WASHINGTON UNIVERSITY IN ST. LOUIS
Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza
DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL (REVISED) | 04.10.2017 WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza
DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL (REVISED) | 04.10.2017
100% DESIGN DEVELOPMENT SUBMITTAL | TABLE OF CONTENTS
INTERIOR DONOR RECOGNITION 1 EXTERIOR DONOR RECOGNITION 2 BUILDING IDENTIFICATION 3 WALL GRAPHICS 4 BUILDING SIGNAGE 5 IMPLEMENTATION BUDGETS 6 PROJECT SCHEDULE 7
WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza
DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017
INTERIOR DONOR RECOGNITION
1
Review of Location Criteria Discussion of Specific Locations (15) Review of Revised Design Concepts
WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza
DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017
Floor
REVIEW | LOCATION CRITERIA
DRAFT2
Floor
The University provided a donor recognition schedule
Outdoor
designs presented here represent 3 of the 5 tiers. The
Level Two
Naming Opportunity Gateway Entrance to Danforth Campus
Donor Tier Donor Recognition Plan 2
12" x 22" Bryan Hall Donor Plaque in common area Recognition Plan (may vary)
We would like to see a rendering with "Robert S. Donor Tier Donor Recognition Plan Brookings Gateway" carved in 2 the wood, as well as options 2 in common area for Plaque presenting the donor story
2
Level Two
1
Level One
3
3 Outdoor
Gateway Entrance Level Three to Danforth Campus
3 2
4
Lab (Faculty: Gary Patti)
3
4 1
Level Four One
3
Plaque in common area
5 3
LevelThree Five Level
3
Plaque in common area
1 4
LabLab (Faculty: Dewey (Faculty: Gary Holten) Patti)
4 3
1 4
Lab (Faculty: Richard Level Four Loomis)
4 3
2 5
Entrance Lobby Level Five
4 3
2 1
Lab (Faculty: Dewey Holten)
4
2 1
Lab (Faculty: Richard Loomis)
4
2
Entrance Lobby
4
2
Lab (Faculty: Dewey Holten)
4
2
Lab (Faculty: Richard Loomis)
4
that included approximate sizes and word counts for 5 levels of interior recognition—Donor Tiers 2–6. The
Naming Opportunity
remaining signs will be designed once a scheme is chosen.
Plaque Size (approx.)
We would like to see a Plaque in common area rendering with "Robert S. Plaque Gateway" in commoncarved area in Brookings the wood, as well as options Plaque outside roomstory for presenting the donor
F T O N Plaque outside room Plaque outside room or in common area Plaque outside room Plaque in common area or in common area Plaque lobby Plaque in inside common area Plaque outside room Plaque outside room or in common area Plaque outside room Plaque outside room or in common area Plaque inside lobby
Plaque Size 12" x 22" (approx.) (may vary) 12" x 22" (may vary) 12" x 12" or 10" x 16" 12" 12" x 22" or 10"vary) x 16" (may 12" x 12" or 10" x 16" 12" x 12" or 10" x 16" 12" x 12" or 10" x 16" 12" x 12" 10" x 10" or 10" x 16" 12" x 12" 10" x 10" or 10" x 16" 12" x 12" 10" x 10" or 10" x 16"
Word Count (approx.)
Font Size (approx.)
Wayfinding: Named Space on Directory
80-125
Donor Name: 46pt Body Text: 27pt
Yes
Word Count (approx.) 80-125 80-125 30-50
30-50 30-50 30-50
20-30 30-50 20-30 30-50
20-30 30-50
10" x 10"
20-30
10" x 10"
20-30
10" x 10"
20-30
Plaque outside Hall\Donor room Recognition\Bryan 10"Hall x 10" G:\Capital Projects\FACILITIES\Bryan Donor Recognition Plan.xlsx20-30 Plaque outside room
10" x 10"
20-30
G:\Capital Projects\FACILITIES\Bryan Hall\Donor Recognition\Bryan Hall Donor Recognition Plan.xlsx
WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza
Wayfinding: Font Size Donor Name: 46pt Named Space on (approx.) No Directory Body Text: 27pt Donor Name: 46pt Body Text: 27pt Donor Name: 46pt Body Text: 27pt Donor Name: 46pt Body Text: 27pt Donor Name: 46pt Body Text: 27pt Donor Name: 46pt Body Text: 27pt Donor Name: 46pt Body Text: 27pt Donor Name: 46pt Body Text: 27pt Donor Name: 46pt Body Text: 27pt Donor Name: 46pt Body Text: 27pt Donor Name: 46pt Body Text: 27pt Donor Name: 46pt Body Text: 27pt Donor Name: 46pt Body Text: 27pt Donor Name: 46pt Body Text: 27pt Donor Name: 46pt Body Text: 27pt
L A IN 30-50 80-125
8/2/2016
Yes Yes Yes No No Yes Yes No No Yes No Yes No No No No Page 1 of 3 No
Page 1 of 3
DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017
REVIEW | LOCATION CRITERIA
Bryan Hall Donor Recognition Plan
DRAFT
The University provided a donor recognition schedule that included approximate sizes and word counts for 5 levels of interior recognition—Donor Tiers 2–6. The designs presented here represent 3 of the 5 tiers. The remaining signs will be designed once a scheme is chosen.
Donor Tier Donor Recognition Plan
8/2/2016
Plaque Size (approx.)
Word Count (approx.)
10" x 10"
20-30
10" x 10"
20-30
10" x 10"
20-30
10" x 10"
20-30
10" x 10"
20-30
10" x 10"
20-30
10" x 10"
20-30
10" x 10"
20-30
Floor
Naming Opportunity
2
Staircase
4
3
Conference Room 1
4
4
Conference Room 2
4
4
Connector Atrium Lounge
4
4
Connector Faculty Office Suite
4
4
Synthetic Lab (Faculty: TBD)
4
5
Connector Conference Room
4
5
Connector Lounge
4
2
Entrance
5
Plaque inside vestibule
8" x 8"
12
2
Faculty Office
5
Plaque outside room
8" x 8"
12
2
Faculty Office
5
Plaque outside room
8" x 8"
12
3
Lounge
5
Plaque inside room Named space on room ID
8" x 8"
12
4
Faculty Office
5
Plaque outside room
8" x 8"
12
4
Faculty Office
5
Plaque outside room
8" x 8"
12
Plaque at staircase Plaque inside room Named space on room ID Plaque inside room Named space on room ID Plaque inside room Named space on room ID Plaque inside suite Named space on room ID
F T O N Plaque outside room
Plaque inside room Named space on room ID Plaque inside room Named space on room ID
Donor Name: 46pt Body Text: 27pt Donor Name: 46pt Body Text: 27pt Donor Name: 46pt Body Text: 27pt Donor Name: 46pt Body Text: 27pt Donor Name: 46pt Body Text: 27pt Donor Name: 46pt Body Text: 27pt Donor Name: 46pt Body Text: 27pt Donor Name: 46pt Body Text: 27pt Donor Name: 46pt Body Text: 27pt Donor Name: 46pt Body Text: 27pt Donor Name: 46pt Body Text: 27pt Donor Name: 46pt Body Text: 27pt Donor Name: 46pt Body Text: 27pt Donor Name: 46pt Body Text: 27pt
L A IN
G:\Capital Projects\FACILITIES\Bryan Hall\Donor Recognition\Bryan Hall Donor Recognition Plan.xlsx
WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza
Font Size (approx.)
Wayfinding: Named Space on Directory No No No Yes No No No Yes No No No No No No
Page 2 of 3
DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017
REVIEW | LOCATION CRITERIA
Bryan Hall Donor Recognition Plan
DRAFT
Plaque Size (approx.)
Word Count (approx.)
Font Size (approx.)
Wayfinding: Named Space on Directory
Floor
Naming Opportunity
4
Faculty Office
5
Plaque outside room
8" x 8"
12
4
Faculty Office
5
Plaque outside room
8" x 8"
12
4
Faculty Office
5
Plaque outside room
8" x 8"
12
4
Faculty Office
5
Plaque outside room
8" x 8"
12
2
Graduate Student Work Space
6
6" x 4"
TBD
TBD
No
2
Graduate Student Work Space
6
6" x 4"
TBD
TBD
No
2
Graduate Student Work Space
6
6" x 4"
TBD
TBD
No
4
Graduate Student Work Space
6
6" x 4"
TBD
TBD
No
4
Graduate Student Work Space
6
6" x 4"
TBD
TBD
No
4
Graduate Student Work Space
6
6" x 4"
TBD
TBD
No
4
Graduate Student Work Space
6
6" x 4"
TBD
TBD
No
4
Large Graduate Student Work Space
6
6" x 4"
TBD
TBD
No
Outdoor
Benches
TBD
TBD
TBD
TBD
No
The University provided a donor recognition schedule that included approximate sizes and word counts for 5 levels of interior recognition—Donor Tiers 2–6. The designs presented here represent 3 of the 5 tiers. The remaining signs will be designed once a scheme is chosen.
Donor Tier Donor Recognition Plan
8/2/2016
F T O N Plaque inside room Named space on room ID Plaque inside room Named space on room ID Plaque inside room Named space on room ID Plaque inside room Named space on room ID Plaque inside room Named space on room ID Plaque inside room Named space on room ID Plaque inside room Named space on room ID Plaque inside room Named space on room ID We would like to see options based on the final bench design
L A IN
G:\Capital Projects\FACILITIES\Bryan Hall\Donor Recognition\Bryan Hall Donor Recognition Plan.xlsx
WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza
Donor Name: 46pt Body Text: 27pt Donor Name: 46pt Body Text: 27pt Donor Name: 46pt Body Text: 27pt Donor Name: 46pt Body Text: 27pt
No No No No
Page 3 of 3
DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017
REVISED SCHEME 2 (ALT A)
An alternate version of Scheme 2 is similar in mounting and finishes, but offers a opportunity for a color accent. A thin white acrylic face is applied to a translucent blue acrylic backer. A “punch-through” seal and reveals the blue backer.
WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza
DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017
REVISED SCHEME 2 ALT A | DESIGN
WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza
DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017
REVISED SCHEME 2 ALT A | DESIGN
WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza
DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017
REVISED SCHEME 2 | PRECEDENTS
WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza
DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017
REVISED SCHEME 2 (ALT B)
An alternate version of Scheme 2 is similar in mounting and finishes, but offers a opportunity for a color accent. A thin white acrylic face is applied to a translucent blue acrylic backer. A “punch-through” seal and reveals the blue backer.
WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza
DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017
REVISED SCHEME 2 ALT B | DESIGN
WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza
DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017
REVISED SCHEME 2 ALT B | DESIGN
WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza
DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017
REVISED SCHEME | PRECEDENTS
WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza
DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017
REVISED SCHEME 3
Scheme 3 uses layered graphics and lettering to give the panels depth. A blue line pattern is screen printed on the back of clear glass while sign lettering is applied to the front, giving the illusion that the words are “floating.” The layered panel rests on a wooden base and is wrapped with an acrylic and brushed metal seal element. A brushed metal band separates the glass and wood components.
WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza
DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017
REVISED SCHEME 3 | DESIGN
WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza
DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL (REVISED) | 04.10.2017
REVISED SCHEME 3 | DESIGN
WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza
DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL (REVISED) | 04.10.2017
REVISED SCHEME 3 | PRECEDENTS
WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza
DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017
EXTERIOR DONOR RECOGNITION
2
Overview Donor Locations (2) Precedent Images
WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza
DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017
OVERVIEW | DISCUSSION ASG has identified 2 unique locations for donor recognition on the exterior of Bryan Hall.
LOCATION 1
LOCATION 2
WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza
DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL (REVISED) | 04.10.2017
LOCATION 1 | PLAN VIEW
LOCATION 1 - MILLSTONE PLAZA
Centrally located and highly visible from multiple vantage points, the ramp switch-back wall offers a true blank canvas for donor recognition that can be designed to memorilize the Millstone Plaza.
WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza
DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL (REVISED) | 04.10.2017
LOCATION 2 | PLAN VIEW
LOCATION 2 - GATEWAY THRESHOLD
ASG envisions a bench-height “end cap” to identify the Gateway Threshold area to students and visitors.
WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza
DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017
LOCATION 1 | EXISTING PLAQUE
WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza
DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017
LOCATION 1 | SCHEME A 10’
3.25’
WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza
DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL (REVISED) | 04.10.2017
LOCATION 1 | SCHEME A
WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza
DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL (REVISED) | 04.10.2017
LOCATION 1 | SCHEME A
10’
10”
3.25’
4.25”
2.5”
RETAINING WALL TYPE B
RETAINING WALL TYPE B
LANDING LANDING WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza
DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL (REVISED) | 04.10.2017
LOCATION 1 | SCHEME B 10’
3.65’
WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza
DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL (REVISED) | 04.10.2017
LOCATION 1 | SCHEME B
WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza
DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL (REVISED) | 04.10.2017
LOCATION 1 | SCHEME B
10’
8.5”
3.65’
3.5”
2.125”
RETAINING WALL TYPE B
SOUTHERN EDGE OF MCMILLEN LABORATORY
LANDING
RETAINING WALL TYPE B
GUARD RAIL RETAINING WALL TYPE B
HANDRAIL
WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza
LANDING LANDING
DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL (REVISED) | 04.10.2017
LOCATIONS 1 AND 2 | PRECEDENTS
WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza
DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL (REVISED) | 04.10.2017
BUILDING IDENTIFICATION
3
Overview Letter Locations Letter Details Renderings Sample Review
WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza
DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017
OVERVIEW | LOCATION 1 ASG has identified 2 unique locations for building identification of Bryan Hall. Pin-mounted to the terra cotta facade, Location 1 identifies the main pedestrian entrance to the building on Level 2 within the Gateway Threshold area.
BRYAN
WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza
DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL (REVISED) | 04.10.2017
OVERVIEW | LOCATION 2 ASG has identified 2 unique locations for building identification of Bryan Hall. Pin-mounted to the terra cotta facade, Location 2 identifies the building on Level 3 from the Millstone Plaza area and the campus pathway adjacent to the Olin Library.
BRYAN
WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza
DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL (REVISED) | 04.10.2017
LOCATION 1 | PLAN VIEW STAIR 1 2S1
IT
ELEC
WRITE-UP
WRITE-UP
OFFICE
WRITE-UP
OFFICE
201
202
203
204
205
206
207
PREP ELEVATOR
210D
2E1
PREP
EQUIP
INSTRUMENT
208D
208C
208B
STORAGE 210B
LAB
LAB
210
208
VESTIBULE
WOMEN'S 2W1
JANITOR
200
2J1
LOCATION 1
MEN'S
(Level 2)
2M1
FUTURE 209
WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza
DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017
LOCATION 1 | PLAN VIEW
STAIR 1 3S1
CONFERENCE 303
IT
ELEC
WRITE-UP
301
302
304
WRITE-UP
WRITE-UP
WRITE-UP
WRITE-UP
WRITE-UP
BREAK RM
305
306
307
308
309
310
PREP
ELEVATOR
311C
3E1
FUTURE
FUTURE
312
311
UP
WOMEN'S 3W1
JANITOR 3J1
SUPPORT 312C
MEN'S STORAGE
3M1
312B
LOCATION 2
(Level 3) WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza
DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017
8"
8"
LOCATIONS 1 AND 2 | LETTER DETAILS
BRYAN BRYAN
4'-0"
4'-0"
SIDE VIEW
GRAPHIC LAYOUT - FACADE LETTERING - LOCATION 1 Scale: 1/8"=1"
SIDE VIEW
GRAPHIC LAYOUT - FACADE LETTERING - LOCATION 1 Scale: 1/8"=1"
4" tall aluminum letters (custom fabricated, vertical brush finish) 5/16" wide letter stroke, 1/4" depth, 1/8" dia mounting studs 1/4" space from back of (custom letters tofabricated, face of terra cotta brush finish) 4" tall aluminum letters vertical 5/16" wide letter stroke, 1/4" depth, 1/8" dia mounting studs 1/4" space from back of letters to face of terra cotta
8'-0"
BRYAN BRYAN 1 5/8"
1'-4"
1'-4"
8'-0"
GRAPHIC LAYOUT - FACADE LETTERING - LOCATION 2 Scale: 1/8"=1"
SIDE VIEW
GRAPHIC LAYOUT - FACADE LETTERING - LOCATION 2 Scale: 1/8"=1"
1 5/8"
SIDE VIEW
WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza
9" tall aluminum letters (custom fabricated, vertical brush finish) 3/4" wide letter stroke, 3/8" depth, 1/8" dia mounting studs 5/8" space from back of (custom letters tofabricated, face of terra cotta brush finish) 9" tall aluminum letters vertical 3/4" wide letter stroke, 3/8" depth, 1/8" dia mounting studs 5/8" space from back of letters to face of terra cotta DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL (REVISED) | 04.10.2017
LOCATION 2 | RENDERINGS AND PRECEDENT
WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza
DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL (REVISED) | 04.10.2017
WALL GRAPHICS
4
Overview Graphic Locations Review of Original Scheme Review of Revised Design Scheme Sample Review
WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza
DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017
OVERVIEW | LOCATION 1 ASG has identified 2 unique locations for wall graphics within Bryan Hall. Location 1 highlights the feature staircase that runs from Levels 2 through 5. The staircase has high visibility from the pedestrian bridge approach as well as from the Fosert Park Parkway.
LOCATION 1
WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza
DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017
OVERVIEW | LOCATION 2 ASG has identified 2 unique locations for wall graphics within Bryan Hall. Location 2 highlights the elevator corridor that runs from Levels 1 through 5. The corridor has high visibility on Levels 2 and 3 from the gateway threshold. Additionally, the graphics act as a visual cue for wayfinding within the building on all floors.
LOCATION 2
WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza
DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017
LOCATIONS 1 AND 2 | PLAN VIEW LOCATION 1
Stairwell
STAIR 1
STAIR 1
2S1
3S1
CONFERENCE 303
IT
ELEC
WRITE-UP
WRITE-UP
OFFICE
WRITE-UP
OFFICE
IT
ELEC
WRITE-UP
201
202
203
204
205
206
207
301
302
304
LOCATION 2
WRITE-UP
WRITE-UP
WRITE-UP
WRITE-UP
WRITE-UP
BREAK RM
305
306
307
308
309
310
PREP
Elevator Lobby
210D
ELEVATOR 2E1
PREP
EQUIP
INSTRUMENT
208D
208C
208B
PREP
ELEVATOR
311C
3E1
STORAGE 210B
LAB
LAB
210
208
WOMEN'S
FUTURE
FUTURE
312
311
UP
WOMEN'S 3W1
2W1
VESTIBULE
JANITOR
200
JANITOR
2J1
3J1
SUPPORT 312C
MEN'S
MEN'S 2M1
3M1
STORAGE 312B
FUTURE 209
LEVEL 2
LEVEL 3
STAIR 2
STAIR 1
STAIR 1 LOUNGE
4S1
412
5S2
5S1
CONFERENCE 403
OFFICE
MEETING
OFFICE
IT
ELEC
WRITE-UP
WRITE-UP
WRITE-UP
WRITE-UP
WRITE-UP
413G
413
413A
401
402
404
405
406
407
408
STORAGE
ELEVATOR
SUPPORT
SUPPORT
413E
4E1
411D
411E
DN
LOUNGE 514
STORAGE
OFFICE
OFFICE
OFFICE
413F
413D
413C
413B
WRITE-UP
WRITE-UP
WRITE-UP
WRITE-UP
504
505
507
508
509
WRITE-UP 503
SUPPORT SUPPORT 512C
512D
FUTURE
SUPPORT
510
510B
REF.
OFFICE
502
5E1
409C
UP
ELEC
ELEVATOR
514A
PREP
IT 501
WRITE-UP
CONFERENCE 513
PANTRY 515
STORAGE 400
SUPPORT
SUPPORT
411H
411K
LAB
LAB
LAB
411
410
409
WOMEN'S
GENDER NEUTRAL
4W1
5U1
JANITOR
FUTURE
FUTURE
4J1
512
511
JANITOR 5J1
MEN'S
GENDER NEUTRAL
4M1
LAB STORAGE
5U2
411J
STORAGE
SUPPORT
SUPPORT
411G
410A
512E
STORAGE 511C
SUPPORT 511B
LEVEL 4
WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza
LEVEL 5
DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017
REVIEW OF ORIGINAL SCHEME
WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza
DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017
LOCATION 1 | ORIGINAL SCHEME LOCATION 1 Stairwell
C B A
STAIR 1 2S1
IT
ELEC
WRITE-UP
WRITE-UP
OFFICE
WRITE-UP
OFFICE
201
202
203
204
205
206
207
PREP ELEVATOR
210D
2E1
PREP
EQUIP
INSTRUMENT
208D
208C
208B
STORAGE 210B
LAB
LAB
210
208
VESTIBULE
WOMEN'S 2W1
JANITOR
200
2J1
MEN'S 2M1
FUTURE 209
ELEVATION A
ELEVATION B
WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza
ELEVATION C
KEY PLAN
DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017
LOCATION 2 | ORIGINAL SCHEME LOCATION 2 Elevator Lobby
STAIR 1
Not Pictured
2S1
IT
ELEC
WRITE-UP
WRITE-UP
OFFICE
WRITE-UP
OFFICE
201
202
203
204
205
206
207
A
PREP ELEVATOR
210D
2E1
PREP
EQUIP
INSTRUMENT
208D
208C
208B
STORAGE 210B
Not Pictured
LAB
LAB
210
208
VESTIBULE
WOMEN'S 2W1
JANITOR
200
2J1
MEN'S 2M1
FUTURE 209
ELEVATION A
WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza
KEY PLAN
DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017
REVIEW | ORIGINAL ARTWORK
ORIGINAL
WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza
DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017
REVISED SCHEME - OPTION 1
This pattern varies the molecular abstraction to add more dimensionality and visual interest to patrons in the stairwell as well as pedestrians approaching the building. The color gradient changes as you ascend or descend the building floors. The molecular pattern is carried over to the elevator corridor.
WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza
DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017
12
LOCATION 1 | REVISED SCHEME - OPTION 1 EXISTING ROOF LEVEL 579' - 8"
LOCATION 1 Stairwell
LEVEL 5 568' - 1"
LEVEL 4 556' - 6"
C B A
STAIR 1 2S1
LEVEL 3 544' - 11"
IT
ELEC
WRITE-UP
WRITE-UP
OFFICE
WRITE-UP
OFFICE
201
202
203
204
205
206
207
PREP ELEVATOR
210D
2E1
PREP
EQUIP
INSTRUMENT
208D
208C
208B
STORAGE 210B
LAB
LAB
210
208
VESTIBULE
WOMEN'S 2W1
JANITOR
200
2J1
ELEVATION A
ELEVATION B
WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza
ELEVATION C
STAIR LANDING 534' - 8" LEVEL 2 533' - 4"
MEN'S 2M1
FUTURE 209
KEY PLAN
DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017
LOCATION 2 | REVISED SCHEME - OPTION 1 LOCATION 2 Elevator Lobby
STAIR 1
Not Pictured
2S1
IT
ELEC
WRITE-UP
WRITE-UP
OFFICE
WRITE-UP
OFFICE
201
202
203
204
205
206
207
A
PREP ELEVATOR
210D
2E1
PREP
EQUIP
INSTRUMENT
208D
208C
208B
STORAGE 210B
Not Pictured
LAB
LAB
210
208
VESTIBULE
WOMEN'S 2W1
JANITOR
200
2J1
MEN'S 2M1
FUTURE 209
ELEVATION A
WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza
KEY PLAN
DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017
REVISED SCHEME - OPTION 2
This pattern varies the molecular abstraction to add more dimensionality and visual interest to patrons in the stairwell as well as pedestrians approaching the building. The color gradient changes as you ascend or descend the building floors. The molecular pattern is carried over to the elevator corridor. In this option, a translucent treatment to the graphic gives the molecules dimensionality and a sense of fading into the background.
WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza
DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017
12
LOCATION 1 | REVISED SCHEME - OPTION 2 EXISTING ROOF LEVEL 579' - 8"
LOCATION 1 Stairwell
LEVEL 5 568' - 1"
LEVEL 4 556' - 6"
C B A
STAIR 1 2S1
LEVEL 3 544' - 11"
IT
ELEC
WRITE-UP
WRITE-UP
OFFICE
WRITE-UP
OFFICE
201
202
203
204
205
206
207
PREP ELEVATOR
210D
2E1
PREP
EQUIP
INSTRUMENT
208D
208C
208B
STORAGE 210B
LAB
LAB
210
208
VESTIBULE
WOMEN'S 2W1
JANITOR
200
2J1
ELEVATION A
ELEVATION B
WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza
ELEVATION C
STAIR LANDING 534' - 8" LEVEL 2 533' - 4"
MEN'S 2M1
FUTURE 209
KEY PLAN
DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017
LOCATION 2 | REVISED SCHEME - OPTION 2 LOCATION 2 Elevator Lobby
STAIR 1
Not Pictured
2S1
IT
ELEC
WRITE-UP
WRITE-UP
OFFICE
WRITE-UP
OFFICE
201
202
203
204
205
206
207
A
PREP ELEVATOR
210D
2E1
PREP
EQUIP
INSTRUMENT
208D
208C
208B
STORAGE 210B
Not Pictured
LAB
LAB
210
208
VESTIBULE
WOMEN'S 2W1
JANITOR
200
2J1
MEN'S 2M1
FUTURE 209
ELEVATION A
WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza
KEY PLAN
DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017
ARTWORK COMPARISON
WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza
DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017
REVIEW | ARTWORK COMPARISON
ORIGINAL
WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza
REVISED OPTION 1
REVISED OPTION 2
DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017
BUILDING SIGNAGE
5
Programming Overview Reviewing Programming Sign System Overview Sign Type Details Sign Location Plans Sign Message Schedule Sample Review
WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza
DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017
PROGRAMMING OVERVIEW
1
2
3
4
Contains an visual example of all sign types including:
Contains an visual example of each sign type including:
Contains the following information for each specific sign location:
Contains the following information for each specific sign location:
• Wall-Mounted Faculty Directory
• Sign Type and Description
LOCATION DOT
SHEET
• Wall-Mounted Building Directory
• Typical Elevation View (in scale)
The placement of the sign in relation to the architectural floor
The Sign Location Plan sheet number where a particular sign is
• Wall-Mounted Directional
• General Component Descriptions
plans
located
• Room Identification Sign
• Color Swatches
• Flag-Mounted Identification Sign
LOCATION NUMBER
LEVEL
• Restroom Identification Sign
The unique sign location number that corresponds to the Sign
The building level where a particular sign is located
• Office Identification Sign
Message Schedule
SIGN SYSTEM OVERVIEW
SIGN TYPE DETAILS
SIGN LOCATION PLANS
SIGN MESSAGE SCHEDULES
• Utility Room Identification Signs
LOCATION
• Regulatory Signs
The unique sign location number that corresponds to the Sign
• Stairwell Identification Sign
Location Plans
• Level Identification Sign • Evacuation Plan
SIGN TYPE The manufacturers unique sign type coding number DESCRIPTION The general description of each sign type MESSAGE The unique wording that will appear on the sign at each location NOTES Additional location-specific information CLIENT REVIEW Check boxes for review direction
WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza
DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017
REVIEWING PROGRAMMING STEP 1 - MATCH SHEET AND FLOOR
STEP 2 - CHOOSE A SIGN LOCATION
STEP 3 - LOCATING ON PLAN
STEP 4 - CONFIRM SIGN TYPE
STEP 5 - CONFIRM SIGN MESSAGE
STEP 6 - NOTATE
STEP 7 - COMPLETE AND RETURN
Confirm you are referencing the same
Start with a location number in the Sign
Find the corresponding sign location
Confirm that the sign type listed is the
Review the message shown within this area
Check “APPROVED” if the location, sign
The notated Sign Location Plans and Sign
SHEET and LEVEL on both the Sign Location
Message Schedule (figure 2.1). The first
number on the Sign Location Plan (figure
preferred sign type to use at a particular
(figure 5.1). The copy is shown EXACTLY as
type, and message are correct (figure 6.1).
Message Schedules is the master list of
Plan (figure 1.1) and the Sign Message
numeral of the sign location number
3.1). This is where that sign will be
location (figure 4.1).
it will appear on the sign.
Schedule (figure 1.2). The Sign Message
indicates the floor.
installed.
Check “APPROVED AS NOTED” if there is a
Schedule is sorted by Level then Location Number.
revisions required for each specific sign location.
If you need to make a correction to the sign
Compare this message to the room use
discrepancy with the location, sign type, or
If you need to make a correction to the
type, hand note it on the Sign Message
indicated on the architectural floor plans
message. If an explanation is necessary,
Please make or compile all revisions/notes
placement of the sign, hand note it on the
Schedule (figure 4.2).
and how the room will be utilized by the end
please write additional notes on the Sign
onto one document, scan this document,
user.
Message Schedule (figure 6.2).
and electronically forward to Ayers Saint
plan (figure 3.2).
Gross. If you need to make a correction to the
Check “DELETE” if the sign is not required
message, hand note it on the Sign Message
(figure 6.3).
Schedule (figure 5.2).
SHEET LEVEL LOCATION SIGN TYPE DESCRIPTION 3.1 1 1.01 EVU1-B4 Utility Room Identification Sign
EVU1-B20 Room Identification Sign
COMPACTOR 100
figure 3.2
LAB MECH
LASER
LASER
FUTURE
101
104
105
107
1.04 1.01
ELEVATOR 1E1
1.02
EQUIP ROOM
1
1.02
EVU1-B4
Utility Room Identification Sign
(message panel) BUILDING MECHANICAL
Mounts to brick, aluminum back plate required [ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
3.1
1
1.03
EVU1-B2
Utility Room Identification Sign
(message panel) BRYAN HALL
Mounts to brick, aluminum back plate required [ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
3.1
1
1.04
EVU1-B4
Utility Room Identification Sign
(message panel) LAB MECHANICAL
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
3.1
1
1.05
EVU1-D10 Wall-Mounted Building Directory
1.14
DN
103
1.07
106
1.15
1.13
1.11
1.06 1.05
VESTIBULE
1.12
DN
1.18 1.16
PREP 110
114
figure 4.1
USER MECH
1.20
108
113
3.1
1
1.06
EVU1-G12 Evacuation Map
3.1
1
1.07
EVU1-B4
Utility Room Identification Sign
(message panel) BUILDING MECHANICAL
(map artwork)
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
3.1
1
1.08
EVU1-B2
Utility Room Identification Sign
(message panel) STORAGE
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
3.1
1
1.09
EVU1-B2
Utility Room Identification Sign
(message panel) MDF ROOM
3.1
1
1.10
EVU1-B4
Utility Room Identification Sign
(message panel) LAB MECHANICAL
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
3.1
1
1.11
EVU1-B4
Utility Room Identification Sign
(message panel) EQUIPMENT ROOM
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
3.1
1
1.12
EVU1-B2
Utility Room Identification Sign
(message panel) PREP ROOM
3.1
1
1.13
EVU1-B4
Utility Room Identification Sign
(message panel) LASER ROOMS 104 & 105
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
3.1
1
1.14
EVU1-B4
Utility Room Identification Sign
(message panel) LASER ROOM 104
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
3.1
1
1.15
EVU1-B4
Utility Room Identification Sign
(message panel) LASER ROOM 105
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
1.08 1.09
MDF
USER MECH
LASER
115B
112
111
figure 2.1
1.10
figure 3.1
LAB MECH
USER MECH
115C
108A
figure 1.2
PROJECT NAME
DOCUMENT TITLE / DATE
WASHINGTON UNIVERSITY IN ST. LOUIS
SECONDARY PROGRAMMING
INTERIOR BUILDING SIGNAGE
SUBMITTAL 09.21.2016
SECTION / DESCRIPTION
3
SHEET TITLE
SIGN LOCATION PLAN LEVEL ONE
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
3.1
1
1.16
EVU1-B2
Utility Room Identification Sign
(message panel) FUTURE PREP
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
3.1
1
1.17
EVU1-B4
Utility Room Identification Sign
(message panel) USER MECHANICAL
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
3.1
1
1.18
EVU1-B4
Utility Room Identification Sign
(message panel) EQUIPMENT ROOM
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
3.1
1
1.19
EVU1-B2
Utility Room Identification Sign
(message panel) PREP ROOM
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
3.1
1
1.20
EVU1-B4
Utility Room Identification Sign
(message panel) LASER ROOM 111
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
3.1
1
1.21
EVU1-B4
Utility Room Identification Sign
(message panel) USER MECHANICAL
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
3.1
1
1.22
EVU1-B2
Utility Room Identification Sign
(message panel) FUTURE
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
Artwork provided by owner
TELECOM ROOM
figure 5.2
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
figure 6.2
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
figure 6.3
SHEET NO.
PROJECT NAME
DOCUMENT TITLE / DATE
3.1
WASHINGTON UNIVERSITY IN ST. LOUIS
SECONDARY PROGRAMMING
Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone
SIGN LOCATION PLANS
INTERIOR BUILDING SIGNAGE
figure 6.1
figure 5.1
FUTURE PREP
115
Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone
Max. capacity 12 message panels
1.21
1.19
PREP
BLDG MECH
1.22
1.17
(top panel) LEVEL (bottom panels) Main Lobby (2) Access to McMillen Laboratory (5) Access to McMillen Laboratory (4) Access to Chemistry Main Office (5) Conference Room 513 (5) Conference Room 403 (4) Conference Room 303 (3) Lounge 514 (5) Lounge 412 (4) Offices 413A-413F (4) Offices 205 and 207 (2) (blank)
EQUIP ROOM
102
NOTES CLIENT REVIEW Mounts to brick, aluminum back plate required [ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
3.1
figure 4.2
1.03
MESSAGE (message panel) LOADING DOCK
SUBMITTAL 09.21.2016
SECTION / DESCRIPTION
4
SIGN MESSAGE SCHEDULES
SHEET TITLE
SIGN MESSAGE SCHEDULE
SHEET NO.
