and active business environment of historic District 1.

2 1

ulevard

EW Bo

3

5

4 5

THU THIEM MASTER PLAN ADJUSTMENT - 2012

Final Report.indd 136-137

137

2/16/2012 2:23:10 PM


Development Summary Parcel Area:

298,080 sm

Parcel Area:

29.8 ha

GFA:

438,860 sm

Residential %

70 %

Residential Useable GFA

210,760 sm

Commercial %

30 %

Commercial Useable GFA

90,840 sm

NET FAR:

1.47

Units:

787

Residential Parking Spaces:

2,108

Commercial Parking Spaces:

1,150

Parking GFA:

81,443 sm

Underground GFA:

238,262 sm

Resident Population:

11,241

Employee Population

7,875

Neighborhood 5 - Massing Final Report.indd 138-139

THU THIEM MASTER PLAN ADJUSTMENT - 2012

139

2/16/2012 2:23:13 PM


City Hall

Children’s Museum Entry Plaza Central Lake

ard lev

EW

u Bo

Cross Section

Neighborhood 5 - Children’s Museum Final Report.indd 140-141

THU THIEM MASTER PLAN ADJUSTMENT - 2012

141

2/16/2012 2:23:19 PM


Neighborhood 5 - Massing Final Report.indd 142-143

THU THIEM MASTER PLAN ADJUSTMENT - 2012

143

2/16/2012 2:23:21 PM


Neighborhood 6 Neighborhood 6 at Thu Thiem is an East/West oriented district that parallels the East/West Boulevard and is held between the natural canal features of the peninsula. North of the East/West Boulevard in Neighborhood 6, a new Software Park will be created. This will be a hub of research and business activity, attracting thousands and providing a heart for this neighborhood. Next door, a new International Hospital is strategically located for easy and fast accessibility to the East/West Boulevard and points both within and beyond Thu Thiem.

1

To the south of the East/West Boulevard, the neighborhood is comprised of commercial mixed-use blocks along the main corridor, with quieter and lower density residential neighborhoods behind. All parts of the neighborhood will be served by public transit, either in the form of buses or circulator, or through the nearby underground Metro station which will be located at the hospital and Software Park.

2 3

ard lev

EW

u Bo

Saigon River

4 5

1. Hospital 2. Software Park 3. Knowledge Park 4. School 5. Community Center

THU THIEM MASTER PLAN ADJUSTMENT - 2012

Final Report.indd 144-145

145

2/16/2012 2:23:33 PM


Development Summary Parcel Area:

350,460 sm

Parcel Area:

35.0 ha

GFA:

1,170,044 sm

Residential %

25 %

Residential Useable GFA

216,365 sm

Commercial %

75 %

Commercial Useable GFA

650,470 sm

NET FAR:

3.34

Units:

422

Residential Parking Spaces:

1,714

Commercial Parking Spaces:

6,932

Parking GFA:

216,150 sm

Underground GFA:

366,282 sm

Resident Population:

9,139

Employee Population

54,646

Neighborhood 6 - Massing Final Report.indd 146-147

THU THIEM MASTER PLAN ADJUSTMENT - 2012

147

2/16/2012 2:23:36 PM


Neighborhood 6 - Massing Final Report.indd 148-149

THU THIEM MASTER PLAN ADJUSTMENT - 2012

149

2/16/2012 2:23:38 PM


Neighborhood 7 Thu Thiem’s easternmost neighborhood, Neighborhood 7 is comprised of a number of unique uses. The Eastern Residential complex, already under construction at the time of these Guidelines (and therefore not included) establish the eastern gateway to Thu Thiem. This high and mid-rise development will be a small city within a city, complete with its own ground floor retail and civic amenities. Directly adjacent to this development – but on its own private island – will be a unique “urban resort hotel”, particularly immersed into the natural landscape of Thu Thiem. Open and airy rooms will spill out onto private gardens and shared pools as the hotel will have axial views looking over an enhanced and improved landscape of palm trees and natural vegetation, down the long linear central canal in the middle of Thu Thiem. The hotel will be at once extremely private yet highly connected to the rest of the development.

3

Across the East/West Boulevard, a new marina complex is proposed where Thu Thiem meets the Saigon River along its southern boundary. Pleasure boats of various sizes will be berthed at this marina, which will come to replace the major industrialized port facilities nearby. Surrounding the marina, a mix of dynamic commercial uses are envisioned – restaurants, shops, and pavilions all sitting within a waterfront, pedestrian pier environment.

1

EW

ard lev u o

B

2

Saigon River

1. Island Resort 2. Marina and Retail Pavilions 3. Eastern Residential

THU THIEM MASTER PLAN ADJUSTMENT - 2012

Final Report.indd 150-151

151

2/16/2012 2:23:48 PM


Development Summary Parcel Area:

261,520 sm

Parcel Area:

26.2 ha

GFA:

764,790 sm

Residential Useable GFA

630,007 sm

Commercial Useable GFA

48,000 sm

NET FAR:

2.92

Units:

6,200

Residential Parking Spaces:

9,300

Commercial Parking Spaces:

480

Parking GFA:

244,500 sm

Underground GFA:

316,292 sm

Resident Population:

24,800

Employee Population

360

Neighborhood 7 - Massing Final Report.indd 152-153

THU THIEM MASTER PLAN ADJUSTMENT - 2012

153

2/16/2012 2:23:51 PM


Neighborhood 8 Neighborhood 8 – also known as the “Southern Delta District” – is the most ecologically sensitive development area at Thu Thiem. For the most part, this area is seen as a zone of enhanced mangrove landscape, dredged and cleaned waterways, and extremely sensitive development that preserves a crucial part of the existing peninsula. In a city of extreme growth and expansion like Ho Chi Minh City, this preserved and enhanced landscape will be a special part of the city that will not be lost, while at the same time contributing to the ecological health of the urban environment. As high tides from the Saigon River pass through the canals and mangroves of the Southern Delta, the water will be cleaned and filtered back into the waterway system. In the meantime, three small development areas offer unique opportunities. A resort hotel, built on stilts and hovering above the water, is located towards the west, while an Aquatic Park and Botanical Research facilities are placed in other discreet areas.

3

It will be critical to design and manage these developments in a sustainable way, ensuring that the Southern Delta can be improved to serve its new purpose for Thu Thiem and the city as a whole.

1 2

Wetlands

Saigon River

1. Resort 2. Aquatic Park 3. Research Institute

THU THIEM MASTER PLAN ADJUSTMENT - 2012

Final Report.indd 154-155

155

2/16/2012 2:24:04 PM


Development Summary

Neighborhood 8 - Massing Final Report.indd 156-157

Parcel Area:

179,095 sm

Parcel Area:

17.9 ha

GFA:

60,000 sm

Residential Useable GFA

0 sm

Commercial Useable GFA

31,000 sm

NET FAR:

0.34

Units:

0

Residential Parking Spaces:

0

Commercial Parking Spaces:

310

Parking GFA:

7,750 sm

Underground GFA:

0 sm

Resident Population:

0

Employee Population

307

THU THIEM MASTER PLAN ADJUSTMENT - 2012

157

2/16/2012 2:24:06 PM


6.0

Public Realm and Landscape

THU THIEM MASTER PLAN ADJUSTMENT - 2012

Final Report.indd 158-159

159

2/16/2012 2:24:10 PM


The Public Realm Seven (7) major Public Realm areas or “typologies” have been defined in the Thu Thiem Master Plan. All of these parks and public zones are critical to the future success of neighborhoods, communities, and tourist destinations in the new urban area. At a larger citywide scale, all of Ho Chi Minh City will stand to benefit from the numerous free programs and spaces that will be created. At an ecological scale, the public spaces will clean the air, clean the water, be open to families, children, and seniors, and act as key components of the ecological sustainability emphasis at Thu Thiem. 1. Crescent Park (Saigon River Park) 2. Central Plaza 3. Neighborhood Parks 4. Wetlands Park 5. Sports Park 6. Central Lake Park 7. Children’s Museum and Plaza Many of these public realm areas have been conceptually designed by the Master Planning team. The concept designs, especially for the Central Lake Park, Children’s Museum Plaza, and Sports Park, should be followed in terms of layout, circulation, and hardscape vs. softscape. Promenades, tree groves, water taxi stations, pathways, and sports fields have been carefully arranged and should be followed during the design development stages of work. 1. Crescent Park (Saigon River Park) The Crescent Park is a continuous riverfront park for public use and access to the river, and sits as a foreground for Thu Thiem’s financial district and core area. Various garden rooms and flexible open spaces are created to accommodate both passive and active uses. Decks and overlook space allow activities to extend into the river. Programs: Waterfront Promenade / Plaza Overlook Decks / Bridge Pedestrian and Bike Network Tree Groves, Shading Seating Area / Shade and Pavilions Rain Gardens / Flower Gardens Water Taxi Piers Ferry Stops 2. Central Plaza The Central Plaza is the most significant and identifiable space in Thu Thiem. At 20 hectares in size, and comprised of a combination of hardscape, softscape, trees, waterways, pavilions, and promenades, it will be Ho Chi Minh City’s largest formal gathering space. It aims to create a visual and physical link between the Saigon River and the Central Lake. It will create a stunning new image for the financial and business district and offer a flexible gathering area for large public events and city-wide celebrations. Programs: Major Public Events Parades and Celebrations Thu Thiem Visitor Information Center Art Exhibition / Craft Market Innovative / Cultural Pavilions Waterways and Fountains Tree Groves, Shading Grand Pedestrian Promenades Cafe / Outdoor Dining Transit Connections and Underground Metro Urban Stormwater Management Corridor

3. Neighborhood Parks Multiple open spaces of varying sizes are distributed throughout Thu Thiem’s urban districts. The parks aim to serve as a welcome amenity for local residents and visitors, to promote environmental and human health, and to increase nearby real estate value. Trees, pathways, lighting, seating, and gardens are all incorporated. The park system also serves a stormwater and natural rainwater filtration purpose that captures and reuses water within the sites. Cleaned water may also be used for park recreation features and irrigation. Many of the parks also act as detention spaces during periods of flooding and extreme high tide Programs: Stormwater Management Natural Water Filtration System Storm and Flood Detention Area Neighborhood Amenities Tree Groves/Shading Children’s Playgrounds 4. Southern Delta and Wetland Parks The Southern Delta and Wetland Parks are preserved areas for enhanced natural landscapes, stormwater and flood management, and improved water quality. Roadways, paths and trails are elevated to allow the natural flow of water to continue during high and low tides. The sites are primarily reserved for natural ecologies and wildlife habitats, while also incorporating eco-learning trail systems that connect different amenities. Sensitive development in the form of eco-resort hotels (built above the water and landscape), Botanical Park, wetland parks, and bio-research are envisioned. Programs: Eco Trails and Boardwalks Information Decks / Pavilions Small Boat Piers Elevated Roadways Bird Watching Stations Fishing Decks Enhanced Mangrove Habitat Dredging of Toxic Soils and Improved Water Flow Urban Storm Management Corridor 5. Sports Park Sitting in the middle of a forest-like landscape, the Sports Park provide various sporting courts, tennis courts, football pitches, and playground for active recreation. Other quieter green spaces that surround the fields and courts can be used for more passive recreation – picnicking, strolling, or jogging. The park is well connected to the both the main Stadium and to the Sports Arena, with a comprehensive pedestrian system and footbridges that connect to surrounding residential neighborhoods. Programs: Sports Courts Tennis, Basketball, Football Badminton, Shuttlecock, Volleyball Flexible Open Lawn Extreme Games Tree Groves/Shading Children’s Playground Picnic Area and Pavilions Small Sports Cafes Health Stations * Public Realm typologies 6 and 7 are shown on page 165

THU THIEM MASTER PLAN ADJUSTMENT - 2012

Final Report.indd 160-161

161

2/16/2012 2:24:10 PM


e1 dg Bri

al Can

nt sce Cre

ard lev

u Bo

3

al Can

Bri

1

dg

e2

ard lev

Pedestrian Bridge

Central Lake

E/ W

u Bo

Thu mR

e Thi oad

ge

3

rid

B

Bridge 4

Saigon River

Public Realm and Landscape Framework Final Report.indd 162-163

THU THIEM MASTER PLAN ADJUSTMENT - 2012

163

2/16/2012 2:24:23 PM


6. The Central Lake Park The Central Lake Park is a man-made central retention basin that aims to improve water quality and filtration of pollutants from upstream. At the same time, the park is a crucial community amenity, adding value as internal gathering and recreational park fronted by new, mixed-use development. The park accommodates various uses of public activities and provides access to the water’s edge with various overlook decks. The park includes flexible open lawn areas for passive and active activities, a new bird habitat island of tree groves, and a green amphitheater. Programs: Public Events and Outdoor Performance Outdoor Markets and Event Pavilions Food and Beverage / Outdoor Cafe Waterfront Overlooks Floating Market Tree Groves, Shading Boat Piers Sport Fields and Seating Terraces Picnic and Family Pavilions Children’s Playgrounds Flower Gardens / Wetland Trails Flexible Storm Detention Space 7. Children’s Museum and Plaza The Children’s Museum and Plaza provide a memorable landmark for the intersection of the East/West Boulevard and the North/South Thu Thiem Road. The museum is also situated at a crucial position on the Central Lake, on a direct visual axis that extends through the core area’s Central Plaza all the way to Me Linh Square on the far side of the Saigon River in District 1. The museum plaza provides a fun, welcoming, and spirited public space with interactive pavilions for children, allowing visitors to walk through different play stations that lead to the museum and lake. Drop-off and parking are screened with landscape mounds and planting. Programs: Interactive Learning Pavilions Public Information Center Children’s Playground and Pool Art Exhibition Lake and Hydrology Laboratory Water Taxi Stop and Boat Pier Outdoor Cinema Sculptural Bridge and Adventure Sky Dome Lighting Exhibition

Cross Section through the Central Lake Park Drive and the Central Lake

The Central Lake Park Final Report.indd 164-165

THU THIEM MASTER PLAN ADJUSTMENT - 2012

165

2/16/2012 2:24:31 PM


City Hall Central Lake Children’s Museum

Central Plaza

rd leva

ou WB

E

THU THIEM MASTER PLAN ADJUSTMENT - 2012

Final Report.indd 166-167

167

2/16/2012 2:24:36 PM


e dg Bri 1

n Ca

ie Th

t

en

m

sc Cre

e2

u Th

al 1

dg

al 3

n Ca

Bri

ard lev

u Bo

a Ro d

Pedestrian Bridge

E/

Central Lake

ge

W

d var ule

Bo

3

id Br

Sidewalk Planting

Saigon River

Bridge 4

5.0m

2.0m

Motor Bike 6.5m

7.0m Sidewalk

Planting Parking 2.0m

3.25m

Lane 3.5m

Lane 3.5m

Median

Lane

Lane

3.5m

3.5m

3.5m

41.0m Driveway

Parking 3.25m 2.0 m

Motor Bike 6.5 m

Planting Sidewalk 2.0 m

5.0 m

7.0m Sidewalk

55.0m R.O.W.

Crescent Boulevard Section 0

100 200

400 m

Project Site Boundary Crescent Boulevard

ROW 55.0 m

Thu Theim Road

ROW 44.7 m

Bridge Connection

ROW 36.2 m

Central Lake Park Drive

ROW 29.2 m

Waterfront Park Drive

ROW 28.1 m

Delta Road

ROW 11.6 m

Local Road - Urban

ROW 26.6 m

Local Road - Residential ROW 22.6 m Central Plaza Road

Street Hierarchy Final Report.indd 168-169

ROW 22.6 m

THU THIEM MASTER PLAN ADJUSTMENT - 2012

169

2/16/2012 2:24:49 PM


Integration of Utilities and Street Activity into the Crescent Boulevard Final Report.indd 170-171

THU THIEM MASTER PLAN ADJUSTMENT - 2012

171

2/16/2012 2:24:56 PM


Sidewalk 8.0m

Planting Bike

Mixed

Mixed

Bike

2.0m 3.0 m

3.3m

3.3m

3.0 m

10.0 m Sidewalk

12.6 m Driveway Central Plaza

22.6 m R.O.W.

Central Plaza Road Section

Central Lake Park Drive Section

Setback Sidewalk Planting Parking 3.0m

4.1m

2.5m

6.6m Sidewalk

3.0m

Mixed 3.5m

Lane 3.5m 17.0m Driveway 29.2m R.O.W.

Street Sections Final Report.indd 172-173

Lane 3.5m

Mixed 3.5m

Sidewalk 2.5m

3.1m

5.6m Sidewalk Central Lake Park

THU THIEM MASTER PLAN ADJUSTMENT - 2012

173

2/16/2012 2:24:58 PM


Sidewalk

Planting

Bike

Mixed

5.6m

2.5m

3.5m

3.5m

8.1m Sidewalk

Lane 3.5m

Lane Lane Median 3.5m

3.5m 0.5m

28.5m Driveway

Lane

Mixed

Bike

Planting

Sidewalk

3.5m

3.5m

3.5m

2.5m

5.6 m 8.1m Sidewalk

44.7m R.O.W.

Thu Thiem Road Section

Waterfront Drive Section

Sidewalk Planting Parking 4.3m

2.5m

6.8m Sidewalk

3.0m

Mixed

Mixed

3.5m

3.5m

13.0m Driveway

Parking Planting 3.0m

2.5m

Sidewalk

Setback

5.8m

3.0m

8.3m Sidewalk

28.1m R.O.W.

Street Sections Final Report.indd 174-175

THU THIEM MASTER PLAN ADJUSTMENT - 2012

175

2/16/2012 2:25:02 PM


Setback 3.0m

Planting 3.0m

2.0m

5.0m Sidewalk

Bike

Lane

Lane

Bike

3.0m

3.3m

3.3m

3.0m

12.6m Driveway

Setback

Planting 2.0m

3.0m

3.0m

5.0m Sidewalk

22.6m R.O.W. Local Road - Residential Section

Street Sections Final Report.indd 176-177

THU THIEM MASTER PLAN ADJUSTMENT - 2012

177

2/16/2012 2:25:03 PM


Sidewalk Planting 5.0m

2.0m

Bike

Mixed

Mixed

3.0m

3.3m

3.3m

7.0m Sidewalk

Bike Planting Sidewalk 3.0m

2.0m

12.6m Driveway

5.0 m

7.0m Sidewalk

26.6m R.O.W.

