Team IDEATE NIRMA UNIVERSITY
Project GRUHA SAMPADA Profile of Project Partner
Siri Sampada, Hyderabad Siri Sampada holds the spotlight when it comes to real estate investment models. Founded in 2013 in Hyderabad, Telangana it came a long way since then and is now considered to be one amongst the finest real estate companies. Siri Sampada offers a variety of tailored - made solutions / services in real estate development. Key person involved: Sowmya Chandramouli Project Manager, Siri Sampada group
Project Description
Location: The site is located at SiriSampada, near NH44, Bureddipalle, Telangana. It is located in a semi urban area close to the National Highway. Site coordinates:16°45’15.1”N 78°06’41.4”E
glo
d H 87 yde km rab a
Site location: Siri Sampada NH 44, Bureddipalle
Ba n
Hyd era ba
Mahbubnagar
re
Siri Sampada
d
Jadcherla Siri Sampada
Fig. 1. Satelite Images, Location of the site, Siri Sampada Climate zone: The climate zone is Composite. Over the course of the year, the temperature typically varies from 16°C to 38°C and is rarely below 12°C or above 41°C. Profile of Occupants: The project would majorly cater to the people working in Pollepally SEZ, Industrial sector. The project requires a Housing facility for approximately 190 families, or 11001200 individuals and 50 supporting staff members and a designated area for commercial usage. Hours of operation: As it is a Mixed-use Housing project, the hours of occupancy for the residents would most likely be throughout the day but for the commercial section, the hours of occupancy would vary depending on the type of commercial usage. Approximate Budget: 175 to 200 Cr. The site gives an opportunity to channelize and collect rain water into the existing water body on site. This water body could also act like a natural sink that can be used for passive cooling. The project is still in the initial planning and design stage. No construction has been started yet. Special Requirements of the Project partner : As per the initial planning by project partners, there is land for commercial development and school building along the edge of the highway. The phase two of the project can be extended in future thus while planning about the access, we need to consider these aspects. The lake should be retained and also it is preffered to develop Hydroponics if possible. Solar Decathlon 2020-21