Washington University in St. Louis - Bryan Hall - 100% Design Development Presentation - 2017

Page 1

WASHINGTON UNIVERSITY IN ST. LOUIS

Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza

DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL (REVISED) | 04.10.2017 WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza

DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL (REVISED) | 04.10.2017


100% DESIGN DEVELOPMENT SUBMITTAL | TABLE OF CONTENTS

INTERIOR DONOR RECOGNITION 1 EXTERIOR DONOR RECOGNITION 2 BUILDING IDENTIFICATION 3 WALL GRAPHICS 4 BUILDING SIGNAGE 5 IMPLEMENTATION BUDGETS 6 PROJECT SCHEDULE 7

WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza

DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017


INTERIOR DONOR RECOGNITION

1

Review of Location Criteria Discussion of Specific Locations (15) Review of Revised Design Concepts

WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza

DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017


Floor

REVIEW | LOCATION CRITERIA

DRAFT2

Floor

The University provided a donor recognition schedule

Outdoor

designs presented here represent 3 of the 5 tiers. The

Level Two

Naming Opportunity Gateway Entrance to Danforth Campus

Donor Tier Donor Recognition Plan 2

12" x 22" Bryan Hall Donor Plaque in common area Recognition Plan (may vary)

We would like to see a rendering with "Robert S. Donor Tier Donor Recognition Plan Brookings Gateway" carved in 2 the wood, as well as options 2 in common area for Plaque presenting the donor story

2

Level Two

1

Level One

3

3 Outdoor

Gateway Entrance Level Three to Danforth Campus

3 2

4

Lab (Faculty: Gary Patti)

3

4 1

Level Four One

3

Plaque in common area

5 3

LevelThree Five Level

3

Plaque in common area

1 4

LabLab (Faculty: Dewey (Faculty: Gary Holten) Patti)

4 3

1 4

Lab (Faculty: Richard Level Four Loomis)

4 3

2 5

Entrance Lobby Level Five

4 3

2 1

Lab (Faculty: Dewey Holten)

4

2 1

Lab (Faculty: Richard Loomis)

4

2

Entrance Lobby

4

2

Lab (Faculty: Dewey Holten)

4

2

Lab (Faculty: Richard Loomis)

4

that included approximate sizes and word counts for 5 levels of interior recognition—Donor Tiers 2–6. The

Naming Opportunity

remaining signs will be designed once a scheme is chosen.

Plaque Size (approx.)

We would like to see a Plaque in common area rendering with "Robert S. Plaque Gateway" in commoncarved area in Brookings the wood, as well as options Plaque outside roomstory for presenting the donor

F T O N Plaque outside room Plaque outside room or in common area Plaque outside room Plaque in common area or in common area Plaque lobby Plaque in inside common area Plaque outside room Plaque outside room or in common area Plaque outside room Plaque outside room or in common area Plaque inside lobby

Plaque Size 12" x 22" (approx.) (may vary) 12" x 22" (may vary) 12" x 12" or 10" x 16" 12" 12" x 22" or 10"vary) x 16" (may 12" x 12" or 10" x 16" 12" x 12" or 10" x 16" 12" x 12" or 10" x 16" 12" x 12" 10" x 10" or 10" x 16" 12" x 12" 10" x 10" or 10" x 16" 12" x 12" 10" x 10" or 10" x 16"

Word Count (approx.)

Font Size (approx.)

Wayfinding: Named Space on Directory

80-125

Donor Name: 46pt Body Text: 27pt

Yes

Word Count (approx.) 80-125 80-125 30-50

30-50 30-50 30-50

20-30 30-50 20-30 30-50

20-30 30-50

10" x 10"

20-30

10" x 10"

20-30

10" x 10"

20-30

Plaque outside Hall\Donor room Recognition\Bryan 10"Hall x 10" G:\Capital Projects\FACILITIES\Bryan Donor Recognition Plan.xlsx20-30 Plaque outside room

10" x 10"

20-30

G:\Capital Projects\FACILITIES\Bryan Hall\Donor Recognition\Bryan Hall Donor Recognition Plan.xlsx

WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza

Wayfinding: Font Size Donor Name: 46pt Named Space on (approx.) No Directory Body Text: 27pt Donor Name: 46pt Body Text: 27pt Donor Name: 46pt Body Text: 27pt Donor Name: 46pt Body Text: 27pt Donor Name: 46pt Body Text: 27pt Donor Name: 46pt Body Text: 27pt Donor Name: 46pt Body Text: 27pt Donor Name: 46pt Body Text: 27pt Donor Name: 46pt Body Text: 27pt Donor Name: 46pt Body Text: 27pt Donor Name: 46pt Body Text: 27pt Donor Name: 46pt Body Text: 27pt Donor Name: 46pt Body Text: 27pt Donor Name: 46pt Body Text: 27pt Donor Name: 46pt Body Text: 27pt

L A IN 30-50 80-125

8/2/2016

Yes Yes Yes No No Yes Yes No No Yes No Yes No No No No Page 1 of 3 No

Page 1 of 3

DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017


REVIEW | LOCATION CRITERIA

Bryan Hall Donor Recognition Plan

DRAFT

The University provided a donor recognition schedule that included approximate sizes and word counts for 5 levels of interior recognition—Donor Tiers 2–6. The designs presented here represent 3 of the 5 tiers. The remaining signs will be designed once a scheme is chosen.

Donor Tier Donor Recognition Plan

8/2/2016

Plaque Size (approx.)

Word Count (approx.)

10" x 10"

20-30

10" x 10"

20-30

10" x 10"

20-30

10" x 10"

20-30

10" x 10"

20-30

10" x 10"

20-30

10" x 10"

20-30

10" x 10"

20-30

Floor

Naming Opportunity

2

Staircase

4

3

Conference Room 1

4

4

Conference Room 2

4

4

Connector Atrium Lounge

4

4

Connector Faculty Office Suite

4

4

Synthetic Lab (Faculty: TBD)

4

5

Connector Conference Room

4

5

Connector Lounge

4

2

Entrance

5

Plaque inside vestibule

8" x 8"

12

2

Faculty Office

5

Plaque outside room

8" x 8"

12

2

Faculty Office

5

Plaque outside room

8" x 8"

12

3

Lounge

5

Plaque inside room Named space on room ID

8" x 8"

12

4

Faculty Office

5

Plaque outside room

8" x 8"

12

4

Faculty Office

5

Plaque outside room

8" x 8"

12

Plaque at staircase Plaque inside room Named space on room ID Plaque inside room Named space on room ID Plaque inside room Named space on room ID Plaque inside suite Named space on room ID

F T O N Plaque outside room

Plaque inside room Named space on room ID Plaque inside room Named space on room ID

Donor Name: 46pt Body Text: 27pt Donor Name: 46pt Body Text: 27pt Donor Name: 46pt Body Text: 27pt Donor Name: 46pt Body Text: 27pt Donor Name: 46pt Body Text: 27pt Donor Name: 46pt Body Text: 27pt Donor Name: 46pt Body Text: 27pt Donor Name: 46pt Body Text: 27pt Donor Name: 46pt Body Text: 27pt Donor Name: 46pt Body Text: 27pt Donor Name: 46pt Body Text: 27pt Donor Name: 46pt Body Text: 27pt Donor Name: 46pt Body Text: 27pt Donor Name: 46pt Body Text: 27pt

L A IN

G:\Capital Projects\FACILITIES\Bryan Hall\Donor Recognition\Bryan Hall Donor Recognition Plan.xlsx

WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza

Font Size (approx.)

Wayfinding: Named Space on Directory No No No Yes No No No Yes No No No No No No

Page 2 of 3

DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017


REVIEW | LOCATION CRITERIA

Bryan Hall Donor Recognition Plan

DRAFT

Plaque Size (approx.)

Word Count (approx.)

Font Size (approx.)

Wayfinding: Named Space on Directory

Floor

Naming Opportunity

4

Faculty Office

5

Plaque outside room

8" x 8"

12

4

Faculty Office

5

Plaque outside room

8" x 8"

12

4

Faculty Office

5

Plaque outside room

8" x 8"

12

4

Faculty Office

5

Plaque outside room

8" x 8"

12

2

Graduate Student Work Space

6

6" x 4"

TBD

TBD

No

2

Graduate Student Work Space

6

6" x 4"

TBD

TBD

No

2

Graduate Student Work Space

6

6" x 4"

TBD

TBD

No

4

Graduate Student Work Space

6

6" x 4"

TBD

TBD

No

4

Graduate Student Work Space

6

6" x 4"

TBD

TBD

No

4

Graduate Student Work Space

6

6" x 4"

TBD

TBD

No

4

Graduate Student Work Space

6

6" x 4"

TBD

TBD

No

4

Large Graduate Student Work Space

6

6" x 4"

TBD

TBD

No

Outdoor

Benches

TBD

TBD

TBD

TBD

No

The University provided a donor recognition schedule that included approximate sizes and word counts for 5 levels of interior recognition—Donor Tiers 2–6. The designs presented here represent 3 of the 5 tiers. The remaining signs will be designed once a scheme is chosen.

Donor Tier Donor Recognition Plan

8/2/2016

F T O N Plaque inside room Named space on room ID Plaque inside room Named space on room ID Plaque inside room Named space on room ID Plaque inside room Named space on room ID Plaque inside room Named space on room ID Plaque inside room Named space on room ID Plaque inside room Named space on room ID Plaque inside room Named space on room ID We would like to see options based on the final bench design

L A IN

G:\Capital Projects\FACILITIES\Bryan Hall\Donor Recognition\Bryan Hall Donor Recognition Plan.xlsx

WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza

Donor Name: 46pt Body Text: 27pt Donor Name: 46pt Body Text: 27pt Donor Name: 46pt Body Text: 27pt Donor Name: 46pt Body Text: 27pt

No No No No

Page 3 of 3

DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017


REVISED SCHEME 2 (ALT A)

An alternate version of Scheme 2 is similar in mounting and finishes, but offers a opportunity for a color accent. A thin white acrylic face is applied to a translucent blue acrylic backer. A “punch-through” seal and reveals the blue backer.

WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza

DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017


REVISED SCHEME 2 ALT A | DESIGN

WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza

DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017


REVISED SCHEME 2 ALT A | DESIGN

WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza

DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017


REVISED SCHEME 2 | PRECEDENTS

WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza

DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017


REVISED SCHEME 2 (ALT B)

An alternate version of Scheme 2 is similar in mounting and finishes, but offers a opportunity for a color accent. A thin white acrylic face is applied to a translucent blue acrylic backer. A “punch-through” seal and reveals the blue backer.

WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza

DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017


REVISED SCHEME 2 ALT B | DESIGN

WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza

DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017


REVISED SCHEME 2 ALT B | DESIGN

WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza

DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017


REVISED SCHEME | PRECEDENTS

WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza

DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017


REVISED SCHEME 3

Scheme 3 uses layered graphics and lettering to give the panels depth. A blue line pattern is screen printed on the back of clear glass while sign lettering is applied to the front, giving the illusion that the words are “floating.” The layered panel rests on a wooden base and is wrapped with an acrylic and brushed metal seal element. A brushed metal band separates the glass and wood components.

WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza

DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017


REVISED SCHEME 3 | DESIGN

WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza

DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL (REVISED) | 04.10.2017


REVISED SCHEME 3 | DESIGN

WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza

DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL (REVISED) | 04.10.2017


REVISED SCHEME 3 | PRECEDENTS

WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza

DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017


EXTERIOR DONOR RECOGNITION

2

Overview Donor Locations (2) Precedent Images

WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza

DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017


OVERVIEW | DISCUSSION ASG has identified 2 unique locations for donor recognition on the exterior of Bryan Hall.