Local Road - Urban Section

Local Road - Residential Section

Sidewalk 3.0m

2.0m

5.0m Sidewalk

Bridge Connection Section

Bike

Mixed

Mixed

Bike

Sidewalk

3.0m

3.3m

3.3m

3.0m

2.0m 3.0 m

12.6m Driveway 22.6 R.O.W.

Street Sections Final Report.indd 178-179

5.0m Sidewalk

Sidewalk

Planting

Bike

Mixed

Lane

Lane

Mixed

Bike

Planting

Sidewalk

2.5m

3.0m

3.5m

3.5m

3.5m

3.5m

3.0m

2.5m

5.6m

5.6m 8.1m Sidewalk

20.0m Driveway

8.1m Sidewalk

36.2m R.O.W.

THU THIEM MASTER PLAN ADJUSTMENT - 2012

179

2/16/2012 2:25:08 PM


Integration of local culture and ‘street life’ into the Public Realm Final Report.indd 180-181

THU THIEM MASTER PLAN ADJUSTMENT - 2012

181

2/16/2012 2:25:11 PM


7.0

Urban Design Guidelines

THU THIEM MASTER PLAN ADJUSTMENT - 2012

Final Report.indd 182-183

183

2/16/2012 2:25:16 PM


Intentions and Contents

1 ge Brid

The Thu Thiem Urban Design Guidelines are a component of the 1:2000 Thu Thiem Master Plan Adjustment project. Numerous Ho Chi Minh City agencies and individuals were involved in the Guidelines process. The purposes of the Guidelines for Thu Thiem are listed below: nt

d var ule

Bo

1. The Guidelines are a set of agreed-upon criteria – a “tool kit” – for the coherent and accurate implementation of the Thu Thiem Master Plan.

n Ca

sce

Cre

al 3

n Ca

ge

al 1

Brid

2

NEIGHBORHOOD

1 Pedestrian Bridge

E/

W

ard lev ou

B

Central Lake

Th uT hie m a Ro d

ge

2. The Guidelines assure a clear, logical, and efficient sequence of development for the ICA (development authority) and private developers (investors). 3. The Guidelines provide the blueprint for a memorable new city district and skyline. 4. The Guidelines are a manual for creating appropriately designed streets, blocks, and development parcels. 5. The Guidelines clearly demonstrate how to use buildings to frame street edges and create excellent pedestrian environments.

3

id

6. The Guidelines allow for architectural flexibility, but mandate certain key aspects of the Urban Design scheme.

Bridge 4

Br

1

Neighborhood 1 forms the northern half of Thu Thiem’s “Core Area” which is the high density mixed-use Central Business District. Surrounded on three (3) sides by water bodies – the Saigon River, Canal #1, and the Central Lake – and connected to HCMC District 1 by Thu Thiem Bridge #2, the neighborhood is a highly valuable and integrated area of Thu Thiem. In Neighborhood 1, the Crescent Boulevard is the main spine, with the highest towers clustered along the edge and decreasing in height towards the Saigon River and Central Lake. The neighborhood is anchored by the 50,000 sm Conference Center which will attract thousands of visitors to exhibition and events on the Saigon River. A nearby mixed-use development of hotels, restaurants, and shop supports this major complex. A major new iconic cultural facility – the Opera House – is also located in Neighborhood 1 along the river and at the foot of Thu Thiem Bridge #2. A nearby Visitors Center and other mixed-use commercial towers form the northern boundary of the Central Plaza, which will become the largest public space of its kind in Vietnam. The entire neighborhood is wrapped on its western side by the Crescent Park, Thu Thiem’s new public landscape facing the historic city.

Saigon River

Neighborhood 1 - Context Plan

0

100 200

7. The Guidelines encourage a dynamic mix of uses, spontaneous interaction, and the vibrant flows of daily life that are typical of Ho Chi Minh City.

400 m

Project Site Boundary

8. The Guidelines are a reference manual to encourage world-class and ecological public spaces

Neighborhood Boundary

9. The Guidelines explain how much GFA and parking can be built on each parcel of Thu Thiem 114

THU THIEM URBAN DESIGN GUIDELINES

TT Urban Design Guideline.indd 114-115

115

2/10/2012 5:09:33 PM

Fundamentally, the Guidelines seek to achieve the following goals for Thu Thiem:

ge

rid

Saigon River

nB

- The development of blocks framed by development on all sides to form a dense urban environment for living, working, and visiting that encourages street, sidewalk, and waterfront activities

al 1

n Ca

(1) (2)

Brid

ge

ard lev

ou

tB

en

c es Cr

2

11. Every proposed development at Thu Thiem should be reviewed by the ICA and a “Design Review Committee” to ensure compliance.

tria

es

d Pe

10. Every proposed development at Thu Thiem should be mandated by and judged against these Guidelines.

- The avoidance of stand-along tower buildings on individual parcels surrounded by parking or underutilized landscape - The accommodation of a diverse range of land uses and development opportunities over time that can adapt to changing socioeconomic conditions

(3)

- The creation of a meaningful public realm that serves an ecological purpose and provides places to recreate, relax, and gather

(4)

- The creation of a clear and efficient street and public transit network to facilitate movement Within the Guidelines, explanations of the Tower Arrangements, Block Structure and Building Typologies, Underground Parking Options and Tower Setbacks, City Skyline, and Sustainability are given. All are critical for investors and developers to understand and incorporate into their developments:

Central Lake

Project Site Boundary Neighborhood Boundary Central Plaza Boundary (1)

Conference Center

(2)

Mixed-Use Hotel

(3)

Opera House

(4)

Visitor Center

Neighborhood 1 - Illustrative Plan

0

50

100

200m

116

TT Urban Design Guideline.indd 116-117

Sample Urban Design Guidelines Final Report.indd 184-185

Neighborhood 1 - Massing Image THU THIEM URBAN DESIGN GUIDELINES

117

2/10/2012 5:09:42 PM

THU THIEM MASTER PLAN ADJUSTMENT - 2012

185

2/16/2012 2:25:18 PM


Tower Arrangement: Tall building towers should be carefully arranged within the Core Area. They should be staggered on podiums in order to provide better views and to encourage natural wind movement.

0 14 m

8

Block Structure/Building Typology:

ge

rid

nB

tria

es

d Pe

Saigon River

A fundamental requirement of the Thu Thiem Guidelines is that blocks should include a minimum 4-story podium to frame the block and to provide a strong street frontage. This will form active street edges where a mix of uses can occur. Tall towers that stand along on blocks and are set well back from the street are not allowed.

m

m

.4

4 19

m

1.4 18

4

5.

34

al 1

1-20 Conference Center

al 1

1-20

n Ca

n Ca

4.

38

ge

rid

nB

tria

es

d Pe

.2

Saigon River

m

Brid

ge

1-12 .0

m

6 15

.7

m m

.2

m .9

m .1

1-6

77.4

1-7

79.2 m

m

m

.3

m

88

.5

1-2

88

m

.5

88

.3

1-3

87.6

m

Options for developers exist for underground parking, including an underground and above grade condition. In the underground condition, the GFA of the parking area does not count toward the developers allotted GFA for their project. In the above grade condition, the GFA does count against the allotment. Should the above grade condition be selected, it must be screened from the street by development program (retail at the ground floor levels). Tower setback options above the podiums are also shown for both conditions.

1-4 .1

0 10

m

m

1-21 Opera House

1-1

.6 81

m

1-9 1-17

1-1

m

1-5

1-14

m

1-19 Visitor Center

m

1-2

1-10

1-18

1-6 1-15 1-3

1-11

m

1-7

m

77.9

1-13

88

1-5

98 .8

11 9.7

m

12 5

79.2

m

83.1

76 .4

m

1-8

m

.6

5 10

66.8

m 98.1

95.6 m

.8

m 83.1 m

m

97.2

1-11

m

79.0 m

97. 5

1-10 97.4

75

m

m

7m

m

1-4

m

14 4

105 .5 m

m

106.6

74 .

6

97.

m

1-15

1.1 12

m

17 2.7

15 6

m 116 .9

120 .8 m

133 .9 m

61.3 m

5m

77.4 m

m

m

74 .3

1-9

97.

1-14

76.7

61.3m

1-19 93.7 m

7m

76.7 118.5 m

m

m

19 4

17 8.2

m

69.9 m

67.2 m

92.9

.4

77.

m

1-18

95

m

109 .7 m

122 .5

1-13

m

.6

91.7

m

.3

6 12

89

1-17

91.1

78

es Cr

1-16

m

.6

Underground Parking Options and Tower Setbacks:

n ce

m

m

1-8 .8

.7

88.4

3m

.0

6 14

94

73

m

m 87.

1-21

es Cr

m

tB

m

.5

.3

.0

ou

m

.0

84

84

83

o

90

1-16

rd va le

ul

tB

n ce

1-12 Mixed-Use Hotel

2

d ar ev

m

.1

m

m

80 .6

18 5

m

.9

1m

75

51.

m

10 4.2

.0

m

14 0

m

2

67.9

ge

64.0

Brid

City Skyline: Central Lake

Central Lake

Project Site Boundary Neighborhood Boundary Central Plaza Boundary Commercial Commercial Mixed-Use E/W

Project Site Boundary

vard Boule

Residential Mixed-Use

Neighborhood Boundary

Public Parks

Central Plaza Boundary

Central Plaza

Neighborhood 1 - Development Parcel Dimensions

0

50

E/W

Cultural Facilities

100

Sustainability and Orientation:

Neighborhood 1 - Land Use Distribution

200m

vard Boule

0

118

50

100

200m

THU THIEM URBAN DESIGN GUIDELINES

Neighborhood 1 - Development Areas and FAR

TT Urban Design Guideline.indd 118-119

119

2/10/2012 5:09:44 PM

Development Summary

1-20 1-12

1-16

1-8 1-13 1-4

1-21

1-9

1-17

1-19

1-2

1-10

1-18

1-1

1-5

1-14 1-6

1-15 1-11

1-3 1-7

Parcel Area:

254,451 sm

Parcel Area:

25.4 ha

GFA:

1,765,000 sm

Residential %

30 %

Residential Useable GFA

372,540 sm

Commercial %

70 %

Commercial Useable GFA

949,960 sm

NET FAR:

6.94

Units:

3,725

Residential Parking Spaces:

5,588

Commercial Parking Spaces:

9,850

Parking GFA:

385,943 sm

Underground GFA:

554,756 sm

Resident Population:

14,902

Employee Population

81,713

The new Thu Thiem skyline will be an exciting, memorable urban landscape of towers, mid-rise buildings, and glittering cultural facilities along the banks of the Saigon River. The skyline will not just be viewed from one vantage point, but rather be an ever shifting composition of tall buildings along the Crescent Boulevard transitioning down to the River and Central Lake to either side. Views must be maintained from all buildings to maximize value. The 86-story mixed-use Observation Tower will be visible in every view and act as the major iconic landmark at Thu Thiem.

Sustainability is a critical component of Thu Thiem. At the urban design level, the Master Plan shows organizes a majority of buildings with their long sides facing south, a positive orientation to minimize heat gain from the low, late-afternoon sun. This serves a sustainable purpose in minimizing energy use as much as possible. Wastewater and stormwater management, solid waste recycling, and environmental best practices at all levels should all be incorporated by the developer.

Development Program Parcel Number

1-1 1-2 1-3 1-4 1-5 1-6 1-7 1-8 1-9 1-10 1-11 1-12 1-13 1-14 1-15 1-16 1-17 1-18 1-19 1-20 1-21

Parcel Program Number

Program Parcel Area Parcel Area Parcel Area GFA Parcel NET AreaEfficiency GFA (sm) (ha) (sm)(sm) (ha) FAR (sm)

Residential 1-1Mixed Use Residential Mixed Use 8,040 Residential 1-2Mixed Use Residential Mixed Use 7,941 Residential 1-3Mixed Use Residential Mixed Use 5,061 Residential 1-4Mixed Use Residential Mixed Use 8,382 Residential 1-5Mixed Use Residential Mixed Use 8,414 Residential 1-6Mixed Use Residential Mixed Use 5,655 Commercial 1-7 Commercial 5,726 Commercial 1-8 Mixed Use Commercial Mixed12,610 Use Commercial 1-9 Mixed Use Commercial Mixed13,049 Use Commercial 1-10Mixed Use Commercial Mixed Use 8,815 Commercial 1-11 Commercial 8,735 Commercial 1-12/ Hotel Commercial / Hotel32,069 Commercial 1-13Mixed Use Commercial Mixed13,221 Use Commercial 1-14Mixed Use Commercial Mixed Use 8,572 Commercial 1-15 Commercial 8,659 Residential 1-16 Mixed Use Residential Mixed 14,988 Use Residential 1-17 Mixed Use Residential Mixed 11,370 Use Commercial 1-18 Commercial 6,000 1-19 Cultural Facility - Visitor Cultural Center Facility - Visitor 6,000Center Conference 1-20Center Conference Center51,114 Cultural Facility 1-21 - Opera Cultural House Facility - Opera 10,030House TOTAL

TOTAL

254,451

0.8 0.8 0.5 0.8 0.8 0.6 0.6 1.3 1.3 0.9 0.9 3.2 1.3 0.9 0.9 1.5 1.1 0.6 0.6 5.1 1.0

3.42 0.8 3.40 0.8 3.95 0.5 5.61 0.8 4.75 0.8 5.31 0.6 13.97 0.6 12.69 1.3 10.73 1.3 18.15 0.9 16.03 0.9 7.80 3.2 11.35 1.3 14.00 0.9 13.11 0.9 4.00 1.5 7.48 1.1 8.33 0.6 0.83 0.6 0.98 5.1 1.00 1.0

Useable NET GFA Efficiency Unit Size Useable Residential GFA Unit Residential Size Residential Commercial Residential Commercial Commercial UnitsCommercial Residential Units Residential Residential Commercial Residential Commercial Commercial Parking Commercial Parking ParkingUG Levels Parking UG Levels UG Levels Underground UG Levels People Underground Resident PeopleEmployee ResidentEmployee Employee FAR (sm) (sm) (sm) % (sm) GFA (sm) % % GFA (sm)GFA (sm) % (No.) GFA Parking (sm) Factor (No.) Spaces Parking Factor ParkingSpaces Factor Parking Spaces Factor GFA Factor Spaces (sm) GFA GFA (sm) Factor (Required) (sm) GFA (sm) (Actual) (Required)GFA (Actual) (sm) Per GFA Unit(sm) Population Per Unit PerPopulation sm Population Per sm

27,500 80% 27,000 80% 20,000 80% 47,000 80% 40,000 80% 30,000 80% 80,000 80% 160,000 80% 140,000 80% 160,000 80% 140,000 80% 250,000 65% 150,000 80% 120,000 80% 113,500 80% 60,000 80% 85,000 80% 50,000 80% 50% 5,000 50,000 60% 10,000 50%

3.4222,000 3.4021,600 3.9516,000 5.6137,600 4.7532,000 5.3124,000 13.9764,000 12.69 128,000 10.73 112,000 18.15 128,000 16.03 112,000 7.80 162,500 11.35 120,000 14.0096,000 13.1190,800 4.0048,000 7.4868,000 8.3340,000 0.83 2,500 0.9830,000 1.00 5,000

25.4 254,451 1,765,000

6.94 25.4 1,765,000

6.94 1,360,000

1,360,000

372,540

1,700,000 1,700,000

1,700,000 1,700,000

1,322,500 1,322,500

1,322,500 30% 1,322,500

396,750 30% 372,540

without special programs without (TARGET) special programs (TARGET) without special programs without (ACHIEVED) special programs (ACHIEVED)

8,040 27,500 7,941 27,000 5,061 20,000 8,382 47,000 8,414 40,000 5,655 30,000 5,726 80,000 12,610 160,000 13,049 140,000 8,815 160,000 8,735 140,000 32,069 250,000 13,221 150,000 8,572 120,000 8,659 113,500 14,988 60,000 11,370 85,000 6,000 50,000 6,000 5,000 51,114 50,000 10,030 10,000

80% 80% 80% 80% 80% 80% 80% 80% 80% 80% 80% 65% 80% 80% 80% 80% 80% 80% 50% 60% 50%

100 100 100 100 100 100 100 100 100 100 100 100 100 100

22,000 95% 21,600 95% 16,000 95% 37,600 95% 32,000 95% 24,000 95% 64,0000% 128,000 20% 112,000 20% 128,000 20% 112,0000% 162,5000% 120,000 20% 96,000 20% 90,8000% 48,000 95% 68,000 95% 40,0000% 2,500 30,0000% 5,000

100 100 100 100 100 100 100 100 100 100 100 100 100 100

20,900 95% 5% 20,900 1,100 5%209 20,520 95% 5% 20,520 1,080 5%205 15,200 95% 5% 15,200 800 5%152 35,720 95% 5% 35,720 1,880 5%357 30,400 95% 5% 30,400 1,600 5%304 22,800 95% 5% 22,800 1,200 5%228 0 0% 100% 0 64,000100% 25,600 20% 80% 25,600 102,400 80%256 22,400 20% 80% 22,400 89,600 80%224 25,600 20% 80% 25,600 102,400 80%256 0 0% 100% 0 112,000100% 0 0% 100% 0 162,500100% 0 24,000 20% 80% 24,000 96,000 80%240 19,200 20% 80% 19,200 76,800 80%192 0 0% 100% 0 90,800100% 45,600 95% 5% 45,600 2,400 5%456 64,600 95% 5% 64,600 3,400 5%646 0 0% 100% 0 40,000100% 0 0%

100%

0 30,000100%

372,540 979,960

120

TT Urban Design Guideline.indd 120-121

Sample Urban Design Guidelines Final Report.indd 186-187

3,725

70%396,750 925,750 70% 372,540 949,960

1,100 1,080 800 1,880 1,600 1,200 64,000 102,400 89,600 102,400 112,000 162,500 96,000 76,800 90,800 2,400 3,400 40,000

1.5 209 1.5 205 1.5 152 1.5 357 1.5 304 1.5 228 1.5 1.5 256 1.5 224 1.5 256 1.5 1.50 1.5 240 1.5 192 1.5 1.5 456 1.5 646 1.5

314 308 228 536 456 342 0 384 336 384 0 0 360 288 0 684 969 0

1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5

30,000

1.5

0

1.5

979,960

3,725

5,588

100 314 100 308 100 228 100 536 100 456 100 342 100 0 100 384 100 336 100 384 100 0 100 0 100 360 100 288 100 0 100 684 100 969 100 0 150 100 0 150

