Sheet Number A0.00 A0.01
Sheet Name
Contents Design Statement A1.01 Basement Plan A1.02 Level 1 Plan A1.03 Old P.O. Level 2 Plan A1.04 Addition Level 2 Plan A2.01 South Elevation (Gray Street) A2.01.1 South Elevation (Addition) A2.02 North Elevation (Easement Alley) A2.03 West Elevation (Peters Ave.) A2.04 East Elevation A3.01 Building Sections A3.02 Building Sections A3.03 Building Sections A3.04 Building Sections A3.05 Building Sections A3.06 Building Sections A3.07 Building Sections A3.14 Detail Building Sections
Sheet List Sheet Number A3.15 A4.01 A5.01
A5.02
A6.01 A7.01 A8.01 A9.01 A9.02 A9.03 A9.04
A9.05 C1.01 C1.02 C1.03 C1.04 C1.05
FD 1 FD 2 FD 5
Sheet Name Wall Section Details Design Development Details Design Development Details Room Schedule Interior Elevations Interior Details 3D Drawings 3D Drawings 3D Drawings Structural Rendered Isometric Section South Perspective View Site Plan Basement Room Plan Level 1 Room Plan Level 2 Room Plan (Addition) Level 2 Room Plan (Renovation) Site Plan Plans 1 Sections
Sheet List Sheet Number FD 6 S1.01 S1.02 S1.03 S1.04 S1.05 S6.01 S6.02
Sheet Name Elevations Foundation Addition Basement Addition Level 1 Addition Level 2 Addition Roof - Addition Column Schedules Unnamed
Norman Arts Council
www.coa.ou.edu
Old Post Office Adaptive Reuse & Addition
No.
Description
Date
Contents Project number Date Drawn by Checked by
2014-1 04/11/14 Designer Checker
A0.00 Scale
4/20/2015 12:23:57 PM
Sheet List
Schindler 400AE™ Machine Room 1 Less General Purpose ElevatorA3.04
1 2 A3.01 FD 5
1 3 1
2
A3.05 FD 5
3
4
5
6
7
8
9
10
A
1 4 A3.15 FD 5
1 A3.03
B
C
1 A3.06 1 5
D
A3.02 FD 5
UP
Basement 1/16" = 1'-0" Norman Arts Council
www.coa.ou.edu
Old Post Office Adaptive Reuse & Addition
No.
Description
Date
Basement Plan Project number Date Drawn by Checked by
2014-1 07/22/02 James Duke Checker
A1.01 Scale 1/16" = 1'-0"
4/20/2015 12:24:03 PM
1
A2.02 FD 6 1
2
3
4
5
6
7
8
9
10
1 3 DN 10' - 1 1/32" 8' - 11 1/32" 10' - 1 1/32"
DN UP
5 1 FDA5.01 6
A
B
C
D
Sim DN
DN
DN 8
1 9
A2.04 FD 6
1 A2.03 FD 6 2 7
10
21
11
20 27
1
Norman Arts Council
www.coa.ou.edu
Old Post Office Adaptive Reuse & Addition
No.
Description
Date
Level 1 Plan Project number Date Drawn by Checked by
2014-1 03/24/14 James Duke Checker
A1.02 Scale 1/16" = 1'-0"
4/20/2015 12:24:06 PM
Level 1 1 1/16" = 1'-0"
5 1 3
1
A3.05 FD 5
A3.04
1 2 FD 6 A3.01 FD 5
OW EL B EN OP
OW EL B EN OP
1 A3.07
P.O. - Level 2 3/32" = 1'-0" Norman Arts Council
www.coa.ou.edu
Old Post Office Adaptive Reuse & Addition
No.
Description
Date
Old P.O. Level 2 Plan Project number Date Drawn by Checked by
2014-1 03/24/14 James Duke Checker
A1.03 Scale 3/32" = 1'-0"
4/20/2015 12:24:07 PM
1
2
1
1 2
A3.05 FD 5
A3.04
A3.01 FD 5
3
4
5
6
7
8
9
10 3' - 9" 4'2'- -0"4 1/32"
1
1 3
1 4 1
A3.15 FD 5
A3.03
A
B
DN C
1 A3.06 1 5
D
A3.02 FD 5
1 5 A2.01.1 FD 6
Addition - Level 2 1/16" = 1'-0"
Norman Arts Council
www.coa.ou.edu
Old Post Office Adaptive Reuse & Addition
No.