4.1
LEVEL ONE
figure 1.1
WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza
DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017
SIGN SYSTEM OVERVIEW DEPARTMENT OF CHEMISTRY
LASER ROOM
207 WOMEN
105 Room Identification Sign
Flag-Mounted Identification Sign
Paula Ryan, PhD
Restroom Identification Sign
Office Identification Sign
FACULTY NAME
LOCATION
FACULTY NAME
LOCATION
FACULTY NAME
LOCATION
J. Ackerman
M-507
M. Gross
C-101
B. Sadtler
M-515
A. Barnes
M-405
S. Hayes
M-407
D. Sarantites
R-158
J. Barnes
LS-401D
D. Holten
L-336
J. Schaefer
L-340
V. Birman
M-409
R. Loomis
M-411
M. Singh
M-421
R. Lovett
R-258
L. Sobotka
R-259 L-450
R. Blankenship
STORAGE Utility Room Identification Sign
FIRE EXIT
MECHANICAL ROOM
Paula Ryan, PhD Utility Room Identification Sign
Regulatory Sign
LS-401B
J. Bleeke
M-501
J. Luo
L-448
G. Szteinberg
W. Buhro
M-521
R. Mabbs
M-513
J. Taylor
LS-401A
J. D’Arcy
M-509
L. Mirica
M-425
T. Wencewicz
LS-401C
M. Daschbach
L-452
K. Moeller
L-440
M. De La Cruz
LS-101D
G. Patti
M-505
R. Dunn
M-519
J. Ponder
L-453
P. Gaspar
L-536
A. Redden
LS-101F
C - Cyclotron | L - Louderman | LS - Lab Sciences | M - McMillen Lab | R - Radiochemistry
Wall-Mounted Faculty Directory
Insert Sign
LEVEL
STAIR 1 FLOOR
3
LEVEL McMillen Laboratory Offices Lounge
SERVES 2-5 No Roof Access Down to Second Floor for Exit Discharge STAIR 1 Stairwell Identification Sign
FLOOR 3 Level Identification Sign
(map
ar
k) twor
4
Access to McMillen Laboratory
5
Access to Chemistry Main Office
5
Conference Room 513
5
Lounge 514
5
Access to McMillen Laboratory
4
Conference Room 403
4
Faculty Offices 413A-413G
4
Conference Room 303
3
Main Lobby
2
Restrooms Elevator
STAIR 1 Evacuation Plan
WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza
Wall-Mounted Directional
Wall-Mounted Building Directory
DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017
SIGN TYPE DETAILS
WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza
DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017
EVU1-B2 | UTILITY ROOM IDENTIFICATION SIGN
STORAGE Paula Ryan, PhD Shown with additional Insert Sign
MESSAGE PANEL Color: A01 - White
STORAGE
ADA COPY AND BRAILLE Typeface: Source Sans Regular Color: A14 - Medium Gray
Utility Room Identification Sign
WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza
DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017
EVU1-B4 | UTILITY ROOM IDENTIFICATION SIGN
EQUIPMENT ROOM MESSAGE PANEL Color: A01 - White
Paula Ryan, PhD
MECHANICAL ROOM
Shown with additional Insert Sign
Sign Type: EVU1-B4 Scale: 3/4” = 1”
WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza
ADA COPY AND BRAILLE Typeface: Source Sans Regular Color: A14 - Medium Gray
Utility Room Identification Sign
DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017
EVU1-B20 | ROOM IDENTIFICATION SIGN
STUDENT OFFICE
TOP PANEL Color: A01 - White
LASER ROOM
105 Paula Ryan, PhD Shown with additional Insert Sign
PRINTED COPY Typeface: Source Sans Regular Color: A14 - Medium Gray
BOTTOM PANEL Color: A14 - Medium Gray
105 Sign Type: EVU1-B20 Scale: 3/4” = 1”
WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza
ADA NUMBER AND BRAILLE Typeface: Source Sans Regular Color: A01 - White
Room Identification Sign
DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017
EVU1-R.P1 | FLAG-MOUNTED IDENTIFICATION SIGN
MESSAGE PANELS (2) Color: A01 - White
Wall Surface
PRINTED SYMBOLS Color: A14 - Medium Gray
MOUNTING BRACKET Color: A14 - Medium Gray
Sign Type: EVU1-R.P1 Scale: 3/4” = 1”
WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza
Flag-Mounted Identification Sign
DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017
EVU1-R1 | RESTROM IDENTIFICATION SIGN
TOP PANEL Color: A01 - White
PRINTED SYMBOLS Color: A14 - Medium Gray
WOMEN Sign Type: EVU1-R1 Scale: 3/4” = 1”
WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza
BOTTOM PANEL Color: A14 - Medium Gray ADA COPY AND BRAILLE Typeface: Source Sans Regular Color: A01 - White
Restroom Identification Sign
DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017
EVU1-A7 | OFFICE IDENTIFICATION SIGN
TOP PANEL Color: A14 - Medium Gray
207
ADA NUMBER AND BRAILLE Typeface: Source Sans Regular Color: A01 - White
BOTTOM PANEL (paper insert holder) Color: A01 - White
Paula Ryan, PhD Sign Type: EVU1-A7 Scale: 3/4” = 1”
WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza
PRINTED COPY Typeface: Source Sans Regular Color: A14 - Medium Gray
Office Identification Sign
DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017
EVU1-D8 | WALL-MOUNTED DIRECTIONAL
LEVEL
4
McMillen Laboratory
TOP PANEL Color: A14 - Medium Gray PRINTED COPY AND NUMBER Typeface: Source Sans Regular Color: A01 - White
MESSAGE PANEL (10) Color: A01 - White
Offices
PRINTED COPY AND SYMBOLS Typeface: Source Sans Regular Color: A14 - Medium Gray
Lounge Restrooms Elevator
Sign Type: EVU1-D8 Scale: 3/8” = 1”
WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza
Wall-Mounted Directional
DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017
EVU1-D10 | WALL-MOUNTED BUILDING DIRECTORY
LEVEL Access to McMillen Laboratory
5
Access to Chemistry Main Office
5
Conference Room 513
5
Lounge 514
5
Access to McMillen Laboratory
4
Conference Room 403
4
Faculty Offices 413A-413G
4
Conference Room 303
3
Main Lobby
2
Sign Type: EVU1-D10 Scale: 1/4” = 1”
WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza
TOP PANEL Color: A14 - Medium Gray PRINTED COPY Typeface: Source Sans Regular Color: A01 - White MESSAGE PANELS (12) Color: A01 - White PRINTED COPY AND NUMBERS Typeface: Source Sans Regular Color: A14 - Medium Gray
Wall-Mounted Building Directory
DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017
EVU1-D10 (3) | WALL-MOUNTED FACULTY DIRECTORY
TOP PANELS (1 EACH, 3 TOTAL) Color: A14 - Medium Gray
DEPARTMENT OF CHEMISTRY FACULTY NAME
LOCATION
FACULTY NAME
LOCATION
FACULTY NAME
LOCATION
J. Ackerman
M-507
M. Gross
C-101
B. Sadtler
M-515
A. Barnes
M-405
S. Hayes
M-407
D. Sarantites
R-158
J. Barnes
LS-401D
D. Holten
L-336
J. Schaefer
L-340
MESSAGE PANELS (12 EACH, 36 TOTAL) Color: A01 - White
V. Birman
M-409
R. Loomis
M-411
M. Singh
M-421
R. Lovett
R-258
L. Sobotka
R-259
PRINTED COPY AND NUMBERS Typeface: Source Sans Regular Color: A14 - Medium Gray
L-450
R. Blankenship
LS-401B
J. Bleeke
M-501
J. Luo
L-448
G. Szteinberg
W. Buhro
M-521
R. Mabbs
M-513
J. Taylor
LS-401A
J. D’Arcy
M-509
L. Mirica
M-425
T. Wencewicz
LS-401C
M. Daschbach
L-452
K. Moeller
L-440
M. De La Cruz
LS-101D
G. Patti
M-505
R. Dunn
M-519
J. Ponder
L-453
P. Gaspar
L-536
A. Redden
LS-101F
Sign Type: EVU1-D10 Scale: 3/16” = 1”
C - Cyclotron | L - Louderman | LS - Lab Sciences | M - McMillen Lab | R - Radiochemistry
Wall-Mounted Faculty Directory
PRINTED COPY Typeface: Source Sans Regular Color: A01 - White
PRINTED COPY Typeface: Source Sans Bold Color: A14 - Medium Gray
UNIQUE CONDITION - LOCATION 2.08 REQUIRES 3 SIGNS MOUNTED ADJACENT TO ONE ANOTHER w/ 0.5” GAP AS SHOWN
WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza
DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017
EVU1-G2 | REGULATORY SIGN
INSERT PANEL (paper insert holder) Color: A01 - White
Paula Ryan, PhD Sign Type: N/A Scale: 3/4” = 1”
WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza
PRINTED COPY Typeface: Source Sans Regular Color: A14 - Medium Gray
Insert Sign
DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017
EVU1-F5 | REGULATORY SIGN
FIRE EXIT Sign Type: EVU1-F5 Scale: 3/4” = 1”
WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza
MESSAGE PANEL Color: A01 - White
PRINTED COPY Typeface: Source Sans Regular Color: A51 - Deep Red
Regulatory Sign
DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017
EVU1-F6 | STAIRWELL IDENTIFICATION SIGN
TOP PANEL Color: A01 - White
PRINTED SYMBOL Color: A14 - Medium Gray
STAIR 1 Sign Type: EVU1-F6 Scale: 3/4” = 1”
WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza
BOTTOM PANEL Color: A14 - Medium Gray ADA COPY, NUMBER, AND BRAILLE Typeface: Source Sans Regular Color: A01 - White
Stairwell Identification Sign
DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017
EVU1-F10 | LEVEL IDENTIFICATION SIGN
STAIR 1 FLOOR
3
TOP PANEL Color: A01 - White
PRINTED COPY, NUMBERS, AND SYMBOL Typeface: Source Sans Regular Color: A14 - Medium Gray
SERVES 2-5 No Roof Access Down to Second Floor for Exit Discharge FLOOR 3 Sign Type: EVU1-F10 Scale: 3/8” = 1” WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza
STAIR 1
BOTTOM PANEL Color: A14 - Medium Gray ADA COPY, NUMBER, AND BRAILLE Typeface: Source Sans Regular Color: A01 - White
Level Identification Sign
DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017
EVU1-G12 | EVACUATION PLAN
Evacuation Plan PAPER INSERT HOLDER Color: A01 - White
(m
Sign Type: EVU1-G12 Scale: 3/8” = 1”
WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza
ap a
) k r o rtw
PRINTED MAP (colors and artwork by owner)
Evacuation Plan
DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017
SIGN LOCATION PLANS
WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza
DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017
SIGN LOCATION PLAN | LEVEL ONE
COMPACTOR 100
LAB MECH
LASER
LASER
FUTURE
101
104
105
107
1.03 1.04 1.01
ELEVATOR 1E1
1.02
EQUIP ROOM
1.14
DN
VESTIBULE 103
1.07
106
1.15
1.13
1.11
1.06 1.05
EQUIP ROOM
102
1.12
DN
1.18 1.16
1.21
1.19
PREP
PREP
110
114
BLDG MECH
1.23
1.17
USER MECH
1.20
108 1.22
FUTURE PREP
115
113
1.08 1.09
MDF
USER MECH
LASER
115B
112
111
1.10
WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza
LAB MECH
USER MECH
115C
108A
DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017
SIGN LOCATION PLAN | LEVEL TWO
2.13
STAIR 1 2S1
2.12
2.11
2.14
2.15
2.16
2.17
2.18
2.20
2.22
2.23
IT
ELEC
WRITE-UP
WRITE-UP
OFFICE
WRITE-UP
OFFICE
201
202
203
204
205
206
207
2.21
PREP
2.07
210D
ELEVATOR
2.19
2.06
2E1
PREP
EQUIP
INSTRUMENT
208D
208C
208B
2.34
STORAGE
2.10
2.09 2.08 2.03
2.05
210B
2.29
2.04
2.28
2.24
2.27
2.25 2.26
2.02
2.01
LAB
LAB
210
208
WOMEN'S 2W1
2.30
VESTIBULE
JANITOR 2.31 2J1
200
2.32 MEN'S
2.33
2M1
FUTURE 209
WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza
DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017
SIGN LOCATION PLAN | LEVEL THREE
STAIR 1 3S1
CONFERENCE 303
3.09 3.14 3.08
3.10
3.11
3.12
IT
ELEC
WRITE-UP
301
302
304
WRITE-UP
WRITE-UP
WRITE-UP
WRITE-UP
WRITE-UP
BREAK RM
305
306
307
308
309
310
PREP
ELEVATOR
311C
3E1
3.01
FUTURE
FUTURE
312
311
3.29 3.21
3.02 3.22 3.23