11 11 8 19 16 12 640 1,024 896 1,024 1,120 1,625 960 768 908 24 34 400 17 300 33

5,588

9,850

100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 150 100 150

11 25 11 25 25 8 19 25 16 25 12 25 640 25 1,024 25 896 25 1,024 25 1,120 25 1,625 25 960 25 768 25 908 25 24 25 34 25 400 25 17 25 300 25 33 25

8,113 7,965 5,900 13,865 11,800 8,850 16,000 35,200 30,800 35,200 28,000 40,625 33,000 26,400 22,700 17,700 25,075 10,000 417 7,500 833

9,850

385,943

25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25

1.08,113 1.07,965 1.25,900 1.7 13,865 1.4 11,800 1.68,850 2.8 16,000 2.8 35,200 2.4 30,800 4.0 35,200 3.2 28,000 1.3 40,625 2.5 33,000 3.1 26,400 2.6 22,700 1.2 17,700 2.2 25,075 1.7 10,000 0.1 417 0.17,500 0.1 833 385,943

1 1 1 2 2 2 3 3 3 5 3 3 3 4 3 1 3 2 1 1 1

1.0 1.0 1.2 1.7 1.4 1.6 2.8 2.8 2.4 4.0 3.2 1.3 2.5 3.1 2.6 1.2 2.2 1.7 0.1 0.1 0.1

8,040 7,941 5,061 16,764 16,828 11,310 17,178 37,830 39,147 44,075 26,205 96,207 39,663 34,288 25,977 14,988 34,110 12,000 6,000 51,114 10,030 554,756

1 1 1 2 2 2 3 3 3 5 3 3 3 4 3 1 3 2 1 1 1

4 8,040 4 7,941 4 5,061 416,764 416,828 411,310 17,178 437,830 439,147 444,075 26,205 496,207 439,663 434,288 25,977 414,988 434,110 12,000 6,000 51,114 10,030

836 821 608 1,429 1,216 912

4 4 4 4 4 4

1,024 896 1,024

4 4 4

0 960 768

4 4 4

1,824 2,584

4 4

554,756 14,902

Employee Population

12 836 92 12 12 821 90 12 12 608 67 12 12 1,429 157 12 12 1,216 133 12 12 912 100 12 12 5,333 12 12 1,024 8,533 12 12 896 7,467 12 12 1,024 8,533 12 12 9,333 12 12 0 13,542 12 12 960 8,000 12 12 768 6,400 12 12 7,567 12 12 1,824 200 12 12 2,584 283 12 12 3,333 12 150 17 150 12 2,500 12 150 33 150 14,902 81,713

92 90 67 157 133 100 5,333 8,533 7,467 8,533 9,333 13,542 8,000 6,400 7,567 200 283 3,333 17 2,500 33 81,713

925,750 949,960 THU THIEM URBAN DESIGN GUIDELINES

121

2/10/2012 5:09:50 PM

THU THIEM MASTER PLAN ADJUSTMENT - 2012

187

2/16/2012 2:25:21 PM


Note: The 2005 Guidelines indicated various percentages for "Build to Lines" on development parcels. This has been replaced in 2011 by requirements for "Street Level Setbacks" for each neighborhood as indicated in these Urban Design Guidelines.

Residential Mixed-Use

ge

rid

nB

tria

es

d Pe

Saigon River

Commercial

ge

rid

nB

tria

es

d Pe

Saigon River

ge

rid

nB

tria

es

d Pe

Saigon River 10

al 1

10

al 1

al 1

1-20

n Ca

n Ca

n Ca

1-20

1-20

10

10

Brid

ge

Brid

ge

1-12

2

Brid

ge

1-12

2

d ar ev

ou

n ce

10

1-21

1-21

1-9 1-17 1-5

1-2

1-2

1-14

A

15

10

Building

6

Crescent Boulevard

Building

Courtyard

Building

6

6 10

15

1-3

1-11

6

1-7

50

Building

1-2

1-6

1-15 30

1-1

Section A

15

50

1-7

1-7

10

1-5

1-10 30

1-19

1-3

1-11

10

15 15

40

1-6 1-15

1-19 1-3

1-11

1-9 40

30

20

1-6 1-15

1-19

1-18

15 15

25

20

1-10

1-18

10

1-4

20

1-17

1-5

1-14

1-10

1-18

10

30

30

25

1-1

1-8

1-13

1-21

1-9 1-17

1-1 1-14

30

20

1-4

1-4

25

es Cr

20

1-16

1-8

1-13

1-13

ou

tB

n ce

10

es Cr

1-16 1-8

rd va le

20

10

tB

es Cr

1-16

15

l

l

ou

tB

n ce

1-12

15

2

d ar ev

20

Central Lake

Central Lake

Central Lake

Project Site Boundary Neighborhood Boundary Central Plaza Boundary No Setback 3m Setback Flexible Setback

E/W

Project Site Boundary

vard Boule

10 m Setback

Parcels that have podium and street level retail should maintain NO SETBACK from the street edge up to the podium height. Above the podium the building can be setback as required.

0

50

100

200m

Neighborhood 1 - Street Level Retail

0

(24 m)

40

40 Floors

(160 m)

50

50 Floors

(200 m)

E/W

50

100

Neighborhood 1 - Maximum Building Heights

200m

125

0

Brid

ge

1-12

2

1-17

1-2

1-2

1-10

1-2

1-19

1-19 (1)

1-3

1-11

1-7

1-7

1-2 (1)

1-10 (5)

1-18 (2)

1-15

1-6 (2)

1-15 (3) 1-11 (3)

1-7

Central Lake

Central Lake

1-1 (1)

1-5 (2)

1-6 1-3

1-11

1-4 (2) 1-9 (3)

1-14 (4)

1-10

1-18

1-6 1-19

1-17 (3)

1-1 1-5

1-14

1-15

1-3

1-21 (1)

1-17

1-1

1-8 (3)

tB

1-4 1-9

1-5

1-18

1-16 (1)

1-8

1-13 (3)

1-21

1-14

1-15

Bo

1-4

1-17

1-1 1-5

1-11

1-12 (2)

2

rd va le

1-13

1-9

1-6 1-19

1-8

ce

1-21

nt

ce

es Cr

1-16

Cr es

1-4

1-10

Anchor

ou lev ar d

lev ar d nt Bo u

1-8

1-9

1-18

al 1

ge

1-20 (1)

u

1-16 1-13

1-14

ge

n Ca

al 1

Brid

129

rid

nB

tria

es

d Pe

Saigon River

1-20

rd va le

1-13

1-21

ge

n Ca

Bo

Neighborhood 1 - Section with Building Heights

rid

nB

tria

es

d Pe

u

nt

ce

es Cr

1-16

200m

2/10/2012 5:09:56 PM

Saigon River

1-12

2

100

TT Urban Design Guideline.indd 128-129

al 1

ge

50

THU THIEM URBAN DESIGN GUIDELINES

n Ca

Brid

vard Boule

128

ge

1-20

1-12

2

(120 m)

rid

nB

tria

es

d Pe

Saigon River

al 1

ge

30 Floors

Maximum Building Heights allow flexbility by 20 percent

n Ca

Brid

30

10 Floors (40 m)

ge

1-20

(16 m)

6 Floors

rid

nB

(100 m)

4 Floors 6

2/10/2012 5:09:51 PM

tria

(80 m)

25 Floors

10

TT Urban Design Guideline.indd 124-125

es

(60 m)

20 Floors

25

Retail frontage Required (Minimum 20 m depth)

THU THIEM URBAN DESIGN GUIDELINES

d Pe

15 Floors

20

Central Plaza Boundary

Central Plaza Boundary

124

Saigon River

15

Neighborhood Boundary

en

Neighborhood 1 - Street Level Setbacks

Project Site Boundary

Cr es c

Internal Courtyard Concept

E/W

Neighborhood Boundary

vard Boule

1-3 (1) 1-7 (3)

Central Lake

Central Lake

Project Site Boundary Project Site Boundary

Neighborhood Boundary

Neighborhood Boundary Crescent Boulevard

Circulator Bus Line and Stop ROW 55.0 m

Bus Line and Stop

Bridge Connection

ROW 36.2 m

M

Municipal Subway

Central Lake Park Drive

ROW 29.2 m

AE

Airport Express

Waterfront Park Drive

ROW 28.1 m

Local Road - Urban

ROW 26.6 m

Local Road - Residential

ROW 22.6 m

Central Plaza Road

ROW 22.6 m

Neighborhood 1 - Street Typology

E/W

0

50

100

vard Boule

200m

126

TT Urban Design Guideline.indd 126-127

Sample Urban Design Guidelines Final Report.indd 188-189

M AE rd

E/W

Ferry Line and Stop

va Boule

Project Site Boundary

Project Site Boundary

Neighborhood Boundary

Neighborhood Boundary

Central Plaza Boundary

Underground Garage

On-Street Parking

Underground Retail

Internal Courtyard Concept

Water Taxi Line and Stop

Ramp to Underground Parking

200 m / 2.5 minute Walking Radius

Vehicular / Service Entry (15 m Minimum Away from Street Intersection )

Neighborhood 1 - Transit Connections

0

50

100

Neighborhood 1 - Vehicular Access and At Grade Parking

200m

THU THIEM URBAN DESIGN GUIDELINES

127

2/10/2012 5:09:52 PM

130

TT Urban Design Guideline.indd 130-131

E/W

vard Boule

M

Circulation M

E/W

Metro Line and Station

vard Boule

Entrance Ramp (1)

0

50

100

200m

Levels of Underground Parking

Neighborhood 1 - Underground Parking

0

50

100

200m

THU THIEM URBAN DESIGN GUIDELINES

131

2/10/2012 5:09:58 PM

THU THIEM MASTER PLAN ADJUSTMENT - 2012

189

2/16/2012 2:25:23 PM


Appendix 1 - Master Plan GFA and Infrastructure Memorandum





                                                             

 

 

                   

THU THIEM MASTER PLAN ADJUSTMENT - 2012

Final Report.indd 190-191

191

2/16/2012 2:25:23 PM






                                                       

     •  •  •  •  •  •                                      

THU THIEM MASTER PLAN ADJUSTMENT - 2012

Final Report.indd 192-193

193

2/16/2012 2:25:24 PM




                      

THU THIEM MASTER PLAN ADJUSTMENT - 2012

Final Report.indd 194-195

195

2/16/2012 2:25:24 PM


Appendix 2 - Project Boards

Development Areas

Hydrology

Flood Control

Spatial Spine

Ý tưởng thiết kế kết hợp Bối cảnh Quy hoạch Design Concepts and Integrated Context Plan 1

02/15/2012

Mitch Glass Romil Sheth Hsing-Chih Lee Victor Eskinazi Vee Petchthevee Andy McClurg Dennis Pieprz

Accessibility Ý tưởng thiết kế kết hợp Bối cảnh Quy hoạch - Concepts & Integrated Context Plan

TT final boards A0.indd 1

2/16/2012 12:15:15 PM

THU THIEM MASTER PLAN ADJUSTMENT - 2012

Final Report.indd 196-197

197

2/16/2012 2:25:27 PM


ge

d Bri 1

Saigon River

n Ca al 3

(1) n Ca al 1

(2)

Bo

m

nt

ce

d

a Ro

es Cr

hie

(3)

e2

uT

dg

(13) rd va ule

Th

Bri

(11)

(4)

(12)

(5) Pedestrian Bridge

(10) (9)

Central Lake

EW

rd leva

Bou

(6)

(7)

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16)

Museum Conference Center Mixed Use Hotel Symphony Theater Visitors Center Observation Tower Complex Sports Arena Stadium House for Children City Hall International Hospital Marina Development Luxury Hotel South Delta Resort Aquatic Park South Delta Research

Br

ge

id

3

(16)

(8) (14) (15) Quy hoạch Kiến trúc Cảnh quan Illustrative Master Plan 2

02/15/2012

Mitch Glass Romil Sheth Hsing-Chih Lee Victor Eskinazi Vee Petchthevee Andy McClurg Dennis Pieprz

0

100

200

400 m Quy hoạch Kiến trúc Cảnh quan - Illustrative Master Plan

TT final boards A0.indd 2

2/16/2012 12:15:36 PM

THU THIEM MASTER PLAN ADJUSTMENT - 2012

Final Report.indd 198-199

199

2/16/2012 2:25:31 PM


Existing Site Conditions - 2012

Illustrative Master Plan - 2005 Tổng mặt bằng Quy hoạch năm 2005 2005 Master Plan

Site Analysis - 2005

1 - New City Center 2 - Residential District 3 - Public Institution District 4 - Urban Neighborhood 5 - Commercial Center 6 - Convention Center 7 - Arena 8 - Museum 9 - Sports Center 10 - Research Institution 11 - Cultural Center 12 - Neighborhood Center 13 - Central Plaza 14 - Riverfront Promenade

15 - Crescent Park 16 - City Park 17 - Aquatic Park 18 - Entertainment 19 - Resort Hotel 20 - Botanical Gardens 21 - Delta Research Institute 22 - Marina 23 - Preserved Wetland 24 - Observation Tower 25 - Amphitheatre 26 - Historic Structure 27 - Subway Transit Station

3

02/15/2012

Mitch Glass Romil Sheth Hsing-Chih Lee Victor Eskinazi Vee Petchthevee Andy McClurg Dennis Pieprz

Tổng mặt bằng Quy hoạch năm 2005 - 2005 Master Plan

TT final boards A0.indd 3

2/16/2012 12:15:45 PM

THU THIEM MASTER PLAN ADJUSTMENT - 2012

Final Report.indd 200-201

201

2/16/2012 2:25:35 PM


Projected integration of the Thu Thiem massing into the larger context of Ho Chi Minh City

Existing Site Conditions, 2012

Tích hợp sơ đồ Khối 3D vào Bối cảnh thành phố Hồ Chí Minh Integrated Massing 4

02/15/2012

Mitch Glass Romil Sheth Hsing-Chih Lee Victor Eskinazi Vee Petchthevee Andy McClurg Dennis Pieprz

Tích hợp sơ đồ Khối 3D vào Bối cảnh thành phố Hồ Chí Minh - Integrated Massing

TT final boards A0.indd 4

2/16/2012 12:16:04 PM

THU THIEM MASTER PLAN ADJUSTMENT - 2012

Final Report.indd 202-203

203

2/16/2012 2:25:38 PM


Phối cảnh Khối 3D Tổng thể Overall Massing 5

02/15/2012

Mitch Glass Romil Sheth Hsing-Chih Lee Victor Eskinazi Vee Petchthevee Andy McClurg Dennis Pieprz

Phối cảnh Khối 3D Tổng thể - Overall Massing

TT final boards A0.indd 5

2/16/2012 12:16:07 PM

THU THIEM MASTER PLAN ADJUSTMENT - 2012

Final Report.indd 204-205

205

2/16/2012 2:25:42 PM


Phối cảnh Khối 3D Tổng thể Overall Massing 6

02/15/2012

Mitch Glass Romil Sheth Hsing-Chih Lee Victor Eskinazi Vee Petchthevee Andy McClurg Dennis Pieprz

Phối cảnh Khối 3D Tổng thể - Overall Massing

TT final boards A0.indd 6

2/16/2012 12:16:11 PM

THU THIEM MASTER PLAN ADJUSTMENT - 2012

Final Report.indd 206-207

207

2/16/2012 2:25:45 PM


Phối cảnh Khối 3D Tổng thể Overall Massing 7

02/15/2012

Mitch Glass Romil Sheth Hsing-Chih Lee Victor Eskinazi Vee Petchthevee Andy McClurg Dennis Pieprz

Phối cảnh Khối 3D Tổng thể - Overall Massing

TT final boards A0.indd 7

2/16/2012 12:16:13 PM

THU THIEM MASTER PLAN ADJUSTMENT - 2012

Final Report.indd 208-209

209

2/16/2012 2:25:48 PM


View 1: From the North As seen from the Bao Son Port area, the Thu Thiem skyline is a dynamic composition of building heights and types. The Saigon River, Crescent Park, and key cultural buildings are in the foreground, while the skyline steps up and back, culminating in the landmark Observation Tower. A detailed view of the skyline from the north shows a rich spatial layering of buildings and building heights. All buildings are afforded views to the Crescent Park and Saigon River, adding immense value to the real estate.

3

View 2: From Me Linh Square The skyline view from Me Linh Square focuses on the Central Plaza, in a composition with the nearby Observation Tower. The view from Me Linh Square to the Children’s Museum is maintained to emphasize this important iconic destination for all of Ho Chi Minh City. The skyline frames the Central Plaza with two major landmark towers. The axis is left open for views to the Children’s Museum. The Observation Tower punctuates the skyline.

1 2

View 3: From the South The skyline from the south features the HCMC Stadium in the foreground. The skyline sweeps dynamically upward from the west and east towards the Observation Tower.

