705931 thi khanh hoa phan ass 3 final

Page 1

SITE TECTONICS

STUDENT: THI KHANH HOA PHAN STUDENT NO: 705931 MAJOR: LANDSCAPE ARCHITECTURE SM1 - YEAR 2


FINAL SUBMISSION LIST SUB1000

DRAWING COVER LIST

SUB1001 SUB1002 SUB1003 SUB1004

FINAL RAMP PLAN AFTER PHASE II 1:500 @A3 DESIGN ITERATION CONTOUR PLAN OF ENGINEERED SCHEME 1:500 @A3 DESIGN ITERATION (CON’T)

SUB2001 SUB2002 SUB2003 SUB2004

OVERVIEW RENDER HUMAN PERSPECTIVE RENDER 02 HUMAN PERSPECTIVE RENDER 03 HUMAN PERSPECTIVE RENDER 03

SUB3001 SUN SHADDOW STUDY SUB3002 VOLUME CALCULATION SUB4001 SUB4002 SUB4003 SUB4004 SUB4005 SUB4006 SUB4007

REVISED LANDFORM-INSPIRED RAMP DRAFTED IN AUTOCAD 1:500 @A3 FLOATING WALKWAY AND TOPOGRAPHIC MANIPULATION PLAN 1:500 @A3 FLOATING WALKWAY DESIGN - RENDER 01 FLOATING WALKWAY DESIGN - RENDER 02 FLOATING WALKWAY DESIGN - RENDER 03 FLOATING WALKWAY DESIGN - OVERVIEW WATERFALL LANDFORM

THE UNIVERSITY OF MELBOURNE

ABPL20047_SM2_2015 SITE TECTONICS

DRAWING No.

DRAWING TITLE

SUB1000

DRAWING LIST

DRAWN BY: THI KHANH HOA PHAN

STUDENT NUMBER: 705931 MAJOR: LANDSCAPE ARCHITECTURE - YEAR 2

DATE COMPLETED: 29/10/2015


RV1

This is my original CAD plan. As I received good comment on my ramp scheme, not much radical change happening with my final ramp plan. However, the problem I did notice with my CAD plan is the point at RV1. Although I felt there’s something wrong happening there, but not until I model it in 3D was I able to visualize the issue and improve accordingly. THE UNIVERSITY OF MELBOURNE

ABPL20047_SM2_2015 SITE TECTONICS

DRAWING No.

SUB1001

DRAWING TITLE

FINAL RAMP PLAN

DRAWN BY: THI KHANH HOA PHAN

STUDENT NUMBER: 705931 MAJOR: LANDSCAPE ARCHITECTURE - YEAR 2

SCALE: 1:500 @A3 DATE COMPLETED: 7/09/2015

N


It turned out that the building cut made this point look bulky and the Farnworth house lost its origial design intention which is to ‘touch the ground lightly’.

RV2 RV1

So I decided to only make the platform cut, without fill. The result is much more satisfying. Also, with the CAD plan, I was really trying to calculate the exact spot level of ramp, but there are still minor gaps in the meeting points of ramp/path and ramp/building. With 3D visualizing tool, I can easily pick it up and precisely change the design.

RV1

RV2

THE UNIVERSITY OF MELBOURNE

ABPL20047_SM2_2015 SITE TECTONICS

DRAWING No.

SUB1002

DRAWING TITLE

DESIGN ITERATION

DRAWN BY: THI KHANH HOA PHAN

STUDENT NUMBER: 705931 MAJOR: LANDSCAPE ARCHITECTURE - YEAR 2

DATE COMPLETED: 29/10/2015


RV3

RV1

RV1: platform fill removed from grading plan RV3: I should have paid more attention to/learn how to accurately model the gradient of this cut. It does not meet the suggested 1: 2.5 gradient for platform cut

THE UNIVERSITY OF MELBOURNE

ABPL20047_SM2_2015 SITE TECTONICS

DRAWING No.