LOCATION 1

LOCATION 2

WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza

DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL (REVISED) | 04.10.2017


LOCATION 1 | PLAN VIEW

LOCATION 1 - MILLSTONE PLAZA

Centrally located and highly visible from multiple vantage points, the ramp switch-back wall offers a true blank canvas for donor recognition that can be designed to memorilize the Millstone Plaza.

WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza

DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL (REVISED) | 04.10.2017


LOCATION 2 | PLAN VIEW

LOCATION 2 - GATEWAY THRESHOLD

ASG envisions a bench-height “end cap” to identify the Gateway Threshold area to students and visitors.

WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza

DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017


LOCATION 1 | EXISTING PLAQUE

WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza

DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017


LOCATION 1 | SCHEME A 10’

3.25’

WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza

DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL (REVISED) | 04.10.2017


LOCATION 1 | SCHEME A

WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza

DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL (REVISED) | 04.10.2017


LOCATION 1 | SCHEME A

10’

10”

3.25’

4.25”

2.5”

RETAINING WALL TYPE B

RETAINING WALL TYPE B

LANDING LANDING WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza

DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL (REVISED) | 04.10.2017


LOCATION 1 | SCHEME B 10’

3.65’

WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza

DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL (REVISED) | 04.10.2017


LOCATION 1 | SCHEME B

WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza

DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL (REVISED) | 04.10.2017


LOCATION 1 | SCHEME B

10’

8.5”

3.65’

3.5”

2.125”

RETAINING WALL TYPE B

SOUTHERN EDGE OF MCMILLEN LABORATORY

LANDING

RETAINING WALL TYPE B

GUARD RAIL RETAINING WALL TYPE B

HANDRAIL

WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza

LANDING LANDING

DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL (REVISED) | 04.10.2017


LOCATIONS 1 AND 2 | PRECEDENTS

WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza

DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL (REVISED) | 04.10.2017


BUILDING IDENTIFICATION

3

Overview Letter Locations Letter Details Renderings Sample Review

WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza

DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017


OVERVIEW | LOCATION 1 ASG has identified 2 unique locations for building identification of Bryan Hall. Pin-mounted to the terra cotta facade, Location 1 identifies the main pedestrian entrance to the building on Level 2 within the Gateway Threshold area.

BRYAN

WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza

DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL (REVISED) | 04.10.2017


OVERVIEW | LOCATION 2 ASG has identified 2 unique locations for building identification of Bryan Hall. Pin-mounted to the terra cotta facade, Location 2 identifies the building on Level 3 from the Millstone Plaza area and the campus pathway adjacent to the Olin Library.

BRYAN

WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza

DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL (REVISED) | 04.10.2017


LOCATION 1 | PLAN VIEW STAIR 1 2S1

IT

ELEC

WRITE-UP

WRITE-UP

OFFICE

WRITE-UP

OFFICE

201

202

203

204

205

206

207

PREP ELEVATOR

210D

2E1

PREP

EQUIP

INSTRUMENT

208D

208C

208B

STORAGE 210B

LAB

LAB

210

208

VESTIBULE

WOMEN'S 2W1

JANITOR

200

2J1

LOCATION 1

MEN'S

(Level 2)

2M1

FUTURE 209

WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza

DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017


LOCATION 1 | PLAN VIEW

STAIR 1 3S1

CONFERENCE 303

IT

ELEC

WRITE-UP

301

302

304

WRITE-UP

WRITE-UP

WRITE-UP

WRITE-UP

WRITE-UP

BREAK RM

305

306

307

308

309

310

PREP

ELEVATOR

311C

3E1

FUTURE

FUTURE

312

311

UP

WOMEN'S 3W1

JANITOR 3J1

SUPPORT 312C

MEN'S STORAGE

3M1

312B

LOCATION 2

(Level 3) WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza

DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017


8"

8"

LOCATIONS 1 AND 2 | LETTER DETAILS

BRYAN BRYAN

4'-0"

4'-0"

SIDE VIEW

GRAPHIC LAYOUT - FACADE LETTERING - LOCATION 1 Scale: 1/8"=1"

SIDE VIEW

GRAPHIC LAYOUT - FACADE LETTERING - LOCATION 1 Scale: 1/8"=1"

4" tall aluminum letters (custom fabricated, vertical brush finish) 5/16" wide letter stroke, 1/4" depth, 1/8" dia mounting studs 1/4" space from back of (custom letters tofabricated, face of terra cotta brush finish) 4" tall aluminum letters vertical 5/16" wide letter stroke, 1/4" depth, 1/8" dia mounting studs 1/4" space from back of letters to face of terra cotta

8'-0"

BRYAN BRYAN 1 5/8"

1'-4"

1'-4"

8'-0"

GRAPHIC LAYOUT - FACADE LETTERING - LOCATION 2 Scale: 1/8"=1"

SIDE VIEW

GRAPHIC LAYOUT - FACADE LETTERING - LOCATION 2 Scale: 1/8"=1"

1 5/8"

SIDE VIEW

WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza

9" tall aluminum letters (custom fabricated, vertical brush finish) 3/4" wide letter stroke, 3/8" depth, 1/8" dia mounting studs 5/8" space from back of (custom letters tofabricated, face of terra cotta brush finish) 9" tall aluminum letters vertical 3/4" wide letter stroke, 3/8" depth, 1/8" dia mounting studs 5/8" space from back of letters to face of terra cotta DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL (REVISED) | 04.10.2017


LOCATION 2 | RENDERINGS AND PRECEDENT

WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza

DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL (REVISED) | 04.10.2017


WALL GRAPHICS

4

Overview Graphic Locations Review of Original Scheme Review of Revised Design Scheme Sample Review

WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza

DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017


OVERVIEW | LOCATION 1 ASG has identified 2 unique locations for wall graphics within Bryan Hall. Location 1 highlights the feature staircase that runs from Levels 2 through 5. The staircase has high visibility from the pedestrian bridge approach as well as from the Fosert Park Parkway.

LOCATION 1

WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza

DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017


OVERVIEW | LOCATION 2 ASG has identified 2 unique locations for wall graphics within Bryan Hall. Location 2 highlights the elevator corridor that runs from Levels 1 through 5. The corridor has high visibility on Levels 2 and 3 from the gateway threshold. Additionally, the graphics act as a visual cue for wayfinding within the building on all floors.

LOCATION 2

WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza

DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017


LOCATIONS 1 AND 2 | PLAN VIEW LOCATION 1

Stairwell

STAIR 1

STAIR 1

2S1

3S1

CONFERENCE 303

IT

ELEC

WRITE-UP

WRITE-UP

OFFICE

WRITE-UP

OFFICE

IT

ELEC

WRITE-UP

201

202

203

204

205

206

207

301

302

304

LOCATION 2

WRITE-UP

WRITE-UP

WRITE-UP

WRITE-UP

WRITE-UP

BREAK RM

305

306

307

308

309

310

PREP

Elevator Lobby

210D

ELEVATOR 2E1

PREP

EQUIP

INSTRUMENT

208D

208C

208B

PREP

ELEVATOR

311C

3E1

STORAGE 210B

LAB

LAB

210

208

WOMEN'S

FUTURE

FUTURE

312

311

UP

WOMEN'S 3W1

2W1

VESTIBULE

JANITOR

200

JANITOR

2J1

3J1

SUPPORT 312C

MEN'S

MEN'S 2M1

3M1

STORAGE 312B

FUTURE 209

LEVEL 2

LEVEL 3

STAIR 2

STAIR 1

STAIR 1 LOUNGE

4S1

412

5S2

5S1

CONFERENCE 403

OFFICE

MEETING

OFFICE

IT

ELEC

WRITE-UP

WRITE-UP

WRITE-UP

WRITE-UP

WRITE-UP

413G

413

413A

401

402

404

405

406

407

408

STORAGE

ELEVATOR

SUPPORT

SUPPORT

413E

4E1

411D

411E

DN

LOUNGE 514

STORAGE

OFFICE

OFFICE

OFFICE

413F

413D

413C

413B

WRITE-UP

WRITE-UP

WRITE-UP

WRITE-UP

504

505

507

508

509

WRITE-UP 503

SUPPORT SUPPORT 512C

512D

FUTURE

SUPPORT

510

510B

REF.

OFFICE

502

5E1

409C

UP

ELEC

ELEVATOR

514A

PREP

IT 501

WRITE-UP

CONFERENCE 513

PANTRY 515

STORAGE 400

SUPPORT

SUPPORT

411H

411K

LAB

LAB

LAB

411

410

409

WOMEN'S

GENDER NEUTRAL

4W1

5U1

JANITOR

FUTURE

FUTURE

4J1

512

511

JANITOR 5J1

MEN'S

GENDER NEUTRAL

4M1

LAB STORAGE

5U2

411J

STORAGE

SUPPORT

SUPPORT

411G

410A

512E

STORAGE 511C

SUPPORT 511B

LEVEL 4

WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza

LEVEL 5

DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017


REVIEW OF ORIGINAL SCHEME

WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza

DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017


LOCATION 1 | ORIGINAL SCHEME LOCATION 1 Stairwell

C B A

STAIR 1 2S1

IT

ELEC

WRITE-UP

WRITE-UP

OFFICE

WRITE-UP

OFFICE

201

202

203

204

205

206

207

PREP ELEVATOR

210D

2E1

PREP

EQUIP

INSTRUMENT

208D

208C

208B

STORAGE 210B

LAB

LAB

210

208

VESTIBULE

WOMEN'S 2W1

JANITOR

200

2J1

MEN'S 2M1

FUTURE 209

ELEVATION A

ELEVATION B

WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza

ELEVATION C

KEY PLAN

DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017


LOCATION 2 | ORIGINAL SCHEME LOCATION 2 Elevator Lobby

STAIR 1

Not Pictured

2S1

IT

ELEC

WRITE-UP

WRITE-UP

OFFICE

WRITE-UP

OFFICE

201

202

203

204

205

206

207

A

PREP ELEVATOR

210D

2E1

PREP

EQUIP

INSTRUMENT

208D

208C

208B

STORAGE 210B

Not Pictured

LAB

LAB

210

208

VESTIBULE

WOMEN'S 2W1

JANITOR

200

2J1

MEN'S 2M1

FUTURE 209

ELEVATION A

WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza

KEY PLAN

DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017


REVIEW | ORIGINAL ARTWORK

ORIGINAL

WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza

DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017


REVISED SCHEME - OPTION 1

This pattern varies the molecular abstraction to add more dimensionality and visual interest to patrons in the stairwell as well as pedestrians approaching the building. The color gradient changes as you ascend or descend the building floors. The molecular pattern is carried over to the elevator corridor.

WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza

DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017


12

LOCATION 1 | REVISED SCHEME - OPTION 1 EXISTING ROOF LEVEL 579' - 8"

LOCATION 1 Stairwell

LEVEL 5 568' - 1"

LEVEL 4 556' - 6"

C B A

STAIR 1 2S1

LEVEL 3 544' - 11"

IT

ELEC

WRITE-UP

WRITE-UP

OFFICE

WRITE-UP

OFFICE

201

202

203

204

205

206

207

PREP ELEVATOR

210D

2E1

PREP

EQUIP

INSTRUMENT

208D

208C

208B

STORAGE 210B

LAB

LAB

210

208

VESTIBULE

WOMEN'S 2W1

JANITOR

200

2J1

ELEVATION A

ELEVATION B

WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza

ELEVATION C

STAIR LANDING 534' - 8" LEVEL 2 533' - 4"

MEN'S 2M1

FUTURE 209

KEY PLAN

DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017


LOCATION 2 | REVISED SCHEME - OPTION 1 LOCATION 2 Elevator Lobby

STAIR 1

Not Pictured

2S1

IT

ELEC

WRITE-UP

WRITE-UP

OFFICE

WRITE-UP

OFFICE

201

202

203

204

205

206

207

A

PREP ELEVATOR

210D

2E1

PREP

EQUIP

INSTRUMENT

208D

208C

208B

STORAGE 210B

Not Pictured

LAB

LAB

210

208

VESTIBULE

WOMEN'S 2W1

JANITOR

200

2J1

MEN'S 2M1

FUTURE 209

ELEVATION A

WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza

KEY PLAN

DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017


REVISED SCHEME - OPTION 2

This pattern varies the molecular abstraction to add more dimensionality and visual interest to patrons in the stairwell as well as pedestrians approaching the building. The color gradient changes as you ascend or descend the building floors. The molecular pattern is carried over to the elevator corridor. In this option, a translucent treatment to the graphic gives the molecules dimensionality and a sense of fading into the background.

WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza

DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017


12

LOCATION 1 | REVISED SCHEME - OPTION 2 EXISTING ROOF LEVEL 579' - 8"

LOCATION 1 Stairwell

LEVEL 5 568' - 1"

LEVEL 4 556' - 6"

C B A

STAIR 1 2S1

LEVEL 3 544' - 11"

IT

ELEC

WRITE-UP

WRITE-UP

OFFICE

WRITE-UP

OFFICE

201

202

203

204

205

206

207

PREP ELEVATOR

210D

2E1

PREP

EQUIP

INSTRUMENT

208D

208C

208B

STORAGE 210B

LAB

LAB

210

208

VESTIBULE

WOMEN'S 2W1

JANITOR

200

2J1

ELEVATION A

ELEVATION B

WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza

ELEVATION C

STAIR LANDING 534' - 8" LEVEL 2 533' - 4"

MEN'S 2M1

FUTURE 209

KEY PLAN

DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017


LOCATION 2 | REVISED SCHEME - OPTION 2 LOCATION 2 Elevator Lobby

STAIR 1

Not Pictured

2S1

IT

ELEC

WRITE-UP

WRITE-UP

OFFICE

WRITE-UP

OFFICE

201

202

203

204

205

206

207

A

PREP ELEVATOR

210D

2E1

PREP

EQUIP

INSTRUMENT

208D

208C

208B

STORAGE 210B

Not Pictured

LAB

LAB

210

208

VESTIBULE

WOMEN'S 2W1

JANITOR

200

2J1

MEN'S 2M1

FUTURE 209

ELEVATION A

WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza

KEY PLAN

DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017


ARTWORK COMPARISON

WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza

DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017


REVIEW | ARTWORK COMPARISON

ORIGINAL

WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza

REVISED OPTION 1

REVISED OPTION 2

DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017


BUILDING SIGNAGE

5

Programming Overview Reviewing Programming Sign System Overview Sign Type Details Sign Location Plans Sign Message Schedule Sample Review

WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza

DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017


PROGRAMMING OVERVIEW

1

2

3

4

Contains an visual example of all sign types including:

Contains an visual example of each sign type including:

Contains the following information for each specific sign location:

Contains the following information for each specific sign location:

• Wall-Mounted Faculty Directory

• Sign Type and Description

LOCATION DOT

SHEET

• Wall-Mounted Building Directory

• Typical Elevation View (in scale)

The placement of the sign in relation to the architectural floor

The Sign Location Plan sheet number where a particular sign is

• Wall-Mounted Directional

• General Component Descriptions

plans

located

• Room Identification Sign

• Color Swatches

• Flag-Mounted Identification Sign

LOCATION NUMBER

LEVEL

• Restroom Identification Sign

The unique sign location number that corresponds to the Sign

The building level where a particular sign is located

• Office Identification Sign

Message Schedule

SIGN SYSTEM OVERVIEW

SIGN TYPE DETAILS

SIGN LOCATION PLANS

SIGN MESSAGE SCHEDULES

• Utility Room Identification Signs

LOCATION

• Regulatory Signs

The unique sign location number that corresponds to the Sign

• Stairwell Identification Sign

Location Plans

• Level Identification Sign • Evacuation Plan

SIGN TYPE The manufacturers unique sign type coding number DESCRIPTION The general description of each sign type MESSAGE The unique wording that will appear on the sign at each location NOTES Additional location-specific information CLIENT REVIEW Check boxes for review direction

WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza

DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017


REVIEWING PROGRAMMING STEP 1 - MATCH SHEET AND FLOOR

STEP 2 - CHOOSE A SIGN LOCATION

STEP 3 - LOCATING ON PLAN

STEP 4 - CONFIRM SIGN TYPE

STEP 5 - CONFIRM SIGN MESSAGE

STEP 6 - NOTATE

STEP 7 - COMPLETE AND RETURN

Confirm you are referencing the same

Start with a location number in the Sign

Find the corresponding sign location

Confirm that the sign type listed is the

Review the message shown within this area

Check “APPROVED” if the location, sign

The notated Sign Location Plans and Sign

SHEET and LEVEL on both the Sign Location

Message Schedule (figure 2.1). The first

number on the Sign Location Plan (figure

preferred sign type to use at a particular

(figure 5.1). The copy is shown EXACTLY as

type, and message are correct (figure 6.1).

Message Schedules is the master list of

Plan (figure 1.1) and the Sign Message

numeral of the sign location number

3.1). This is where that sign will be

location (figure 4.1).

it will appear on the sign.

Schedule (figure 1.2). The Sign Message

indicates the floor.

installed.

Check “APPROVED AS NOTED” if there is a

Schedule is sorted by Level then Location Number.

revisions required for each specific sign location.

If you need to make a correction to the sign

Compare this message to the room use

discrepancy with the location, sign type, or

If you need to make a correction to the

type, hand note it on the Sign Message

indicated on the architectural floor plans

message. If an explanation is necessary,

Please make or compile all revisions/notes

placement of the sign, hand note it on the

Schedule (figure 4.2).

and how the room will be utilized by the end

please write additional notes on the Sign

onto one document, scan this document,

user.

Message Schedule (figure 6.2).

and electronically forward to Ayers Saint

plan (figure 3.2).

Gross. If you need to make a correction to the

Check “DELETE” if the sign is not required

message, hand note it on the Sign Message

(figure 6.3).

Schedule (figure 5.2).

SHEET LEVEL LOCATION SIGN TYPE DESCRIPTION 3.1 1 1.01 EVU1-B4 Utility Room Identification Sign

EVU1-B20 Room Identification Sign

COMPACTOR 100

figure 3.2

LAB MECH

LASER

LASER

FUTURE

101

104

105

107

1.04 1.01

ELEVATOR 1E1

1.02

EQUIP ROOM

1

1.02

EVU1-B4

Utility Room Identification Sign

(message panel) BUILDING MECHANICAL

Mounts to brick, aluminum back plate required [ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

3.1

1

1.03

EVU1-B2

Utility Room Identification Sign

(message panel) BRYAN HALL

Mounts to brick, aluminum back plate required [ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

3.1

1

1.04

EVU1-B4

Utility Room Identification Sign

(message panel) LAB MECHANICAL

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

3.1

1

1.05

EVU1-D10 Wall-Mounted Building Directory

1.14

DN

103

1.07

106

1.15

1.13

1.11

1.06 1.05

VESTIBULE

1.12

DN

1.18 1.16

PREP 110

114

figure 4.1

USER MECH

1.20

108

113

3.1

1

1.06

EVU1-G12 Evacuation Map

3.1

1

1.07

EVU1-B4

Utility Room Identification Sign

(message panel) BUILDING MECHANICAL

(map artwork)

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

3.1

1

1.08

EVU1-B2

Utility Room Identification Sign

(message panel) STORAGE

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

3.1

1

1.09

EVU1-B2

Utility Room Identification Sign

(message panel) MDF ROOM

3.1

1

1.10

EVU1-B4

Utility Room Identification Sign

(message panel) LAB MECHANICAL

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

3.1

1

1.11

EVU1-B4

Utility Room Identification Sign

(message panel) EQUIPMENT ROOM

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

3.1

1

1.12

EVU1-B2

Utility Room Identification Sign

(message panel) PREP ROOM

3.1

1

1.13

EVU1-B4

Utility Room Identification Sign

(message panel) LASER ROOMS 104 & 105

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

3.1

1

1.14

EVU1-B4

Utility Room Identification Sign

(message panel) LASER ROOM 104

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

3.1

1

1.15

EVU1-B4

Utility Room Identification Sign

(message panel) LASER ROOM 105

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

1.08 1.09

MDF

USER MECH

LASER

115B

112

111

figure 2.1

1.10

figure 3.1

LAB MECH

USER MECH

115C

108A

figure 1.2

PROJECT NAME

DOCUMENT TITLE / DATE

WASHINGTON UNIVERSITY IN ST. LOUIS

SECONDARY PROGRAMMING

INTERIOR BUILDING SIGNAGE

SUBMITTAL 09.21.2016

SECTION / DESCRIPTION

3

SHEET TITLE

SIGN LOCATION PLAN LEVEL ONE

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

3.1

1

1.16

EVU1-B2

Utility Room Identification Sign

(message panel) FUTURE PREP

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

3.1

1

1.17

EVU1-B4

Utility Room Identification Sign

(message panel) USER MECHANICAL

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

3.1

1

1.18

EVU1-B4

Utility Room Identification Sign

(message panel) EQUIPMENT ROOM

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

3.1

1

1.19

EVU1-B2

Utility Room Identification Sign

(message panel) PREP ROOM

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

3.1

1

1.20

EVU1-B4

Utility Room Identification Sign

(message panel) LASER ROOM 111

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

3.1

1

1.21

EVU1-B4

Utility Room Identification Sign

(message panel) USER MECHANICAL

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

3.1

1

1.22

EVU1-B2

Utility Room Identification Sign

(message panel) FUTURE

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

Artwork provided by owner

TELECOM ROOM

figure 5.2

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

figure 6.2

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

figure 6.3

SHEET NO.

PROJECT NAME

DOCUMENT TITLE / DATE

3.1

WASHINGTON UNIVERSITY IN ST. LOUIS

SECONDARY PROGRAMMING

Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone

SIGN LOCATION PLANS

INTERIOR BUILDING SIGNAGE

figure 6.1

figure 5.1

FUTURE PREP

115

Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone

Max. capacity 12 message panels

1.21

1.19

PREP

BLDG MECH

1.22

1.17

(top panel) LEVEL (bottom panels) Main Lobby (2) Access to McMillen Laboratory (5) Access to McMillen Laboratory (4) Access to Chemistry Main Office (5) Conference Room 513 (5) Conference Room 403 (4) Conference Room 303 (3) Lounge 514 (5) Lounge 412 (4) Offices 413A-413F (4) Offices 205 and 207 (2) (blank)

EQUIP ROOM

102

NOTES CLIENT REVIEW Mounts to brick, aluminum back plate required [ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

3.1

figure 4.2

1.03

MESSAGE (message panel) LOADING DOCK

SUBMITTAL 09.21.2016

SECTION / DESCRIPTION

4

SIGN MESSAGE SCHEDULES

SHEET TITLE

SIGN MESSAGE SCHEDULE

SHEET NO.