Typical Section Concept

Đường chân trời Thủ Thiêm và Mặt cắt Ý tưởng Điển hình Thu Thiem Skyline and Typical Section Concept 8

02/15/2012

Mitch Glass Romil Sheth

Saigon River

Crescent Blvd

Hsing-Chih Lee Victor Eskinazi

Central Lake

Vee Petchthevee Andy McClurg Dennis Pieprz

Đường chân trời Thủ Thiêm và Mặt cắt Ý tưởng Điển hình Thu Thiem Skyline and Typical Section Concept

TT final boards A0.indd 8

2/16/2012 12:16:21 PM

THU THIEM MASTER PLAN ADJUSTMENT - 2012

Final Report.indd 210-211

211

2/16/2012 2:25:52 PM


Các Chiến lược Bền vững Sustainability Strategies 9

02/15/2012

Mitch Glass Romil Sheth Hsing-Chih Lee Victor Eskinazi Vee Petchthevee Andy McClurg Dennis Pieprz

Các Chiến lược Bền vững - Sustainability Strategies

TT final boards A0.indd 9

2/16/2012 12:16:31 PM

THU THIEM MASTER PLAN ADJUSTMENT - 2012

Final Report.indd 212-213

213

2/16/2012 2:25:56 PM


Land Use Summary 2011 Land Use

2005

Area (Ha)

%

Area (Ha)

%

Commercial Commercial Mixed-Use

49.1 29.5

7.5 4.5

46.6 22.0

7.1 3.3

Residential Mixed-Use Residential- High Density Residential- Medium Density

33.2 23.7 0

5.0 3.6 0

23.2 45.3 4.7

3.5 6.9 0.7

Residential- Low Density Cultural Facilities

26.1 18.7

4.0 2.8

24.0 23.4

3.7 3.6

School Software Park Civic Facilities

15.9 9.7 3.5

2.4 1.5 0.5

14.6 0 17.1

2.2 0 2.6

3.9 2.1

0.6 0.3

0 0

0 0

86.1 29.5

13.1 4.5

86.1 27.3

13.1 4.2

Wetland Road Water

85.1 175.8 65.1

13.0 26.8 9.9

105.3 152.2 65.1

16.0 23.2 9.9

TOTALS

657

100

657

100

Medical Utilities ge

d Bri

Public Park Recreational/ Educational

1

al 3

n Ca

s

Cre

2011 Development Summary

m

hie

e2

uT

dg

d var ule

Bo

Th

al 1

n Ca

Bri

t cen

d

a Ro

Pedestrian Bridge Central Lake

Br

ge

657

ha

Developable Site Area

2,142,178

sm

Developable Site Area

214.2

ha

Overall GFA (above ground)

7,563,750

sm

Overall GFA (underground)

2,536,371

sm

Residential Useable GFA

3,188,251

sm

Commercial Useable GFA

2,538,321

sm

Total Site Area

EW

NET FAR

d var ule

Residential Units

Bo

3.53 23,693

units

Resident Population

146,745

people

Employee Population

215,965

people

3

id

4

Phân bổ Sử dụng Đất Land Use Distribution

Bridge

Saigon River

10

02/15/2012

Mitch Glass Romil Sheth Hsing-Chih Lee Victor Eskinazi Vee Petchthevee Andy McClurg Dennis Pieprz

2011 Land Use Plan

0

100

200

400 m

2005 Land Use Plan Phân bổ Sử dụng Đất - Land Use Distribution

TT final boards A0.indd 10

2/16/2012 12:16:39 PM

THU THIEM MASTER PLAN ADJUSTMENT - 2012

Final Report.indd 214-215

215

2/16/2012 2:26:02 PM


Flexibility in Building Height 20% variation in Maximum Building Height is permissible though the street edge must be held by a minimum 4 storey high podium. The additional height can be achieved by reducing the footprint of the tower or increasing the height of the podium to a maximum of 8 storeys. Podium - Commercial Mixed Use

Podium with higher building height

Tower - Residential Mixed Use

Sidewalk

Underground Parking

Courtyard

Section

d Bri

Courtyard

ge

Courtyard

1 Street

al 3

n Ca

Plan Courtyard

Courtyard

m

hie

e2

s Cre

uT

dg

d var ule

Bo

Th

al 1

n Ca

Bri

t cen

d

a Ro

Pedestrian Bridge Central Lake

EW

Massing

d var ule

Bo

Project Site Boundary 4 Floors

(16 m)

25 Floors

(100 m)

6 Floors

(24 m)

30 Floors

(120 m)

10 Floors

(40 m)

40 Floors

(160 m)

15 Floors

(60 m)

50 Floors

(200 m)

20 Floors

(80 m)

86 Floors

(344 m)

Maximum Building Heights allow flexbility by 20%

Br

ge

3

id

4

Chiều cao Xây dựng Tối đa Maximum Building Heights

Bridge

Saigon River

11

02/15/2012

Mitch Glass Romil Sheth Hsing-Chih Lee Victor Eskinazi Vee Petchthevee Andy McClurg Dennis Pieprz

Maximum Building Height

0

100

200

400 m Chiều cao Xây dựng Tối đa - Maximum Building Heights

TT final boards A0.indd 11

2/16/2012 12:16:46 PM

THU THIEM MASTER PLAN ADJUSTMENT - 2012

Final Report.indd 216-217

217

2/16/2012 2:26:09 PM


M

M

d Bri

ge

ge

d Bri

1

1

e2

M

Bri

l1 na Ca

dg

l3 na Ca

M

l1 na Ca

Bri

n sce Cre

ard lev

ou

tB

l3 na Ca

M

ard lev

ou

tB

n sce Cre

dg

e2

M

M

M M

M

Pedestrian Bridge

Central Lake

EW

M

M

d var ule

Bo

Pedestrian Bridge

Central Lake

M

hie

hie

m

m

Br

ge

d

d

a Ro

M

a Ro

M

d var ule

Bo

uT Th

M AE

uT Th

M AE

EW

3

id

Br

ge

3

id

M

M

M

4 Bridge

Saigon River

4

M

Saigon River

M

M

M

M

0

Transit Networks - Bus line Coverage

Bridge

M

100 200

400 m

0

100 200

400 m

Transit Networks - Subway Coverage

Project Site Boundary

Project Site Boundary

M

Municipal Subway and stations

M

Municipal Subway and stations

AE

Airport Express Station

AE

Airport Express Station

Circulator Bus Line and Stop

Circulator Bus Line and Stop

Bus Line and Stop

Bus Line and Stop

Ferry Line and Stop

Ferry Line and Stop

Water Taxi Line and Stop

Water Taxi Line and Stop

200 m / 2.5 minute Walking Radius

800 m / 10 minute Walking Radius 400 m / 5 minute Walking Radius

Tổng hợp Mạng lưới Giao thông Công cộng Integration of Multi-modal Transit 12

02/15/2012

Mitch Glass Romil Sheth Hsing-Chih Lee Victor Eskinazi Vee Petchthevee Andy McClurg Dennis Pieprz

Tổng hợp Mạng lưới Giao thông Công cộng) - Integration of Multi-modal Transit

TT final boards A0.indd 12

2/16/2012 12:16:53 PM

THU THIEM MASTER PLAN ADJUSTMENT - 2012

Final Report.indd 218-219

219

2/16/2012 2:26:16 PM


Sidewalk

Planting

Bike

Mixed

Lane

Lane

Mixed

Bike

Planting

Sidewalk

Sidewalk

Planting

Bike

Mixed

2.5m

3.0m

3.5m

3.5m

3.5m

3.5m

3.0m

2.5m

5.6m

5.6m

2.5m

3.5m

3.5m

5.6m 8.1m Sidewalk

20.0m Driveway

Lane 3.5m

Lane Lane Median 3.5m

8.1m Sidewalk

8.1m Sidewalk

3.5m 0.5m

Lane

Mixed

Bike

Planting

Sidewalk

3.5m

3.5m

3.5m

2.5m

5.6 m

28.5m Driveway

36.2m R.O.W.

Sidewalk Planting 5.0m

Motor Bike

2.0m

6.5m

Planting Parking 2.0m

3.25m

7.0m Sidewalk

8.1m Sidewalk

3.5m

Lane 3.5m

Median

Lane

Lane

3.5m

3.5m

3.5m

Parking

Motor Bike

3.25m 2.0 m

6.5 m

Planting Sidewalk 2.0 m

41.0m Driveway

5.0 m

7.0m Sidewalk

55.0m R.O.W.

44.7m R.O.W.

Bridge Connection - ROW 36.2 m

Lane

Thu Thiem Road - ROW 44.7 m

1.5m

Crescent Boulevard - ROW 55.0 m

Sidewalk Planting Parking 4.3m

2.5m

6.8m Sidewalk

3.0m

Mixed

Mixed

3.5m

3.5m

Parking Planting 3.0m

2.5m

13.0m Driveway

Sidewalk

Setback

5.8m

3.0m

Setback Sidewalk Planting Parking

Planting Bike

Mixed

Mixed

Bike

2.0m 3.0 m

3.3m

3.3m

3.0 m

10.0 m Sidewalk

3.0m

3.5m

Lane 3.5m

Lane 3.5m

Mixed 3.5m

Sidewalk 2.5m

17.0m Driveway

Boardwalk

3.0m

29.2m R.O.W.

Sidewalk Planting 5.0m

2.0m

7.0m Sidewalk Central Plaza

Bike

Mixed

Mixed

3.0m

3.3m

3.3m

12.6m Driveway

Bike Planting Sidewalk 3.0m

2.0m

5.0 m

7.0m Sidewalk

26.6m R.O.W.

Central Plaza Road (ROW 22.6 m)

Bicycle or Lane Emergency Lane

3.1m

5.6m Sidewalk

Local Road - Urban (ROW 26.6 m)

3.5m

3.0m

Setback 3.0m

Planting 3.0m

2.0m

5.0m Sidewalk

3.3m

Delta Landscape

Lane 1.0m 3.3m

9.6m Driveway 11.6m R.O.W.

Central Lake Park

Central Lake Park Drive - ROW 29.2 m

12.6 m Driveway 22.6 m R.O.W.

2.5m

6.6m Sidewalk

Waterfront Park Drive - ROW 28.1 m

8.0m

4.1m

1.0m

8.3m Sidewalk

28.1m R.O.W.

Sidewalk

Mixed

Delta Landscape 3.0m

Delta Road - ROW 11.6 m

Bike

Lane

Lane

Bike

3.0m

3.3m

3.3m

3.0m

12.6m Driveway 22.6m R.O.W.

Setback

Planting 2.0m

3.0m

3.0m

5.0m Sidewalk

Sidewalk 3.0m

2.0m

5.0m Sidewalk

3 m Setback

Bike

Mixed

Mixed

Bike

Sidewalk

3.0m

3.3m

3.3m

3.0m

2.0m 3.0 m

12.6m Driveway 22.6 R.O.W.

5.0m Sidewalk

No Setback

Local Road - Residential (ROW 22.6 m)

Phân loại Đường giao thông và các Mặt cắt Street Typologies and Sections

Street Typologies

13

02/15/2012

Crescent Boulevard

ROW 55.0 m

Mitch Glass

Thu Theim Road

ROW 44.7 m

Romil Sheth

Bridge Connection

ROW 36.2 m

Central Lake Park Drive

ROW 29.2 m

Vee Petchthevee

Waterfront Park Drive

ROW 28.1 m

Andy McClurg

Delta Road

ROW 11.6 m

Local Road - Urban

ROW 26.6 m

Local Road - Residential

ROW 22.6 m

Central Plaza Road

ROW 22.6 m

Hsing-Chih Lee Victor Eskinazi

Dennis Pieprz

Phân loại Đường giao thông và các Mặt cắt - Street Typologies and Sections

TT final boards A0.indd 13

2/16/2012 12:17:07 PM

THU THIEM MASTER PLAN ADJUSTMENT - 2012

Final Report.indd 220-221

221

2/16/2012 2:26:26 PM


Integration of local culture and street life into the Public Realm

Crescent Boulevard Cross Section

Sidewalk Planting 5.0m 7.0m Sidewalk

2.0m

Motor Bike 6.5m

Planting Parking 2.0m

3.25m

Lane 3.5m

Lane 3.5m

Median

Lane

Lane

3.5m

3.5m

3.5m

41.0m Driveway

Parking 3.25m 2.0 m

Motor Bike 6.5 m

Planting Sidewalk 2.0 m

5.0 m

7.0m Sidewalk

55.0m R.O.W.

Articulation of the Crescent Boulevard

Kết nối các không gian của Đại lộ Vòng cung Articulation of the Crescent Boulevard 14

02/15/2012

Mitch Glass Romil Sheth Hsing-Chih Lee Victor Eskinazi Vee Petchthevee Andy McClurg Dennis Pieprz

Kết nối các không gian của Đại lộ Vòng cung - Articulation of the Crescent Blvd

TT final boards A0.indd 14

2/16/2012 12:17:26 PM

THU THIEM MASTER PLAN ADJUSTMENT - 2012

Final Report.indd 222-223

223

2/16/2012 2:26:30 PM


Ground Level Plan

Underground Level Plan

Retail

Underground Retail

Conference Center

Underground Parking

Cultural Facilities

Circulation

School

M

Parking

Metro Line and Station Access Ramps

Entry Lobbies Circulation Access Ramps Pedestrian Entrance

M

Khu L천i Trung t창m The Core Area 15

02/15/2012

Mitch Glass Romil Sheth Hsing-Chih Lee Victor Eskinazi Vee Petchthevee Andy McClurg Dennis Pieprz

0

50

100

200m

0

50

100

200m Khu L천i Trung t창m - Core Area Detail Plan

TT final boards A0.indd 15

2/16/2012 12:17:28 PM

THU THIEM MASTER PLAN ADJUSTMENT - 2012

Final Report.indd 224-225

225

2/16/2012 2:26:32 PM


d Bri ge 1 d var ule

Bo

n Ca

t cen

al 3

s

Cre

n Ca al 1

Bri

dg

e2

Pedestrian Bridge

E/

W

d var ule

Bo

Central Lake

m

hie

uT

Th d

a Ro

Br

ge

3

id

Public Realm Typologies

Bridge 4

Central Lake Park Central Plaza Saigon Riverfront Park Children Museum Plaza Sports Park Neighborhood Parks Wetland Parks

Saigon River

Central Plaza

City Hall

Central Lake

Children’s Museum

Không gian mở Công cộng và Công viên Hồ Trung tâm Public Realm and Central Lake Park 16

02/15/2012

Mitch Glass Romil Sheth Hsing-Chih Lee Victor Eskinazi Vee Petchthevee Andy McClurg Dennis Pieprz

Cross Section through the Central Lake Park Drive and the Central Lake Không gian mở Công cộng và Công viên Hồ Trung tâm Public Realm & Central Lake Park

TT final boards A0.indd 16

2/16/2012 12:17:44 PM

THU THIEM MASTER PLAN ADJUSTMENT - 2012

Final Report.indd 226-227

227

2/16/2012 2:26:36 PM


ge

rid

nB

nB

tria

Can al 1

al 1

ge

Brid

tB

ge

en

sc

Cre

2

1-20

Brid

ge

1-12

2

1-12

2

rd va le

rd va ule

ou

o

tB

tB

en

en

sc

1-16

Cre

Cre

1-8

1-8

1-13 1-4

1-4

(3)

1-21

1-21

1-9

o tB

1-17

1-9 1-17

1-1

1-1

1-5

1-14

en

c es Cr

sc

1-16

1-13

rd va ule

2

e2

leva

ou

(2)

Brid

al 1

dg

1-20

rd

n Ca

1

es

Ped

Saigon River Can

al 1

(1)

ge

rid

nB

tria

es

Ped

Saigon River

Can

Saigon River

Bri

ge

rid

ria

est

d Pe

Saigon River

1-2

1-10

1-18

1-5

1-14

1-2

1-10

1-18

1-6

1-6 1-15

1-19

(4)

1-15

1-19

1-3

1-3

1-11

1-11

1-7

1-7

Central Lake

Central Lake

Central Lake

Project Site Boundary Neighborhood Boundary

3

Project Site Boundary

Central Plaza Boundary

Neighborhood Boundary

No Setback

Central Plaza Boundary

3m Setback

(1)

Conference Center

Flexible Setback

(2)

Mixed-Use Hotel

10 m Setback

(3)

Opera House

Internal Courtyard Concept

(4)

Visitor Center

E/W

Project Site Boundary

vard Boule

Neighborhood 1 - Illustrative Plan

0

50

100

200m

Neighborhood 1 - Massing Image THU THIEM URBAN DESIGN GUIDELINES

117

1/27/2012 1:32:44 PM

vard Boule

Central Plaza Boundary

Neighborhood 1 - Street Level Setbacks

116

TT Urban Design Guideline.indd 116-117

E/W

Neighborhood Boundary

Retail frontage Required (Minimum 20 m depth)

Parcels that have podium and street level retail should maintain NO SETBACK from the street edge up to the podium height. Above the podium the building can be setback as required.

0

50

100

Neighborhood 1 - Street Level Retail

200m

0

124

50

100

200m

THU THIEM URBAN DESIGN GUIDELINES

TT Urban Design Guideline.indd 124-125

125

1/27/2012 1:33:27 PM

4 ge

nB

Ped

m

es

Ped

Saigon River

Can

1-20

al 1

al 1

m

1-20

1.4 18

4

al 1

1-20 Conference Center

al 1

m

5.4

4.

34

19

m

m 6.2

m

15

4.9

m

1-6

77.4

m

1-7 79.2 m

m

m

.5

m

.3

m

1-2

1-4 1-9 1-1 1-5

1-14 1-2

1-10

1-18

1-6

1-19 Visitor Center

88

m

1-2

1-10

1-18

1-6

1-6

1-15

1-15

1-19

1-19

1-3

1-3

87.6

m

1-8

1-17

1-1 1-5

1-14

1-10

1-18

.6

.5

1-9 1-17

1-1 1-5

1-14

1-21

m

1-2

88

1-4

1-9

m

81.

88

.8 98

m

m

6

m

1-15 1-3

1-3

1-11

1-11

1-11

m

77.9

79.0

m 83.1

10

4.2 m

83.1

79.2

m

m

14

5.1 12

11 9.7

m

.8

.4

1-13

1-13

1-21

1-17

1-1 .3

76

m

1-11 95.6 m

1

0.

10

m

1-21 Opera House

1-7

66.8

97.5 m

m

m

118.5

97.2

77.4 m

75

m

1-8

1-4 m

88

1-5

lev ard

m 7 19 4.

m 8.2

m

17

2.7 17

m

97.4

m

m

1-15

1-10

1-13

m

5.6

10

74

.6

m

m

116

105.5

97.7

m

106.6

m

1-9

97.5

.9 m

120.8

m

98.1

m

m

122.5

m

109.7

133.9

m

m

76.7

61.3

69.9

76.7

m

61.3m

67.2 m

92.9

1-19 93.7 m

1-14

1-4

m

m

rd leva

91.7

1-18

77.7

m

m

1.1

12 74

.3

1-16

Cre

1-8

m

12

m

m

.6 89

1-17

m 91.1

Bou

.4

m

tB

en

sc

1-16

Cre

m

88.4

.3

6.6

.8

95

78

m

1-12

ou

tB

en

sc

1-16

.7 73

87.3

1-8 94

1-13

m

m

m

m

.5

.3

0

6.

14

2

rd va le

ou

ou

tB

en

sc

.0 90

84 84

1-21

rd va le

rd va le

m

6.

