ABPL30041 Construction Design Final Model

Page 1

Model – Final Model Submission Construction Design (ABPL30041_2020_SM1)

Student name: Yan He Student number: 980425 Tutorial group: 06 Tutor:Andy Bosworth Section C


FRONT VIEW


Loads transfer RIGHT VIEW


FRONT VIEW


LEFT VIEW


Exisiting concrete slab

Ground water (depth below ground 800mm1400mm)

SILTY CLAY (high plasticity) SANDY CLAY (medium plasicity)

ROCK (suitable for supporting) GROUND CONDITION


Loads transfer

Pushed away when digging holes

Precast reinforced concrete

Segmental driven piles (350MM square pile) FOUNDATION


Under plank beam Full depth beam

Camber is induced in hollowcore slab

GROUND BEAMS


Base plate with anchor bars casting in

Starter bars

GROUND CONNECTIONS


Adjustable clips to adjust the level of suspended ceiling

Suspended flush plasterboard ceiling Soffit lining

SUSPENDED CEILING


Double glazed fixed glass window with 16mm airgap

Aluminium glazing adaptor Timber stud frame work: Kiln Dried Hard Wood

Support bracket Reinforcement of precast concrete panel

PRECAST CONCRETE PANEL & WINDOW


Wall tie & precast wall connection Bent plate clip with anchor bars

Panel connection Welded plate with N16 anchor full strength butt weld to plate

PRECAST CONCRETE PANEL


13mm flush plasterboard wall lining on stud frame Thermal/acoustic polyester batt insulation 20mm cavity continuous sarking double layers of 13mm plasterboard 50mm sound absorbent 90mm timber stud 70mm timber stud

TIMBER STUD WALL


aluminium screen sunshading

80x40x4mm aluminium channel gutter

75x75x3 square hollow section with Full Strength Butt Weld connections

WINDOWS


Cast in plate to precast facade with 6CFW site weld to frame colour matched caulking

Steel top hat section fixed to steel sub-frame using screws

continuous RFL sarking aluminium panel cladding

WINDOWS WITH CLADDING


Plasterboard ceiling on batten

First floor carpet

Ground floor Suspended flush plasterboard ceiling FLOORS & CEILINGS


Beam with Shortcrete for Fire protection 700WB115

Beam & hollowcore connection plate cleat with screw bolts installed

STEEL FRAMING


300PFC

Cleat with bolts bolted in joist C25019 Column & beam connection The cleat is welded on the column and it is bolted into the beam 200UC52

STEEL FRAMING


530UB92

End plate with 2M20 bolts in 200UC52

STEEL FRAMING


Flashing turn down Folded colorbond metal flashing

Wall tie & beam connection The cleat is welded on the column and it is bolted into the beam Wall tie: 250PFC

STEEL FRAMING


Need to re-spray the paint to avoid corrosion If hole is drilled on site Safety mesh

Loads transfer

Briding for purlin allows the purlin to resist wind loads

Mezzanine Hangers: 2 no. of M20 Rods hold the Mezzanine Beam Roof bracing: prevent buckling or rotation of trusses

ROOFING


colorbond metal sheet roof 3mm think Styrofoam thermal spacers Blanket sarking

Carpet 25mm THK structural particle board floor

Balustrade ROOFING & BALUSTRADE


metal deck is thin and need to be coated roof sheet need to be overlap according to the wind direction

Fix the roof sheets screw the sheet into purlin

ROOFING