3.03 UP
3.07
3.04 WOMEN'S 3W1
3.25 3.26
JANITOR 3J1
SUPPORT 312C
3.27 MEN'S STORAGE 312B
WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza
3.28
3M1
DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017
SIGN LOCATION PLAN | LEVEL FOUR
STAIR 1 LOUNGE
4S1
412
4.46
CONFERENCE
4.27
4.26
4.09
4.01
403 4.30
4.28
4.29
4.31
4.33
4.34
4.35
4.37
OFFICE
MEETING
OFFICE
IT
ELEC
WRITE-UP
WRITE-UP
WRITE-UP
WRITE-UP
413G
413
413A
401
402
404
405
406
407
4.08 4.07
4.32
WRITE-UP
4.36
408
4.02 4.06
STORAGE 4.03 4.05 413E 4.04
ELEVATOR
SUPPORT
SUPPORT
4E1
411D
411E
PREP 409C
UP
4.47
4.18 OFFICE
OFFICE
OFFICE
OFFICE
413F
413D
413C
413B
4.10
4.13
4.11
4.14
4.16
4.38
4.17 4.39
4.12 4.15
4.40
STORAGE 400
SUPPORT
SUPPORT
411H
411K
LAB
LAB
LAB
411
410
409
WOMEN'S 4W1
4.42 JANITOR 4.43 4J1
4.44 MEN'S
4.25
LAB STORAGE 411J
4.22
4.19
4.21
4.45
4M1
4.23 4.24
SUPPORT
SUPPORT
411G
410A
4.20
WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza
DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017
SIGN LOCATION PLAN | LEVEL FIVE
STAIR 2
STAIR 1
5.19
5S1
5.20
5.22
5.23
5.24
5S2
5.13
5.12 5.37
DN
5.14
LOUNGE
5.01
514
STORAGE
5.15
WRITE-UP
WRITE-UP
WRITE-UP
WRITE-UP
504
505
507
508
509
IT
ELEC
501
502
5.18
WRITE-UP 503
5.17
SUPPORT SUPPORT
5E1
512C
5.03
5.25 5.26
5.21
5.16
ELEVATOR
514A
5.02
WRITE-UP
512D
FUTURE
SUPPORT
510
510B
REF.
5.38
CONFERENCE 513
5.27 PANTRY 5.05
5.04
5.06 5.28
515
5.11
5.29
5.07
GENDER NEUTRAL 5U1
FUTURE
FUTURE
512
511
5.31 5.32 JANITOR 5J1
5.34 STORAGE 512E
5.33 GENDER NEUTRAL 5U2
STORAGE 511C
SUPPORT 511B
WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza
DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017
SIGN LOCATION PLAN | PENTHOUSE
6.08 6.07 STAIR 2 6S2
6.06
ELEV MECH 600B
6.01 ELEVATOR
6.05
6.02
6E1
MECHANICAL 600
6.03
6.04
WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza
DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017
SIGN MESSAGE SCHEDULE
WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza
DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017
SIGN MESSAGE SCHEDULE | LEVEL ONE SHEET LEVEL LOCATION SIGN TYPE DESCRIPTION 3.1 1 1.01 EVU1-‐B4 Utility R oom Identification S ign
3.1
1
1.13
EVU1-‐B4
Utility R oom Identification S ign
3.1
1
1.13
N/A
Insert S ign
3.1
1
1.14
EVU1-‐B4
Utility R oom Identification S ign
3.1
1
1.14
N/A
Insert S ign
3.1
1
1.15
EVU1-‐B4
Utility R oom Identification S ign
3.1
1
1.15
N/A
Insert S ign
3.1
1
1.16
EVU1-‐B2
3.1
1
1.17
3.1
1
3.1
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
MESSAGE (message panel) LOADING DOCK
NOTES CLIENT REVIEW Mounts to brick, aluminum back plate required [ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
3.1
1
1.02
EVU1-‐B4
Utility R oom Identification S ign
(message panel) BUILDING MECHANICAL
Mounts to brick, aluminum back plate required [ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
3.1
1
1.03
EVU1-‐B2
Utility R oom Identification S ign
(message panel) BRYAN HALL
Mounts to brick, aluminum back plate required [ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
3.1
1
1.04
EVU1-‐B4
Utility R oom Identification S ign
(message panel) LAB MECHANICAL
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
3.1
1
1.04
N/A
Insert S ign
(insert panel) Professor Dewey Holton
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
3.1
1
1.05
EVU1-‐D10 Wall-‐Mounted B uilding Directory
(top panel) LEVEL
Max. capacity 12 m essage panels
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
(bottom panels) Access to McMillen Laboratory ( 5) Access to Chemistry Main Office ( 5) Conference R oom 513 (5) Lounge 514 ( 5) (blank) Access to McMillen Laboratory ( 4) Conference R oom 403 (4) Faculty Offices 413A-‐413F (4) (blank) Conference R oom 303 (3) (blank) Main Lobby ( 2)
(map artwork)
Artwork provided by owner
(message panel) LASER R OOMS 104 & 105
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
(insert panel) Professor Dewey Holton
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
(message panel) LASER R OOM 104
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
(insert panel) Professor Dewey Holton
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
(message panel) LASER R OOM 105
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
(insert panel) Professor Dewey Holton
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
Utility R oom Identification S ign
(message panel) 113
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
EVU1-‐B4
Utility R oom Identification S ign
(message panel) USER MECHANICAL
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
1.17
N/A
Insert S ign
(insert panel) Professor R ichard Loomis
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
1
1.18
EVU1-‐B4
Utility R oom Identification S ign
(message panel) EQUIPMENT ROOM
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
3.1
1
1.18
N/A
Insert S ign
(insert panel) Professor Dewey Holton
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
3.1
1
1.06
EVU1-‐G12 Evacuation Map
3.1
1
1.07
EVU1-‐B4
Utility R oom Identification S ign
(message panel) BUILDING MECHANICAL
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
3.1
1
1.19
EVU1-‐B4
Utility R oom Identification S ign
(message panel) LAB 111 PREP R OOM
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
3.1
1
1.08
EVU1-‐B2
Utility R oom Identification S ign
(message panel) STORAGE
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
3.1
1
1.20
EVU1-‐B4
Utility R oom Identification S ign
(message panel) LASER R OOM 111
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
3.1
1
1.09
EVU1-‐B2
Utility R oom Identification S ign
(message panel) MDF R OOM
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
3.1
1
1.20
N/A
Insert S ign
(insert panel) Professor R ichard Loomis
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
3.1
1
1.10
EVU1-‐B4
Utility R oom Identification S ign
(message panel) LAB MECHANICAL
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
3.1
1
1.21
EVU1-‐B4
Utility R oom Identification S ign
(message panel) USER MECHANICAL
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
3.1
1
1.10
N/A
Insert S ign
(insert panel) Professor R ichard Loomis
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
3.1
1
1.21
N/A
Insert S ign
(insert panel) Professor R ichard Loomis
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
3.1
1
1.11
EVU1-‐B4
Utility R oom Identification S ign
(message panel) EQUIPMENT ROOM
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
3.1
1
1.22
EVU1-‐B4
Utility R oom Identification S ign
(message panel) USER MECHANICAL
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
3.1
1
1.11
N/A
Insert S ign
(insert panel) Professor Dewey Holton
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
3.1
1
1.23
EVU1-‐B2
Utility R oom Identification S ign
(message panel) 107
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
3.1
1
1.12
EVU1-‐B4
Utility R oom Identification S ign
(message panel) LABS 104 & 105 PREP R OOM
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza
DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017
SIGN MESSAGE SCHEDULE | LEVEL TWO SHEET LEVEL LOCATION SIGN TYPE DESCRIPTION MESSAGE 3.2 2 2.01 EVU1-‐D8 Wall-‐Mounted B uilding Directional
(top panel) LEVEL 2
NOTES Max. capacity 10 m essage panels
CLIENT REVIEW [ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
(bottom panels) (blank) > Offices 205 and 207 > R estrooms ( restroom symbols) (blank) (blank) (blank) (blank) (blank) (blank) (blank) 3.2
2
2.02
EVU1-‐B2
Utility R oom Identification S ign
3.2
2
2.03
EVU1-‐B20 Room Identification S ign
3.2
2
2.12
EVU1-‐F10 Level Identification S ign
2
2.03
N/A
Insert S ign
3.2
2
2.04
EVU1-‐B4
3.2
2
2.05
3.2
2
3.2
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
(bottom panel) FLOOR 2 S TAIR 1
(message panel) 209
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
(top panel) LAB
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
3.2
2
2.13
EVU1-‐F5
Regulatory S ign
3.2
2
2.14
EVU1-‐D8
Wall-‐Mounted B uilding Directional
(message panel) FIRE EXIT (top panel) LEVEL 2
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE Max. capacity 10 m essage panels
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
(bottom panels) (blank) < Offices 205 and 207 < R estrooms (restroom symbols) (blank) ^ Main Lobby ^ Elevator ( elevator symbol) (blank) (blank) (blank) (blank)
(bottom panel) 210 3.2
(top panel) STAIR 1 FLOOR 2 SERVES 2-‐5 No R oof Access Exit Discharge This F loor
(insert panel) Professor R ichard Loomis
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
Utility R oom Identification S ign
(message panel) LAB 210
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
3.2
2
2.15
EVU1-‐B2
Utility R oom Identification S ign
(message panel) IT CLOSET
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
EVU1-‐B2
Utility R oom Identification S ign
(message panel) STORAGE
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
3.2
2
2.16
EVU1-‐B4
Utility R oom Identification S ign
(message panel) ELECTRICAL CLOSET
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
2.06
EVU1-‐B4
Utility R oom Identification S ign
(message panel) LAB 210 PREP R OOM
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
3.2
2
2.17
EVU1-‐B20 Room Identification S ign
2
2.07
EVU1-‐B4
Utility R oom Identification S ign
(message panel) LAB 210
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
3.2
2
2.08
EVU1-‐D10 Wall-‐Mounted F aculty Directory (3 EACH)
(Ref. S ign Type Details f or Layout)
Max. capacity 36 m essage panels
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
3.2
2
2.17
N/A
3.2
2
2.09
EVU1-‐D10 Wall-‐Mounted B uilding Directory
(top panel) LEVEL
Max. capacity 12 m essage panels
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
3.2
2
2.18
EVU1-‐B20 Room Identification S ign
(bottom panels) Access to McMillen Laboratory ( 5) Access to Chemistry Main Office ( 5) Conference R oom 513 ( 5) Lounge 514 ( 5) (blank) Access to McMillen Laboratory ( 4) Conference R oom 403 ( 4) Faculty Offices 413A-‐413F ( 4) (blank) Conference R oom 303 ( 3) (blank) Main Lobby ( 2) 3.2
2
2.10
EVU1-‐G12 Evacuation Map
(map artwork)
3.2
2
2.11
EVU1-‐F6
(top panel) (stair symbol)
Stairwell Identification S ign
(top panel) STUDENT OFFICE
Mounts to glass, vinyl back plate required
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
(bottom panel) 203 Insert S ign
(insert panel) Professor R ichard Loomis