4.1

LEVEL ONE

figure 1.1

WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza

DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017


SIGN SYSTEM OVERVIEW DEPARTMENT OF CHEMISTRY

LASER ROOM

207 WOMEN

105 Room Identification Sign

Flag-Mounted Identification Sign

Paula Ryan, PhD

Restroom Identification Sign

Office Identification Sign

FACULTY NAME

LOCATION

FACULTY NAME

LOCATION

FACULTY NAME

LOCATION

J. Ackerman

M-507

M. Gross

C-101

B. Sadtler

M-515

A. Barnes

M-405

S. Hayes

M-407

D. Sarantites

R-158

J. Barnes

LS-401D

D. Holten

L-336

J. Schaefer

L-340

V. Birman

M-409

R. Loomis

M-411

M. Singh

M-421

R. Lovett

R-258

L. Sobotka

R-259 L-450

R. Blankenship

STORAGE Utility Room Identification Sign

FIRE EXIT

MECHANICAL ROOM

Paula Ryan, PhD Utility Room Identification Sign

Regulatory Sign

LS-401B

J. Bleeke

M-501

J. Luo

L-448

G. Szteinberg

W. Buhro

M-521

R. Mabbs

M-513

J. Taylor

LS-401A

J. D’Arcy

M-509

L. Mirica

M-425

T. Wencewicz

LS-401C

M. Daschbach

L-452

K. Moeller

L-440

M. De La Cruz

LS-101D

G. Patti

M-505

R. Dunn

M-519

J. Ponder

L-453

P. Gaspar

L-536

A. Redden

LS-101F

C - Cyclotron | L - Louderman | LS - Lab Sciences | M - McMillen Lab | R - Radiochemistry

Wall-Mounted Faculty Directory

Insert Sign

LEVEL

STAIR 1 FLOOR

3

LEVEL McMillen Laboratory Offices Lounge

SERVES 2-5 No Roof Access Down to Second Floor for Exit Discharge STAIR 1 Stairwell Identification Sign

FLOOR 3 Level Identification Sign

(map

ar

k) twor

4

Access to McMillen Laboratory

5

Access to Chemistry Main Office

5

Conference Room 513

5

Lounge 514

5

Access to McMillen Laboratory

4

Conference Room 403

4

Faculty Offices 413A-413G

4

Conference Room 303

3

Main Lobby

2

Restrooms Elevator

STAIR 1 Evacuation Plan

WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza

Wall-Mounted Directional

Wall-Mounted Building Directory

DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017


SIGN TYPE DETAILS

WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza

DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017


EVU1-B2 | UTILITY ROOM IDENTIFICATION SIGN

STORAGE Paula Ryan, PhD Shown with additional Insert Sign

MESSAGE PANEL Color: A01 - White

STORAGE

ADA COPY AND BRAILLE Typeface: Source Sans Regular Color: A14 - Medium Gray

Utility Room Identification Sign

WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza

DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017


EVU1-B4 | UTILITY ROOM IDENTIFICATION SIGN

EQUIPMENT ROOM MESSAGE PANEL Color: A01 - White

Paula Ryan, PhD

MECHANICAL ROOM

Shown with additional Insert Sign

Sign Type: EVU1-B4 Scale: 3/4” = 1”

WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza

ADA COPY AND BRAILLE Typeface: Source Sans Regular Color: A14 - Medium Gray

Utility Room Identification Sign

DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017


EVU1-B20 | ROOM IDENTIFICATION SIGN

STUDENT OFFICE

TOP PANEL Color: A01 - White

LASER ROOM

105 Paula Ryan, PhD Shown with additional Insert Sign

PRINTED COPY Typeface: Source Sans Regular Color: A14 - Medium Gray

BOTTOM PANEL Color: A14 - Medium Gray

105 Sign Type: EVU1-B20 Scale: 3/4” = 1”

WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza

ADA NUMBER AND BRAILLE Typeface: Source Sans Regular Color: A01 - White

Room Identification Sign

DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017


EVU1-R.P1 | FLAG-MOUNTED IDENTIFICATION SIGN

MESSAGE PANELS (2) Color: A01 - White

Wall Surface

PRINTED SYMBOLS Color: A14 - Medium Gray

MOUNTING BRACKET Color: A14 - Medium Gray

Sign Type: EVU1-R.P1 Scale: 3/4” = 1”

WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza

Flag-Mounted Identification Sign

DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017


EVU1-R1 | RESTROM IDENTIFICATION SIGN

TOP PANEL Color: A01 - White

PRINTED SYMBOLS Color: A14 - Medium Gray

WOMEN Sign Type: EVU1-R1 Scale: 3/4” = 1”

WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza

BOTTOM PANEL Color: A14 - Medium Gray ADA COPY AND BRAILLE Typeface: Source Sans Regular Color: A01 - White

Restroom Identification Sign

DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017


EVU1-A7 | OFFICE IDENTIFICATION SIGN

TOP PANEL Color: A14 - Medium Gray

207

ADA NUMBER AND BRAILLE Typeface: Source Sans Regular Color: A01 - White

BOTTOM PANEL (paper insert holder) Color: A01 - White

Paula Ryan, PhD Sign Type: EVU1-A7 Scale: 3/4” = 1”

WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza

PRINTED COPY Typeface: Source Sans Regular Color: A14 - Medium Gray

Office Identification Sign

DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017


EVU1-D8 | WALL-MOUNTED DIRECTIONAL

LEVEL

4

McMillen Laboratory

TOP PANEL Color: A14 - Medium Gray PRINTED COPY AND NUMBER Typeface: Source Sans Regular Color: A01 - White

MESSAGE PANEL (10) Color: A01 - White

Offices

PRINTED COPY AND SYMBOLS Typeface: Source Sans Regular Color: A14 - Medium Gray

Lounge Restrooms Elevator

Sign Type: EVU1-D8 Scale: 3/8” = 1”

WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza

Wall-Mounted Directional

DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017


EVU1-D10 | WALL-MOUNTED BUILDING DIRECTORY

LEVEL Access to McMillen Laboratory

5

Access to Chemistry Main Office

5

Conference Room 513

5

Lounge 514

5

Access to McMillen Laboratory

4

Conference Room 403

4

Faculty Offices 413A-413G

4

Conference Room 303

3

Main Lobby

2

Sign Type: EVU1-D10 Scale: 1/4” = 1”

WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza

TOP PANEL Color: A14 - Medium Gray PRINTED COPY Typeface: Source Sans Regular Color: A01 - White MESSAGE PANELS (12) Color: A01 - White PRINTED COPY AND NUMBERS Typeface: Source Sans Regular Color: A14 - Medium Gray

Wall-Mounted Building Directory

DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017


EVU1-D10 (3) | WALL-MOUNTED FACULTY DIRECTORY

TOP PANELS (1 EACH, 3 TOTAL) Color: A14 - Medium Gray

DEPARTMENT OF CHEMISTRY FACULTY NAME

LOCATION

FACULTY NAME

LOCATION

FACULTY NAME

LOCATION

J. Ackerman

M-507

M. Gross

C-101

B. Sadtler

M-515

A. Barnes

M-405

S. Hayes

M-407

D. Sarantites

R-158

J. Barnes

LS-401D

D. Holten

L-336

J. Schaefer

L-340

MESSAGE PANELS (12 EACH, 36 TOTAL) Color: A01 - White

V. Birman

M-409

R. Loomis

M-411

M. Singh

M-421

R. Lovett

R-258

L. Sobotka

R-259

PRINTED COPY AND NUMBERS Typeface: Source Sans Regular Color: A14 - Medium Gray

L-450

R. Blankenship

LS-401B

J. Bleeke

M-501

J. Luo

L-448

G. Szteinberg

W. Buhro

M-521

R. Mabbs

M-513

J. Taylor

LS-401A

J. D’Arcy

M-509

L. Mirica

M-425

T. Wencewicz

LS-401C

M. Daschbach

L-452

K. Moeller

L-440

M. De La Cruz

LS-101D

G. Patti

M-505

R. Dunn

M-519

J. Ponder

L-453

P. Gaspar

L-536

A. Redden

LS-101F

Sign Type: EVU1-D10 Scale: 3/16” = 1”

C - Cyclotron | L - Louderman | LS - Lab Sciences | M - McMillen Lab | R - Radiochemistry

Wall-Mounted Faculty Directory

PRINTED COPY Typeface: Source Sans Regular Color: A01 - White

PRINTED COPY Typeface: Source Sans Bold Color: A14 - Medium Gray

UNIQUE CONDITION - LOCATION 2.08 REQUIRES 3 SIGNS MOUNTED ADJACENT TO ONE ANOTHER w/ 0.5” GAP AS SHOWN

WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza

DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017


EVU1-G2 | REGULATORY SIGN

INSERT PANEL (paper insert holder) Color: A01 - White

Paula Ryan, PhD Sign Type: N/A Scale: 3/4” = 1”

WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza

PRINTED COPY Typeface: Source Sans Regular Color: A14 - Medium Gray

Insert Sign

DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017


EVU1-F5 | REGULATORY SIGN

FIRE EXIT Sign Type: EVU1-F5 Scale: 3/4” = 1”

WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza

MESSAGE PANEL Color: A01 - White

PRINTED COPY Typeface: Source Sans Regular Color: A51 - Deep Red

Regulatory Sign

DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017


EVU1-F6 | STAIRWELL IDENTIFICATION SIGN

TOP PANEL Color: A01 - White

PRINTED SYMBOL Color: A14 - Medium Gray

STAIR 1 Sign Type: EVU1-F6 Scale: 3/4” = 1”

WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza

BOTTOM PANEL Color: A14 - Medium Gray ADA COPY, NUMBER, AND BRAILLE Typeface: Source Sans Regular Color: A01 - White

Stairwell Identification Sign

DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017


EVU1-F10 | LEVEL IDENTIFICATION SIGN

STAIR 1 FLOOR

3

TOP PANEL Color: A01 - White

PRINTED COPY, NUMBERS, AND SYMBOL Typeface: Source Sans Regular Color: A14 - Medium Gray

SERVES 2-5 No Roof Access Down to Second Floor for Exit Discharge FLOOR 3 Sign Type: EVU1-F10 Scale: 3/8” = 1” WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza

STAIR 1

BOTTOM PANEL Color: A14 - Medium Gray ADA COPY, NUMBER, AND BRAILLE Typeface: Source Sans Regular Color: A01 - White

Level Identification Sign

DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017


EVU1-G12 | EVACUATION PLAN

Evacuation Plan PAPER INSERT HOLDER Color: A01 - White

(m

Sign Type: EVU1-G12 Scale: 3/8” = 1”

WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza

ap a

) k r o rtw

PRINTED MAP (colors and artwork by owner)

