Contents Contents Site Plan Level 0 Floor Plan Level 1 Floor Plan Level 2 Floor Plan Level 3 Floor Plan Roof Floor Plan Unnamed Level 0 Ceiling Plan Level 1 Ceiling Plan Level 2 Ceiling Plan Level 3 Ceiling Plan Stairwell Ceiling Plan South Elevation East Elevation South Elevation (Detail) North Elevation West Elevation Building Sections Building Sections Building Sections Building Sections Interior Building Sections Details Door Schedules
Sheet Number A6.02 A6.10 A7 A8 A9.01 A10 A10.1 A10.2 A10.3 A10.5 A10.6 A10.10 A10.11 A13 A14 C1.00 C1.01 C1.02 C1.03 C1.04 C2.00 M0.00 M1.00 M1.01 M1.02
Sheet Name Room & Window Schedules Curtian Panel Schedule User Defined User Defined Isometric Wall Sections Exterior Wall Sections Exterior Wall Sections Exterior Wall Section Details Curtain Wall Details Curtain Wall Details Interior Wall Sections Interior Wall Section Details Interior Elevations Interior Details Unnamed Level 0 Area Plan Level 1 Area Plan Level 2 Area Plan Level 3 Area Plan Unnamed Contents Plans Level 0 Mechanical Plan Level 1 Mechanical Plan
Sheet Number M1.03 M1.04 M1.05 M1.06 M3.00 M3.01 M3.02 S0.00 S1.01 S1.02 S1.03 S1.04 S1.05 S1.06 S1.07 S1.25 S6.01 S6.02
Sheet Name Level 2 Mechanical Plan Level 3 Mechanical Plan Roof Mechanical Plan Stair Roof Mechanical Plan Sections Mechanical Section 1 Mechanical Sections Contents Foundation Level 0 Structural Level 1 Structural Level 2 Structural Level 3 Structural Roof Structural Plan Stair Roof Structural Plan Roof Framing Column Schedules Structural Framing Schedule
Univ. Of Oklahoma Studio VII Fall 2013
James Duke
198 Delaware St Kansas City, MO 64105
A0.00 A1.00 A1.01 A1.02 A1.03 A1.04 A1.05 A1.10 A1.11 A1.12 A1.13 A1.14 A1.15 A2.01 A2.02 A2.02.1 A2.03 A2.04 A3.01 A3.02 A3.03 A3.04 A3.10 A5.01 A6.01
Sheet Name
Contents
ECHO Lofts & Shops
Sheet Number
Contents
DISCLAIMER: AS AWESOMELY AS THESE DRAWINGS ARE PREPARED, THE INTENDED USE FOR THESE MASTERPIECES IS FOR A STUDIO PROJECT. ANY MISHAPS OR OTHERWISE ARISING FROM TRYING TO CONSTRUCT A BUILDING FROM THESE DRAWINGS IS SOLELY AND TOTALLY THE FAULT OF THE BUILDER, AND CONSEQUENCES INCLUDE, BUT ARE NOT LIMITED TO MONETARY DAMAGES, BUYING THE PREPARER OF THESE DRAWINGS SOME SORT OF DESSERT, AND AN EXPENSIVE LESSON ON HOW TO READ FINE PRINT, THAT WILL BE GIVEN IN A COURTROOM. ENJOY! HAVE FUN WITH IT!
10/23/13 Contents
1
3D View 8
A0.00