![](https://assets.isu.pub/document-structure/201031123822-dc2c1f59c47aa4d1c92f07ee50b8dcca/v1/303abf5653ecd07e658431aa0beb3f87.jpg?width=720&quality=85%2C50)
1 minute read
Z 240252.7. Mounting of Handrails, Steps and Gratings
2.7. Mounting of Handrails, Steps and Gratings (Z 24025)
1. During this stage of assembly the handrails, steps and gratings can be mounted to the superstructure, cab base and machinery house.
This provides more safety during further assembly.
Position Designation
19 Pair of half clamps 20 Cover plate 21 Bolt 22 Washer 23 Nut 24 Bolt 25 Locking plate
![](https://assets.isu.pub/document-structure/201031123822-dc2c1f59c47aa4d1c92f07ee50b8dcca/v1/7bcb84506389355c7fd50620447ad165.jpg?width=720&quality=85%2C50)
![](https://assets.isu.pub/document-structure/201031123822-dc2c1f59c47aa4d1c92f07ee50b8dcca/v1/5e8bcce0699b8c70d27a6f7716546c4f.jpg?width=720&quality=85%2C50)
![](https://assets.isu.pub/document-structure/201031123822-dc2c1f59c47aa4d1c92f07ee50b8dcca/v1/0d47c00334f74ca18c52a72228562979.jpg?width=720&quality=85%2C50)
![](https://assets.isu.pub/document-structure/201031123822-dc2c1f59c47aa4d1c92f07ee50b8dcca/v1/d548814df6c45a9e5ad4e123ac163ffd.jpg?width=720&quality=85%2C50)
![](https://assets.isu.pub/document-structure/201031123822-dc2c1f59c47aa4d1c92f07ee50b8dcca/v1/e53b2717c71e21add1700895ada6372c.jpg?width=720&quality=85%2C50)
![](https://assets.isu.pub/document-structure/201031123822-dc2c1f59c47aa4d1c92f07ee50b8dcca/v1/08ee1127748006279883f33b27eb7fd4.jpg?width=720&quality=85%2C50)
![](https://assets.isu.pub/document-structure/201031123822-dc2c1f59c47aa4d1c92f07ee50b8dcca/v1/ccc120f5f58237667e769dd021f2ee35.jpg?width=720&quality=85%2C50)
Z 24029