Evacuation Plan

DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017


SIGN LOCATION PLANS

WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza

DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017


SIGN LOCATION PLAN | LEVEL ONE

COMPACTOR 100

LAB MECH

LASER

LASER

FUTURE

101

104

105

107

1.03 1.04 1.01

ELEVATOR 1E1

1.02

EQUIP ROOM

1.14

DN

VESTIBULE 103

1.07

106

1.15

1.13

1.11

1.06 1.05

EQUIP ROOM

102

1.12

DN

1.18 1.16

1.21

1.19

PREP

PREP

110

114

BLDG MECH

1.23

1.17

USER MECH

1.20

108 1.22

FUTURE PREP

115

113

1.08 1.09

MDF

USER MECH

LASER

115B

112

111

1.10

WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza

LAB MECH

USER MECH

115C

108A

DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017


SIGN LOCATION PLAN | LEVEL TWO

2.13

STAIR 1 2S1

2.12

2.11

2.14

2.15

2.16

2.17

2.18

2.20

2.22

2.23

IT

ELEC

WRITE-UP

WRITE-UP

OFFICE

WRITE-UP

OFFICE

201

202

203

204

205

206

207

2.21

PREP

2.07

210D

ELEVATOR

2.19

2.06

2E1

PREP

EQUIP

INSTRUMENT

208D

208C

208B

2.34

STORAGE

2.10

2.09 2.08 2.03

2.05

210B

2.29

2.04

2.28

2.24

2.27

2.25 2.26

2.02

2.01

LAB

LAB

210

208

WOMEN'S 2W1

2.30

VESTIBULE

JANITOR 2.31 2J1

200

2.32 MEN'S

2.33

2M1

FUTURE 209

WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza

DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017


SIGN LOCATION PLAN | LEVEL THREE

STAIR 1 3S1

CONFERENCE 303

3.09 3.14 3.08

3.10

3.11

3.12

IT

ELEC

WRITE-UP

301

302

304

WRITE-UP

WRITE-UP

WRITE-UP

WRITE-UP

WRITE-UP

BREAK RM

305

306

307

308

309

310

PREP

ELEVATOR

311C

3E1

3.01

FUTURE

FUTURE

312

311

3.29 3.21

3.02 3.22 3.23

3.03 UP

3.07

3.04 WOMEN'S 3W1

3.25 3.26

JANITOR 3J1

SUPPORT 312C

3.27 MEN'S STORAGE 312B

WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza

3.28

3M1

DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017


SIGN LOCATION PLAN | LEVEL FOUR

STAIR 1 LOUNGE

4S1

412

4.46

CONFERENCE

4.27

4.26

4.09

4.01

403 4.30

4.28

4.29

4.31

4.33

4.34

4.35

4.37

OFFICE

MEETING

OFFICE

IT

ELEC

WRITE-UP

WRITE-UP

WRITE-UP

WRITE-UP

413G

413

413A

401

402

404

405

406

407

4.08 4.07

4.32

WRITE-UP

4.36

408

4.02 4.06

STORAGE 4.03 4.05 413E 4.04

ELEVATOR

SUPPORT

SUPPORT

4E1

411D

411E

PREP 409C

UP

4.47

4.18 OFFICE

OFFICE

OFFICE

OFFICE

413F

413D

413C

413B

4.10

4.13

4.11

4.14

4.16

4.38

4.17 4.39

4.12 4.15

4.40

STORAGE 400

SUPPORT

SUPPORT

411H

411K

LAB

LAB

LAB

411

410

409

WOMEN'S 4W1

4.42 JANITOR 4.43 4J1

4.44 MEN'S

4.25

LAB STORAGE 411J

4.22

4.19

4.21

4.45

4M1

4.23 4.24

SUPPORT

SUPPORT

411G

410A

4.20

WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza

DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017


SIGN LOCATION PLAN | LEVEL FIVE

STAIR 2

STAIR 1

5.19

5S1

5.20

5.22

5.23

5.24

5S2

5.13

5.12 5.37

DN

5.14

LOUNGE

5.01

514

STORAGE

5.15

WRITE-UP

WRITE-UP

WRITE-UP

WRITE-UP

504

505

507

508

509

IT

ELEC

501

502

5.18

WRITE-UP 503

5.17

SUPPORT SUPPORT

5E1

512C

5.03

5.25 5.26

5.21

5.16

ELEVATOR

514A

5.02

WRITE-UP

512D

FUTURE

SUPPORT

510

510B

REF.

5.38

CONFERENCE 513

5.27 PANTRY 5.05

5.04

5.06 5.28

515

5.11

5.29

5.07

GENDER NEUTRAL 5U1

FUTURE

FUTURE

512

511

5.31 5.32 JANITOR 5J1

5.34 STORAGE 512E

5.33 GENDER NEUTRAL 5U2

STORAGE 511C

SUPPORT 511B

WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza

DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017


SIGN LOCATION PLAN | PENTHOUSE

6.08 6.07 STAIR 2 6S2

6.06

ELEV MECH 600B

6.01 ELEVATOR

6.05

6.02

6E1

MECHANICAL 600

6.03

6.04

WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza

DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017


SIGN MESSAGE SCHEDULE

WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza

DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017


SIGN MESSAGE SCHEDULE | LEVEL ONE SHEET LEVEL LOCATION SIGN TYPE DESCRIPTION 3.1 1 1.01 EVU1-­‐B4 Utility R oom Identification S ign

3.1

1

1.13

EVU1-­‐B4

Utility R oom Identification S ign

3.1

1

1.13

N/A

Insert S ign

3.1

1

1.14

EVU1-­‐B4

Utility R oom Identification S ign

3.1

1

1.14

N/A

Insert S ign

3.1

1

1.15

EVU1-­‐B4

Utility R oom Identification S ign

3.1

1

1.15

N/A

Insert S ign

3.1

1

1.16

EVU1-­‐B2

3.1

1

1.17

3.1

1

3.1

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

MESSAGE (message panel) LOADING DOCK

NOTES CLIENT REVIEW Mounts to brick, aluminum back plate required [ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

3.1

1

1.02

EVU1-­‐B4

Utility R oom Identification S ign

(message panel) BUILDING MECHANICAL

Mounts to brick, aluminum back plate required [ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

3.1

1

1.03

EVU1-­‐B2

Utility R oom Identification S ign

(message panel) BRYAN HALL

Mounts to brick, aluminum back plate required [ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

3.1

1

1.04

EVU1-­‐B4

Utility R oom Identification S ign

(message panel) LAB MECHANICAL

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

3.1

1

1.04

N/A

Insert S ign

(insert panel) Professor Dewey Holton

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

3.1

1

1.05

EVU1-­‐D10 Wall-­‐Mounted B uilding Directory

(top panel) LEVEL

Max. capacity 12 m essage panels

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

(bottom panels) Access to McMillen Laboratory ( 5) Access to Chemistry Main Office ( 5) Conference R oom 513 (5) Lounge 514 ( 5) (blank) Access to McMillen Laboratory ( 4) Conference R oom 403 (4) Faculty Offices 413A-­‐413F (4) (blank) Conference R oom 303 (3) (blank) Main Lobby ( 2)

(map artwork)

Artwork provided by owner

(message panel) LASER R OOMS 104 & 105

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

(insert panel) Professor Dewey Holton

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

(message panel) LASER R OOM 104

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

(insert panel) Professor Dewey Holton

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

(message panel) LASER R OOM 105

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

(insert panel) Professor Dewey Holton

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

Utility R oom Identification S ign

(message panel) 113

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

EVU1-­‐B4

Utility R oom Identification S ign

(message panel) USER MECHANICAL

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

1.17

N/A

Insert S ign

(insert panel) Professor R ichard Loomis

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

1

1.18

EVU1-­‐B4

Utility R oom Identification S ign

(message panel) EQUIPMENT ROOM

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

3.1

1

1.18

N/A

Insert S ign

(insert panel) Professor Dewey Holton

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

3.1

1

1.06

EVU1-­‐G12 Evacuation Map

3.1

1

1.07

EVU1-­‐B4

Utility R oom Identification S ign

(message panel) BUILDING MECHANICAL

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

3.1

1

1.19

EVU1-­‐B4

Utility R oom Identification S ign

(message panel) LAB 111 PREP R OOM

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

3.1

1

1.08

EVU1-­‐B2

Utility R oom Identification S ign

(message panel) STORAGE

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

3.1

1

1.20

EVU1-­‐B4

Utility R oom Identification S ign

(message panel) LASER R OOM 111

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

3.1

1

1.09

EVU1-­‐B2

Utility R oom Identification S ign

(message panel) MDF R OOM

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

3.1

1

1.20

N/A

Insert S ign

(insert panel) Professor R ichard Loomis

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

3.1

1

1.10

EVU1-­‐B4

Utility R oom Identification S ign

(message panel) LAB MECHANICAL

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

3.1

1

1.21

EVU1-­‐B4

Utility R oom Identification S ign

(message panel) USER MECHANICAL

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

3.1

1

1.10

N/A

Insert S ign

(insert panel) Professor R ichard Loomis

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

3.1

1

1.21

N/A

Insert S ign

(insert panel) Professor R ichard Loomis

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

3.1

1

1.11

EVU1-­‐B4

Utility R oom Identification S ign

(message panel) EQUIPMENT ROOM

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

3.1

1

1.22

EVU1-­‐B4

Utility R oom Identification S ign

(message panel) USER MECHANICAL

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

3.1

1

1.11

N/A

Insert S ign

(insert panel) Professor Dewey Holton

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

3.1

1

1.23

EVU1-­‐B2

Utility R oom Identification S ign

(message panel) 107

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

3.1

1

1.12

EVU1-­‐B4

Utility R oom Identification S ign

(message panel) LABS 104 & 105 PREP R OOM

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza

DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017


SIGN MESSAGE SCHEDULE | LEVEL TWO SHEET LEVEL LOCATION SIGN TYPE DESCRIPTION MESSAGE 3.2 2 2.01 EVU1-­‐D8 Wall-­‐Mounted B uilding Directional

(top panel) LEVEL 2

NOTES Max. capacity 10 m essage panels

CLIENT REVIEW [ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

(bottom panels) (blank) > Offices 205 and 207 > R estrooms ( restroom symbols) (blank) (blank) (blank) (blank) (blank) (blank) (blank) 3.2

2

2.02

EVU1-­‐B2

Utility R oom Identification S ign

3.2

2

2.03

EVU1-­‐B20 Room Identification S ign

3.2

2

2.12

EVU1-­‐F10 Level Identification S ign

2

2.03

N/A

Insert S ign

3.2

2

2.04

EVU1-­‐B4

3.2

2

2.05

3.2

2

3.2

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

(bottom panel) FLOOR 2 S TAIR 1

(message panel) 209

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

(top panel) LAB

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

3.2

2

2.13

EVU1-­‐F5

Regulatory S ign

3.2

2

2.14

EVU1-­‐D8

Wall-­‐Mounted B uilding Directional

(message panel) FIRE EXIT (top panel) LEVEL 2

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE Max. capacity 10 m essage panels

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

(bottom panels) (blank) < Offices 205 and 207 < R estrooms (restroom symbols) (blank) ^ Main Lobby ^ Elevator ( elevator symbol) (blank) (blank) (blank) (blank)

(bottom panel) 210 3.2

(top panel) STAIR 1 FLOOR 2 SERVES 2-­‐5 No R oof Access Exit Discharge This F loor

(insert panel) Professor R ichard Loomis

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

Utility R oom Identification S ign

(message panel) LAB 210

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

3.2

2

2.15

EVU1-­‐B2

Utility R oom Identification S ign

(message panel) IT CLOSET

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

EVU1-­‐B2

Utility R oom Identification S ign

(message panel) STORAGE

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

3.2

2

2.16

EVU1-­‐B4

Utility R oom Identification S ign

(message panel) ELECTRICAL CLOSET

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

2.06

EVU1-­‐B4

Utility R oom Identification S ign

(message panel) LAB 210 PREP R OOM

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

3.2

2

2.17

EVU1-­‐B20 Room Identification S ign

2

2.07

EVU1-­‐B4

Utility R oom Identification S ign

(message panel) LAB 210

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

3.2

2

2.08

EVU1-­‐D10 Wall-­‐Mounted F aculty Directory (3 EACH)