(top panel) STUDENT OFFICE
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE Mounts to glass, vinyl back plate required
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
(bottom panel) 204 3.2
2
2.18
N/A
Insert S ign
3.2
2
2.19
EVU1-‐B20 Room Identification S ign
(insert panel) Professor R ichard Loomis
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
(top panel) LAB
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
(bottom panel) 210 Artwork provided by owner
(bottom panel) STAIR 1
WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
3.2
2
2.19
N/A
Insert S ign
(insert panel) Professor R ichard Loomis
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
3.2
2
2.20
EVU1-‐A7
Office Identification S ign
(top panel) 205
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE Occupant names provided by owner Mounts to glass, vinyl back plate required
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
(bottom panel) Professor Dewey Holton
DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017
SIGN MESSAGE SCHEDULE | LEVEL TWO 3.2
2
2.21
EVU1-‐B20 Room Identification S ign
(top panel) LAB
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
(bottom panel) 208 3.2
3.2
2
2
2.21
2.22
N/A
Insert S ign
EVU1-‐B20 Room Identification S ign
(insert panel) Professor Dewey Holton
(top panel) STUDENT OFFICE
2
2.22
N/A
Insert S ign
3.2
2
2.23
EVU1-‐A7
Office Identification S ign
Mounts to glass, vinyl back plate required
(insert panel) Professor Dewey Holton
(top panel) 207
2
2.31
EVU1-‐B4
Utility R oom Identification S ign
3.2
2
2.32
EVU1-‐R1
Restroom Identification S ign
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE [ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
(bottom panel) 206 3.2
3.2
(message panel) JANITOR CLOSET
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
(top panel) (male and accessible symbols)
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
(bottom panel) MEN 3.2
2
2.33
EVU1-‐B2
Utility R oom Identification S ign
(message panel) 209
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
3.2
2
2.34
EVU1-‐B2
Utility R oom Identification S ign
(message panel) JOLLEY HALL
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE Occupant names provided by owner Mounts to glass, vinyl back plate required
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
Max. capacity 10 m essage panels
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
(bottom panel) Dr. Christone Kirmaier 3.2
2
2.24
EVU1-‐D8
Wall-‐Mounted B uilding Directional
(top panel) LEVEL 2 (bottom panels) (blank) > Main Lobby > Offices 205 and 207 > Elevator (elevator symbol) (blank) < R estrooms (restroom symbols) (blank) (blank) (blank) (blank)
3.2
2
2.25
EVU1-‐R.P1 Flag-‐Mounted Identification S ign
(sign panel -‐ side a) (restroom symbols)
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
(sign panel -‐ side b) (restroom symbols) 3.2
2
2.26
EVU1-‐B20 Room Identification S ign
(top panel) LAB
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
(bottom panel) 208 3.2
2
2.26
N/A
Insert S ign
(insert panel) Professor Dewey Holton
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
3.2
2
2.27
EVU1-‐B4
Utility R oom Identification S ign
(message panel) LAB 208 INSTRUMENT R OOM
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
3.2
2
2.28
EVU1-‐B4
Utility R oom Identification S ign
(message panel) LAB 208 EQUIPMENT R OOM
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
3.2
2
2.29
EVU1-‐B4
Utility R oom Identification S ign
(message panel) LAB 208 PREP R OOM
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
3.2
2
2.30
EVU1-‐R1
Restroom Identification S ign
(top panel) (female and accessible symbols)
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
(bottom panel) WOMEN
WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza
DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017
SIGN MESSAGE SCHEDULE | LEVEL THREE SHEET LEVEL LOCATION SIGN TYPE DESCRIPTION 3.3 3 3.01 EVU1-‐G12 Evacuation Map
3.3
3
3.02
EVU1-‐D10 Wall-‐Mounted B uilding Directory
MESSAGE (map artwork)
(top panel) LEVEL
NOTES Artwork provided by owner
Max. capacity 12 m essage panels
CLIENT REVIEW [ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
3.3
3
3.03
EVU1-‐B2
Utility R oom Identification S ign
(message panel) 312
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
3.3
3
3.04
EVU1-‐B2
Utility R oom Identification S ign
(message panel) 312C
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
3.3
3
3.07
EVU1-‐D8
Wall-‐Mounted B uilding Directional
Max. capacity 10 m essage panels
3
3.10
EVU1-‐D8
Wall-‐Mounted B uilding Directional
3
3.08
EVU1-‐F6
Stairwell Identification S ign
(top panel) (stair symbol)
3
3.09
EVU1-‐F10 Level Identification S ign
(top panel) STAIR 1 FLOOR 3 SERVES 2-‐5 No R oof Access (down arrow) Down to S econd F loor for Exit Discharge (bottom panel) FLOOR 3 S TAIR 1
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
3
3.11
EVU1-‐B2
Utility R oom Identification S ign
(message panel) IT CLOSET
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
3.3
3
3.12
EVU1-‐B4
Utility R oom Identification S ign
(message panel) ELECTRICAL CLOSET
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
3.3
3
3.14
EVU1-‐B20 Room Identification S ign
(top panel) CONFERENCE ROOM
Mounts to glass, vinyl back plate required
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
Max. capacity 10 m essage panels
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
(bottom panel) 303
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
3.3
3
3.21
EVU1-‐D8
Wall-‐Mounted B uilding Directional
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
3.3
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
3.3
3
3.23
EVU1-‐B2
Utility R oom Identification S ign
3.3
3
3.25
EVU1-‐R1
Restroom Identification S ign
(top panel) LEVEL 3 (bottom panels) (blank) > Conference R oom 303 > Elevator ( elevator symbol) (blank) < R estrooms ( restroom symbols) (blank) (blank) (blank) (blank) (blank)
2
3.22
EVU1-‐R.P1 Flag-‐Mounted Identification S ign
(sign panel -‐ side a) (restroom symbols)
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
(sign panel -‐ side b) (restroom symbols)
(bottom panel) STAIR 1 3.3
Max. capacity 10 m essage panels
3.3
(bottom panels) (blank) > Conference R oom 303 > R estrooms (restroom symbols) (blank) (blank) (blank) (blank) (blank) (blank) (blank) 3.3
(top panel) LEVEL 3 (bottom panels) (blank) < Conference R oom 303 < R estrooms ( restroom symbols) (blank) ^ Elevator ( elevator symbol) (blank) (blank) (blank) (blank) (blank)
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
(bottom panels) Access to McMillen Laboratory ( 5) Access to Chemistry Main Office ( 5) Conference R oom 513 (5) Lounge 514 ( 5) (blank) Access to McMillen Laboratory ( 4) Conference R oom 403 (4) Faculty Offices 413A-‐413F (4) (blank) Conference R oom 303 (3) (blank) Main Lobby ( 2)
(top panel) LEVEL 3
3.3
(message panel) 311
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
(top panel) (female and accessible symbols)
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
(bottom panel) WOMEN 3.3
3
3.26
EVU1-‐B4
Utility R oom Identification S ign
3.3
3
3.27
EVU1-‐R1
Restroom Identification S ign
(message panel) JANITOR CLOSET
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
(top panel) (male and accessible symbols)
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
(bottom panel) MEN 3.3
WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza
3
3.28
EVU1-‐B2
Utility R oom Identification S ign
(message panel) 311
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017
SIGN MESSAGE SCHEDULE | LEVEL THREE 3.3
3
3.29
EVU1-‐B2
Utility R oom Identification S ign
(message panel) JOLLEY HALL
WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017
SIGN MESSAGE SCHEDULE | LEVEL FOUR SHEET LEVEL LOCATION SIGN TYPE DESCRIPTION 3.4 4 4.01 EVU1-‐B20 Room Identification S ign
MESSAGE (top panel) FACULTY OFFICE SUITE 413A-‐G
NOTES Mounts to glass, vinyl back plate required
CLIENT REVIEW [ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
3.4
4
4.11
N/A
Insert S ign
3.4
4
4.12
EVU1-‐B2
Utility R oom Identification S ign
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
3.4
4
4.12
N/A
Insert S ign
3.4
4
4.13
EVU1-‐G12 Evacuation Map
3.4
4
4.14
EVU1-‐D10 Wall-‐Mounted B uilding Directory
(bottom panel) 413 3.4
4
4.02
EVU1-‐A7
Office Identification S ign
(top panel) 413A
Occupant names provided by owner Mounts to glass, vinyl back plate required
(bottom panel) (occupant's name) 3.4
3.4
4
4
4.03
4.04
EVU1-‐B2
EVU1-‐A7
Utility R oom Identification S ign
Office Identification S ign
(message panel) STORAGE
(top panel) 413B
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE Occupant names provided by owner Mounts to glass, vinyl back plate required
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
4
4.05
EVU1-‐A7
Office Identification S ign
(top panel) 413C
Occupant names provided by owner Mounts to glass, vinyl back plate required
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
Occupant names provided by owner Mounts to glass, vinyl back plate required
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
(bottom panel) (occupant's name) 3.4
4
4.06
EVU1-‐A7
Office Identification S ign
(top panel) 413D (bottom panel) (occupant's name)
3.4
4
4.07
EVU1-‐A7
Office Identification S ign
(top panel) 413F
Occupant names provided by owner Mounts to glass, vinyl back plate required
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
(bottom panel) (occupant's name) 3.4
4
4.08
EVU1-‐A7
Office Identification S ign
(top panel) 413G
Occupant names provided by owner Mounts to glass, vinyl back plate required
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
Max. capacity 10 m essage panels
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
(bottom panel) (occupant's name) 3.4
4
4.09
EVU1-‐D8
Wall-‐Mounted B uilding Directional
(top panel) LEVEL 4 (bottom panels) (blank) > Access to McMillen Laboratory > Lounge 412 > Offices 413A -‐ 413F (blank) < Conference R oom 403 < R estrooms (restroom symbols) (blank) ^ Elevator ( elevator symbol) (blank)
3.4
4
4.10
EVU1-‐D8
Wall-‐Mounted B uilding Directional
(top panel) LEVEL 4
Max. capacity 10 m essage panels
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
(bottom panels) (blank) > Access to McMillen Laboratory > Conference R oom 303 > Lounge 412 > Offices 413A -‐ 413F > R estrooms (restroom symbols) (blank) (blank) (blank) (blank) 3.4
