BA R EC PH
Architecture Portfolio CHONG HOU YIN
2021-2022
CONTENTS 01 LYL Masterplan
mixed use development masterplan
14 GA611 Church 06 Pantai Dalam
religious building
high rise residential
18 Ayer Service Apartment 10 IOI Bandar Puteri, Bangi community & commercial village masterplan
commercial title high rise residential
Linkedin Contact: houyin99@hotmail.com Location: Petaling Jaya, Selangor, Malaysia.
CHONG HOU YIN Assistant Architect - BEP Akitek Sdn Bhd. ACADEMIC QUALIFICATION 2012-2016 Catholic High School
2017-2018
SPM 3 A+ 2 A 1 A- 2 B+ 1 B 1 C+ AS
Taylor’s College
2018-2021
Cambridge A Level
Bachelor of Science (Hons) in Architecture
2A1B
A2 2 A 1 B
Taylor’s University
(Sustainable Design) Semester 1 Dean’s list CGPA 3.70/4.00 Semester 5 Dean’s list CGPA 3.74/4.00
Aspire to continuously sharpen interpersonal skill and
Second Upper Class Honour
techniques on the journey of Architecture. Always passionate
Taylor’s Excellence Award Scholarship
and fascinated on delivering a sustainable living environment. ACHIEVEMENTS & CO-CURRICULAR
PERSONAL INFO
School state
Phone number: +6017-3522688 Email: houyin99@hotmail.com
2011 - 2016 Purple Sport House - Active Member
Nationality: Malaysian
2016 Sports Day House Deco Event - Deco Department Leader
Date of Birth: 11/10/1999
2017 Class Xperience Charity H.I.I.T Run - Volunteer 2017 Blood Donation Drive - Volunteer/Donor
INTEREST
2020 Tea Table Talk: Student Symposium 1.0: Reconnect To The Root - Participant National state Sketching
Photography
Design
LANGUAGES AND COMMUNICATIONS English 4/5 Malay 4/5 Mandarin 5/5
2012 Wushu Junior Grade Certification - GRADE 1 2015 30-Hour Famine - Participant International state 2013 Chinese Culture Contest for Overseas Chinese Teenagers - GRADE A 2016 Root-Seeking Overseas Chinese Youth Winter Camp in Qingdao - Participant (Deputy Head) SKILLS & ABILITIES
Dialect (Cantonese, Hakka) WORKING EXPERIENCES Merries - Kao Malaysia Sdn. Bhd. - Promoter 2016
IPSOS - Survey Company QC Department (Freelancer)
6/2018 - 8/2018 3/2109 - 4/2019 12/2019 - 3/2020 Electrician Contractor (Helper) Filmories.my (Founder) BEP Akitek Sdn. Bhd. - Assistant Architect 11/2021-7/2022
Adobe Photoshop
Sketchup
Adobe Illustrator
Lumion
Adobe Lightroom
Enscape
Revit
Microsoft Excel
AutoCAD
Microsoft Word
3DSmax
Microsoft PowerPoint
REFERENCES SMJK Katholik
Taylor’s University Sdn. Bhd.
BEP Akitek Sdn. Bhd.
+603-7956 5484
+603-5629 5000
+603-7806 1888
http://www/chspj.edu.my/
http://university.taylors.edu.my/en.html
bep@bepakitek.com
beb8653@moe.edu.my
campuscentral@taylors.edu.my
01
LYL MASTERPLAN For the first project, the client has assigned us to design a mixed-use development masterplan in an approximately 400 acres of land area located at Semenyih, Selangor. The main concept of the masterplan is to synergize by the existing lake on the highest point of the site, with a clubhouse adjacent to it and secluded with arrays of commercial area, to provide a focal point for the development. From the main focal point, it branches out with series of terrace housing, commercial shop lot/office area and service apartments parcel. The masterplan also supports by specific numbers of basic institutions such as primary schools, surau, police station etc.
SITE LOCATION
Semenyih, Selangor.
PROJECT TIMELINE
2021
6/12 Project begin 20/12 1st Presentation
14/1 2nd Presentation
18/2 3rd Presentation
18/3 4th Proposal
2022
02
03
04
DESIGN STRATEGIES To incorporate sustainable/ livable environment for future residence, pockets of greenery had introduced to overcome the drastic change of contour.