15

Cre

m

ge

ou

0

m

.0

Brid

1-12

2

80

1

83

ge

sc

5.

m

18 m

51.1m

75

1-16

64.0m

m

Brid

1-12 Mixed-Use Hotel

2

tB

ge

m

0.0

en

Brid

1-12

14

2

67.9 m

ge

Cre

Brid

.9

EW

ge

rid

nB

tria

es

Ped

Saigon River

Can

Can

1-20

Central Lake

ge

rid

nB

tria

es

Ped

Saigon River

m

38

Can

4.8

nB

es

2

Saigon River

tria

tria

0. 14

5

ge

rid

rid

Pedestrian Bridge

1-7

1-7

Central Lake

Central Lake

Central Lake

Central Lake

Project Site Boundary Project Site Boundary

Project Site Boundary

Neighborhood Boundary

Neighborhood Boundary

Neighborhood Boundary

Circulator Bus Line and Stop

Central Plaza Boundary Commercial

(1) (2) (3) (4) (5)

Convention Center Hotel Complex Opera House Visitor Center Central Plaza

Commercial Mixed-Use Project Site Boundary

E/W

vard Boule

Residential Mixed-Use E/W

Cultural Facilities

vard Boule

Crescent Boulevard

ROW 55.0 m

Bridge Connection

ROW 36.2 m

Central Lake Park Drive

ROW 29.2 m

Waterfront Park Drive

ROW 28.1 m

Local Road - Urban

ROW 26.6 m

Neighborhood Boundary

Public Parks

Local Road - Residential

ROW 22.6 m

Central Plaza Boundary

Central Plaza

Central Plaza Road

ROW 22.6 m

Neighborhood 1 - Development Parcel Dimensions

0

50

100

200m

Neighborhood 1 - Land Use Distribution

0

118

50

100

119

1/27/2012 1:33:19 PM

vard Boule

M

Municipal Subway

AE

Airport Express

M AE

Ferry Line and Stop

E/W

vard Boule

Water Taxi Line and Stop 200 m / 2.5 minute Walking Radius

Neighborhood 1 - Street Typology

200m

THU THIEM URBAN DESIGN GUIDELINES

TT Urban Design Guideline.indd 118-119

Bus Line and Stop

E/W

0

50

100

Neighborhood 1 - Transit Connections

200m

126

0

50

100

200m

THU THIEM URBAN DESIGN GUIDELINES

TT Urban Design Guideline.indd 126-127

127

1/27/2012 1:33:28 PM

Commercial Residential Mixed-Use

ge

rid

nB

ge

rid

nB

tria

tria

es

Ped

Saigon River

ge

rid

nB

tria

es

Ped

Saigon River

es

Ped

Saigon River

10

Can

1-20

al 1

1-20

al 1

al 1

Can

Can

10

1-20

10

10

Brid

ge

1-12

15

Brid

ge

2 15

Brid

ge

1-12

2

rd va ule

20

10

1-16 10

20

rd va le

15

25

10 15

20

A

15

1-10

Building

Courtyard

1-1 1-5

1-14 1-2

1-10

1-18

1-2

1-10

1-18

1-6

1-6

10

15

1-17

1-1

6

1-15

1-19

1-3

1-15

1-19

1-3

1-3

1-11

1-11

6

1-7

50

Building

1-9

1-5

1-14

6

1-11

30

1-17 Boulevard Crescent

Building

1-2

1-6

1-15

1-19

10

15

50

30

1-4 1-21

1-9

Section A

1-5

40

20

Building

6

1-1

1-14

30

1-18

1-21

10

15

40

1-17

1-4

15

30

1-9

20

1-8

1-13

1-4

10

Cre

1-8

1-13

10

1-13

25

1-21

sc

1-16

Cre

30

1-8

ou

tB

en

sc

1-16 30

1-12

tB

en

25

sc

Cre

20

2

rd va le

ou

o

tB

en

10

1-7

1-7

20

Central Lake

Central Lake

Central Lake

Project Site Boundary Neighborhood Boundary Central Plaza Boundary Project Site Boundary

15

15 Floors

(60 m)

Neighborhood Boundary

20

20 Floors

(80 m)

Central Plaza Boundary

25

25 Floors

(100 m)

4 Floors

(16 m)

30

30 Floors

(120 m)

6

6 Floors

(24 m)

40

40 Floors

(160 m)

10

10 Floors (40 m)

50

50 Floors

(200 m)

No Setback 3m Setback E/W

vard Boule

Flexible Setback

E/W

Neighborhood 1 - Maximum Building Heights

0

50

100

200m

128

Neighborhood Neighborhood 11 -- Street Section Level withSetbacks Building Heights

0

124

50

100

SaigonRiver River Saigon

rd va le

rd va le

ou

17

tB

ou leva

rd

Cre

en tB

1-17 1-17 (3)

1-1 1-5

1-2

1-19 1-19 (1)

1-3

sc e

Victor Eskinazi

1-15 1-3 1-11

1-7 1-7 (3)

1-7

Hsing-Chih Lee 1-2

1-6 1-19 1-3 1-3 (1)

1-11 1-11 (3)

1-11

1-1 1-5

1-10

1-18

1-6 1-6 (2)

1-15 1-15 (3)

Romil Sheth

1-9

1-14 1-2 1-2 (1)

1-6 1-15

Mitch Glass 1-4

1-17

1-1 1-1 (1)

1-5 1-5 (2) 1-10 1-10 (5)

1-18 1-18 (2)

1-21

1-9 1-9 (3)

1-14 1-14 (4)

02/15/2012

1-8

nt

1-13 1-4 1-4 (2)

sc Cre

1-21 1-21 (1)

1-9 1-17

1-10

1-16 1-8 1-8 (3) Cre

1-13 1-13 (3)

Bo

1-16 1-16 (1)

1-8

ule va rd

sc

1-4

1-19

Khu Chức năng số 1 Neighborhood 1

1-12

2

en

1-13

1-18

al 1

ge

ou

1-14

1-20

Brid

tB

1-21

ge

rid

nB

tria

es

Anchor

en

Cre

125

Ped

Saigon River

1-12 1-12 (2)

sc

1-16

200m

Can

al 1

1-20 1-20 (1)

BB ridrid gege 22

1-12

2

100

1/27/2012 1:33:27 PM

al 11 al Can Can

Can

1-20

Brid

50

THU THIEM URBAN DESIGN GUIDELINES

gege ridrid n nB B tria tria eses Ped Ped

ge

rid

nB

0

129

1/27/2012 1:33:30 PM

tria

es

Neighborhood 1 - Street Level Retail

200m

THU THIEM URBAN DESIGN GUIDELINES

Ped

vard Boule

Retail frontage Required (Minimum 20 m depth)

Parcels that have podium and street level retail should maintain NO SETBACK from the street edge up to the podium height. Above the podium the building can be setback as required.

TT Urban Design Guideline.indd 124-125

Saigon River

E/W

Neighborhood Boundary Central Plaza Boundary

Internal Courtyard Concept

TT Urban Design Guideline.indd 128-129

ge

Project Site Boundary

vard Boule

10 m Setback

Maximum Building Heights allow flexbility by 20 percent

Vee Petchthevee

1-7

Andy McClurg Central Lake

CentralLake Lake Central

Central Lake

Project Site Boundary Project Site Boundary Project Site Boundary

Project Site Boundary Neighborhood Boundary

Neighborhood Boundary

Underground Garage Bridge Connection

On-Street Parking Internal Courtyard Concept E/W

Ramp to Underground Parking

vard Boule M

Vehicular / Service Entry (15 m Minimum Away from Street Intersection )

Neighborhood 1 - Vehicular Access and At Grade Parking 130

TT Urban Design Guideline.indd 130-131

TT final boards A0.indd 17

Circulator Bus Line and Stop

Neighborhood Boundary ROW 55.0 m Crescent Boulevard

Central Plaza Boundary

(1)

0

50

100

200m

ROW 36.2 m

Underground Retail Central Lake Park Drive

ROW 29.2 m

Circulation Waterfront Park Drive

ROW 28.1 m

Metro Line- Urban and Station Local Road

ROW 26.6 m

Entrance Local Road Ramp - Residential

ROW 22.6 m

Bus Line and Stop

M dd var var ule ule Bo Bo E/W E/W

Neighborhood Neighborhood 11 -- Street Underground Typology Parking 126

M

Municipal Subway

AE

Airport Express

M AE

Ferry Line and Stop

E/W

vard Boule

Water Taxi Line and Stop 200 m / 2.5 minute Walking Radius

LevelsPlaza of Underground Parking ROW 22.6 m Central Road

TT Urban Design Guideline.indd 126-127

Dennis Pieprz

Neighborhood Boundary

00

5050

100 100

Neighborhood 1 - Transit Connections

200m 200m

THU THIEM URBAN DESIGN GUIDELINES

131

1/27/2012 1:33:33 PM

0

50

100

Khu Chức năng số 1 - Neighborhood 1

200m

THU THIEM URBAN DESIGN GUIDELINES

127

1/27/2012 1:33:28 PM

2/16/2012 12:18:08 PM

THU THIEM MASTER PLAN ADJUSTMENT - 2012

Final Report.indd 228-229

229

2/16/2012 2:26:44 PM


Central Lake Central Lake

Central Lake

2-11

2-9

2-1

2-3

2-5

2-7

2-11

2-2

2-4 2-6

Pedestrian Bridge

(4)

2-8

2-10 2-12

2-12 levard

levard

levard

E/W Bou

E/W Bou

E/W Bou

2-13 2-16

leva

rd leva ou

en

ou

2-15

2-20

2-22

(1)

tB

rd

2-17 2-15

2-20

sc

ou tB

2-14

2-19

2-17

Cre

en

2-14

sc

2-16 2-19

2-13

tB en sc Cre

(3)

Cre

Central Lake

2-22

2-18

le va rd

2-18

2-21

2-21 2-23

2-24 2-26

2-25

E

1

2-23

2-24

(5)

rd leva

ou WB

2-26

2-25

2-27

2-27

3

e

dg

ge

3

2-28

d

Bri

Bri

2-2

2-4

2-6

2-8

2-10

2-1

2-3

2-5

2-7

2-9

ge

3

2-28

d

Bri

(2)

Project Site Boundary Saigon River

Project Site Boundary

Neighborhood Boundary

Saigon River

Saigon River

(1)

Arena

Neighborhood Boundary

(2)

Stadium

No Setback

(3)

Observation Tower Complex

3m Setback

(4)

School

Flexible Setback

(5)

Administrative Center

Special Condition Setback

Saigon River Project Site Boundary Neighborhood Boundary

Parcels that have podium and street level retail should maintain NO SETBACK from the street edge up to the podium height. Above the podium the building can be setback as required.

Internal Courtyard Concept

2

Neighborhood 2 - Illustrative Plan

0

50

100

200m

Neighborhood 2 - Massing Image

Neighborhood 2 - Street Level Setbacks

134

THU THIEM URBAN DESIGN GUIDELINES

TT Urban Design Guideline.indd 134-135

Cr es

1/27/2012 1:33:40 PM

100

200m

143

1/27/2012 1:34:41 PM

Central Lake

2-11

2-9

2-1

2-3

2-5

2-7

2-9

2-11

2-3

2-5

2-7

2-1

79.6 m

M AE

79.2 m 87.4 m

90.6 m

102.3

99.6 m

2-4

2-2

76.5 m

85.7 m

2-6

2-1

2-3

2-5

2-7

2-9

2-11

m

m

m

m

m

88.4 m

2-2

2-4 2-8

2-10

2-12

2-2

2-4

2-6

2-6

2-8

2-10 School

2-12

2-2

2-4

2-6

m

82.1

85.2 m

2-8

2-10 2-12

81.2 m

m

rd

m 7.1 16

2-18

2-21

m

177.9

2-22 Cre

sc

en

tB

ou

lev ard

2-21 2-23

2-23

9.6 m

m

2-24

15

2-24

105.

0m

5.2

m

15

2-24 2-26

2-25

2-26

2-25

m

m 8.2

m

2-27 m

2-28 3.3

m

25

Bri

m

e

223.2

12 2-27 3.5 m

31 2.3

3

112. 7

m

27

50

.6

3.7

m

m

3.7

2-26

2-25

m

2-26

12 12

.0

67. 1

m

55

m .2

m

68

.4

2-15

2-20

2-22 2-18

2-23 3.9

m

10 2-25 0.6 m

2-17 2-15

2-20 2-22 Arena

2-18

m

12

59.5

72

e

dg

2-15

2-20

ard lev ou

m

21 8.6

tB en

.8

2-24

2-17

2-14

sc Cre

.1

rd

m

49

m

2-13 2-16 2-19

rd leva ou

leva

3.0

.4

2-13

tB en sc Cre

ou

12 98 46

2-14

2-21

2-23

m

tB

m

5

.4

en

m

3

8.

10

m

63

75

2-22

.3

5 3.

m

sc

m

10

2-21

2-17

m

9.4

2-18

.8

2-16 2-19

20

m 20

.1 87

.4

78

m

m

245.8 m

2-15 m .8 91

m 4.2 11

.4

83

2-14

2-19

m

m

84

2-16

m

.0 73

m

79

m .0 67

4.0

Cre

m

5.4

m

10

.5

68

m

.8

79

.9

2.7

2-20

leva E/W Bou

m 127.8

.4

2-17

10

m

.4

88

m

.7

25

rd leva ou

m 5.9

2-14

m 9.7

17 m

95

m 5.4

74.6

22

m 4.0

12

3

tB en sc Cre

14

m

m

76.1

m

89

2-13 Observation Tower Complex

2-13

.7

m

m

.1

64

.1

97.2

2-19

2-16

rd

leva E/W Bou

leva E/W Bou

81.1 m 82.5 m 94.9 m

rd

rd

leva E/W Bou

89

i

50

Central Lake

94.9 m

104.0 m

93.3 m

116.0 m

111.5 m

117.1

128.6

125.9

2-8

2-1

85.1 m

88.1 m

84.8 m

2-10

107.0 m

103.2 m

109.3 m

118.6 m

m

150.7

140.8

2-12

138.1

6

7

Br

0

THU THIEM URBAN DESIGN GUIDELINES

82.8 m

2-3

86.8 m

85.6 m

90.8 m

96.5 m

2-5

303.0 m

e dg

Neighborhood 2 - Street Level Retail

200m

89.3 m

2-7

91.3 m

96.5 m

ev ar d

147.0 m

170.9 m

157.3 m

4

160.3 m

Bo

2-9

86.7 m

School Observation Tower Complex SOHO Apartments Arena Stadium Sports Fields Administrative Center Mixed Use Pavilion

100

Central Lake

82.8 m

2-11

95.4 m

(1) (2) (3) (4) (5) (6) (7) (8)

50

TT Urban Design Guideline.indd 142-143

93.7 m 82.3 m

nt

ul

3

0

142

Central Lake 96.1 m

ce

8

135

Retail frontage Required (Minimum 20 m depth)

dg

ge

2-27

3

2-28 Stadium

Bri

e

dg

3

3

2-27

2-28

d Bri

2-28

Bri

17

2.2

m

Project Site Boundary

.8 m

138

Project Site Boundary

Neighborhood Boundary

Saigon River

Project Site Boundary

Commercial Mixed-Use

Neighborhood Boundary

Residential Mixed-Use

Crescent Boulevard

ROW 55.0 m

Bridge Connection

ROW 36.2 m

Saigon River

Community Facilities

Project Site Boundary Neighborhood Boundary

Neighborhood 2 - Development Parcel Dimensions

0

50

100

200m

Neighborhood Boundary

Commercial

Circulator Bus Line and Stop Bus Line and Stop Saigon River

AE

Airport Express

Saigon River

Municipal Subway

School

Central Lake Park Drive

ROW 29.2 m

Administrative Center

Waterfront Park Drive

ROW 28.1 m

Water Taxi Line and Stop

Public Park

Local Road - Urban

ROW 26.6 m

Central Plaza Road

ROW 22.6 m

200 m / 2.5 minute Walking Radius

Wetlands

Neighborhood 2 - Land Use Distribution

0

136

50

100

Neighborhood 2 - Street Typology

200m

THU THIEM URBAN DESIGN GUIDELINES

TT Urban Design Guideline.indd 136-137

M

137

1/27/2012 1:34:33 PM

0

50

100

M Neighborhood 2 - Transit Connections

200m

144

0

50

100

200m

THU THIEM URBAN DESIGN GUIDELINES

TT Urban Design Guideline.indd 144-145

145

1/27/2012 1:34:43 PM

Commercial Residential Mixed-Use

Central Lake Central Lake

Central Lake 40 40

15 40

20

50

2-3

25

2-11

2-5

2-7

2-9

30

15

2-11

2-9

2-1

2-3

2-5

2-7

2-1

20

50

2-11

2-1

2-3

2-5

2-7

2-9

20 10

15

40 30

A

15

2-12

2-2

2-4

2-6

2-8

2-2

2-4

15

2-6

20

25

2-10

15

2-8

2-10 2-12

2-12 levard

15

2-2

2-4

2-6

2-8

2-10

30

levard

E/W Bou

levard

E/W Bou

E/W Bou

15 86

30

2-13

15

2-15 15

40

Section A

15

2-15

2-20

2-22

2-22

2-18

6

2-18

15

2-21

6

2-21

2-23

2-21

2-23

2-23

10

15

2-24 10

10

2-25

2-24

6

6

2-26

2-25

2-26

2-25

10

6

2-27

6

2-27

2-27

2-28

10

3

2-24

2-26

6

10

e dg

2-17

2-15

2-20

2-22

2-18 15

2-14

Building

rd va ule Bo

Crescent Boulevard rd

rd

40

2-17

6

2-20

2-13 2-16 2-19

leva

leva

Building

t en

2-14

2-19

30

ou

15

15

sc Cre

tB

40 30

2-17

ou tB

en

15

15

en

2-16

sc

2-14

15

2-19

sc

2-16

6

Cre

15

2-13

6

Cre

6 30

e dg

Bri

3

2-28

e dg

3

2-28

Bri

Bri 10

Saigon River

Saigon River

Project Site Boundary Project Site Boundary

20

20 Floors

(80 m)

Neighborhood Boundary

Neighborhood Boundary

25

25 Floors

(100 m)

No Setback

4 Floors

(16 m)

30

30 Floors

(120 m)

3m Setback

(24 m)

40

40 Floors

(160 m)

10

10 Floors

(40 m)

50

50 Floors

(200 m)

15

15 Floors

(60 m)

86

86 Floors (344 m)

6

6 Floors

Saigon River Project Site Boundary

Flexible Setback

Neighborhood Boundary Special Condition Setback

0

50

100

200m

TT Urban Design Guideline.indd 146-147

Parcels that have podium and street level retail should maintain NO SETBACK from the street edge up to the podium height. Above the podium the building can be setback as required.

