UNIY CONVENOR: PROF. MARK TALYOR | STUDENT: SHENGYE (SEAN) YU
#ISSUE 01
DESIGN & CONSTRUCTION JOURNAL
ARC20002 ARCHITECTURAL DESIGN STUDIO 3 Socio-economic contexts
Page #
ARC20002: ARCHITECTURAL DESIGN STUDIO 3 (SOCIO-ECONOMIC CONTEXTS)
ARC20002 DESIGN STUD
Socio-economic contexts Edition: #1 Author Sean Yu INFO iamseanyu@hotmail.com Instructor: Mark Taylor
I believe the curiosity driven the design, as I am always found something shiny on the pathway path, put in a jar to light up w I wish I still in the adventure and not stop expl
“Everything you can imagin Page #
DIO
3
UNIY CONVENOR: PROF. MARK TALYOR | STUDENT: SHENGYE (SEAN) YU
instinct, as mission or just point of view. y of designing things. Pick up the sparkles on the where could be the next. loring at the moment you read this journal.
1.
2.
Individual design & Research
Studio design & construction
Project 1: Design Proposition
Project 2: Prototypical Design
ne is real�-Pablo Picasso Page #
Individual Design
ARC20002: ARCHITECTURAL DESIGN STUDIO 3 (SOCIO-ECONOMIC CONTEXTS)
Page #
UNIY CONVENOR: PROF. MARK TALYOR | STUDENT: SHENGYE (SEAN) YU
Topography Map 5M
Smoothed Topography Map
Topography Map 25M
Adjust Height Proportion
Height Projection
Topography Map 50M
Page #
ARC20002: ARCHITECTURAL DESIGN STUDIO 3 (SOCIO-ECONOMIC CONTEXTS)
Page #
UNIY CONVENOR: PROF. MARK TALYOR | STUDENT: SHENGYE (SEAN) YU
Page #
ARC20002: ARCHITECTURAL DESIGN STUDIO 3 (SOCIO-ECONOMIC CONTEXTS)
Individual Desi
Page #
PROTOTYPE
UNIY CONVENOR: PROF. MARK TALYOR | STUDENT: SHENGYE (SEAN) YU
ign
Page #
Material Sourcing ARC20002: ARCHITECTURAL DESIGN STUDIO 3 (SOCIO-ECONOMIC CONTEXTS)
N.
Page #
MI
GIB is gypsum wall board manufacture in NZ for 90 years, local and enviromental sustainable company.
MM
Also other materials GIB has -card circles -plastic inserts from the paper rolls -pallets.
0 118
GIB have the end of paper rolls available in the following dimensions: -Gib Facepaper (1250 wide) -Back paper (1180 wide) -Wideline paper (1350 wide) All of these have a cardboard core in them. They can save approximately thirty (30)rolls of paper per week (a mixture of all of the above)
30 PER WEEK X 9 WEEKS = 270 PAPER ROLLS X
SOCIAL MEDIA INTRODUCTION
SOURCE MATERIAL
UNIY CONVENOR: PROF. MARK TALYOR | STUDENT: SHENGYE (SEAN) YU
WEEK 1. WEEK 2.
STRUCTURAL ENGINEER SUBMIT AND FEEDBACK
WEEK 3.
FINAL DESIGN AND CONSTRUCTION DRAWING
WEEK 4.
SOCIAL MEDIA VIDEO
WEEK 5. WEEK 6. WEEK 7.
WEEK 8. SOCIAL MEDIA RENDERING
WEEK 9.
CONSTRUCTION WEEK Page #
Individual Design
ARC20002: ARCHITECTURAL DESIGN STUDIO 3 (SOCIO-ECONOMIC CONTEXTS)
Page #
UNIY CONVENOR: PROF. MARK TALYOR | STUDENT: SHENGYE (SEAN) YU
Page #
ARC20002: ARCHITECTURAL DESIGN STUDIO 3 (SOCIO-ECONOMIC CONTEXTS)
Project Milestone Social Media Milestone
3 wks Communi
Design Milestone 4.5 wks Mar 1 - May 15
Group Initial Design 6 SEP - 13 SEP 1 wk
Individual Design Research
15 AUG- 6 SEP
Group discussion & concept design
15 AUG 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 SEP 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
3 wks Individual design research & concept design
Page #
5
Finalize Design
4
Finalize Structural Design
3 Project Discussion w FESTA & Site Info Update
2
Behind the Scenes
1
Initial Concept & Team Intro
Project Kick-off 15 AUG
Week 0
1.5 wks
Design Development
7 8 9
Page #
10
PROJECT TIME-FRAME
ication and research potential sponsorship
3 OCT – 14 OCT
FESTA start 20 OCT Project deinstall
Logistic & Planning
Design development behind-the-scene
13 SEP – 2 OCT
Project rendering
Material Sourcing
Organize Materials & Tools Logistics
19 20 21 22 23 24 25 26 27 28 29 30 1 OCT 2 Site info update by FESTA 3 4 5 6 7 8 9 10 11 12 13 14 15 Studio meet up in Christchurch 16 17 18 19 20 Project deadline 21 Explore design variation & prototype
Architectural Draft Submit
6 HSC Work Activity, OHS Doc. & Build Doc. Submission
Short 15-30 sec Clip
UNIY CONVENOR: PROF. MARK TALYOR | STUDENT: SHENGYE (SEAN) YU
Construction Phase OCT15 - 20
Preparation and Construction Planning
1 wks
13 SEP – 14 OCT Design amended to suit updated dimension
OCT 20
OCT 17
PROJECT Build-Plan
ARC20002: ARCHITECTURAL DESIGN STUDIO 3 (SOCIO-ECONOMIC CONTEXTS)
Page #
OCT 21
OCT 22
OCT 18
OCT 19
UNIY CONVENOR: PROF. MARK TALYOR | STUDENT: SHENGYE (SEAN) YU
Page #
ARC20002: ARCHITECTURAL DESIGN STUDIO 3 (SOCIO-ECONOMIC CONTEXTS)
Page #
UNIY CONVENOR: PROF. MARK TALYOR | STUDENT: SHENGYE (SEAN) YU
Page #
Design Variation ARC20002: ARCHITECTURAL DESIGN STUDIO 3 (SOCIO-ECONOMIC CONTEXTS)
HEXAGON
Hanger * 15 Coverage 2.75 SQM
PENTAGON Hanger * 18 Coverage 4 SQM
Page #
UNIY CONVENOR: PROF. MARK TALYOR | STUDENT: SHENGYE (SEAN) YU
SQUARE
Hanger * 8 Coverage 1.9 SQM
TRIANGLE
Hanger * 3 Coverage 0.75 SQM
Page #
Design Configurat
ARC20002: ARCHITECTURAL DESIGN STUDIO 3 (SOCIO-ECONOMIC CONTEXTS)
Page #
tion
UNIY CONVENOR: PROF. MARK TALYOR | STUDENT: SHENGYE (SEAN) YU
Page #
ARC20002: ARCHITECTURAL DESIGN STUDIO 3 (SOCIO-ECONOMIC CONTEXTS)
Page #
UNIY CONVENOR: PROF. MARK TALYOR | STUDENT: SHENGYE (SEAN) YU
Page #