SUB1003

DRAWING TITLE

CONTOUR PLAN

DRAWN BY: THI KHANH HOA PHAN

STUDENT NUMBER: 705931 MAJOR: LANDSCAPE ARCHITECTURE - YEAR 2

SCALE: 1:500 @A3 DATE COMPLETED: 7/09/2015

N


IMPROVEMENT FOR EASE OF USE RV4: Open handrails and extend to terrace stair to get access to terrace and safely enjoy the view from the terrace RV5: Connect railing for safety purpose (wheelchair people will not fall off between this 2 endpoints of ramps). RV6: Trees and shrubs are added to soften the experience of strong cut and fill of the ramp and platform.

RV5

RV5

RV4

RV4

RV6

THE UNIVERSITY OF MELBOURNE

ABPL20047_SM2_2015 SITE TECTONICS

RV6

DRAWING No.

SUB1004

DRAWING TITLE

DESIGN INTERATION

RV6

DRAWN BY: THI KHANH HOA PHAN

STUDENT NUMBER: 705931 MAJOR: LANDSCAPE ARCHITECTURE - YEAR 2

DATE COMPLETED: 29/10/2015


THE UNIVERSITY OF MELBOURNE

ABPL20047_SM2_2015 SITE TECTONICS

DRAWING No.

SUB2001

DRAWING TITLE

RAMP SCHEME OVERVIEW

DRAWN BY: THI KHANH HOA PHAN

STUDENT NUMBER: 705931 MAJOR: LANDSCAPE ARCHITECTURE - YEAR 2

DATE COMPLETED: 29/10/2015


THE UNIVERSITY OF MELBOURNE

ABPL20047_SM2_2015 SITE TECTONICS

DRAWING No.

SUB2002

DRAWING TITLE

HUMAN PERSPECTIVE VIEW 01

DRAWN BY: THI KHANH HOA PHAN

STUDENT NUMBER: 705931 MAJOR: LANDSCAPE ARCHITECTURE - YEAR 2

DATE COMPLETED: 29/10/2015


THE UNIVERSITY OF MELBOURNE

ABPL20047_SM2_2015 SITE TECTONICS

DRAWING No.

SUB2003

DRAWING TITLE

HUMAN PERSPECTIVE VIEW 02

DRAWN BY: THI KHANH HOA PHAN

STUDENT NUMBER: 705931 MAJOR: LANDSCAPE ARCHITECTURE - YEAR 2

DATE COMPLETED: 29/10/2015


THE UNIVERSITY OF MELBOURNE

ABPL20047_SM2_2015 SITE TECTONICS

DRAWING No.

SUB2004

DRAWING TITLE

HUMAN PERSPECTIVE VIEW 03

DRAWN BY: THI KHANH HOA PHAN

STUDENT NUMBER: 705931 MAJOR: LANDSCAPE ARCHITECTURE - YEAR 2

DATE COMPLETED: 29/10/2015


9AM

12PM

3PM

THE UNIVERSITY OF MELBOURNE

ABPL20047_SM2_2015 SITE TECTONICS

DRAWING No.

SUB3001

DRAWING TITLE

SUN SHADOW STUDY

5PM

DRAWN BY: THI KHANH HOA PHAN

STUDENT NUMBER: 705931 MAJOR: LANDSCAPE ARCHITECTURE - YEAR 2

DATE COMPLETED: 29/10/2015


VOLUME CALCULAITON There is no surprise that the difference between original and modified landform due to cut and fill is small. This is because my design of ramp scheme in phase 1 and 2 are intended to take the earth volume from paltform cut to fill the ramp. This act of balancing in designing phase was to minimize cut and fill difference and the result is as expected. THE UNIVERSITY OF MELBOURNE

ABPL20047_SM2_2015 SITE TECTONICS

DRAWING No.