Diagrammatic section explain the insertion of greenery pocket space.
05 CHALLENGE/ LIMITATION Contour The main challenges we faced for this project is the drastic change of contours scattered on the site. To tackle this issue, our team has carefully review the difference in contour for few section, and possibilities to adjust the contour according to the maximum difference in leveling.
06
SEPARATE CARPARK PODIUM (RESIDENTIAL, COMMERCIAL 800kp/500kp) For this project, we are given a task to maximize the plot ratio PANTAI DALAM
of the commercial land by doing few exercises on the calculation and spatial planning. The project is located nearby the PPR Pantai Ria at Pantai Dalam, Kuala Lumpur. The initial idea is the facing the unit block toward north east orientation, direct to the KLCC city skyline view. The main objective of the latest scenario is to increase the plot ratio/density as client requested with compliance of uniform building by law for proposal stage.
L
K J
DARY
RIMET
ER PL
I
LINE
ANTIN
ING SE
TBAC
G
H
K 610
0mm
G
PARC EL 2 RESID ENTIA : L
F
E
ED YP m
T
D
PE
TY
C
PARC EL COM MERCI 1 : AL
sq 90 0sq 97
ft
D
m sq 90 0sq 97
ED
ft
PE
TY
T
E PE
1 17 15
AL
PIC
F PE m TY41sqsq ft
TY
D
E
F
G
H
I
J
EB
1
P
TY
m sq ft 96 33sq 10
EA
P m .6sq ft 80 8sq 86
TY
1 17 15
C
sq ft 96 33sq 10
m .6sq ft 80 8sq 86
OO
FL
T
TY
L RP
B
EB YP m
A PE
AN
P TY41sqm ft sq
2
A
m .6sq ft 8068sq 8
m 6sq ft 10 40sq 11
EF
A
m sq ft 96 33sq 10
PE
TY
TY
sq ft 90 0sq 97
3
TY
EE
P m 6sq ft 10 40sq 11
TY
m sq ft 9070sq 9
ED YP m
1
m sq ft 90 0sq 97
D
EB
P
P
TY
B A
SITE LOCATION
BOUN
2m PE BUILD
2
PE
TY
C PE TY3sq0msqft
B
m sq ft 96 33sq 10
9 0 10
3
EB
P
TY
4 DN
EC
P m 0sq ft 14 07sq 15
TY UP
5
m sq ft 96 33sq 10
EC YP m ft
T
sq 93 00sq 10
4
BOUNDAR
F PE m TY70.6sqsqft
Y LINE
2m PERIMETE
R PLANTING
0
76
C PE TY3sqmsqft
F PE m TY70.6sqsqft
6
BUILDING
SETBACK
5
6100mm
9 00 10
0
76
F PE m TY70.6sqsqft
9 00 10
7
TYPE A
58sqm 625sqft
TYPE A
58sqm 625sqft
TYPE A
58sqm 625sqft
TYPE A
58sqm 625sqft
SETBACK
9
6100mm DN
10
UP
6100mm
DN
58sqm 625sqft
BUILDING
SETBACK
12
2m PERIMETE R PLANTING BOUNDARY LINE 2m PERIMETE R PLANTING
10
TYPE A
8
BUILDING
11 DN
UP
13
UP
BUILDING SETBACK 6100mm
BOUNDARY LINE
2m PERIMETER PLANTING
9
11
14
6100mm
BOUNDARY LINE
R PLANTING
SETBACK
15
12
2m PERIMETE
BUILDING
PROJECT TIMELINE
0
76
TYPE C
OR PLAN
93sqm 1000sqft
TYPICAL FLO
TYPE C
F PE m TY70.6sqsqft
8
Pantai Dalam, Selangor.
