![](https://assets.isu.pub/document-structure/201031123822-dc2c1f59c47aa4d1c92f07ee50b8dcca/v1/8b8c59f9a61942dd963dabf112587e94.jpg?width=720&quality=85%2C50)
1 minute read
2.8. Mounting of Cab (Z 24029
2.8. Mounting of Cab (Z 24029)
1. Lift the cab.
Lifting eyebolts are delivered with the machine. 2. Align the cab with the cab base. 3. Lower the cab fully down and fasten the cab with bolts (1)
M16x2 and sleeves (02). 4. Connect electric cables and the hydraulic hoses. 5. If the machine is equipped with an air conditioner, connect the air hoses and cables. 6. Mount the handrails to the cab if not yet done.
![](https://assets.isu.pub/document-structure/201031123822-dc2c1f59c47aa4d1c92f07ee50b8dcca/v1/6f8a28315569375ce5d85c18e04f289d.jpg?width=720&quality=85%2C50)
![](https://assets.isu.pub/document-structure/201031123822-dc2c1f59c47aa4d1c92f07ee50b8dcca/v1/cb833c9bd767c36e17420add026e3b73.jpg?width=720&quality=85%2C50)
![](https://assets.isu.pub/document-structure/201031123822-dc2c1f59c47aa4d1c92f07ee50b8dcca/v1/67124aee28abb4782db3760d60860c17.jpg?width=720&quality=85%2C50)
![](https://assets.isu.pub/document-structure/201031123822-dc2c1f59c47aa4d1c92f07ee50b8dcca/v1/69deb52a004d50d4e539a5d155fd5325.jpg?width=720&quality=85%2C50)
Z 20371a