(Ref. S ign Type Details f or Layout)

Max. capacity 36 m essage panels

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

3.2

2

2.17

N/A

3.2

2

2.09

EVU1-­‐D10 Wall-­‐Mounted B uilding Directory

(top panel) LEVEL

Max. capacity 12 m essage panels

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

3.2

2

2.18

EVU1-­‐B20 Room Identification S ign

(bottom panels) Access to McMillen Laboratory ( 5) Access to Chemistry Main Office ( 5) Conference R oom 513 ( 5) Lounge 514 ( 5) (blank) Access to McMillen Laboratory ( 4) Conference R oom 403 ( 4) Faculty Offices 413A-­‐413F ( 4) (blank) Conference R oom 303 ( 3) (blank) Main Lobby ( 2) 3.2

2

2.10

EVU1-­‐G12 Evacuation Map

(map artwork)

3.2

2

2.11

EVU1-­‐F6

(top panel) (stair symbol)

Stairwell Identification S ign

(top panel) STUDENT OFFICE

Mounts to glass, vinyl back plate required

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

(bottom panel) 203 Insert S ign

(insert panel) Professor R ichard Loomis

(top panel) STUDENT OFFICE

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE Mounts to glass, vinyl back plate required

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

(bottom panel) 204 3.2

2

2.18

N/A

Insert S ign

3.2

2

2.19

EVU1-­‐B20 Room Identification S ign

(insert panel) Professor R ichard Loomis

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

(top panel) LAB

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

(bottom panel) 210 Artwork provided by owner

(bottom panel) STAIR 1

WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

3.2

2

2.19

N/A

Insert S ign

(insert panel) Professor R ichard Loomis

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

3.2

2

2.20

EVU1-­‐A7

Office Identification S ign

(top panel) 205

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE Occupant names provided by owner Mounts to glass, vinyl back plate required

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

(bottom panel) Professor Dewey Holton

DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017


SIGN MESSAGE SCHEDULE | LEVEL TWO 3.2

2

2.21

EVU1-­‐B20 Room Identification S ign

(top panel) LAB

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

(bottom panel) 208 3.2

3.2

2

2

2.21

2.22

N/A

Insert S ign

EVU1-­‐B20 Room Identification S ign

(insert panel) Professor Dewey Holton

(top panel) STUDENT OFFICE

2

2.22

N/A

Insert S ign

3.2

2

2.23

EVU1-­‐A7

Office Identification S ign

Mounts to glass, vinyl back plate required

(insert panel) Professor Dewey Holton

(top panel) 207

2

2.31

EVU1-­‐B4

Utility R oom Identification S ign

3.2

2

2.32

EVU1-­‐R1

Restroom Identification S ign

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE [ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

(bottom panel) 206 3.2

3.2

(message panel) JANITOR CLOSET

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

(top panel) (male and accessible symbols)

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

(bottom panel) MEN 3.2

2

2.33

EVU1-­‐B2

Utility R oom Identification S ign

(message panel) 209

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

3.2

2

2.34

EVU1-­‐B2

Utility R oom Identification S ign

(message panel) JOLLEY HALL

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE Occupant names provided by owner Mounts to glass, vinyl back plate required

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

Max. capacity 10 m essage panels

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

(bottom panel) Dr. Christone Kirmaier 3.2

2

2.24

EVU1-­‐D8

Wall-­‐Mounted B uilding Directional

(top panel) LEVEL 2 (bottom panels) (blank) > Main Lobby > Offices 205 and 207 > Elevator (elevator symbol) (blank) < R estrooms (restroom symbols) (blank) (blank) (blank) (blank)

3.2

2

2.25

EVU1-­‐R.P1 Flag-­‐Mounted Identification S ign

(sign panel -­‐ side a) (restroom symbols)

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

(sign panel -­‐ side b) (restroom symbols) 3.2

2

2.26

EVU1-­‐B20 Room Identification S ign

(top panel) LAB

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

(bottom panel) 208 3.2

2

2.26

N/A

Insert S ign

(insert panel) Professor Dewey Holton

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

3.2

2

2.27

EVU1-­‐B4

Utility R oom Identification S ign

(message panel) LAB 208 INSTRUMENT R OOM

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

3.2

2

2.28

EVU1-­‐B4

Utility R oom Identification S ign

(message panel) LAB 208 EQUIPMENT R OOM

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

3.2

2

2.29

EVU1-­‐B4

Utility R oom Identification S ign

(message panel) LAB 208 PREP R OOM

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

3.2

2

2.30

EVU1-­‐R1

Restroom Identification S ign

(top panel) (female and accessible symbols)

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

(bottom panel) WOMEN

WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza

DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017


SIGN MESSAGE SCHEDULE | LEVEL THREE SHEET LEVEL LOCATION SIGN TYPE DESCRIPTION 3.3 3 3.01 EVU1-­‐G12 Evacuation Map

3.3

3

3.02

EVU1-­‐D10 Wall-­‐Mounted B uilding Directory

MESSAGE (map artwork)

(top panel) LEVEL

NOTES Artwork provided by owner

Max. capacity 12 m essage panels

CLIENT REVIEW [ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

3.3

3

3.03

EVU1-­‐B2

Utility R oom Identification S ign

(message panel) 312

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

3.3

3

3.04

EVU1-­‐B2

Utility R oom Identification S ign

(message panel) 312C

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

3.3

3

3.07

EVU1-­‐D8

Wall-­‐Mounted B uilding Directional

Max. capacity 10 m essage panels

3

3.10

EVU1-­‐D8

Wall-­‐Mounted B uilding Directional

3

3.08

EVU1-­‐F6

Stairwell Identification S ign

(top panel) (stair symbol)

3

3.09

EVU1-­‐F10 Level Identification S ign

(top panel) STAIR 1 FLOOR 3 SERVES 2-­‐5 No R oof Access (down arrow) Down to S econd F loor for Exit Discharge (bottom panel) FLOOR 3 S TAIR 1

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

3

3.11

EVU1-­‐B2

Utility R oom Identification S ign

(message panel) IT CLOSET

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

3.3

3

3.12

EVU1-­‐B4

Utility R oom Identification S ign

(message panel) ELECTRICAL CLOSET

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

3.3

3

3.14

EVU1-­‐B20 Room Identification S ign

(top panel) CONFERENCE ROOM

Mounts to glass, vinyl back plate required

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

Max. capacity 10 m essage panels

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

(bottom panel) 303

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

3.3

3

3.21

EVU1-­‐D8

Wall-­‐Mounted B uilding Directional

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

3.3

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

3.3

3

3.23

EVU1-­‐B2

Utility R oom Identification S ign

3.3

3

3.25

EVU1-­‐R1

Restroom Identification S ign

(top panel) LEVEL 3 (bottom panels) (blank) > Conference R oom 303 > Elevator ( elevator symbol) (blank) < R estrooms ( restroom symbols) (blank) (blank) (blank) (blank) (blank)

2

3.22

EVU1-­‐R.P1 Flag-­‐Mounted Identification S ign

(sign panel -­‐ side a) (restroom symbols)

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

(sign panel -­‐ side b) (restroom symbols)

(bottom panel) STAIR 1 3.3

Max. capacity 10 m essage panels

3.3

(bottom panels) (blank) > Conference R oom 303 > R estrooms (restroom symbols) (blank) (blank) (blank) (blank) (blank) (blank) (blank) 3.3

(top panel) LEVEL 3 (bottom panels) (blank) < Conference R oom 303 < R estrooms ( restroom symbols) (blank) ^ Elevator ( elevator symbol) (blank) (blank) (blank) (blank) (blank)

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

(bottom panels) Access to McMillen Laboratory ( 5) Access to Chemistry Main Office ( 5) Conference R oom 513 (5) Lounge 514 ( 5) (blank) Access to McMillen Laboratory ( 4) Conference R oom 403 (4) Faculty Offices 413A-­‐413F (4) (blank) Conference R oom 303 (3) (blank) Main Lobby ( 2)

(top panel) LEVEL 3

3.3

(message panel) 311

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

(top panel) (female and accessible symbols)

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

(bottom panel) WOMEN 3.3

3

3.26

EVU1-­‐B4

Utility R oom Identification S ign

3.3

3

3.27

EVU1-­‐R1

Restroom Identification S ign

(message panel) JANITOR CLOSET

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

(top panel) (male and accessible symbols)

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

(bottom panel) MEN 3.3

WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza

3

3.28

EVU1-­‐B2

Utility R oom Identification S ign

(message panel) 311

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017


SIGN MESSAGE SCHEDULE | LEVEL THREE 3.3

3

3.29

EVU1-­‐B2

Utility R oom Identification S ign

(message panel) JOLLEY HALL

WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017


SIGN MESSAGE SCHEDULE | LEVEL FOUR SHEET LEVEL LOCATION SIGN TYPE DESCRIPTION 3.4 4 4.01 EVU1-­‐B20 Room Identification S ign

MESSAGE (top panel) FACULTY OFFICE SUITE 413A-­‐G

NOTES Mounts to glass, vinyl back plate required

CLIENT REVIEW [ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

3.4

4

4.11

N/A

Insert S ign

3.4

4

4.12

EVU1-­‐B2

Utility R oom Identification S ign

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

3.4

4

4.12

N/A

Insert S ign

3.4

4

4.13

EVU1-­‐G12 Evacuation Map

3.4

4

4.14

EVU1-­‐D10 Wall-­‐Mounted B uilding Directory

(bottom panel) 413 3.4

4

4.02

EVU1-­‐A7

Office Identification S ign

(top panel) 413A

Occupant names provided by owner Mounts to glass, vinyl back plate required

(bottom panel) (occupant's name) 3.4

3.4

4

4

4.03

4.04

EVU1-­‐B2

EVU1-­‐A7

Utility R oom Identification S ign

Office Identification S ign

(message panel) STORAGE

(top panel) 413B

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE Occupant names provided by owner Mounts to glass, vinyl back plate required

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

4

4.05

EVU1-­‐A7

Office Identification S ign

(top panel) 413C

Occupant names provided by owner Mounts to glass, vinyl back plate required

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

Occupant names provided by owner Mounts to glass, vinyl back plate required

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

(bottom panel) (occupant's name) 3.4

4

4.06

EVU1-­‐A7

Office Identification S ign

(top panel) 413D (bottom panel) (occupant's name)

3.4

4

4.07

EVU1-­‐A7

Office Identification S ign

(top panel) 413F

Occupant names provided by owner Mounts to glass, vinyl back plate required

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

(bottom panel) (occupant's name) 3.4

4

4.08

EVU1-­‐A7

Office Identification S ign

(top panel) 413G

Occupant names provided by owner Mounts to glass, vinyl back plate required

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

Max. capacity 10 m essage panels

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

(bottom panel) (occupant's name) 3.4

4

4.09

EVU1-­‐D8

Wall-­‐Mounted B uilding Directional

(top panel) LEVEL 4 (bottom panels) (blank) > Access to McMillen Laboratory > Lounge 412 > Offices 413A -­‐ 413F (blank) < Conference R oom 403 < R estrooms (restroom symbols) (blank) ^ Elevator ( elevator symbol) (blank)