6
C PE TY3sqmsqft
0
76
93sqm 1000sqft
7
13
14
UTARA
16
15
BUILDING SETBACK
2021
6100mm
16
2m PERIMETER PLANTING BOUNDARY LINE
4/4 1st Presentation 23/3 Project begin
11/5 2nd Presentation 1/6 3rd Presentation
2022
Initial scheme
07
BOUN
2m PE
DARY
RIMET
ER PL
BUILD
TBAC
TYPE A
88.2sqm 949sqft
TYPE B
85.4sqm 919sqft
TYPE A
88.2sqm 949sqft
TYPE B
66.2sqm 712sqft
TYPE E
88.2sqm 949sqft
TYPE B
88.2sqm 949sqft
TYPE B
85.4sqm 919sqft
TYPE B
66.2sqm 712sqft
TYPE E
88.2sqm 949sqft
LINE
R PLANTING
6100mm
66.2sqm 712sqft
66.2sqm 712sqft
SETBACK
TYPE E
TYPE E
66.2sqm 712sqft
66.2sqm 712sqft
TYPE E
2m PERIMETE
BUILDING
TYPE E
TYPE E
66.2sqm 712sqft
TYPE B
88.2sqm 949sqft
BOUNDARY
53.6sqm 577sqft
TYPE E
TYPE E
66.2sqm 712sqft
TYPE B
88.2sqm 949sqft
85.4sqm 919sqft
PARC EL 1 COM MERCI : AL
TYPE D
53.6sqm 577sqft
TYPE D
66.2sqm 712sqft
TYPE A
85.4sqm 919sqft
TYPE A
85.4sqm 919sqft
TYPE A
85.4sqm 919sqft
TYPE A
53.6sqm 577sqft
TYPE D
53.6sqm 577sqft
TYPE A
85.4sqm 919sqft
TYPE D
53.6sqm 577sqft
TYPE D
IN/OUT
mm
mm
EXIT
BUILDING SETBACK 6100
76.3sqm 821sqft
DROP OFF
2m PERIMETER PLANTING
TYPE C
DROP OFF
BOUNDARY LINE 2m PERIMETER PLANTING
BUILDING SETBACK 6100
TYPE C 76.3sqm 821sqft
DN
DN
m
LINE
TING
ETER PLAN
UTARA
76.3sqm 821sqft
BOUNDARY
TYPE C
SETBACK 6100m
UP
2m PERIM
76.3sqm 821sqft
BUILDING
TYPE C
UP
2m PERIMETER PLANTING
BOUNDARY LINE
ENTRANCE
Parking By reducing the land size by half for both tower and podium plinth, the number of car park unit is difficult to achieve for the initial scheme. My task is to sort out the possibilities of the car park arrangement, application of car park ramp etc.
PARC EL 2 RESID ENTIA : L
BUILDING SETBACK 6100mm
The main limitation for this project is the land size and land title. Due to the marketing trend, we took the cashflow of developer into one of the considerations. We had proposed to separate the unit tower with car park podium. This decision causes the building plinth of tower become smaller. We decide to redesign the tower orientation to maximize the plot ratio/density. Throughout the design process, one of my tasks is to clarify the size of units and requirement on the low-cost unit for specific land title.
0mm
DN
Land size/title
G
K 610
UP
CHALLENGES/ LIMITATIONS
LINE
ANTIN
ING SE
10 % KWS LAPANG TYPE C 76.3sqm 821sqft
BUILDING SETBACK
6100mm
8 % KWS LAPANG
2m PERIMETER PLANTING
BOUNDARY LINE
Revised scheme (Ground Floor Plan)
08
BOUN
2m PE
DARY
RIMET
ER PL
BUILD
TBAC
G
0mm
PARC EL 2 RESID ENTIA : L
TYPE E
66.2sqm 712sqft
66.2sqm 712sqft
TYPE E
88.2sqm 949sqft
LINE
R PLANTING
SETBACK
6100mm
66.2sqm 712sqft
TYPE E
66.2sqm 712sqft
TYPE E
66.2sqm 712sqft
66.2sqm 712sqft
TYPE E
2m PERIMETE
BUILDING
TYPE E
TYPE E
66.2sqm 712sqft