Internal Courtyard Concept

Maximum Building Heights allow flexbility by 20 percent

Neighborhood 2 - Maximum Building Heights 146

Neighborhood Neighborhood2 2- Street - Section Level withSetbacks Building Heights

0

142

THU THIEM URBAN DESIGN GUIDELINES

50

100

TT Urban Design Guideline.indd 142-143

2-3

2-5

2-7

Neighborhood 2 - Street Level Retail

200m

2-112-11 (1)

2-7 2-7 (3)

2-92-9 (2)

2-52-5 (5)

2-9

tB

en

sc

2-14 2-14 (2)

2-192-19 (1)

leva

ou

rd leva ou rd tB en uleva sc o Cre ent B sc

Cre

Cre

2-16 2-16 (2)

rd

2-17 2-17(2)

levard

E/W Bou

2-132-13 (2)

Mitch Glass 2-15

ou

tB ard lev

2-18

Romil Sheth

2-22

en

2-20

2-22 2-22 (1)

Cre

sc

en

tB

Hsing-Chih Lee

ou

lev ard

2-21 2-23

2-23 2-23 2-24 2-24

2-26

Victor Eskinazi

2-24 2-26 2-26 (1)

2-25 2-25

02/15/2012

2-14

2-17

sc

2-24

18

2-19

2-18 2-18 (2) 2-21 2-21 (1)

2-23

Khu Chức năng số 2 Neighborhood 2 2-13

2-16

Cre

2-18

2-21

2-25

2-2

2-4

2-6

2-15 2-15 (2)

2-20 2-20 (1)

2-22

2-1

2-8

2-10

rd rd levaleva BouBou E/WE/W

2-15

2-20

2-2 2-2 (3)

2-42-4 (3)

2-13

2-17

2-3

2-5

2-7

2-12

levard

2-19

143

M AE

2-62-6 (4)

E/W Bou

2-14

200m

Central Lake

2-11

M 2-82-8 (4)

2-10 2-10

2-12 2-12 (2)

2-16

100

1/27/2012 1:34:41 PM

2-12-1 (2)

2-32-3 (3)

2-2

2-4

2-6

50

THU THIEM URBAN DESIGN GUIDELINES

Central Lake Central Lake

2-1

2-8

2-10

2-12

0

147

1/27/2012 1:34:45 PM

Central Lake

2-9

2-11

Retail frontage Required (Minimum 20 m depth)

2-26

2-25

Vee Petchthevee 2-27 2-27 (1)

2-27

e

dg

3

3 e e3 g

2-28

dg Bri Brid

Bri

e

dg

Bus Line and Stop

Crescent BoulevardGarage ROW 55.0 m Underground Saigon River

Internal Courtyard Concept Ramp to Underground Parking

M

Vehicular / Service Entry (15 m Minimum Away from Street Intersection )

Neighborhood 2 - Vehicular Access and At Grade Parking

TT final boards A0.indd 18

Circulator Bus Line and Stop

Neighborhood Boundary Neighborhood Boundary

On-Street Parking

148

Dennis Pieprz

Neighborhood Boundary

Project Site Boundary Project Site Boundary

Neighborhood Boundary

TT Urban Design Guideline.indd 148-149

Andy McClurg

2-28

Project Site Boundary

Project Site Boundary

Surface Parking Zone (Maximum 20 m wide)

2-27

Bri

2-28

2-28 (1)

3

(1)

0

50

100

200m

Bridge Connection Retail Underground

ROW 36.2 m

Central Lake Park Drive Circulation

ROW 29.2 m

Saigon River Saigon River

AE

Airport Express

M

Municipal Subway

Waterfront Metro Park Line Drive and StationROW 28.1 m

Water Taxi Line and Stop

LocalEntrance Road - Urban Ramp

200 m / 2.5 minute Walking Radius

ROW 26.6 m

Central Plaza 22.6 m Levels of Road UndergroundROW Parking

Neighborhood Neighborhood2 2- Street - Underground TypologyParking

0

144

THU THIEM URBAN DESIGN GUIDELINES

TT Urban Design Guideline.indd 144-145

0

50 50 100 100

Saigon River

M Neighborhood 2 - Transit Connections

200m 200m

149

1/27/2012 1:34:48 PM

0

50

100

Khu Chức năng số 2 - Neighborhood 2

200m

THU THIEM URBAN DESIGN GUIDELINES

145

1/27/2012 1:34:43 PM

2/16/2012 12:18:32 PM

THU THIEM MASTER PLAN ADJUSTMENT - 2012

Final Report.indd 230-231

231

2/16/2012 2:26:54 PM


Br i Brid

Brid

ge

ge

ge

1

1

1

e1

Brid

dg

Saigon River

Saigon River

Saigon River

Saigon River rd leva

ou

tB

3-14

scen

3-14

Cre

3-15

3-15

(1) 3-16

3-17

3-16

3-17

3-10

3-10

rd leva

rd leva

ou

ou

tB

tB

3-6

3-11 Thu

Thu

scen

3-6

em

3-12

em

em

3-7

d

d

d

3-13

3-2

Roa

3-2

Roa

Roa

3-7

Thi

Thi

Thi

3-12 3-13

3-11

Cre

Thu

scen

Cre

3-8

3-8 3-1

3-9

3-3 3-4

al 1

Can

al 1

1

3-1

3-4

Can

al 1

Can

(2)

3-9

3-3

3-5

3-5

Project Site Boundary Neighborhood Boundary No Setback Project Site Boundary

(1)

Museum

(2)

School

Central Lake

3m Setback

Neighborhood Boundary

Project Site Boundary

Flexible Setback Central Lake

Neighborhood Boundary

35 m Setback

n Ca

Neighborhood 3 - Illustrative Plan

0

50

100

200m

Neighborhood 3 - Massing Image

Neighborhood 3 - Street Level Setbacks

al 1

156

THU THIEM URBAN DESIGN GUIDELINES

TT Urban Design Guideline.indd 156-157

157

1/27/2012 1:35:11 PM

0

50

100

Central Lake

Retail frontage Required (Minimum 20 m depth)

Parcels that have podium and street level retail should maintain NO SETBACK from the street edge up to the podium height. Above the podium the building can be setback as required.

Internal Courtyard Concept

Neighborhood 3 - Street Level Retail

200m

0

164

50

100

200m

THU THIEM URBAN DESIGN GUIDELINES

TT Urban Design Guideline.indd 164-165

165

1/27/2012 1:35:52 PM

uT

Th hie

ard lev

m

ou

Brid

Saigon River

ge 1

1

Saigon River

Saigon River

m

99.3

m

m

m

3-14

131.6

.7

60

117.6

123.2

2

m 122.4

7.3

3-14

3-14

168.4

3-15

3-15

m

m

122.4

m

0m

3-15

m

3-16

91.2

m

m

3-17 Museum

3-10

100.

3-14

m

m

3-15

164.2

3-16

191.3

0.6 29

0.5 29

3-17

14

m

113.0

1

1

ge

ge

Brid

Saigon River

Brid

d

ge

ce

es Cr

Brid

a Ro

B nt

3-16

3-17

3-10

3-16

3-17

3-10

3-10

m

7 110.

100.0

ou

tB

m 122.4

scen

3-6 Thu Thi em

3-12

em

3-7

3-2

d

d

m

3-13

d

Roa

3-2

Roa

Roa

3-7

3-13

3-11

Cre

Thi

em

3-12 3-2

.4 98

m 0.8

m

17

128.4

3-8

3-8

3-8 3-1

3-1 3-9

m

3-3

3-1 3-9

3-3

3-3

m

al 1

al 1

al 1

m

m

3-5

3-4

Can

3-4

Can

3-4 School

Can

m

114.5m

3-5

3-5

m

m

Project Site Boundary

Project Site Boundary

(1) Cultural Museum (2) School

Neighborhood Boundary

Neighborhood Boundary

Circulator Bus Line and Stop

Commercial Mixed-Use

Project Site Boundary

rd leva

ou

tB

3-6

3-11 Thu

Thi

3-7

3-9 122.6

106.1

scen

Cre

Thu

77.4

d

107.9

103.3

.7

95

al 1

66.5

m

3-4

3-1

m

7.1

13

Can

m

3-5

3-3

143.2

m

110.7 .2

65

3-12 3-13 m

ou tB

3-6

3-11

3-2

122.4

m m

m

m

103.1

77.4

77.4

3-9

tB

scen

Cre

122.4

Roa

m

3-8

m

64

m

102.7

m

91.0

.4

m

3-7

77.4

m m

110.7

em

101.6

91.2

3-13

rd leva

ou

Thi

3-12

m

63

m

m

m

101.3

rd leva

m

3-6

3-11 Thu

m

110.7

77.4

Cre

.5

rd leva

m

scen

m

91.2

.1

63

Residential Mixed-Use

Project Site Boundary

Residential High Density

Neighborhood Boundary

Neighborhood Boundary

Crescent Boulevard

ROW 55.0 m

Thu Thiem Road

ROW 44.7 m

Local Road-Urban

0

50

100

200m

Neighborhood 3 - Land Use Distribution

0

158

50

100

Ferry Line and Stop

THU THIEM URBAN DESIGN GUIDELINES

TT Urban Design Guideline.indd 158-159

200 m / 2.5 minute Walking Radius

Central Lake

ROW 22.6 m

Neighborhood 3 - Street Typology

200m

159

1/27/2012 1:35:45 PM

Municipal Subway

Water Taxi Line and Stop

Central Lake Park Drive ROW 29.2 m

Central Lake

Wetlands

Neighborhood 3 - Development Parcel Dimensions

Bus Line and Stop

Cultural Facilities School Public Parks

Central Lake

M

0

50

100

Central Lake

Neighborhood 3 - Transit Connections

200m

166

0

50

100

200m

THU THIEM URBAN DESIGN GUIDELINES

TT Urban Design Guideline.indd 166-167

167

1/27/2012 1:35:53 PM

Commercial Residential Mixed-Use Residential High Density Community Space

ge

Brid

ge

Brid

1

1

Brid

Saigon River

Saigon River

Saigon River

ge 1 15

A

3-14

Courtyard

Building

Crescent 3-14 Boulevard

Building

Building

3-14

10 15

Section A

15

10

3-15

3-15

3-16

3-17

20

rd leva

ou

tB

20

3-12 3-7

3-6

3-12 3-2

3-7

3-13

3-2

d

3-13

Roa

6

em

3-2

3-11

Thi

6

10

scen

Cre

Thu

15

d Roa

3-8

3-7

d Roa

10

3-10

rd leva

tB

3-6

3-11 em Thi

em Thi

25

3-13

scen

Cre

10

Thu

Thu

25

tB

3-6

3-16

ou

ou

15

3-17

3-10 rd leva

10

25 10

10

10

10

3-9

3-16

3-17

20

20

3-11 3-12 25

3-10

15

scen

Cre

10

3-15

15

10

3-8

6

3-8 3-1

10

10

3-3

3-9

3-1

10

3-1 3-9

3-3

6

3-3

6

al 1

3-5

6

3-4

Can

3-4

al 1

al 1

3-5

Can

Can

6

3-4 6

3-5

Project Site Boundary Neighborhood Boundary

Project Site Boundary

4 Floors

(16 m)

Neighborhood Boundary

6

6 Floors

(24 m)

10

10 Floors (40 m)

15

15 Floors (60 m)

20

20 Floors (60 m)

25

25 Floors (100 m)

No Setback Central Lake

3m Setback

Project Site Boundary

Flexible Setback Central Lake

Neighborhood Boundary

35 m Setback

Neighborhood 3 - Maximum Building Heights

0

50

100

200m

168

TT Urban Design Guideline.indd 168-169

Neighborhood Neighborhood3 3- Street - Section Level withSetbacks Building Heights

0

164

THU THIEM URBAN DESIGN GUIDELINES

50

100

TT Urban Design Guideline.indd 164-165

Central Lake

Retail frontage Required (Minimum 20 m depth)

Parcels that have podium and street level retail should maintain NO SETBACK from the street edge up to the podium height. Above the podium the building can be setback as required.

Internal Courtyard Concept

Maximum Building Heights allow flexbility by 20 percent

Neighborhood 3 - Street Level Retail

200m

0

169

50

100

200m

THU THIEM URBAN DESIGN GUIDELINES

1/27/2012 1:35:55 PM

165

1/27/2012 1:35:52 PM

Saigon River

1

1

ge

ge

Brid

Brid

Saigon River Saigon River

Saigon River

Thu

rd leva

3-143-14 (2)

em Thi

ou

tB

3-14

scen

Cre

Khu Chức năng số 3 Neighborhood 3

3-14

3-15

3-153-15 (1)

3-16

3-17

3-10

3-17

3-17

Thu em Thi

Roa d

3-3

Vee Petchthevee

3-4 3-5

Andy McClurg Dennis Pieprz

Project Site Boundary Neighborhood Boundary Circulator Bus Line and Stop

Surface Parking Zone (Maximum 20 m wide)

Project Site Boundary

Internal Courtyard Concept

Neighborhood Boundary ROW 55.0 m Crescent Boulevard

Ferry Line and Stop

ThuUnderground Thiem Road Garage ROW 44.7 m

Water Taxi Line and Stop

Entrance Central Lake Ramp Park Drive ROW 29.2 m Central Lake Central Lake Levels of Parking ROW 22.6 m Local Road-Urban

200 m / 2.5 minute Walking Radius

Bus Line and Stop

Project Site Boundary Boundary Neighborhood

Ramp to Underground Parking Central Lake

Neighborhood 3 - Vehicular Access and At Grade Parking 170

em

al 1

3-5 3-5 (1)

On-Street Parking

TT Urban Design Guideline.indd 170-171

Thi

3-4 3-4

Neighborhood Boundary

TT final boards A0.indd 19

Victor Eskinazi

3-1 3-9

Project Site Boundary

Vehicular / Service Entry (15 m Minimum Away from Street Intersection )

Thu

3-1 3-1 (1)

3-3 3-3 (1)

Can

al 1

al 1 Can 1 al Can

Can

3-5

Hsing-Chih Lee

3-2

3-8

3-9 3-9 (1)

3-4

3-7

3-13

d

Roa

3-2 3-2 (1)

3-8 3-8 (1)

3-1

Romil Sheth

3-6

3-11

3-12

em

3-133-13 (3)

3-3

rd leva

scen

Cre

Thi

3-7 3-7 (1)

3-8 3-9

tB

3-6 3-6 (1)

Thu

d

3-13

Mitch Glass

3-10

ou

3-113-11 (2)

3-123-12 (2)

3-2

3-7

3-16

3-17

3-103-10 (2)

rd rd levaleva ou ou tBtB scenscen CreCre

3-6

Roa

3-11

3-15

3-163-16 (1)

3-12

02/15/2012

d

Roa

19

(1)

0

50

100

200m

M

Neighborhood Neighborhood3 3- Street - Underground TypologyParking

0

166

THU THIEM URBAN DESIGN GUIDELINES

TT Urban Design Guideline.indd 166-167

0

50 50 100 100

Municipal Subway

Central Lake

Neighborhood 3 - Transit Connections

200m 200m

171

1/27/2012 1:35:57 PM

0

50

100

Khu Chức năng số 3 - Neighborhood 3

200m

THU THIEM URBAN DESIGN GUIDELINES

167

1/27/2012 1:35:53 PM

2/16/2012 12:18:51 PM

THU THIEM MASTER PLAN ADJUSTMENT - 2012

Final Report.indd 232-233

233

2/16/2012 2:27:02 PM


Saigon River Saigon River

Saigon River 4-21

4-21

4-20

4-20

4-22

4-22

4-23

4-23

4-24

Saigon River

4-24 4-16

rd leva

4-11

ou

tB

4-25 C

4-27 4-26

4-13

4-1

4-19

4-19 4-14 4-5

4-5

(3)

4-15

4-15

4-4

4-4 4-10

4-10

Thi

Thi

Thi

4-3

4-3

em

em

em

(3)

4-9

Thu

4-9

Thu

Thu

(1) (2)

4-6

Roa

Roa

4-8

d

d

d

Roa

4-6 4-8

4-7

Project Site Boundary

Administrative Center

3m Setback

(3)

School

Flexible Setback

al 3

n Ca

4

W

E/

rd leva

Neighborhood Boundary

Bou

Community Facility

(2)

(4)

1

4-7

Project Site Boundary rd leva

Neighborhood Boundary (1)

4-2

al 3

al 3

al 3

4-14

4-1 Can

4-2

Can

(4)

4-12

4-17

4-18 4-13

(3)

Can

rd leva

ou

tB

scen

4-11

C

4-26

4-18

Cre

4-16

en resc

4-27

4-12

4-17

rd leva

ou

tB

4-25

en resc

E/W

rd leva

Bou

E/W

Bou

No Setback

Fire Station

Project Site Boundary Neighborhood Boundary

Parcels that have podium and street level retail should maintain NO SETBACK from the street edge up to the podium height. Above the podium the building can be setback as required.

