Jessica Hartwig M.Arch, Years 1-3 2015
01_Thesis Prep Astrid Lipka
02_Design Studio 4 David Lewis
03_Design Studio 3 (w/Jelisa Blumberg) David Leven, Derek Porter
_Construction Tech 2 (w/Jelisa Blumberg) Alexis Kraft
04_Design Studio 2 (w/Felipe Colin Jr.) David Leven, Andy Bernheimer
14 Meserole St • Apt 2b • New York, NY 11206 • 248.990.4634 • Hartwig.Jessica@gmail.com
Traditional building systems and material use is compositional and based in systems of disconnected layers. Often the techniques of textile production are used only as a metaphor. This thesis suggests that there is a possibility to create systems and use materials in a cohesive way using traditional textile production leading to a more specific, responsive, and higher performing building. Textiles In/As/In Architecture Making_Materiality_Education Fashion District, Manhattan
SCE Fashion D&T ThesisPrep_Astrid Lipka • M.Arch_Year 3_Fall 2014 • Site Research
ThesisPrep_Astrid Lipka • M.Arch_Year 3_Fall 2014 • Site Research
SEWING
structure
WEAVING program
KNITTING circulation
cutting + attaching
warp + weft
interconnected loops
ThesisPrep_Astrid Lipka • M.Arch_Year 3_Fall 2014 • Site Research
ThesisPrep_Astrid Lipka • M.Arch_Year 3_Fall 2014 • Site Research
The program this thesis will focus on is a textile campus; a space that allows for the research, manufacturing and selling of textiles and textile based technologies. This program exists in the intersection between many disciplines, including architecture, interior design, design and technology, and fashion.
LAB:dye LECTURE HALL
OPEN STUDIOS LOBBY STORE MANUFACTURING
ThesisPrep_Astrid Lipka • M.Arch_Year 3_Fall 2014 • Site Research
ThesisPrep_Astrid Lipka • M.Arch_Year 3_Fall 2014 • Site Research
loading MANUFACTURING
CAFE
GALLERY
As a connection between many disciplines in the New School community, the site for this thesis will be the previous fashion building located in the fashion district in Manhattan on the corner of 40th street and 7th avenue. Using this existing structure, this thesis aims to maintain the school’s presence in this neighborhood as well as creating new spaces for interaction and discovery for students whose disciplines rarely overlap.
Kissena Velodrome Welcome Center Identity_Visibility_Access Queens, NYC
Studio 4_David Lewis• M.Arch_Year 3_Fall 2014
Studio 4_David Lewis• M.Arch_Year 3_Fall 2014
Studio 4_David Lewis• M.Arch_Year 3_Fall 2014
Studio 4_David Lewis• M.Arch_Year 3_Fall 2014
2
3
3
4
4
5
5
6
6
7
0' - 0"
7
1
10' - 0"
B
B 40' - 0"
M. CHANGING M. CHANGING
C
D
D
MECH
66' - 2 1/2"
MECH
DN
E
3
4
4
5
5
6
6
7
7
1
1
2
2
3
3
4
4
5
5
A
A
B
B
C
C
D
D
E
E
A
A
25' - 4 1/2"
B
B
C
C
D
D
E
E
F
F
G
G
25' - 4 1/2"
CAFE 2 32' - 0 1/2"
CAFE 2
C
3
10' - 0"
32' - 0 1/2"
W. CHANGING W. CHANGING
2
41' - 3 1/2"
14' - 9"
A
2
14' - 9"
41' - 3 1/2"
A
1
39' - 7 1/2"
2
0' - 0"
39' - 7 1/2"
1
-5' - 0"
40' - 0"
1
-5' - 0"
UP
UP
66' - 2 1/2"
DN
DN
DN
E
EXHIBITION HALL EXHIBITION HALL 2 2
F
F
F
F
G
G
G
G
1
LEVEL 1 LEVEL 1 1 1 1/8" = 1'-0" 1/8" = 1'-0"
LEVEL 2 LEVEL 2 1 1 1/8" = 1'-0" 1/8" = 1'-0"
LEVEL 4 36' - 0"
LEVEL 4 36' - 0" 1 M-101
LEVEL 4 36' - 0"
LEVEL 4 36' - 0"
1 M-101
LEVEL 3 24' - 0"
LEVEL 3 24' - 0"
LEVEL 3 24' - 0"
LEVEL 3 24' - 0"
LEVEL 2 12' - 0"
LEVEL 2 12' - 0"
LEVEL 2 12' - 0"
LEVEL 2 12' - 0"
LEVEL 1 0' - 0"
LEVEL 1 0' - 0"
LEVEL 1 0' - 0"
LEVEL 1 0' - 0"
1 2
NORTH SECTION NORTH SECTION 2 1/8" = 1'-0" 1/8" = 1'-0"
Studio 4_David Lewis• M.Arch_Year 3_Fall 2014
Studio 4_David Lewis• M.Arch_Year 3_Fall 2014
WEST SECTION WEST SECTION 1 1/8" = 1'-0" 1/8" = 1'-0"
LEVEL 4 LEVEL 4 1 1/8" = 1'-0" 1/8" = 1'-0"
6
6
7
1
2 27' - 10"
3
4
5 85' - 8"
6 16' - 6"
108' - 3" PROJECT TEAM Lead Designer Jessica Hartwig 248.990.4634 hartwig.jessica@gmail.com
LEVEL 4 36' - 0"
Architect of Record David Lewis, LTL Architects
LEVEL 3 24' - 0" LEVEL 2 12' - 0"
Energy Consultant David White
No.
