PLANNING AND IMPLEMENTATION IN RECORD TIME NEW ICE SPORTS FACILITY AFTER COLLAPSE OF STERZING ICE STADIUM D e t a il s

Author and photos

REALICE - Intercom Dr. Leitner, IT – 39040 Freienfeld - Sterzing, www.realice.info

After record snowfalls in the winter of 2021, the ice stadium in Sterzing collapsed under the weight of the snow on 10th February. No one was injured and it quickly became clear that a new solution was needed. REALICE delivered the turnkey solution in record time. In the same year as the collapse of the ice stadium, Sterzing now has a new ice sports facility for athletes and the public. In less than four months, the South Tyrolean company Intercom Dr. Leitner – together with its business unit REALICE – planned and built a turnkey solution: a new airdome with innovative ice technology. With the investigations still ongoing at the time of the project start, it was very quickly decided that Intercom Dr. Leitner, with its many years of experience in the field of ice rinks, was the right partner for this challenge. The main requirements were to ensure the shortest possible ­implementation time, profound planning competence and long-term project experience. In the end, REALICE built one of the most modern airdomes in the entire region, which today again offers space for more than 700 fans, hosts hockey championships and training sessions, and is an ­attraction for the skating-loving public. Turnkey solution One of the first steps in the project, and at the same time a huge challenge, was to drain the ground before the actual work could begin. Another special circumstance ­ ­facing the entire project was the need to ensure alignment ­almost simultaneously between technical planning, m ­ aterial 74

­ rocurement and installation on-site. Every single project p step had to run 100 % hand-in-hand. The experienced team of engineers, project managers and installation staff proved essential. For ice rinks in general – whether permanent or mobile solutions – the key factor is always to deliver the best ice quality, based on a reliable technology that ultimately provides a perfect experience for athletes and leisure skaters alike. REALICE has established a strong reputation for itself worldwide in this area, and can cite a wide range of both prestigious projects and standard solutions. The highest possible level of quality, reliability and payback in the shortest possible timescales are essential – no matter whether a turnkey or a temporary solution. The patented REALICE ice technology (refrigeration technology and mat systems), the installation of the new board system, as well as the ­project and planning experience were the criteria for success in Sterzing. Finally, in the same year as the previous stadium’s collapse, the national hockey championship was held and both skating-addicted children and adults were again able to pursue their passion. A true lighthouse project for the entire region - from zero to 100 in less than four months. sb 1/2022


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

Temporary or permanent: RÖDER sports halls for every discipline

1min
page 77

Customised individual solutions

1min
page 79

Sports floors made of glass by ASB GlassFloor are requested in Europe and overseas

2min
page 75

New ice sports facility after collapse of Sterzing ice stadium

2min
page 76

and circumstances

3min
pages 72-73

WashMatic WM800 and ClearMatic CM1800

1min
page 74

ISS and ICEGRID® conquer the industry

3min
pages 70-71

UK’s first Robbins anchored timber floating floor

4min
pages 64-65

The Arc open-air hall at Green School Bali

1min
pages 52-53

a step-by-step account

4min
pages 66-67

WM ice technics ensure absolute transparency

3min
pages 68-69

Water treatment in fitness clubs

8min
pages 60-63

OM Nursery in Hitachi-Omiya

3min
pages 48-51

Gymnase Poissonniers sports centre in Paris

3min
pages 40-43

Sports and leisure park in Winchester

3min
pages 44-47

Community centre in Modrice

3min
pages 28-31

IAKS Study Trip 2022

1min
pages 6-7

Innovative sports hall concepts

13min
pages 16-19

Everyday lab for different user groups

3min
pages 14-15

Multi-purpose arena in Tampere

5min
pages 32-35

Neutal hall for sport and culture

3min
pages 36-39

2022 IAKS Events Calendar

3min
pages 8-9

New to the IAKS network

5min
pages 10-13
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.