Internal Courtyard Concept

Neighborhood 4 - Illustrative Plan

0

50

100

200m

Neighborhood 4 - Massing Image

Neighborhood 4 - Street Level Setbacks

174

THU THIEM URBAN DESIGN GUIDELINES

TT Urban Design Guideline.indd 174-175

175

1/27/2012 1:36:04 PM

Retail frontage Required (Minimum 20 m depth)

0

50

100

Neighborhood 4 - Street Level Retail

200m

0

182

50

100

200m

THU THIEM URBAN DESIGN GUIDELINES

TT Urban Design Guideline.indd 182-183

183

1/27/2012 1:36:45 PM

1 21.3 m

m 67.34-21 74.7 m

m

Saigon River

Saigon River Saigon River 4-21

151.9 m

51.8 m

m

45.3 m

46.9 m

m

.9

52.4 m

.6

70 50

95.3 m

4-20

4-21

4-21

4-20

4-20

4-20

4-22

4-22

4-22

m

4-23

4-23

90.8 m

m 117.0

21.0

4-23

m

122.4

m

4-1

4-13

4-2

Can

4-19

al 3

al 3

al 3

Can

4-2

4-14 4-5

4-5 4-15

4-10

Thi

4-3

4-3

em

em

4-6

Roa

4-6

Roa

4-8

d

4-8

d

99.8 m

49.8 m

d

4-8

4-10

Thi

m

Roa

.8

4-6 School

4-9

Thu

4-9

Thu

4-3

em

66

m 9.7

m

6. 11

4-4

4-4

4-10

Thi

m

16

6

4-9

Thu

m

4-3

m

12

.7

37.3

4-7

4-7

m

m

126.0

4-18

4-14

4-4 37.8

66

m

2.6

4-12

4-17

4-1

4-13 4-19

4-15

m

112.6

m 9.5

77.4

d

m 122.4 4-7

4-2 Fire Station

4-15 School

112.5

16

Roa

4-8

4-14

m

m

em

4-6

4-19

4-4

77.4

m

m

Thi

77.4

Thu

122.4

m

4-1 School

4-13 Can

m

m

4-9

122.4

rd leva

scen

4-18

m

4-2

51.4 m

m 8.1

77.4

61.2 m

ou

tB

4-26

m

112.2

4-10

4-27

4-12

4-17

4-11

4-25

scen

4-26

4-5

112.4

m

4-15

61.2

18

77.4

m

d

77.4

m

al 3

91.2

m

4-5

4-16 4-11

Cre

4-27

4-12

4-17

4-18 46.4

111.8

scen

Cre

4-27

4-16

rd leva

ou

tB

4-25

Cre

4-1 m

111.8

m

m

4-14

Can

77.4

m

a Ro

122.4

m

122.4

4-11

m

m

91.2

111.5

4-13

4-19

53.3 m

4-26 183.7

257.3 m

m

m

m

m

m

m

4-12 77.4

91.2

20.4

111.4

4-16

rd leva

ou

tB

4-25

4-24

4-24

4-24

100.9 m

4-11

m

m

m

4-17

4-18 122.4

127.9

.1

111.0

m 2.4

12

89

4-16

85

scen

Cre

m

131.0

m m

.2

33

ou

tB

m

.2

4-27

m

rd leva

91.1

m

20

m

m

.2

m

115.4

4-26

m

127.5

4-25

47.7 m

m

.6

m

108.2

87.1

hie

(1) (2) (3) (4)

2.

14

4-22

166.9 m

.6

20

3

uT

Bo

9m

4-24

20

Th

nt

ce

es Cr

rd va ule

1

21.4

al 1

2

4-23

m

95.0

n Ca

77.8

77.8

40.0 m

Saigon River

4-7

m

School Community Center Administrative Center Fire Station

Project Site Boundary Neighborhood Boundary Commercial Commercial Mixed-Use

M

Residential Mixed-Use Project Site Boundary

Residential High Density rd leva

E/W

School

E/W

Bou

Administrative Center

Future location and boundary for the Fire Station (Parcel 4-2) may be adjusted based on new requirements and regulations

Utilities

Neighborhood 4 - Development Parcel Dimensions

0

50

100

200m

ROW 55.0 m

Thu Thiem Road

ROW 44.7 m

Local Road - Urban

Wetlands Neighborhood Boundary

Crescent Boulevard

Neighborhood Boundary

rd leva

E/W

Bou

Neighborhood 4 - Land Use Distribution

0

176

50

100

Bou

Municipal Subway 200 m 2.5 minute Walking Radius

Neighborhood 4 - Street Typology 177

1/27/2012 1:36:38 PM

E/W

Bus Line and Stop M

ROW 26.6 m

Local Road - Residential ROW 22.6 m

200m

THU THIEM URBAN DESIGN GUIDELINES

TT Urban Design Guideline.indd 176-177

rd leva

Circulator Bus Line and Stop

Central Lake Park Drive ROW 29.2 m

Public Park

Project Site Boundary

Project Site Boundary

Neighborhood Boundary

rd leva

Community Facilities

Bou

0

50

100

Neighborhood 4 - Transit Connections

200m

184

0

50

100

200m

THU THIEM URBAN DESIGN GUIDELINES

TT Urban Design Guideline.indd 184-185

185

1/27/2012 1:36:47 PM

Commercial Residential Mixed-Use Residential High Density

Saigon River

Saigon River

Saigon River

4-21

4-21

4-21

10

4-20

6

4-23

10

15

4-16

15

4-17

15

4-26

15

4-16 4-11

4-16

rd leva

4-11

ou

scen

Cre

4-27

4-12

4-17

tB

4-25

scen

Cre

4-27

4-12 15

rd leva

ou

tB

4-25

10 15

4-24

10

4-11

scen

Cre

4-27

4-23

4-24 rd leva

ou

tB

4-25 15

4-26

4-22

4-22

4-22

4-24

A A

4-20

4-20

10 10

4-23

4-26

4-12

4-17

15 15

4-18

15

20

4-13

Building 4-18

Crescent Boulevard

Building

4-13

4-18 4-13

4-1

4-19

4-2

4-19 4-14 4-5

4-5

4-15

4-2

al 3

al 3

4-14

6

4-1 Can

4-2

al 3

10

4-5 6

Courtyard

Section A

4-1

10

15

10

4-14

15

Building

10

15

20

Can

4-19

Can

20

4-15

4-15 6

6

4-3

4-9 4-10 4-3 4-6 4-8

d

4-8

d

4-6

Roa

4-6

Roa

d

Roa

6

em Thi

4-3

6

4-4

4-9 4-10

em Thi

em Thi

6 6

4-8

Thu

6

6

Thu

Thu

4-10

4-4

6

4-4 4-9 6

6

6

4-7 6

4-7

4-7

Project Site Boundary Neighborhood Boundary 4 Floors

Project Site Boundary

rd leva

(16 m)

E/W

Bou

6 Floors

(24 m)

No Setback

10 Floors

(40 m)

3m Setback

15

15 Floors

(60 m)

20

20 Floors

(80 m)

rd leva

Neighborhood Boundary

6 10

E/W

rd leva

Bou

E/W

Flexible Setback

0

50

100

200m

186

TT Urban Design Guideline.indd 186-187

Neighborhood Neighborhood4 4- Street - Section Level withSetbacks Building Heights

0

182

THU THIEM URBAN DESIGN GUIDELINES

50

100

TT Urban Design Guideline.indd 182-183

Saigon River

Retail frontage Required (Minimum 20 m depth)

Parcels that have podium and street level retail should maintain NO SETBACK from the street edge up to the podium height. Above the podium the building can be setback as required.

Internal Courtyard Concept

Maximum Building Heights allow flexbility by 20 percent

Neighborhood 4 - Maximum Building Heights

Bou

Project Site Boundary Neighborhood Boundary

Neighborhood 4 - Street Level Retail

200m

0

187

50

100

200m

THU THIEM URBAN DESIGN GUIDELINES

1/27/2012 1:36:49 PM

183

1/27/2012 1:36:45 PM

Saigon Saigon River River Saigon River 4-21

4-23 (1)4-23

4-23

4-22 4-23

4-24

(1) rd rd levaleva ou ou tBtB scen scen CreCre

4-16

rd leva

4-11

ou

tB

4-254-25

scen

Cre

4-27

4-22 4-22 (1)

4-244-24

4-24

4-26

4-20

4-20 4-20 (1)

4-22

4-25

4-21

4-214-21

4-20

(1)

4-27 4-27

4-12

4-17

4-26 4-26 (2)

4-19 4-5

4-54-5 (1)

4-4

Roa d

d

Roa

4-84-8 (1)

4-7

4-3

em

em

4-64-6

4-34-3 (1)

Hsing-Chih Lee

4-9 4-10

Thi

Thi

4-6 4-8

Romil Sheth

4-15 4-44-4 (1)

4-94-9

Thu

d Roa d em Thi Roa Thu hiem T Thu

Thu

4-3

Mitch Glass

4-2

al 3

4-14

4-10 4-10

02/15/2012

4-1

4-13 4-24-2

4-15 4-15 4-4 4-9

4-10

20 Can

al 3

4-5 4-15

4-12

4-17

4-18

4-14 4-14 (1)

al 3 Can 3 al Can

Can

4-19 4-19 (2)

rd leva

ou

tB

en resc

4-14-1

4-13 4-13 (1)

4-2

4-27 4-26

Khu Chức năng số 4 Neighborhood 4

4-11

4-25

C

4-18 4-18 (2)

4-1

4-13

4-14

4-16 4-11 4-11 (1)

4-12 4-12 (1)

4-174-17 (2)

4-18

4-19

4-164-16 (2)

4-74-7 (1)

Victor Eskinazi

4-6 4-8

Vee Petchthevee

4-7

Andy McClurg Dennis Pieprz

Project Site Boundary

M

Neighborhood Boundary Project Site Boundary

On-Street Parking

Internal Courtyard Concept

E/W

Bou

ProjectBoulevard Site Boundary ROW 55.0 m Crescent ThuNeighborhood Thiem Road Boundary ROW 44.7 m

Ramp to Underground Parking

Neighborhood 4 - Vehicular Access and At Grade Parking 188

TT Urban Design Guideline.indd 188-189

Neighborhood Boundary

rd rd levaleva BouBou E/WE/W

Entrance Local Road -Ramp Urban (1)

0

50

100

200m

M

E/W

Bou

Municipal Subway 200 m 2.5 minute Walking Radius

ROW 26.6 m

Levels of -Underground Parking Local Road Residential ROW 22.6 m

Neighborhood Neighborhood4 4- Street - Underground TypologyParking

0

184

THU THIEM URBAN DESIGN GUIDELINES

TT Urban Design Guideline.indd 184-185

rd leva

Circulator Bus Line and Stop Bus Line and Stop

Underground Garage Central Lake Park Drive ROW 29.2 m

Vehicular / Service Entry (15 m Minimum Away from Street Intersection )

TT final boards A0.indd 20

Project Site Boundary

Neighborhood Boundary

rd leva

Surface Parking Zone (Maximum 20 m wide)

0

50 50 100 100

Neighborhood 4 - Transit Connections

200m 200m

189

1/27/2012 1:36:51 PM

0

50

100

Khu Chức năng số 4 - Neighborhood 4

200m

THU THIEM URBAN DESIGN GUIDELINES

185

1/27/2012 1:36:47 PM

2/16/2012 12:19:11 PM

THU THIEM MASTER PLAN ADJUSTMENT - 2012

Final Report.indd 234-235

235

2/16/2012 2:27:11 PM


5-3

5-3

rd leva

Central Lake

E/W

(2)

Bou

5-1

Central Lake

(1)

5-1

Central Lake

rd leva

5-2

E/W

rd leva

5-2

Bou

E/W

Bou

5-4

2 Central Lake

5-5

5-4

5-5

5-6

5-6

5-7

5-7 5-9

1

5-9

5-8

5-8 5-10

5-10 5-13

5-13 5-11

5-11

Roa

5-21

d

5-16

5-22

5-17

em

d

5-21

5-18

Thi

5-19

Roa

d

Roa

5-19 5-16

Thu

5-15

em

em

5-15

5-12

5-18

Thi

Thi

5-12

(3)

5-14

Thu

Thu

5-14

5-22

5-17 5-24

(4)

5-24

5-23

5-23 5-25

5-20

5-25

5-20

5-27

5-27 5-26

(4)

5-28

(5)

5-28

5-32

5-32

5-29 5-31

rd leva Bou

5-29 5-31

5-30

5-30

Neighborhood Boundary Children’s Museum

Neighborhood Boundary

(2)

City Hall

No Setback

(3)

Community Facility

3m Setback

(4)

School

Flexible Setback

(5)

Administrative Center

(1)

u Th

EW

5-26

Neighborhood Boundary

10 -70 m Setback

ie Th m

0

50

100

200m

Neighborhood 5 - Street Level Setbacks

Neighborhood 5 - Massing Image

a Ro

192

THU THIEM URBAN DESIGN GUIDELINES

TT Urban Design Guideline.indd 192-193

193

1/27/2012 1:37:00 PM

Retail frontage Required (Minimum 20 m depth)

Parcels that have podium and street level retail should maintain NO SETBACK from the street edge up to the podium height. Above the podium the building can be setback as required.

Internal Courtyard Concept

Neighborhood 5 - Illustrative Plan

0

50

100

Neighborhood 5 - Street Level Retail

200m

0

200

50

100

200m

THU THIEM URBAN DESIGN GUIDELINES

TT Urban Design Guideline.indd 200-201

201

1/27/2012 1:38:03 PM

d 75.8 m

5-3

5-3

22 3.2 m

248.2 m

66.4 m 165.0 m

5-1

172.4

rd leva

5-2

m

E/W

84 .8

85

m

5-4

m

m

5-23

m

5-25

5-28

.7

.5

72

1.2

m

14

5-29

5-25

5-20

5-27

5-27 5-26

m

57.1

.9

93

m

5-31

5-28

5-32

5-29

34.9m

5-26 5-28

Administrative Center

5-32 School

92

m

m

m

m

90.0

5-25

5-20

5-27

.2m

5-30

5-24 5-23

5-26 32

m 90.1

5-22

5-23

5-20 School

m

m 184.3

d

m

.1 m

Roa

d

67.4

m

5-28

67.4

174

em

m

Thi

Roa

5-21

5-16 5-17 5-24

m

87.5

m

9.1

m

25

67.4

5-31

em

m

m

m

m

5-18

5-19

5-22

5-17

m

.6

90

4m

107.

5-13

5-15 5-21

5-24

5-27

.1

5-16

5-22

5-17

88

5-25

67.4

4m

5-12

5-18

Thi

67.4

67.4

m

5-26

5-14

5-19 5-21

d

m

m

5-24

90

67.4

7.7

17

209.9

m

.0

90

.1

107.

5-32

5-16

m

5-15

Roa

.2

d

67.4

Roa

.3

m

4m

5-23

5-19

90

5-22

67.4

m

m

107.

5-14 5-12

em

5-15 m

5-18

Thi

5-12

m

5-21

5-11 Thu

5-14 m

81.1

68

em

m

67.4

68.3

m

5-13 5-11

Thu

74.2

m

Thi

67.4

234.6

m

67.4

m

m 7.0

18

5-20

Children’s Museum City Hall Community Center Administrative Center School

71 .7

5-18

m

.1

5-10

Thu

.0

m

5-19

90

m

5-10

5-11

m

49

Thu

m

67.4

67.4

5-16

5-17 77.0

68

m

67.4

m

m

.1

90

5-9 5-8

5-13

m

.3

44

.8

5-14

5-7 5-9

5-8 5-10

5-13

67.4

m

67.4

m 9.6

67.1

4m

5-15

5-6

5-7 5-9

m

67.4

14

5

m

m

.1

90

107.

m 87.4

m

m

169.4

5-7 5-8

m .2 36 .2 m 36

5-10

5-11

5-12

5-9

67.4

m

.3

4

4m

m 68.0

67.4

64

5

107.

5-5

5-6

m

.3

44

m

90

4m

107.

.8

5-7 .1

5-5

5-6

49

90

6m

5-8

5-5

121.9

.1

m

m

0.3

22

107.

5-4

m

5-6

67.4

5m 103.

ev ar d

Bou

5-4

m

72.3 m

.6

75

Bo

E/W

M

.8

m

rd leva

5-2

Bou

89.4 m

m

143.1

5-5

ul

(1) (2) (3) (4) (5)

170.9

220.7

5-1 Central Lake

rd leva

5-2

Bou

E/W

m

5-4

nt

5-1

Central Lake

rd leva

5-2 Children’s Museum

Bou

E/W 303.6

5-1 City Hall

Central Lake m

188.9

201.6 m

ce

5-3

29.0 m

Central Lake

Cr es

5-3

22.7 m

3

5-32

5-29 5-31

5-30

5-29 5-31

5-30

5-30

m

117.7 m

Neighborhood Boundary Circulator Bus Line and Stop Neighborhood Boundary

School

Commercial Mixed-Use

Administrative Center

Neighborhood Boundary

Residential Mixed-Use

Utilities

Thu Thiem Road

ROW 44.7 m

Water Taxi Line and Stop

Residential Low Density

Public Park

Local Road - Urban

ROW 26.6 m

Community Facilities

Wetlands

Local Road - Residential ROW 22.6 m

200 m 2.5 minute Walking Radius

Bus Line and Stop M

Municipal Subway

Neighborhood Boundary

Neighborhood 5 - Development Parcel Dimensions

0

50

100

200m

Neighborhood 5 - Land Use Distribution

0

194

50

100

Neighborhood 5 - Street Typology

200m

THU THIEM URBAN DESIGN GUIDELINES

TT Urban Design Guideline.indd 194-195

195

1/27/2012 1:37:54 PM

0

50

100

Neighborhood 5 - Transit Connections

200m

202

0

50

100

200m

THU THIEM URBAN DESIGN GUIDELINES

TT Urban Design Guideline.indd 202-203

203

1/27/2012 1:38:06 PM

Commercial Residential Mixed-Use Residential High Density

5-3

5-3

5-3

5-1 Central Lake

5-1

Central Lake

5-1

Central Lake

10

rd leva

10

5-2

E/W

10

E/W

6

Bou

Courtyard

Courtyard

Building

5-4

Building

Building

Thu Thiem Road

Section A

6 10

E/W

5-4

10 6

5-5

rd leva

5-2

Bou

10

5-4

10

10

rd leva

5-2

Bou

5-5

5-6

5-5

5-6

5-6

10 10

5-7

5-7

6

5-10

5-9

d

5-24

6

5-25

5-24 5-23

5-25

5-20

6

5-27

5-27

10

5-26

5-26

6

5-28

5-28

6

5-25

5-20

5-27

6

5-26

6

5-28

5-32

5-29

6

5-21

5-22

5-23

5-20

5-32

5-16 5-17

6

Roa

6

6

6

5-18

em

6

5-23

6

5-21

5-22

5-17

Thi

5-24

Thu

5-16

6

6

5-19

d

5-22

6

6

5-13

5-12 5-15

Roa

d

6

5-19

5-21

6

6

6

5-17

5-15

6

5-18

em Thi

10

5-14

Thu

6

5-12

5-18

Roa

5-19

6

6

5-16

6

5-14

10

em Thi

6

5-15

5-11

5-11

Thu

6

6 6

5-10 5-13

10

5-14 6

6

5-8 5-10

6

5-13

A

6

5-9

5-8

6

6 6

5-11 5-12

5-7

5-9 10

5-8

5-32

5-29

5-29

6

6 6

5-31

5-30

5-31

5-31

5-30

5-30

Neighborhood Boundary No Setback Neighborhood Boundary 4 Floors

3m Setback

(16 m)

6

6 Floors

(24 m)

10

10 Floors

(40 m)

Flexible Setback Neighborhood Boundary

10 -70 m Setback

Neighborhood 5 - Maximum Building Heights

0

50

100

200m

204

TT Urban Design Guideline.indd 204-205

Retail frontage Required (Minimum 20 m depth)

Parcels that have podium and street level retail should maintain NO SETBACK from the street edge up to the podium height. Above the podium the building can be setback as required.