Description
Date
LEVEL 1 0' - 0"
1
SOUTH ELEVATION 1/16" = 1'-0"
PROJECT INFO
F 270' - 6"
7' - 2"
E 9' - 5"
D
C
43' - 9"
B
Kissena Velodrome Flushing, NY 11355
A
48' - 8"
LEVEL 4 36' - 0" 10' - 0"
21' - 6" PROJECT TITLE
LEVEL 3 24' - 0"
Kissena Velodrome Welcome Center 92' - 5"
DWG TITLE
SOUTH & EAST ELEVATIONS
LEVEL 1 0' - 0"
SEAL & SIGNATURE
DATE: PROJECT NO.:
3
EAST ELEVATION 1/16" = 1'-0"
DWG BY: CHK BY:
5-7-2014 2014-01 Author Checker
A-200 SCALE:
1/16" = 1'-0"
OF 17 __ 8__OF
5/5/2014 11:20:37 PM
LEVEL 2 12' - 0"
6
B ROOF MEMBRANE 4" RIGID INSULATION
METAL ROOF EDGE
PROJECT TEAM
PROJECT TEAM 2x6 BLOCKING
Lead Designer Jessica Hartwig 248.990.4634 hartwig.jessica@gmail.com
Lead Designer Jessica Hartwig 248.990.4634 hartwig.jessica@gmail.com
Architect of Record David Lewis, LTL Architects
Architect of Record David Lewis, LTL Architects
Energy Consultant David White
Energy Consultant David White
No.
3
Callout (2) of NORTH SECTION 3" = 1'-0"
2
Callout (2) of WALL SECTION 3" = 1'-0"
4
Description
No.
Date
Description
Date
Callout (3) of NORTH SECTION 3" = 1'-0"
6 B
A PROJECT INFO
PROJECT INFO
PROJECT TITLE
PROJECT TITLE
Kissena Velodrome Welcome Center
Kissena Velodrome Welcome Center
DWG TITLE
DWG TITLE
MECH SYSTEM LAYOUT
SECTION DETAILS DATE: PROJECT NO.: DWG BY: CHK BY:
5
Callout (4) of NORTH SECTION 3" = 1'-0"
6
Callout (3) of WALL SECTION 3" = 1'-0"
1
Callout of WALL SECTION 3" = 1'-0"
A-500 SCALE:
3" = 1'-0"
Studio 4_David Lewis• M.Arch_Year 3_Fall 2014
5-7-2014 2014-01 JH SCE
16 __ OF OF __17
SEAL & SIGNATURE
DATE: PROJECT NO.: DWG BY: CHK BY:
5/7/2014 8:12:04 AM
SEAL & SIGNATURE
5-7-2014 2014-01 Author Checker
M-100 SCALE:
Studio 4_David Lewis• M.Arch_Year 3_Fall 2014
__ OF __
5/5/2014 11:45:47 PM
1' - 0"
Kissena Velodrome Flushing, NY 11355
Kissena Velodrome Flushing, NY 11355
0' - 9"
TIE CH RY S BROO
ME
LES Light Lab
Screens_Layers_Light
Grounding the public exhibition space, and lifting the private student lab space
Orienting the lab space to the northsouth grid to enhance views and facilitate measurements
Adding layers of screens based on program
Lower East Side, Manhattan
Design Studio 3_David Leven_Derek Porter • M.Arch_Year 2_Fall 2013 • Assignment 2_Light Lab (w/Jelisa Blumberg)
Design Studio 3_David Leven_Derek Porter • M.Arch_Year 2_Fall 2013 • Assignment 2_Light Lab (w/Jelisa Blumberg)
Design Studio 3_David Leven_Derek Porter • M.Arch_Year 2_Fall 2013 • Assignment 2_Light Lab (w/Jelisa Blumberg)
Design Studio 3_David Leven_Derek Porter • M.Arch_Year 2_Fall 2013 • Assignment 2_Light Lab (w/Jelisa Blumberg)
PRIVATE_TESTING LAB MIXED_COLLABORATE PUBLIC_DISPLAY
Gallery_Outdoor Space Cafe_Auditorium Entry_Store
Early shadows studies done on the Heliodon led to the types of screens and their layering depending on the orientation and program behind
3
SOUTH FACING
1
1
SECTION : 1/4” = 1’
2
3
SECTION : 1/4” = 1’
2
NORTH FACING 10 - 150’
09 - 130’
08 - 115’
07 - 100’