TYPE B
88.2sqm 949sqft
BOUNDARY
53.6sqm 577sqft
TYPE E
TYPE A
85.4sqm 919sqft
PARC EL 1 COM MERCI : AL
TYPE D
53.6sqm 577sqft
TYPE D
66.2sqm 712sqft
TYPE E
TYPE B
88.2sqm 949sqft
66.2sqm 712sqft
TYPE A
85.4sqm 919sqft
TYPE A
53.6sqm 577sqft
TYPE D
53.6sqm 577sqft
DN
85.4sqm 919sqft
TYPE D
53.6sqm 577sqft
TYPE D
TYPE B
85.4sqm 919sqft
TYPE A
88.2sqm 949sqft
TYPE B
85.4sqm 919sqft
TYPE A
88.2sqm 949sqft
TYPE B
88.2sqm 949sqft
TYPE B
85.4sqm 919sqft
TYPE A
88.2sqm 949sqft
TYPE B
85.4sqm 919sqft
TYPE A
K 610
UP
STRATEGIES
LINE
ANTIN
ING SE
Linear arrangement
mm
BUILDING SETBACK 6100 mm
76.3sqm 821sqft
2m PERIMETER PLANTING
TYPE C
BOUNDARY LINE 2m PERIMETER PLANTING
BUILDING SETBACK 6100
TYPE C 76.3sqm 821sqft
DN
DN
UTARA
76.3sqm 821sqft
ACK 6100m m
TYPE C
UP
BOUNDARY LINE 2m PERIM ETER PLAN TING
76.3sqm 821sqft
BUILDING SETB
TYPE C
UP
2m PERIMETER PLANTING
BOUNDARY LINE
BUILDING SETBACK 6100mm
Due to constraint of the land shape, we have to adjust the unit block to linear arrangement, aligned to the longest grid direction to maximize land usage.
TYPE C 76.3sqm 821sqft
BUILDING SETBACK
6100mm
2m PERIMETER PLANTING BOUNDARY LINE
Revised scheme (Typical Carpark Plan)
09
BOUN
2m PE
DARY
RIMET
ER PL
BUILD
LINE
ANTIN
ING SE
TBAC
G
0mm
PARC EL 2 RESID ENTIA : L
TYPE E
66.2sqm 712sqft
53.6sqm 577sqft
66.2sqm 712sqft
TYPE E
88.2sqm 949sqft
TYPE D
2m PERIMETE
6100mm
66.2sqm 712sqft
TYPE E
SETBACK
66.2sqm 712sqft
66.2sqm 712sqft
TYPE E
66.2sqm 712sqft
TYPE E
53.6sqm 577sqft
TYPE D
53.6sqm 577sqft
TYPE D
TYPE E
66.2sqm 712sqft
TYPE D
53.6sqm 577sqft
TYPE D
TYPE D
53.6sqm 577sqft
TYPE E
LINE
R PLANTING
BUILDING
66.2sqm 712sqft
66.2sqm 712sqft
BOUNDARY
53.6sqm 577sqft
66.2sqm 712sqft
TYPE B
88.2sqm 949sqft
TYPE E
mm
mm
76.3sqm 821sqft
BUILDING SETBACK 6100
76.3sqm 821sqft
TYPE C
2m PERIMETER PLANTING
TYPE C
BOUNDARY LINE 2m PERIMETER PLANTING
76.3sqm 821sqft
BUILDING SETBACK 6100
2m PERIMETER PLANTING
BUILDING SETBACK 6100mm
BOUNDARY LINE
TYPE C
PARC EL 1 COM MERCI : AL
53.6sqm 577sqft
TYPE D
TYPE E
85.4sqm 919sqft
TYPE A
DROP OFF
TYPE E
66.2sqm 712sqft
TYPE E
88.2sqm 949sqft
TYPE B
53.6sqm 577sqft
TYPE D
53.6sqm 577sqft
TYPE A
85.4sqm 919sqft
TYPE A
85.4sqm 919sqft
TYPE D
53.6sqm 577sqft
TYPE D
TYPE B
85.4sqm 919sqft
TYPE A
88.2sqm 949sqft
TYPE B
85.4sqm 919sqft
TYPE A
88.2sqm 949sqft
TYPE B
88.2sqm 949sqft
TYPE B
85.4sqm 919sqft
TYPE A
88.2sqm 949sqft
TYPE B
85.4sqm 919sqft
TYPE A
K 610
TYPE E 66.2sqm 712sqft
TYPE D
TYPE C 76.3sqm 821sqft
TYPE E
TYPE C
53.6sqm 577sqft
TYPE D
53.6sqm 577sqft
66.2sqm 712sqft
TYPE D
53.6sqm 577sqft
m
ACK 6100m
TYPE E
76.3sqm 821sqft
TYPE C 76.3sqm 821sqft
TYPE E
66.2sqm 712sqft
TYPE D
53.6sqm 577sqft
UTARA
76.3sqm 821sqft
TYPE C
