sb 2/2022 (english)

Page 62

ADVERT

A GEM OF A SPORTS FACILITY

HOPTBÜHL PLAYING FIELD IN VILLINGEN-SCHWENNINGEN, FEATURING PRODUCTS FROM POLYTAN Author and photos Polytan GmbH, DE – 86666 Burgheim, www.polytan.com

Good things come to those who wait, including in Villingen-Schwenningen. It took 20 years for the school playing field at Hoptbühl Gymnasium to be renovated. But all is well that ends well: the fully renovated sports field is proving to be a real gem. It features various products from sports surface specialist Polytan. The road to the new sports facility was indeed long and rocky: barely linear, it was full of surprising twists and turns. The low point was when the dilapidated site was completely shut for safety reasons, and outdoor sport had to be removed from the school timetable. Then things started to change: in May 2019, the local council ­decided that the sports facility at Hoptbühl would finally be ­renovated. The result is an absolute gem that is u ­ nrivalled in the local area. After 15 months’ construction time, young athletes in ­Villingen-Schwenningen are delighted by a new artificial turf pitch surrounded by a four-lane running track, three 60

long jump and two high jump runways, a throwing circle for shot put, a small playing field, two beach volleyball courts, three bouldering walls and a calisthenics street workout park. The sports facility was designed by ­Martin B. Kuberczyk of k3 LandschaftsArchitektur, based in ­Villingen-Schwenningen, and realised by Erhard Gfrörer & Sohn Schotterwerk, based in nearby Empfingen. Professional sports surfaces for successful training and competition The new facility features LigaTurf Cross football turf, in which Polytan has successfully combined artificial turf ­systems sb 2/2022


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

at Styrum Sports Park

2min
page 69

Innovative answer to the challenges of environmental and climate protection

2min
page 68

featuring products from Polytan

2min
pages 62-63

Life cycle of the sports hall floor

3min
pages 64-65

Ceiling design with HAVER Architectural Mesh

2min
pages 66-67

Stainless steel mesh from Carl Stahl ARC

2min
pages 60-61

“La Pradería“ sports integration centre

2min
pages 58-59

Simon Fraser University Stadium in Burnaby

2min
pages 54-55

FSF sports and leisure centre in Fliess

2min
pages 56-57

National Speed Skating Oval in Beijing

3min
pages 52-53

SoFi Stadium in Inglewood

6min
pages 40-43

at Lord’s Cricket Ground in London

3min
pages 48-51

Europa Park Stadium in Freiburg

3min
pages 44-47

in Luxembourg

2min
pages 36-39

Recovery after the pandemic

20min
pages 18-25

2nd International IAKS Pool Conference

1min
pages 10-11

Hayward Field athletics stadium in Eugene

4min
pages 32-35

New to the IAKS Network

3min
pages 12-13

IAKS Conference: "Innovative indoor sports and leisure facilities"

2min
pages 6-7

Jamsil Sports MICE Complex

2min
pages 16-17

Skypark in Shenzhen

5min
pages 26-31

Coronation Park Sports and Recreation Centre

2min
pages 14-15
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.