06 - 85’
05 - 70’
04 - 55’
03 - 35’
2.5 - 25’
02 - 15’
01 - 0’ CHRYSTIE STREET
Design Studio 3_David Leven_Derek Porter • M.Arch_Year 2_Fall 2013 • Assignment 2_Light Lab (w/Jelisa Blumberg)
CHRYSTIE STREET
Design Studio 3_David Leven_Derek Porter • M.Arch_Year 2_Fall 2013 • Assignment 2_Light Lab (w/Jelisa Blumberg)
Design Studio 3_David Leven_Derek Porter • M.Arch_Year 2_Fall 2013 • Assignment 2_Light Lab (w/Jelisa Blumberg)
Design Studio 3_David Leven_Derek Porter • M.Arch_Year 2_Fall 2013 • Assignment 2_Light Lab (w/Jelisa Blumberg)
2 LAYERS 5/8" GYP 2 LAYERS 5/8" GYP
5 1/2" MTL STUDS
2 1/2" MTL. STUDS
2 LAYERS 5/8" GYP
2 LAYERS 5/8" GYP
EXTRUDED CORTEN STEEL EGGCRATE SCREEN 4X4' PANELS 1" ø HORIZONTAL CORTEN SCREEN
PROJECT MANAGER Alexis Kraft
0'
0' - 1"
PROJECT TEAM
6"
DRAWING COORDINATOR Jessica Hartwig
1X1" HORIZONTAL TOP & BOTTOM FRAME 0' - 1"
0' - 5"
ENVIRONMENTAL SYSTEMS SPECIALIST Derick Brown
° 30.00
0' - 6"
FACADE/ENVELOPE SPECIALIST Jelisa Blumberg
STRUCTURAL CONSULTANT Kristina Cowger 0' - 3"
No.
Description
Date
0' - 8"
8
INT - 5" PARTITION 1 1/2" = 1'-0"
7
INT- 8" PARTITION 1 1/2" = 1'-0"
6
UPPER SCREEN 1 1/2" = 1'-0"
5
SOUTH SCREEN 1 1/2" = 1'-0"
2 1/2" PRECAST CONC PANEL
0' - 1"
3" FOIL FACED RIGID INSULATION
WATERPROOFING MEMBRANE
2.5x5" ALUMINUM MULLION
1" ø HORIZONTAL CORTEN SCREEN
12X8X16" 2 CORE CMU
1" AIR SPACE
DOUBLE GLAZING
5/8" PLYWOOD SHEATHING 6" MTL STUD W/ BATT INSULATION
1' - 0"
5/8" GYP
LES Light Lab
PROJECT TITLE
LIGHT GAUGE STEEL ZEES 3X1 1/2"
LES Light Lab
1/2" JOINT SEALANT AND BACKER ROD DWG TITLE
Screens_Layers_Light
2X3" HORIZONTAL TOP & BOTTOM FRAME
EXT
INT
0' - 3"
EXT
WALL TYPES
INT
0' - 5"
1' - 1"
SEAL & SIGNATURE
1' - 0"
DATE: PROJECT NO.: DWG BY:
Lower East Side, Manhattan
CHK BY:
4
LOWER SCREEN 1 1/2" = 1'-0"
3
EXT- STOREFRONT 1 1/2" = 1'-0"
2
EXT- CONC PANEL ON MTL STUDS 1 1/2" = 1'-0"
1
EXT- 12" CMU 1 1/2" = 1'-0"
A-001.00 SCALE:
1 1/2" = 1'-0"
Construction Tech 2_Alexis Kraft • M.Arch_Year 2_Spring 2014 • CD Set (w/Jelisa Blumberg)
Construction Tech 2_Alexis Kraft • M.Arch_Year 2_Spring 2014 • CD Set (w/Jelisa Blumberg)
5-14-14 2014-001 JH SCE
__ OF __
10 OF 26
Construction Tech 2_Alexis Kraft • M.Arch_Year 2_Spring 2014 • CD Set (w/Jelisa Blumberg)
housing
roof park
lobby market cafe seating/hot food (offset in)
planters
Alfred E. Smith Housing Addition Stratification_Shelter_Connection Two Bridges, Manhattan
Market Plans (3 floors compressed)
Design Studio 2_David Leven • M.Arch_Year 1_Spring 2013 • Assignment 2_Housing (w/Felipe Colin Jr.)
Design Studio 2_David Leven • M.Arch_Year 1_Spring 2013 • Assignment 2_Housing (w/Felipe Colin Jr.)
louvers
up up
up
up
up
up
up
up
glass
mullions
Unit Plans (Studio, 1 & 2 BD) panel
Design Studio 2_David Leven • M.Arch_Year 1_Spring 2013 • Assignment 2_Housing (w/Felipe Colin Jr.)
Design Studio 2_David Leven • M.Arch_Year 1_Spring 2013 • Assignment 2_Housing (w/Felipe Colin Jr.)