66.2sqm 712sqft
76.3sqm 821sqft
TYPE C TYPE C
TYPE D
BOUNDARY LINE 2m PERIM ETER PLAN TING
76.3sqm 821sqft
76.3sqm 821sqft
BUILDING SETB
TYPE C
53.6sqm 577sqft
TYPE C
76.3sqm 821sqft
BUILDING SETBACK
6100mm
2m PERIMETER PLANTING
BOUNDARY LINE
TAPAK TEMPAT LETAK
Revised scheme (Typical Floor Plan)
IOI BANDAR PUTERI, BANGI
SITE LOCATION
10
PROJECT TIMELINE
For this project, our client has given a task to propose & design a community & commercial village masterplan. After several discussion session, we had proposed the programme such as event space, art bazaar/sport arena, food republic/drive thru, common retail space, nursery, kindergarten, and garden space. The main concept Is to revive the existing residential area by inserting youth activities, form a young and family oriented space making for surrounding area.
2021
13/5 1st Presentation 9/5 Joined
3/6 2nd Presentation
Bangi, Selangor. 3048mm PERIMETRE PLANTING
PERIMETER PLANTING 10'
CASH ROOM
REFUSE CHAMBER 18SQ.M TROLLEY BAY
WATER FEATURE
3048mm PERIMETRE PLANTING
OFFICE & ADMIN ROOM
ATM 2
1
P+C P+C P+C P+C P+C P+C
CSD
3500.00 E/E DATA 10.20SQ.M
SURAU MALE 14SQ.M
JAN 8.20SQ.M
SURAU FEMALE 14SQ.M
FEMALE TOILET 19.4SQ.M
MOTHER'S ROOM 10SQ.M
SERVICE DUCT
DISABLED 8SQ.M
COUNTER
DISH WASHING 20.5SQ.M
MALE TOILET 19.4SQ.M
MOE ENTRY FROM PARKING (OPTIONAL)
ENT
CART
PERIMETER PLANTING 10'
Lease Area 5000 sqm
12200
DDDDDD
STORE
CHECKOUTS
ENT
COUNTER
FOOD COUNTER
FOOD COUNTER
FOOD COUNTER
FOOD COUNTER
DRINK COUNTER
T
T
T
T
T
T
T
T
IN
OUT
TURFING AREA
12200
N
ALA
12200
PERIMETER PLANTING 10'
AB J REZ
PERIMETER PLANTING 10'
A
2022
11 ISSUE No proper food celebration center and sport arena around the neighborhood community.
Site access
Pedestrian connectivity
Drive thru
Zoning
Drop off
Landscape
12
00'
SCALE 1:1200 (A3)
KP
KP
4
(PE
MB
AN
GU
NA
NA
KA
ND
AT
AN
G)
13 3
BLOK 9 (11 UNIT)
KP
KP
4
4
KP
4
GA 611 CHURCH This project is located at Section 13, Petaling Jaya. The client has appointed us to build a stand-alone Sanctuary Hall building as extension of the existing church. This church domain by a double volume hexagonal shape Sanctuary Hall (with mezzanine seating); surrounded by series of supporting facilities such as office, wedding hall, breakout room, multipurpose hall etc. The main architecture feature of the building is the collision between traditional material and advanced material, create a story telling effect for the building. Application of glass is widely use to create a translucent box effect, wrapping around the massive scale of stone wall. The space is well designed to provide a comfortable and home like spatial ambience when prayer visit the building.
SITE LOCATION
Section 13, Petaling Jaya, Selangor.