3.4

4

4.10

EVU1-­‐D8

Wall-­‐Mounted B uilding Directional

(top panel) LEVEL 4

Max. capacity 10 m essage panels

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

(bottom panels) (blank) > Access to McMillen Laboratory > Conference R oom 303 > Lounge 412 > Offices 413A -­‐ 413F > R estrooms (restroom symbols) (blank) (blank) (blank) (blank) 3.4

4

4.11

EVU1-­‐B2

Utility R oom Identification S ign

(message panel) STORAGE

WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

(message panel) STORAGE

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

(insert panel) Professor G ary Patti

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

(map artwork)

(top panel) LEVEL

Artwork provided by owner

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

Max. capacity 12 m essage panels

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

(bottom panels) Access to McMillen Laboratory ( 5) Access to Chemistry Main Office ( 5) Conference R oom 513 (5) Lounge 514 ( 5) (blank) Access to McMillen Laboratory ( 4) Conference R oom 403 (4) Faculty Offices 413A-­‐413F ( 4) (blank) Conference R oom 303 (3) (blank) Main Lobby ( 2)

(bottom panel) (occupant's name) 3.4

(insert panel) Professor G ary Patti

3.4

4

4.15

EVU1-­‐B20 Room Identification S ign

(top panel) LABS

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

(bottom panel) 410 AND 411 3.4

4

4.15

N/A

Insert S ign

(insert panel) Professor G ary Patti

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

3.4

4

4.16

EVU1-­‐B4

Utility R oom Identification S ign

(message panel) LAB 411 SUPPORT R OOM

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

3.4

4

4.17

EVU1-­‐B4

Utility R oom Identification S ign

(message panel) LAB 410 SUPPORT R OOM

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

3.4

4

4.18

EVU1-­‐B4

Utility R oom Identification S ign

(message panel) LAB 410

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

3.4

4

4.19

EVU1-­‐B4

Utility R oom Identification S ign

(message panel) LAB STORAGE

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

3.4

4

4.20

EVU1-­‐B4

Utility R oom Identification S ign

(message panel) TISSUE CULTURE LAB S UPPORT

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

3.4

4

4.21

EVU1-­‐B4

Utility R oom Identification S ign

(message panel) TISSUE CULTURE LAB 1

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

3.4

4

4.22

EVU1-­‐B4

Utility R oom Identification S ign

(message panel) TISSUE CULTURE LAB 2

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

3.4

4

4.23

EVU1-­‐B2

Utility R oom Identification S ign

(message panel) CLEAN LAB

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

3.4

4

4.24

EVU1-­‐B4

Utility R oom Identification S ign

(message panel) LAB 410

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017


SIGN MESSAGE SCHEDULE | LEVEL FOUR 3.4

4

4.25

EVU1-­‐B2

Utility R oom Identification S ign

3.4

4

4.26

EVU1-­‐F6

Stairwell Identification S ign

(message panel) CLEAN LAB

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

(top panel) (stair symbol)

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

4

4.27

EVU1-­‐F10 Level Identification S ign

(top panel) STAIR 1 FLOOR 4 SERVES 2-­‐5 No R oof Access (down arrow) Down to S econd F loor for Exit Discharge

4

4.28

EVU1-­‐B2

Utility R oom Identification S ign

3.4

4

4.29

EVU1-­‐B4

Utility R oom Identification S ign

3.4

4

4.30

EVU1-­‐B20 Room Identification S ign

4

4.31

EVU1-­‐B20 Room Identification S ign

3.4 [ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

(message panel) ELECTRICAL CLOSET

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

(top panel) WRITE-­‐UP ROOM

Mounts to glass, vinyl back plate required

4

4.31

N/A

Insert S ign

3.4

4

4.32

EVU1-­‐B20 Room Identification S ign

4

4.36

EVU1-­‐B20 Room Identification S ign

4

4.37

EVU1-­‐B20 Room Identification S ign

4.38

EVU1-­‐D8

Wall-­‐Mounted B uilding Directional

4

4.39

EVU1-­‐R.P1 Flag-­‐Mounted Identification S ign

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE 3.4

(insert panel) Professor G ary Patti

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

(top panel) LABS

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

4

4.40

EVU1-­‐B20 Room Identification S ign

4.32

N/A

Insert S ign

3.4

4

4.33

EVU1-­‐B20 Room Identification S ign

(insert panel) Professor G ary Patti

(top panel) WRITE-­‐UP ROOM

4

4.42

EVU1-­‐R1

Restroom Identification S ign

3.4

4

4

4.33

4.34

N/A

Insert S ign

EVU1-­‐B20 Room Identification S ign

Mounts to glass, vinyl back plate required

(insert panel) Professor G ary Patti

(top panel) STUDENT OFFICE

4

4.34

N/A

Insert S ign

3.4

4

4.43

EVU1-­‐B4

Utility R oom Identification S ign

3.4

4

4.44

EVU1-­‐R1

Restroom Identification S ign

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

(top panel) STUDENT OFFICE

Mounts to glass, vinyl back plate required

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

Mounts to glass, vinyl back plate required

(insert panel) Professor G ary Patti

WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza

(top panel) LEVEL 4

Max. capacity 10 m essage panels

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

(sign panel -­‐ side a) (restroom symbols)

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

(top panel) LAB

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

(top panel) (female and accessible symbols)

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

(message panel) JANITOR CLOSET

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

(top panel) (male and accessible symbols)

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

(bottom panel) MEN 3.4

4

4.45

EVU1-­‐B4

Utility R oom Identification S ign

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

(message panel) LAB 409

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

3.4

4

4.46

EVU1-­‐B4

Utility R oom Identification S ign

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

(message panel) MCMILLAM LABORATORY

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

3.4

4

4.47

EVU1-­‐B2

Utility R oom Identification S ign

(message panel) JOLLEY HALL

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

(bottom panel) 406 3.4

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

(bottom panel) WOMEN

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

(bottom panel) 405 3.4

(top panel) LAB

(bottom panel) 409

(bottom panel) 410 AND 411 4

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

(sign panel -­‐ side b) (restroom symbols)

3.4

3.4

Mounts to glass, vinyl back plate required

(bottom panels) (blank) > Access to McMillen Laboratory > Conference R oom 403 > Lounge 412 > Offices 413A -­‐ 413F > Elevator ( elevator symbol) (blank) < R estrooms ( restroom symbols) (blank) (blank) 3.4

Mounts to glass, vinyl back plate required

4

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

(bottom panel) 404 3.4

(top panel) WRITE-­‐UP ROOM

(bottom panel) 408

(bottom panel) 403 3.4

EVU1-­‐B20 Room Identification S ign

(bottom panel) 409 3.4

(message panel) IT CLOSET

(top panel) CONFERENCE ROOM

4.35

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

(bottom panel) FLOOR 4 S TAIR 1 3.4

4

(bottom panel) 407 3.4

(bottom panel) STAIR 1 3.4

3.4

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017


SIGN MESSAGE SCHEDULE | LEVEL FIVE SHEET LEVEL LOCATION SIGN TYPE DESCRIPTION 3.5 5 5.01 EVU1-­‐B2 Utility R oom Identification S ign

3.5

5

5.02

EVU1-­‐B2

Utility R oom Identification S ign

3.5

5

5.03

EVU1-­‐B20 Room Identification S ign

MESSAGE (message panel) STORAGE

NOTES

(message panel) STORAGE

(top panel) CONFERENCE ROOM

CLIENT REVIEW [ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

5

5.04

EVU1-­‐D8

Wall-­‐Mounted B uilding Directional

(top panel) LEVEL 5

Mounts to glass, vinyl back plate required

3.5

5

5

5.05

5.06

EVU1-­‐G12 Evacuation Map

EVU1-­‐D10 Wall-­‐Mounted B uilding Directory

(map artwork)

(top panel) LEVEL

5.13

EVU1-­‐F10 Level Identification S ign

3.5

Max. capacity 10 m essage panels

Artwork provided by owner

Max. capacity 12 m essage panels

(top panel) STAIR 1 FLOOR 5 SERVES 2-­‐5 No R oof Access (down arrow) Down to S econd F loor for Exit Discharge

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

(bottom panel) FLOOR 5 S TAIR 1

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

5

5.14

EVU1-­‐D8

Wall-­‐Mounted B uilding Directional

(top panel) LEVEL 5

Max. capacity 10 m essage panels

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

(bottom panels) (blank) > Access to McMillen Laboratory > Access to Chemistry Main Office > Conference R oom 513 > Lounge 514 (blank) < R estrooms ( restroom symbols) (blank) ^ Elevator ( elevator symbol) (blank) (blank)

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

(bottom panels) (blank) > Access to Chemistry Main Office > Conference R oom 513 > Lounge 514 > R estrooms ( restroom symbols) (blank) (blank) (blank) (blank) (blank) 3.5

5

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

(bottom panel) 513 3.5

3.5

3.5

5

5.15

EVU1-­‐B2

Utility R oom Identification S ign

(message panel) IT CLOSET

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

3.5

5

5.16

EVU1-­‐B4

Utility R oom Identification S ign

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

(message panel) ELECTRICAL CLOSET

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

3.5

5

5.17

EVU1-­‐B2

Utility R oom Identification S ign

(message panel) 512

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

3.5

5

5.18

EVU1-­‐B2

Utility R oom Identification S ign

(message panel) 503

Mounts to glass, vinyl back plate required

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

3.5

5

5.19

EVU1-­‐B2

Utility R oom Identification S ign

(message panel) 504

Mounts to glass, vinyl back plate required

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

3.5

5

5.20

EVU1-­‐B2

Utility R oom Identification S ign

(message panel) 505

Mounts to glass, vinyl back plate required

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

(bottom panels) Access to McMillen Laboratory ( 5) Access to Chemistry Main Office ( 5) Conference R oom 513 (5) Lounge 514 ( 5) (blank) Access to McMillen Laboratory ( 4) Conference R oom 403 (4) Faculty Offices 413A-­‐413F (4) (blank) Conference R oom 303 (3) (blank) Main Lobby ( 2) 3.5

5

5.07

EVU1-­‐B2

Utility R oom Identification S ign

(message panel) 512

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

3.5

5

5.21

EVU1-­‐B2

Utility R oom Identification S ign

(message panel) 510

3.5

5

5.11

EVU1-­‐B2

Utility R oom Identification S ign

(message panel) 512

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

3.5

5

5.22

EVU1-­‐B2

Utility R oom Identification S ign

(message panel) 507

Mounts to glass, vinyl back plate required

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

3.5

5

5.12

EVU1-­‐F6

Stairwell Identification S ign

(top panel) (stair symbol)

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

3.5

5

5.23

EVU1-­‐B2

Utility R oom Identification S ign

(message panel) 508

Mounts to glass, vinyl back plate required

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

3.5

5

5.24

EVU1-­‐B2

Utility R oom Identification S ign

(message panel) 509

Mounts to glass, vinyl back plate required

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

3.5

5

5.25

EVU1-­‐F6

Stairwell Identification S ign

(bottom panel) STAIR 1

(top panel) (stair symbol)

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

(bottom panel) STAIR 2

WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza

DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017


SIGN MESSAGE SCHEDULE | LEVEL FIVE 3.5

5

5.26

EVU1-­‐F10 Level Identification S ign

(top panel) STAIR 2 FLOOR 5 SERVES 5-­‐PENTHOUSE No R oof Access Exit Discharge This F loor