SUB3002

DRAWING TITLE

VOLUME CALCULATION

DRAWN BY: THI KHANH HOA PHAN

STUDENT NUMBER: 705931 MAJOR: LANDSCAPE ARCHITECTURE - YEAR 2

DATE COMPLETED: 29/10/2015


19 01

A

02

A

03

A

04

N

A

05

20

M O B

18 06 21

L

P

B 17

+ BS 9000

07

22

K

+ FFL 10500

+ FTL 9750

C 08 Q

09 D 12

16

11 22

E 10

J

F

R

13 15 H

G

23 9.00 8.00 7.00

14

6.00 5.00 4.00 3.00

RAMP SCHEME FROM ASSIGNMENT 1 REVISITED For the topography manipulation test, I decided to revisit my floating ramp scheme from assignment 1 and improve upon that marine-inspired land form. I picked up the skills learned from the last 2 assignments with my mechanical grading ramp and applied it to this ramp scheme. This turned out to be a good idea because finally I have enough technical skills to develop a design-wise ramp I embraced at the beginning of the semester. THE UNIVERSITY OF MELBOURNE

ABPL20047_SM2_2015 SITE TECTONICS

DRAWING No.

SUB4001

L

S

O

W

E

R

P

A

T

H

R

24

DRAWING TITLE

ORIGINAL RAMP PLAN

DRAWN BY: THI KHANH HOA PHAN

STUDENT NUMBER: 705931 MAJOR: LANDSCAPE ARCHITECTURE - YEAR 2

I R SCALE: 1:500 @A3 A M

B

Y

R

N

O

DATE COMPLETED: 7/09/2015

N

I

V

G

N

E

R


RAMP SCHEME FROM ASSIGNMENT 1 REVISITED DESIGN CONCEPT: CONCEAL AND REVEAL (as seen in photo sequence) Contour plan was generated from 3dxmax. Generally, the platform is intended to sit 7m above the river level to deal with the problem of flooding (refer to assignment 1 site analysis and design response). P1, P2, P3 are points from which view renders in next few sheets are taken.

P1

P2

P3

THE UNIVERSITY OF MELBOURNE

ABPL20047_SM2_2015 SITE TECTONICS

DRAWING No.

SUB4002

DRAWING TITLE

REVISED CONTOUR PLAN

DRAWN BY: THI KHANH HOA PHAN

STUDENT NUMBER: 705931 MAJOR: LANDSCAPE ARCHITECTURE - YEAR 2

SCALE: 1:500 @A3 DATE COMPLETED: 29/10/2015

N


Columns to support the structure

THE UNIVERSITY OF MELBOURNE

ABPL20047_SM2_2015 SITE TECTONICS

DRAWING No.

DRAWING TITLE

SUB4003

RENDER 01

DRAWN BY: THI KHANH HOA PHAN

STUDENT NUMBER: 705931 MAJOR: LANDSCAPE ARCHITECTURE - YEAR 2

DATE COMPLETED: 29/10/2015


THE UNIVERSITY OF MELBOURNE

DRAWING No.

ABPL20047_SM2_2015 SITE TECTONICS

SUB4004

DRAWING TITLE

RENDER 02

DRAWN BY: THI KHANH HOA PHAN

STUDENT NUMBER: 705931 MAJOR: LANDSCAPE ARCHITECTURE - YEAR 2

DATE COMPLETED: 29/10/2015


THE UNIVERSITY OF MELBOURNE

ABPL20047_SM2_2015 SITE TECTONICS

DRAWING No.

SUB4005

DRAWING TITLE

RENDER 03

DRAWN BY: THI KHANH HOA PHAN

STUDENT NUMBER: 705931 MAJOR: LANDSCAPE ARCHITECTURE - YEAR 2

DATE COMPLETED: 29/10/2015


THE UNIVERSITY OF MELBOURNE

ABPL20047_SM2_2015 SITE TECTONICS

DRAWING No.

SUB4006

DRAWING TITLE

RAMP OVERVIEW

DRAWN BY: THI KHANH HOA PHAN

STUDENT NUMBER: 705931 MAJOR: LANDSCAPE ARCHITECTURE - YEAR 2

DATE COMPLETED: 29/10/2015


THE UNIVERSITY OF MELBOURNE

ABPL20047_SM2_2015 SITE TECTONICS

DRAWING No.

SUB

DRAWING TITLE

WATERFALL LANDFORM

DRAWN BY: THI KHANH HOA PHAN

STUDENT NUMBER: 705931 MAJOR: LANDSCAPE ARCHITECTURE - YEAR 2

DATE COMPLETED: 29/10/2015


THE END


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.