PROJECT TIMELINE 2021
23/5 1th TCM 25/4 Joined1st CCM
17/5 2nd CCM
30/5 3rd CCM
10/6 2nd TCM
5/7 3rd TCM 20/6 4th CCM
2022
ARCHITECTURAL FEATURES 1. Cross sky light feature act as natural lighting source, allow daylight penetrate into the Sanctuary Hall. 2. Wide application of glass feature to provide modern and transparency figure for the building envelope. 3. Massive scale of stone wall provides traditional feel for the old churches. 4. Timber finishes provide warm ambience to the user.
14
15
16 E
F
G
H
D
6 C
I
PRE-FUNCTION
7
J
B BR E RO AK-O OM UT
1 2
K
CONTROL DESK
A 3 AC
CW
L MV
FP
R TE FE
CA IA
8
SANCTUARY
AA
9
RO
OM
10 PA
BB
M
ING
DD
WE LL
HA
CC
ST
OR
AG
E
E
AG
ST
STAGE
N
R OO E TD AC OU ERR T
DD
SECURITY & FIRE CONTROL ROOM
PUMP ROOM ICT
BACK STAGE & MAKE-UP ROOM
ELV
O
ELEC
LE MA T FE OILE T
EE
LE MA ILET TO
P
FF
R
S
ET
NS
GE
E BL OR CA RID R CO
GG
R
Q
EN.HENG CHEE HUNG 640114-12-5617 (PENGARAH) BEULAH LAND SDN. BHD. BLOCK B, 1st. FLOOR, DATARAN HAMODAL, 4, JALAN 13/4, 46200 PETALING JAYA, SELANGOR TEL : 03-79567709 FAX : 03-19544409
D AR BO IN OM MA RO
LE ING ER B S B ION TN HAMTAT C BS SU
ER ET B M OM TN RO
HH
B ME TN FOR S M AN ROO
TR R
II
JJ
KK
Ground Floor Plan
17
Rendering show application of different feature staircase material reflect different ambience to the user.
18
AYER SERVICE APARTMENT This project is located at a junction near Bandar Bukit Puchong, adjacent to SJK (C) Sin Ming. The client has appointed us to propose a commercial titled high rise building on a land plot size of 2.02 acres. We been brief to provide 3-unit types, which is 900 sqft, 1000 sqft & 550 sqft (affordable unit). During first round of discussion, our team has trying to sort out the possible figures (tabulation for no. of unit/parking) to provide in our scheme. After few rounds of trial and error, we had decided our figure and start working for the design.
SITE LOCATION
Puchong, Selangor.
PROJECT TIMELINE 2021
13/7 1st Design Proposal 21/6 Project begin
2022
19
20
Ground Floor Plan
21
AC LEDGE
CA EGD EL
AC LEDGE
C EG A DEL
Second Floor Plan
22
DESIGN CONCEPTS Scenic view
AC LEDGE
CA EGD EL
AC LEDGE AC LEDGE
The main concept of this service apartment is to invite the serene view from the lake nearby, and city skyline view from the future development site. Each view is opposite to each other and it decide the orientation of the unit tower. For sake of reducing the building plinth of tower (To allow more car park units), the unit layout is design in point configuration, and sit on the top right edges on the site plan.
AC LEDGE
LEDGE AC
LEDGE
AC
C EG A DEL
LEDGE AC
Typical Floor Plan
23
24
DESIGN STRATEGIES Lifestyle podium YOG
A DEC
K
YOG A STUDIO
MANAG
EM ROOM ENT
GOUR KITCHEMET N
PLAYGR
OUND
LEISUR ROO E M REA DIN ROO G M
MALE TOILET
GAME ROOM
MALE TOILET
The podium is nicely design by scattering of series of facilities. Main axis is generated from the viewing point, and allow cross ventilation coming through from all direction. The pool deck is setback on the longest edge of podium, creating a wide spatial experience for all. A circular loop of jogging track is wrap around the pool and other supporting facilities, such as games room, leisure room, multipurpose hall, gym gourmet kitchen etc. Landscaping is well designed to provide shades and cooling effect for the residents. The idea is to provide a lifestyle arena for the private community, and introduce leisure and healthy element to every individual who stay in the building.
STO
RAG
E
Podium
25
26
Diagrammatic Section
27