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

(bottom panel) FLOOR 5 S TAIR 2 3.5

5

5.27

EVU1-­‐D8

Wall-­‐Mounted B uilding Directional

(top panel) LEVEL 5

Max. capacity 10 m essage panels

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

(bottom panels) (blank) > Access to McMillen Laboratory > Access to Chemistry Main Office > Conference R oom 513 > Lounge 514 > Elevator ( elevator symbol) (blank) < R estrooms (restroom symbols) (blank) (blank) 3.5

5

5.28

EVU1-­‐R.P1 Flag-­‐Mounted Identification S ign

(sign panel -­‐ side a) (restroom symbols)

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

(sign panel -­‐ side b) (restroom symbols) 3.5

5

5.29

EVU1-­‐B2

Utility R oom Identification S ign

3.5

5

5.31

EVU1-­‐R1

Restroom Identification S ign

(message panel) 510

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

(top panel) (female and accessible symbols)

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

(bottom panel) WOMEN 3.5

5

5.32

EVU1-­‐B4

Utility R oom Identification S ign

3.5

5

5.33

EVU1-­‐R1

Restroom Identification S ign

(message panel) JANITOR CLOSET

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

(top panel) (male and accessible symbols)

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

(bottom panel) MEN 3.5

5

5.34

EVU1-­‐B2

Utility R oom Identification S ign

(message panel) 511

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

3.5

5

5.37

EVU1-­‐B4

Utility R oom Identification S ign

(message panel) MCMILLAN LABORATORY

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

3.5

5

5.38

EVU1-­‐B2

Utility R oom Identification S ign

(message panel) JOLLEY HALL

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza

DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017


SIGN MESSAGE SCHEDULE | PENTHOUSE SHEET LEVEL LOCATION SIGN TYPE DESCRIPTION 3.6 6 6.01 EVU1-­‐G12 Evacuation Map

MESSAGE (map artwork)

NOTES Artwork provided by owner

CLIENT REVIEW [ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

3.6

6

6.02

EVU1-­‐B4

Utility R oom Identification S ign

(message panel) ELEVATOR MACHINE R OOM

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

3.6

6

6.03

EVU1-­‐B2

Utility R oom Identification S ign

(message panel) ROOF ACCESS

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

3.6

6

6.04

EVU1-­‐B4

Utility R oom Identification S ign

(message panel) MECHANICAL ROOM

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

3.6

6

6.05

EVU1-­‐B2

Utility R oom Identification S ign

(message panel) ROOF ACCESS

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

3.6

6

6.06

EVU1-­‐B4

Utility R oom Identification S ign

(message panel) MECHANICAL ROOM

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

3.6

6

6.07

EVU1-­‐F6

Stairwell Identification S ign

(top panel) (stair symbol)

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

(bottom panel) STAIR 2 3.6

6

6.08

EVU1-­‐F10 Level Identification S ign

(top panel) STAIR 2 PENTHOUSE SERVES 5-­‐PENTHOUSE No R oof Access (down arrow) Down to F ifth F loor for Exit Discharge

[ ] APPROVED [ ] APPROVED AS NOTED [ ] DELETE

(bottom panel) PENTHOUSE S TAIR 1

WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza

DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017


IMPLEMENTATION BUDGETS

WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza

6

DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017


IMPLEMENTATION BUDGETS 1. INTERIOR DONOR RECOGNITION

BRYAN HALL SIGNAGE AND GRAPHICS FINAL IMPLEMENTATION ESTIMATE

Sign Type

1. Interior Donor Recognition

$

2. Exterior Donor Recognition

$

4,000.00

3. Building Identification

$

7,750.00

4. Wall Graphics

$

68,625.00

5. Interior Building Signage

$

39,130.30

TOTAL PROJECT ESTIMATE

$

WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza

119,505.30

FINAL IMPLEMENTATION ESTIMATE Description

Qnty

Unit Cost

Grand Total

T2

Donor Tier 2

0

$

-

$

-

T3

Donor Tier 3

0

$

-

$

-

T4

Donor Tier 4

0

$

-

$

-

T5

Donor Tier 5

0

$

-

$

-

T6

Donor Tier 6

0

$

-

$

-

$

-

Shop Drawings, Samples, Submittals, and Prototypes

$

-

Packaging and Shipping

$

-

Installation

$

-

TOTAL PROJECT ESTIMATE

$

-

0

DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017


IMPLEMENTATION BUDGETS 2. EXTERIOR DONOR RECOGNITION

BRYAN HALL SIGNAGE AND GRAPHICS FINAL IMPLEMENTATION ESTIMATE

Sign Type

1. Interior Donor Recognition

$

2. Exterior Donor Recognition

$

4,000.00

FINAL IMPLEMENTATION ESTIMATE Description

Qnty

$

7,750.00

4. Wall Graphics

$

68,625.00

5. Interior Building Signage

$

39,130.30

TOTAL PROJECT ESTIMATE

$

119,505.30

WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza

Grand Total

T1

Donor Tier 1 (MILLSTONE PLAZA)

1

$ 2,500.00 $

2,500.00

T1

Donor Tier 1 (CAMPUS THRESHOLD)

1

$ 1,500.00 $

1,500.00

2

3. Building Identification

Unit Cost

$ 4,000.00

Shop Drawings, Samples, Submittals, and Prototypes

$

-

Packaging and Shipping

$

-

Installation

$

-

TOTAL PROJECT ESTIMATE

$

4,000

DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017


IMPLEMENTATION BUDGETS 3. BUILDING IDENTIFICATION

BRYAN HALL SIGNAGE AND GRAPHICS FINAL IMPLEMENTATION ESTIMATE

Location

1. Interior Donor Recognition

$

2. Exterior Donor Recognition

$

4,000.00

FINAL IMPLEMENTATION ESTIMATE Description

Qnty

$

7,750.00

4. Wall Graphics

$

68,625.00

5. Interior Building Signage

$

39,130.30

TOTAL PROJECT ESTIMATE

$

119,505.30

WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza

Grand Total

1

South Elevation - 9" Tall Letters

1

$ 1,500.00 $

2

West Elevation - 4" Tall Letters

1

$

2

3. Building Identification

Unit Cost

750.00 $

1,500.00 750.00

$ 2,250.00

Shop Drawings, Samples, Submittals, and Prototypes

$

2,500

Packaging and Shipping

$

500

Installation

$

2,500

TOTAL PROJECT ESTIMATE

$

7,750

DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017


IMPLEMENTATION BUDGETS 4. WALL GRAPHICS

BRYAN HALL SIGNAGE AND GRAPHICS FINAL IMPLEMENTATION ESTIMATE

Location

1. Interior Donor Recognition

$

2. Exterior Donor Recognition

$

4,000.00

FINAL IMPLEMENTATION ESTIMATE Description

Qnty

$

7,750.00

4. Wall Graphics

$

68,625.00

5. Interior Building Signage

$

39,130.30

TOTAL PROJECT ESTIMATE

$

119,505.30

WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza

Grand Total

1

Stairwell Graphics

1750

$

16.50 $ 28,875.00

2

Elevator Lobbies

1500

$

16.50 $ 24,750.00

3250

3. Building Identification

Unit Cost

$ 53,625.00

Shop Drawings, Samples, Submittals, and Prototypes

$

1,500

Packaging and Shipping

$

1,500

Installation

$

12,000

TOTAL PROJECT ESTIMATE

$

68,625

DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017


IMPLEMENTATION BUDGETS 5. INTERIOR BUILDING SIGNAGE

BRYAN HALL SIGNAGE AND GRAPHICS FINAL IMPLEMENTATION ESTIMATE

Sign Type

1. Interior Donor Recognition

$

2. Exterior Donor Recognition

$

4,000.00

3. Building Identification

$

7,750.00

4. Wall Graphics

$

68,625.00

5. Interior Building Signage

$

39,130.30

TOTAL PROJECT ESTIMATE

$

119,505.30

FINAL IMPLEMENTATION ESTIMATE Description

Qnty

Grand Total

EVU1-B2

Utility Room Identification Sign

41

$

82.95 $

3,400.95

EVU1-B4

Utility Room Identification Sign

44

$ 121.20 $

5,332.80

EVU1-B20

Room Identification Sign

20

$ 158.25 $

3,165.00

EVU1-R.P1

Flag-Mounted Identification Sign

4

$ 190.00 $

760.00

EVU1-R1

Restroom Identification Sign

8

$ 144.80 $

1,158.40

EVU1-A7

Office Identification Sign

8

$ 174.00 $

1,392.00

EVU1-D8

Wall-Mounted Directional

12

$ 486.30 $

5,835.60

EVU1-D10

Wall-Mounted Building Directory

4

$ 707.60 $

2,830.40

EVU1-D10 (x3)

Wall-Mounted Faculty Directory

3

$ 707.60 $

2,122.80

N/A

Insert Sign

24

$

90.30 $

2,167.20

EVU1-F5

Regulatory Sign

1

$ 199.95 $

199.95

EVU1-F6

Stairwell Identification Sign

6

$ 170.30 $

1,021.80

EVU1-F10

Level Identification Sign

6

$ 390.40 $

2,342.40

EVU1-G12

Evac Plan

6

$ 183.50 $

1,101.00

187

WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza

Unit Cost

$ 32,830.30

Shop Drawings, Samples, Submittals, and Prototypes

$

-

Packaging and Shipping

$

1,800

Installation

$

4,500

TOTAL PROJECT ESTIMATE

$

39,130

DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017


PROJECT SCHEDULE

WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza

7

DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017


PROJECT SCHEDULE APRIL

MAY

JUNE

JULY

AUGUST

SEPTEMBER

OCTOBER

NOVEMBER

Week 1 Week 2 Week 3 Week 4 Week 1 Week 2 Week 3 Week 4 Week 5 Week 1 Week 2 Week 3 Week 4 Week 1 Week 2 Week 3 Week 4 Week 1 Week 2 Week 3 Week 4 Week 5 Week 1 Week 2 Week 3 Week 4 Week 1 Week 2 Week 3 Week 4 Week 1 Week 2 Week 3 Week 4 Week 5

INTERIOR BUILDING SIGNAGE Final Design Revisions Bid Documents and Final Programming Bidding Docs Issued to Vendors Pricing / Contract Award Submittals & Shop Drawings Fabrication Installation Punchlist Corrections

INTERIOR SPECIALTY GRAPHICS Final Design Revisions Bid Documents and Final Artwork Bidding Docs Issued to Vendors Pricing / Contract Award Submittals & Shop Drawings Fabrication Installation Punchlist Corrections

EXTERIOR BUILDING IDENTIFICATION Final Design Revisions Bid Documents Bidding Docs Issued to Vendors Pricing / Contract Award Samples, Submittals & Shop Drawings Fabrication Installation Punchlist Corrections

INTERIOR DONOR RECOGNITION Design Development - Layout Approvals Final Design Revisions Bid Documents Bidding Docs Issued to Vendors Pricing / Contract Award Submittals & Shop Drawings Fabrication Installation Punchlist Corrections

WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza

DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017


1040 Hull Street, Suite 100 Baltimore, MD 21230 www.asg-architects.com

WASHINGTON UNIVERSITY IN ST. LOUIS Bryan Hall Renovation and New North Facade, Forest Park Parkway Bridge and Millstone Plaza

DONOR RECOGNITION, BUILDING IDENTIFICATION, WALL GRAPHICS, AND BUILDING SIGNAGE | 100% DESIGN DEVELOPMENT SUBMITTAL | 04.03.2017


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.