4
4.11
EVU1-‐B2
Utility R oom Identification S ign
(message panel) STORAGE
WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
(message panel) STORAGE
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
(insert panel) Professor G ary Patti
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
(map artwork)
(top panel) LEVEL
Artwork provided by owner
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
Max. capacity 12 m essage panels
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
(bottom panels) Access to McMillen Laboratory ( 5) Access to Chemistry Main Office ( 5) Conference R oom 513 (5) Lounge 514 ( 5) (blank) Access to McMillen Laboratory ( 4) Conference R oom 403 (4) Faculty Offices 413A-‐413F ( 4) (blank) Conference R oom 303 (3) (blank) Main Lobby ( 2)
(bottom panel) (occupant's name) 3.4
(insert panel) Professor G ary Patti
3.4
4
4.15
EVU1-‐B20 Room Identification S ign
(top panel) LABS
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
(bottom panel) 410 AND 411 3.4
4
4.15
N/A
Insert S ign
(insert panel) Professor G ary Patti
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
3.4
4
4.16
EVU1-‐B4
Utility R oom Identification S ign
(message panel) LAB 411 SUPPORT R OOM
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
3.4
4
4.17
EVU1-‐B4
Utility R oom Identification S ign
(message panel) LAB 410 SUPPORT R OOM
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
3.4
4
4.18
EVU1-‐B4
Utility R oom Identification S ign
(message panel) LAB 410
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
3.4
4
4.19
EVU1-‐B4
Utility R oom Identification S ign
(message panel) LAB STORAGE
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
3.4
4
4.20
EVU1-‐B4
Utility R oom Identification S ign
(message panel) TISSUE CULTURE LAB S UPPORT
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
3.4
4
4.21
EVU1-‐B4
Utility R oom Identification S ign
(message panel) TISSUE CULTURE LAB 1
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
3.4
4
4.22
EVU1-‐B4
Utility R oom Identification S ign
(message panel) TISSUE CULTURE LAB 2
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
3.4
4
4.23
EVU1-‐B2
Utility R oom Identification S ign
(message panel) CLEAN LAB
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
3.4
4
4.24
EVU1-‐B4
Utility R oom Identification S ign
(message panel) LAB 410
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017
SIGN MESSAGE SCHEDULE | LEVEL FOUR 3.4
4
4.25
EVU1-‐B2
Utility R oom Identification S ign
3.4
4
4.26
EVU1-‐F6
Stairwell Identification S ign
(message panel) CLEAN LAB
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
(top panel) (stair symbol)
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
4
4.27
EVU1-‐F10 Level Identification S ign
(top panel) STAIR 1 FLOOR 4 SERVES 2-‐5 No R oof Access (down arrow) Down to S econd F loor for Exit Discharge
4
4.28
EVU1-‐B2
Utility R oom Identification S ign
3.4
4
4.29
EVU1-‐B4
Utility R oom Identification S ign
3.4
4
4.30
EVU1-‐B20 Room Identification S ign
4
4.31
EVU1-‐B20 Room Identification S ign
3.4 [ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
(message panel) ELECTRICAL CLOSET
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
(top panel) WRITE-‐UP ROOM
Mounts to glass, vinyl back plate required
4
4.31
N/A
Insert S ign
3.4
4
4.32
EVU1-‐B20 Room Identification S ign
4
4.36
EVU1-‐B20 Room Identification S ign
4
4.37
EVU1-‐B20 Room Identification S ign
4.38
EVU1-‐D8
Wall-‐Mounted B uilding Directional
4
4.39
EVU1-‐R.P1 Flag-‐Mounted Identification S ign
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE 3.4
(insert panel) Professor G ary Patti
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
(top panel) LABS
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
4
4.40
EVU1-‐B20 Room Identification S ign
4.32
N/A
Insert S ign
3.4
4
4.33
EVU1-‐B20 Room Identification S ign
(insert panel) Professor G ary Patti
(top panel) WRITE-‐UP ROOM
4
4.42
EVU1-‐R1
Restroom Identification S ign
3.4
4
4
4.33
4.34
N/A
Insert S ign
EVU1-‐B20 Room Identification S ign
Mounts to glass, vinyl back plate required
(insert panel) Professor G ary Patti
(top panel) STUDENT OFFICE
4
4.34
N/A
Insert S ign
3.4
4
4.43
EVU1-‐B4
Utility R oom Identification S ign
3.4
4
4.44
EVU1-‐R1
Restroom Identification S ign
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
(top panel) STUDENT OFFICE
Mounts to glass, vinyl back plate required
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
Mounts to glass, vinyl back plate required
(insert panel) Professor G ary Patti
WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza
(top panel) LEVEL 4
Max. capacity 10 m essage panels
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
(sign panel -‐ side a) (restroom symbols)
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
(top panel) LAB
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
(top panel) (female and accessible symbols)
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
(message panel) JANITOR CLOSET
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
(top panel) (male and accessible symbols)
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
(bottom panel) MEN 3.4
4
4.45
EVU1-‐B4
Utility R oom Identification S ign
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
(message panel) LAB 409
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
3.4
4
4.46
EVU1-‐B4
Utility R oom Identification S ign
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
(message panel) MCMILLAM LABORATORY
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
3.4
4
4.47
EVU1-‐B2
Utility R oom Identification S ign
(message panel) JOLLEY HALL
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
(bottom panel) 406 3.4
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
(bottom panel) WOMEN
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
(bottom panel) 405 3.4
(top panel) LAB
(bottom panel) 409
(bottom panel) 410 AND 411 4
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
(sign panel -‐ side b) (restroom symbols)
3.4
3.4
Mounts to glass, vinyl back plate required
(bottom panels) (blank) > Access to McMillen Laboratory > Conference R oom 403 > Lounge 412 > Offices 413A -‐ 413F > Elevator ( elevator symbol) (blank) < R estrooms ( restroom symbols) (blank) (blank) 3.4
Mounts to glass, vinyl back plate required
4
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
(bottom panel) 404 3.4
(top panel) WRITE-‐UP ROOM
(bottom panel) 408
(bottom panel) 403 3.4
EVU1-‐B20 Room Identification S ign
(bottom panel) 409 3.4
(message panel) IT CLOSET
(top panel) CONFERENCE ROOM
4.35
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
(bottom panel) FLOOR 4 S TAIR 1 3.4
4
(bottom panel) 407 3.4
(bottom panel) STAIR 1 3.4
3.4
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017
SIGN MESSAGE SCHEDULE | LEVEL FIVE SHEET LEVEL LOCATION SIGN TYPE DESCRIPTION 3.5 5 5.01 EVU1-‐B2 Utility R oom Identification S ign
3.5
5
5.02
EVU1-‐B2
Utility R oom Identification S ign
3.5
5
5.03
EVU1-‐B20 Room Identification S ign
MESSAGE (message panel) STORAGE
NOTES
(message panel) STORAGE
(top panel) CONFERENCE ROOM
CLIENT REVIEW [ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
5
5.04
EVU1-‐D8
Wall-‐Mounted B uilding Directional
(top panel) LEVEL 5
Mounts to glass, vinyl back plate required
3.5
5
5
5.05
5.06
EVU1-‐G12 Evacuation Map
EVU1-‐D10 Wall-‐Mounted B uilding Directory
(map artwork)
(top panel) LEVEL
5.13
EVU1-‐F10 Level Identification S ign
3.5
Max. capacity 10 m essage panels
Artwork provided by owner
Max. capacity 12 m essage panels
(top panel) STAIR 1 FLOOR 5 SERVES 2-‐5 No R oof Access (down arrow) Down to S econd F loor for Exit Discharge
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
(bottom panel) FLOOR 5 S TAIR 1
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
5
5.14
EVU1-‐D8
Wall-‐Mounted B uilding Directional
(top panel) LEVEL 5
Max. capacity 10 m essage panels
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
(bottom panels) (blank) > Access to McMillen Laboratory > Access to Chemistry Main Office > Conference R oom 513 > Lounge 514 (blank) < R estrooms ( restroom symbols) (blank) ^ Elevator ( elevator symbol) (blank) (blank)
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
(bottom panels) (blank) > Access to Chemistry Main Office > Conference R oom 513 > Lounge 514 > R estrooms ( restroom symbols) (blank) (blank) (blank) (blank) (blank) 3.5
5
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
(bottom panel) 513 3.5
3.5
3.5
5
5.15
EVU1-‐B2
Utility R oom Identification S ign
(message panel) IT CLOSET
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
3.5
5
5.16
EVU1-‐B4
Utility R oom Identification S ign
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
(message panel) ELECTRICAL CLOSET
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
3.5
5
5.17
EVU1-‐B2
Utility R oom Identification S ign
(message panel) 512
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
3.5
5
5.18
EVU1-‐B2
Utility R oom Identification S ign
(message panel) 503
Mounts to glass, vinyl back plate required
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
3.5
5
5.19
EVU1-‐B2
Utility R oom Identification S ign
(message panel) 504
Mounts to glass, vinyl back plate required
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
3.5
5
5.20
EVU1-‐B2
Utility R oom Identification S ign
(message panel) 505
Mounts to glass, vinyl back plate required
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
(bottom panels) Access to McMillen Laboratory ( 5) Access to Chemistry Main Office ( 5) Conference R oom 513 (5) Lounge 514 ( 5) (blank) Access to McMillen Laboratory ( 4) Conference R oom 403 (4) Faculty Offices 413A-‐413F (4) (blank) Conference R oom 303 (3) (blank) Main Lobby ( 2) 3.5
5
5.07
EVU1-‐B2
Utility R oom Identification S ign
(message panel) 512
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
3.5
5
5.21
EVU1-‐B2
Utility R oom Identification S ign
(message panel) 510
3.5
5
5.11
EVU1-‐B2
Utility R oom Identification S ign
(message panel) 512
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
3.5
5
5.22
EVU1-‐B2
Utility R oom Identification S ign
(message panel) 507
Mounts to glass, vinyl back plate required
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
3.5
5
5.12
EVU1-‐F6
Stairwell Identification S ign
(top panel) (stair symbol)