Internal Courtyard Concept

Maximum Building Heights allow flexbility by 20 percent

Neighborhood Level Neighborhood5 5- Street - Section withSetbacks Building Heights

0

200

THU THIEM URBAN DESIGN GUIDELINES

50

100

TT Urban Design Guideline.indd 200-201

Neighborhood 5 - Street Level Retail

200m

5-3

5-1

E/W

100

200m

201

1/27/2012 1:38:03 PM

5-3

5-1

5-15-1 (1)

Central Lake Central Lake

rd leva

5-2

50

THU THIEM URBAN DESIGN GUIDELINES

5-3 5-3

Central Lake

0

205

1/27/2012 1:38:08 PM

Central Lake rd

rd leva leva Bou Bou E/WE/W

5-2 5-2

Bou

5-4

rd leva

5-2 E/W

M

Bou

Khu Chức năng số 5 Neighborhood 5

5-4

5-4 5-4 (1)

21 5-5

5-5 5-5 (1)

5-6

5-6 5-6 (1) 5-75-7 (1)

5-7 5-9 5-8

Roa d

5-21

5-22

5-17

5-25

5-20 5-20

5-265-26 (1)

5-28

Vee Petchthevee

5-22

5-17 5-24 5-24 (1)

5-24

5-25

5-20

Andy McClurg

5-27

5-275-27 (1)

5-26

5-28 5-28 (1)

5-28 5-32

5-29 5-29 (1) 5-31 5-31 (1)

5-30

5-21

5-16

5-32 5-32

5-29 5-31

Victor Eskinazi

5-19

5-21 5-21 (1)

5-25 5-25 (1)

5-27

5-32

Hsing-Chih Lee

5-18

5-23

5-23 5-23 (1)

5-26

Romil Sheth 5-13

5-15

5-22 5-22 (1)

5-17 5-17 (1)

5-24 5-23 5-20

5-19 5-19

5-16 5-16 (1)

5-14 5-12

5-18 5-18 (1)

d

em

5-15 5-15 (1)

Roa

Thi

5-19 5-16

5-10 5-11

5-14 5-14 (1)

d Roa em oad R Thi Thu Thiem Thu

Thu

5-15

5-8

5-13 (1) 5-13

em Thi

5-115-11 (1) 5-12 5-12 (1)

5-18

Mitch Glass 5-9

Thu

5-10 5-10 (1)

5-13 5-14

02/15/2012

5-6 5-7

5-8 (1)

5-8 5-10 5-11

5-12

5-5

5-9 5-9 (1)

5-305-30 (1)

5-29 5-31

Dennis Pieprz

5-30

Neighborhood Boundary Neighborhood Boundary

Circulator Bus Line and Stop

On-Street Parking

Bus Line and Stop Neighborhood Neighborhood Boundary Boundary

Surface Parking Zone Ramp to Underground Parking Vehicular / Service Entry (15 m Minimum Away from Street Intersection )

Neighborhood 5 - Vehicular Access and At Grade Parking 206

TT Urban Design Guideline.indd 206-207

TT final boards A0.indd 21

(1)

0

50

100

200m

M

Municipal Subway

ThuUnderground Thiem Road Garage ROW 44.7 m

Water Taxi Line and Stop

Local Entrance Road -Ramp Urban

200 m 2.5 minute Walking Radius

ROW 26.6 m

Local Levels Road of-Underground Residential ROW Parking 22.6 m

Neighborhood Neighborhood5 5- Street - Underground TypologyParking

0

202

THU THIEM URBAN DESIGN GUIDELINES

TT Urban Design Guideline.indd 202-203

0

50 50 100 100

Neighborhood 5 - Transit Connections

200m 200m

207

1/27/2012 1:38:12 PM

0

50

100

Khu Chức năng số 5 - Neighborhood 5

200m

THU THIEM URBAN DESIGN GUIDELINES

203

1/27/2012 1:38:06 PM

2/16/2012 12:19:36 PM

THU THIEM MASTER PLAN ADJUSTMENT - 2012

Final Report.indd 236-237

237

2/16/2012 2:27:24 PM


(1)

6-1 6-1 6-9

6-9

6-5

6-5 6-10

6-10 6-6 6-11

6-7

6-3

6-11

6-12 rd leva

6-8

1

6-6

6-2

E/W

Bou

6-7

6-2

6-3

6-12 rd leva

6-8

E/W

6-15

6-4

Bou

6-15

6-4

6-16

6-13

6-16

6-13

6-18

6-18

6-17

6-17 6-19

6-19 6-14

6-14

E/W

2

rd leva Bou

6-20

6-20

(3)

6-23

6-23 6-21

6-21

6-24

6-24 6-22

6-22

(2)

Saigon River

Saigon River

Saigon River 6-25

6-25

6-27

6-27 6-26

6-26

3

6-28

6-29

6-28

6-29 6-30

6-30

Thu

Thu

Thu

6-31

6-31

Thi

Thi

Thi

em

em

em

d

Roa

d

Roa

d

Roa

Project Site Boundary Project Site Boundary

Neighborhood Boundary

Neighborhood Boundary (1)

International Hospital

(2)

Community Facility

(3)

School

Neighborhood 6 - Illustrative Plan

0

No Setback

50

Project Site Boundary

3m Setback

Neighborhood Boundary

Flexible Setback

Parcels that have podium and street level retail should maintain NO SETBACK from the street edge up to the podium height. Above the podium the building can be setback as required.

100

200m

Neighborhood 6 - Massing Image

Neighborhood 6 - Street Level Setbacks

212

THU THIEM URBAN DESIGN GUIDELINES

TT Urban Design Guideline.indd 212-213

213

1/27/2012 1:38:24 PM

Retail frontage Required (Minimum 20 m depth)

Internal Courtyard Concept

0

50

100

Neighborhood 6 - Street Level Retail

200m

0

220

50

100

200m

THU THIEM URBAN DESIGN GUIDELINES

TT Urban Design Guideline.indd 220-221

221

1/27/2012 1:39:20 PM

Central Lake

371.2

8m

m

6-4

6-12

Bou

6-15

6-4

m

6-16

6-13

67.4 m

72

61.6 m

211.1

6-18

6-18 6-17

m

6-19

6-14

6-14 6-20

m

6-20

6-20 6-23

6-23

263.5

6-17

6-19

6-19 6-14

6-23

6-21

6-21

6-21 6-24

6-24

6-24

6-22

6-22

6-22

Saigon River

Saigon River 6-25 6-27

6-27 6-26

.4

88

m

6-28

6-29

m

67.8

113.1

m

m

6-26

6-26

m

Saigon River

6-25 6-27

6-28

E/W

6-16

6-17

67.4

6-29

m

67.4

m

m

.5

69.0

m

6-3

6-8 6-15

6-25

8.3

M

6-7

rd leva

Bou

6-13

Saigon River

12

6-11

6-12 rd leva

E/W

6-18

m

157.4

m

.1

6-30

6-17

m

m

m

6-3

6-16

6-13

6-27

67.4

m

6-7

6-8

6-4

12

m

Bou

6-15

m

173.1

2.4

m

3 102.

m

69.0

69.0

6-25

93

88

6-24

m

m

67.4

m .1

2.

12

m

67.4

m

69.0

68.4

d

6-26

m

m

69.0

m

.7

82

m

m 3.7

17

67.4

67.4

67.4

a Ro

.6

98

m

m

m

6-21

87.6

m

3.3

6-23 4m

6-12 rd leva

E/W

20

6-20

m

.5

0.7

6-2

16

m

6-19

m

12

m

6-3

m

6-15

157.4

m

.7 84

88.1

m

m

67.5

.6

12

2.4

m

.0

68

94

6-18

67.4

.7 84

m

hie

0.7

24

6-22

m

2.4

m

73.7 m

.7

101.7

72.7 m

85

uT

m

6-14

67.4

m

m

117.2

m

m 85.3

85.2

m

m

.6 55

6-16

2.5

6-6

6-2

m

m

.7 82

.7 82

m

13

25

6-11

6-7 m

6-8

6-13

6-5 6-10

6-6

6-2

6-11

8.2

26

m

3.9

25

8.0 21

m

1.0

26

6-12

m

6-9 6-5

6-10 6-6

.7 84

m

rd leva

Bou

E/W

26

79.5 m

m

.7 82

m

5 110.

m

7 118.

m 9.9

6.4

60.8 m

6-28

6-29

6-29

6-30

6-30

6-28

6-30

m

73

m

6-31

d

d

Neighborhood Boundary

Project Site Boundary

d

Roa

Roa

d

Roa

Roa

em

Project Site Boundary

6-31

em

Thi

em

em

60

Thi

6-31

Thi

m

m

.0

Thu

m

Thi

67.4

Thu

Thu

6-31

Thu

.5

68

69.0

Hospital Software Park Knowledge Park School Community Center

190.2

m

m

m

6-3

m

6-1 6-9

6-5 6-10

6-2

6-4

Th

(1) (2) (3) (4) (5)

4 118.

m

.4 53

m

6-7

.4 53 8.1

28

15

6-1 6-1 6-9

m

6.8

25

m

8 110.

6-6 .0 80

m

m 5.4

6-5

.0 80

m

5.1

14

m

m

6-8

m

2 118.

m

.7 48

m

8.1

9.4

m

m

5 118.

14

15

.2 65

51.7

16

6-11

Saigon River

m

6-10

6-1

m

111.0

1m 118.

165.1

.3 68

9.3 11

2.3

EW

6-9

m

5 rd leva Bou

m

9.1

16

74.9

4

Neighborhood Boundary

Commercial Mixed-Use

Circulator Bus Line and Stop

Residential Low Density

Bus Line and Stop

Software Park Project Site Boundary

School

Neighborhood 6 - Development Parcel Dimensions

0

50

100

Local Road - Urban

Public Parks

Neighborhood Boundary

200m

Neighborhood 6 - Land Use Distribution

0

50

Water Taxi Line and Stop ROW 26.6 m

200 m / 2.5 minute Walking Radius

Local Road - Residential ROW 22.6 m

Wetlands

214

Ferry Line and Stop

Neighborhood Boundary

Medical Project Site Boundary

Municipal Subway

M

Cultural Facilities

100

Neighborhood 6 - Street Typology

200m

THU THIEM URBAN DESIGN GUIDELINES

TT Urban Design Guideline.indd 214-215

215

1/27/2012 1:39:12 PM

0

50

100

Neighborhood 6 - Transit Connections

200m

222

0

50

100

200m

THU THIEM URBAN DESIGN GUIDELINES

TT Urban Design Guideline.indd 222-223

223

1/27/2012 1:39:22 PM

Commercial Residential Mixed-Use Software Park

10

6-1

15

6-1 6-9

10

25

6-7

10

6-2

30

6-10 6-6

6

25

6-3

6-11

6-7

6-3

6 10 40

25

6-4

E/W

20

6

6-16

6-15

6

15

15 20

Courtyard

6-7

6-3

6-12 rd leva

E/W

Building 6-15

Bou

6-15

6-4

6-16

6-13

Section A

6

Building

6-4

6

6-2

6-8

E/W E/W Boulevard

Building

6

6

6-13

6-11

6-12 Bou

6-8

15

10

rd leva

6

15

Bou

10

25

6-6

6-2

10

6-12

10

rd leva

6

A

15

10

6-5

6-5

20 30

15

6

6-8

6-9

6-9

15

6-10

10

10

6

6-11 10

10

15 15

6-6

6

15

6-1

10

6-5

6

10

10

6-10

6-16

6-13

6 6

6-18

15

6-19

6

6-18

6-18

6

6-17

6-17

6-17

6

6-19

6-19 6-14

10

15

6

6

10

6-20

6-14

6-14

6-20

6-20

6

6-23

6-23

15

6-23

6

6-21

6-22

6-22

6

Saigon River

Saigon River

6-27

6-26

6-26

6-29

6-28

6-29

6-28

6

6-27

6-27

6 6

6-30

Saigon River 6-25

6-25

6-25 6-26

6-24

6-24

6-24

6

6-22 6

6-21

6-21

6

6-30

6-30

6

6-28

6-29

6

6

6-31

Maximum Building Heights allow flexbility by 20 percent

d Roa

d Roa

d Roa

Neighborhood Boundary

(24 m)

6

6 Floors

10

10 Floors (40 m)

Project Site Boundary

15

15 Floors (60 m)

Neighborhood Boundary

20

20 Floors (60 m)

25

25 Floors (100 m)

30

30 Floors (120 m)

40

40 Floors (160 m)

Neighborhood 6 - Maximum Building Heights

0

50

No Setback Project Site Boundary

3m Setback

100

200m

224

Neighborhood Neighborhood6 6- Street - Section Level withSetbacks Building Heights

0

220

THU THIEM URBAN DESIGN GUIDELINES

50

100

6-7

6-9 6-9 (1)

6-106-10 (1)

6-3

6-11 6-11 (1)

6-12 rd leva

6-8

E/W

Bou

6-7 (1)

6-7

6-1 6-5

6-3 6-3 (2)

6-11

6-126-12 (1)

rd rd levaleva BouBou E/WE/W

6-166-16 (1)

6-3 E/W

6-12

Bou

6-20 6-20 (1) 6-21 6-21 (1)

6-24 6-22 6-22 (1)

Saigon River

Mitch Glass

6-18 6-17

6-20

6-24 Saigon River 6-25

6-276-27 (1)

6-27

6-26 6-26 (1)

Vee Petchthevee

6-26

6-306-30 (1)

6-29 6-29 (1)

6-286-28 (1)

6-29

6-28

Andy McClurg

6-30

Thu

6-31

em

Project Site Boundary

Neighborhood Boundary

Neighborhood Boundary

Circulator Bus Line and Stop

Surface Parking Zone (Maximum 20 m wide)

Bus Line and Stop Project Site Boundary

Municipal Subway

M

Internal Courtyard Concept

Project Site Boundary Neighborhood Boundary

Ferry Line and Stop

Ramp to Underground Parking

Neighborhood Boundary Underground Garage

Water Taxi Line and Stop

Vehicular / Service Entry (15 m Minimum Away from Street Intersection )

Local Road - Urban ROW 26.6 m Entrance Ramp

200 m / 2.5 minute Walking Radius

Neighborhood 6 - Vehicular Access and At Grade Parking 226

TT Urban Design Guideline.indd 226-227

TT final boards A0.indd 22

0

50

100

Dennis Pieprz

Project Site Boundary

d

d

Roa

Roa

em

Thi

6-31 6-31 (1)

Thi

d Roa d em Thi Roa Thu hiem T Thu

Thu

6-31

Victor Eskinazi

6-22 Saigon Saigon River River

6-28

6-30

Hsing-Chih Lee

6-23

6-24 6-24 (1)

6-27 6-26

Romil Sheth

6-19 6-14

6-23 6-23 6-21

6-25 6-25

6-25

02/15/2012

6-16

6-13

6-196-19 (1)

6-146-14 (1) 6-23

22

6-15

6-4

6-176-17 (1)

6-19

Khu Chức năng số 6 Neighborhood 6

M

6-7

rd leva

6-156-15 (1)

6-18 6-18 (1)

6-20

6-29

6-2

6-8

6-136-13 (1)

6-21

221

6-9

6-6

6-17

6-22

200m

1/27/2012 1:39:20 PM

6-2 6-2 (2)

6-18

6-14

100

6-10

6-66-6 (1)

6-4 6-4 (2)

6-16

6-13

50

THU THIEM URBAN DESIGN GUIDELINES

6-5 6-5 (1)

6-8 6-8 (1) 6-15

6-4

0

225

6-1 6-1 (1)

6-1

6-5

6-2

Neighborhood 6 - Street Level Retail

200m

1/27/2012 1:39:24 PM

6-9

6-10

Retail frontage Required (Minimum 20 m depth)

Internal Courtyard Concept

TT Urban Design Guideline.indd 220-221

6-11

Neighborhood Boundary

Flexible Setback

Parcels that have podium and street level retail should maintain NO SETBACK from the street edge up to the podium height. Above the podium the building can be setback as required.

TT Urban Design Guideline.indd 224-225

6-6

6-31

em Thi

Project Site Boundary

(16 m)

6-31

em Thi

em Thi

6

4 Floors

Thu

Thu

Thu

6

Local(1) Road - Residential ROW 22.6 m Levels of Parking

200m

Neighborhood Neighborhood6 6- Street - Underground TypologyParking

0

222

THU THIEM URBAN DESIGN GUIDELINES

TT Urban Design Guideline.indd 222-223

0

50 50 100 100

Neighborhood 6 - Transit Connections

200m 200m

227

1/27/2012 1:39:27 PM

0

50

100

Khu Chức năng số 6 - Neighborhood 6

200m

THU THIEM URBAN DESIGN GUIDELINES

223

1/27/2012 1:39:22 PM

2/16/2012 12:20:00 PM

THU THIEM MASTER PLAN ADJUSTMENT - 2012

Final Report.indd 238-239

239

2/16/2012 2:27:35 PM


Acknowledgements Thu Thiem I.C.A. Mr. Nguyen Anh Tuan, Head of ICA Mr. Trang Bao Son, Deputy Head of ICA Mr. Le Phuoc Tai, MSc Civil Engineer Mrs. Luu Hoa Lan, MSc Utility Engineer Mr. Truong Thien Thu, Ph.D, Planner Mr. Tran Dang Linh, MSc Planner Mr. Nguyen Minh Long, Planner Mrs. Le Thi Van Binh, Planner Mrs. Nguyen Hoang Lan, Planner

Sasaki Dennis Pieprz, Principal Mitch Glass, Project Manager Romil Sheth, Urban Designer Hsing-Chih Lee, Urban Designer Victor Eskinazi, Urban Designer Haley Heard, Urban Designer Vee Petchthevee, Landscape Architect Michelle Gauvin, Civil Engineer Andy McClurg, Transportation Planner Carolyn Brown, Architect Richard York, Software Specialist

THU THIEM MASTER PLAN ADJUSTMENT - 2012

Final Report.indd 240-241

241

2/16/2012 2:27:39 PM


Prepared for the Investment and Construction Authority for Thu Thiem Urbanized Area (I.C.A.) January, 2012

Final Report.indd 242

2/16/2012 2:27:47 PM


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.