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
3.5
5
5.23
EVU1-‐B2
Utility R oom Identification S ign
(message panel) 508
Mounts to glass, vinyl back plate required
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
3.5
5
5.24
EVU1-‐B2
Utility R oom Identification S ign
(message panel) 509
Mounts to glass, vinyl back plate required
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
3.5
5
5.25
EVU1-‐F6
Stairwell Identification S ign
(bottom panel) STAIR 1
(top panel) (stair symbol)
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
(bottom panel) STAIR 2
WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza
DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017
SIGN MESSAGE SCHEDULE | LEVEL FIVE 3.5
5
5.26
EVU1-‐F10 Level Identification S ign
(top panel) STAIR 2 FLOOR 5 SERVES 5-‐PENTHOUSE No R oof Access Exit Discharge This F loor
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
(bottom panel) FLOOR 5 S TAIR 2 3.5
5
5.27
EVU1-‐D8
Wall-‐Mounted B uilding Directional
(top panel) LEVEL 5
Max. capacity 10 m essage panels
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
(bottom panels) (blank) > Access to McMillen Laboratory > Access to Chemistry Main Office > Conference R oom 513 > Lounge 514 > Elevator ( elevator symbol) (blank) < R estrooms (restroom symbols) (blank) (blank) 3.5
5
5.28
EVU1-‐R.P1 Flag-‐Mounted Identification S ign
(sign panel -‐ side a) (restroom symbols)
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
(sign panel -‐ side b) (restroom symbols) 3.5
5
5.29
EVU1-‐B2
Utility R oom Identification S ign
3.5
5
5.31
EVU1-‐R1
Restroom Identification S ign
(message panel) 510
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
(top panel) (female and accessible symbols)
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
(bottom panel) WOMEN 3.5
5
5.32
EVU1-‐B4
Utility R oom Identification S ign
3.5
5
5.33
EVU1-‐R1
Restroom Identification S ign
(message panel) JANITOR CLOSET
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
(top panel) (male and accessible symbols)
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
(bottom panel) MEN 3.5
5
5.34
EVU1-‐B2
Utility R oom Identification S ign
(message panel) 511
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
3.5
5
5.37
EVU1-‐B4
Utility R oom Identification S ign
(message panel) MCMILLAN LABORATORY
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
3.5
5
5.38
EVU1-‐B2
Utility R oom Identification S ign
(message panel) JOLLEY HALL
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza
DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017
SIGN MESSAGE SCHEDULE | PENTHOUSE SHEET LEVEL LOCATION SIGN TYPE DESCRIPTION 3.6 6 6.01 EVU1-‐G12 Evacuation Map
MESSAGE (map artwork)
NOTES Artwork provided by owner
CLIENT REVIEW [ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
3.6
6
6.02
EVU1-‐B4
Utility R oom Identification S ign
(message panel) ELEVATOR MACHINE R OOM
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
3.6
6
6.03
EVU1-‐B2
Utility R oom Identification S ign
(message panel) ROOF ACCESS
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
3.6
6
6.04
EVU1-‐B4
Utility R oom Identification S ign
(message panel) MECHANICAL ROOM
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
3.6
6
6.05
EVU1-‐B2
Utility R oom Identification S ign
(message panel) ROOF ACCESS
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
3.6
6
6.06
EVU1-‐B4
Utility R oom Identification S ign
(message panel) MECHANICAL ROOM
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
3.6
6
6.07
EVU1-‐F6
Stairwell Identification S ign
(top panel) (stair symbol)
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
(bottom panel) STAIR 2 3.6
6
6.08
EVU1-‐F10 Level Identification S ign
(top panel) STAIR 2 PENTHOUSE SERVES 5-‐PENTHOUSE No R oof Access (down arrow) Down to F ifth F loor for Exit Discharge
[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE
(bottom panel) PENTHOUSE S TAIR 1
WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza
DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017
IMPLEMENTATION BUDGETS
WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza
6
DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017
IMPLEMENTATION BUDGETS 1. INTERIOR DONOR RECOGNITION
BRYAN HALL SIGNAGE AND GRAPHICS FINAL IMPLEMENTATION ESTIMATE
Sign Type
1. Interior Donor Recognition
$
2. Exterior Donor Recognition
$
4,000.00
3. Building Identification
$
7,750.00
4. Wall Graphics
$
68,625.00
5. Interior Building Signage
$
39,130.30
TOTAL PROJECT ESTIMATE
$
WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza
119,505.30
FINAL IMPLEMENTATION ESTIMATE Description
Qnty
Unit Cost
Grand Total
T2
Donor Tier 2
0
$
-
$
-
T3
Donor Tier 3
0
$
-
$
-
T4
Donor Tier 4
0
$
-
$
-
T5
Donor Tier 5
0
$
-
$
-
T6
Donor Tier 6
0
$
-
$
-
$
-
Shop Drawings, Samples, Submittals, and Prototypes
$
-
Packaging and Shipping
$
-
Installation
$
-
TOTAL PROJECT ESTIMATE
$
-
0
DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017
IMPLEMENTATION BUDGETS 2. EXTERIOR DONOR RECOGNITION
BRYAN HALL SIGNAGE AND GRAPHICS FINAL IMPLEMENTATION ESTIMATE
Sign Type
1. Interior Donor Recognition
$
2. Exterior Donor Recognition
$
4,000.00
FINAL IMPLEMENTATION ESTIMATE Description
Qnty
$
7,750.00
4. Wall Graphics
$
68,625.00
5. Interior Building Signage
$
39,130.30
TOTAL PROJECT ESTIMATE
$
119,505.30
WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza
Grand Total
T1
Donor Tier 1 (MILLSTONE PLAZA)
1
$ 2,500.00 $
2,500.00
T1
Donor Tier 1 (CAMPUS THRESHOLD)
1
$ 1,500.00 $
1,500.00
2
3. Building Identification
Unit Cost
$ 4,000.00
Shop Drawings, Samples, Submittals, and Prototypes
$
-
Packaging and Shipping
$
-
Installation
$
-
TOTAL PROJECT ESTIMATE
$
4,000
DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017
IMPLEMENTATION BUDGETS 3. BUILDING IDENTIFICATION
BRYAN HALL SIGNAGE AND GRAPHICS FINAL IMPLEMENTATION ESTIMATE
Location
1. Interior Donor Recognition
$
2. Exterior Donor Recognition
$
4,000.00
FINAL IMPLEMENTATION ESTIMATE Description
Qnty
$
7,750.00
4. Wall Graphics
$
68,625.00
5. Interior Building Signage
$
39,130.30
TOTAL PROJECT ESTIMATE
$
119,505.30
WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza
Grand Total
1
South Elevation - 9" Tall Letters
1
$ 1,500.00 $
2
West Elevation - 4" Tall Letters
1
$
2
3. Building Identification
Unit Cost
750.00 $
1,500.00 750.00
$ 2,250.00
Shop Drawings, Samples, Submittals, and Prototypes
$
2,500
Packaging and Shipping
$
500
Installation
$
2,500
TOTAL PROJECT ESTIMATE
$
7,750
DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017
IMPLEMENTATION BUDGETS 4. WALL GRAPHICS
BRYAN HALL SIGNAGE AND GRAPHICS FINAL IMPLEMENTATION ESTIMATE
Location
1. Interior Donor Recognition
$
2. Exterior Donor Recognition
$
4,000.00
FINAL IMPLEMENTATION ESTIMATE Description
Qnty
$
7,750.00
4. Wall Graphics
$
68,625.00
5. Interior Building Signage
$
39,130.30
TOTAL PROJECT ESTIMATE
$
119,505.30
WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza
Grand Total
1
Stairwell Graphics
1750
$
16.50 $ 28,875.00
2
Elevator Lobbies
1500
$
16.50 $ 24,750.00
3250
3. Building Identification
Unit Cost
$ 53,625.00
Shop Drawings, Samples, Submittals, and Prototypes
$
1,500
Packaging and Shipping
$
1,500
Installation
$
12,000
TOTAL PROJECT ESTIMATE
$
68,625
DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017
IMPLEMENTATION BUDGETS 5. INTERIOR BUILDING SIGNAGE
BRYAN HALL SIGNAGE AND GRAPHICS FINAL IMPLEMENTATION ESTIMATE
Sign Type
1. Interior Donor Recognition
$
2. Exterior Donor Recognition
$
4,000.00
3. Building Identification
$
7,750.00
4. Wall Graphics
$
68,625.00
5. Interior Building Signage
$
39,130.30
TOTAL PROJECT ESTIMATE
$
119,505.30
FINAL IMPLEMENTATION ESTIMATE Description
Qnty
Grand Total
EVU1-B2
Utility Room Identification Sign
41
$
82.95 $
3,400.95
EVU1-B4
Utility Room Identification Sign
44
$ 121.20 $
5,332.80
EVU1-B20
Room Identification Sign
20
$ 158.25 $
3,165.00
EVU1-R.P1
Flag-Mounted Identification Sign
4
$ 190.00 $
760.00
EVU1-R1
Restroom Identification Sign
8
$ 144.80 $
1,158.40
EVU1-A7
Office Identification Sign
8
$ 174.00 $
1,392.00
EVU1-D8
Wall-Mounted Directional
12
$ 486.30 $
5,835.60
EVU1-D10
Wall-Mounted Building Directory
4
$ 707.60 $
2,830.40
EVU1-D10 (x3)
Wall-Mounted Faculty Directory
3
$ 707.60 $
2,122.80
N/A
Insert Sign
24
$
90.30 $
2,167.20
EVU1-F5
Regulatory Sign
1
$ 199.95 $
199.95
EVU1-F6
Stairwell Identification Sign
6
$ 170.30 $
1,021.80
EVU1-F10
Level Identification Sign
6
$ 390.40 $
2,342.40
EVU1-G12
Evac Plan
6
$ 183.50 $
1,101.00
187
WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza
Unit Cost
$ 32,830.30
Shop Drawings, Samples, Submittals, and Prototypes
$
-
Packaging and Shipping
$
1,800
Installation
$
4,500
TOTAL PROJECT ESTIMATE
$
39,130
DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017
PROJECT SCHEDULE
WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza
7
DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017
PROJECT SCHEDULE APRIL
MAY
JUNE
JULY
AUGUST
SEPTEMBER
OCTOBER
NOVEMBER
Week 1 Week 2 Week 3 Week 4 Week 1 Week 2 Week 3 Week 4 Week 5 Week 1 Week 2 Week 3 Week 4 Week 1 Week 2 Week 3 Week 4 Week 1 Week 2 Week 3 Week 4 Week 5 Week 1 Week 2 Week 3 Week 4 Week 1 Week 2 Week 3 Week 4 Week 1 Week 2 Week 3 Week 4 Week 5
INTERIOR BUILDING SIGNAGE Final Design Revisions Bid Documents and Final Programming Bidding Docs Issued to Vendors Pricing / Contract Award Submittals & Shop Drawings Fabrication Installation Punchlist Corrections
INTERIOR SPECIALTY GRAPHICS Final Design Revisions Bid Documents and Final Artwork Bidding Docs Issued to Vendors Pricing / Contract Award Submittals & Shop Drawings Fabrication Installation Punchlist Corrections
EXTERIOR BUILDING IDENTIFICATION Final Design Revisions Bid Documents Bidding Docs Issued to Vendors Pricing / Contract Award Samples, Submittals & Shop Drawings Fabrication Installation Punchlist Corrections
INTERIOR DONOR RECOGNITION Design Development - Layout Approvals Final Design Revisions Bid Documents Bidding Docs Issued to Vendors Pricing / Contract Award Submittals & Shop Drawings Fabrication Installation Punchlist Corrections
WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza
DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017
1040 Hull Street, Suite 100 Baltimore, MD 21230 www.asg-architects.com
WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza
DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017