Description
Date
Addition Level 2 Plan Project number Date Drawn by Checked by
2014-1 03/24/14 James Duke Checker
A1.04 Scale 1/16" = 1'-0"
4/20/2015 12:24:10 PM
1
1
2
1 3
1
1 2
A3.05 FD 5
A3.04
A3.01 FD 5
3
4
5
6
7
8
9
10 Addition - Roof 31' - 4" P.O. - Parapet 26' - 0"
P.O. - Roof 23' - 0" Addition - Level 2 17' - 4" P.O. - Level 2 12' - 10" Level 1 3' - 4" Ground Level 0' - 0"
South 1/16" = 1'-0" Norman Arts Council
www.coa.ou.edu
Old Post Office Adaptive Reuse & Addition
No.
Description
Date
South Elevation (Gray Street) Project number Date Drawn by Checked by
2014-1 07/22/02 James Duke Checker
A2.01 Scale 1/16" = 1'-0"
4/20/2015 12:24:14 PM
1
1
2
1 3
1
1 2
A3.05 FD 5
A3.04
A3.01 FD 5
3
4
5
6
7
8
9
10
Addition - Roof 31' - 4" P.O. - Parapet 26' - 0" P.O. - Roof 23' - 0" Addition - Level 2 17' - 4" P.O. - Level 2 12' - 10"
Level 1 3' - 4" Ground Level 0' - 0"
South (Addition Only) 1/16" = 1'-0"
Norman Arts Council
www.coa.ou.edu
Old Post Office Adaptive Reuse & Addition
No.
Description
Date
South Elevation (Addition) Project number Date Drawn by Checked by
2014-1 03/26/14 James Duke Checker
A2.01.1 Scale 1/16" = 1'-0"
4/20/2015 12:24:16 PM
1
10
9
8
7
6
1 2
1
1 3
A3.01 FD 5
A3.04
A3.05 FD 5
5
4
3
2
1
Addition - Roof 31' - 4" P.O. - Parapet 26' - 0" P.O. - Roof 23' - 0" Addition - Level 2 17' - 4" P.O. - Level 2 12' - 10"
Level 1 3' - 4" Ground Level 0' - 0"
North 1/16" = 1'-0"
Norman Arts Council
www.coa.ou.edu
Old Post Office Adaptive Reuse & Addition
No.
Description
Date
North Elevation (Easement Alley) Project number Date Drawn by Checked by
2014-1 03/24/14 James Duke Checker
A2.02 Scale 1/16" = 1'-0"
4/20/2015 12:24:23 PM
1
1
1 5
A3.03
A3.02 FD 5
1 4
1
1
A3.15 FD 5
A3.06
A3.07
A
B
C
D
Addition - Roof 31' - 4"
P.O. - Parapet 26' - 0" P.O. - Roof 23' - 0"
23' - 8"
Addition - Level 2 17' - 4"
P.O. - Level 2 12' - 10"
Level 1 3' - 4" Ground Level 0' - 0"
West 3/32" = 1'-0" Norman Arts Council
www.coa.ou.edu
Old Post Office Adaptive Reuse & Addition
No.
Description
Date
West Elevation (Peters Ave.) Project number Date Drawn by Checked by
2014-1 03/24/14 James Duke Checker
A2.03 Scale 3/32" = 1'-0"
4/20/2015 12:24:24 PM
1
1 5
1
A3.02 FD 5
A3.03
1
1
1 4
A3.07
A3.06
A3.15 FD 5
D
C
B
A
Addition - Roof 31' - 4"
P.O. - Parapet 26' - 0" P.O. - Roof 23' - 0"
Addition - Level 2 17' - 4"
P.O. - Level 2 12' - 10"
Level 1 3' - 4" Ground Level 0' - 0"
East 3/32" = 1'-0" Norman Arts Council
www.coa.ou.edu
Old Post Office Adaptive Reuse & Addition
No.
Description
Date
East Elevation Project number Date Drawn by Checked by
2014-1 03/24/14 James Duke Checker
A2.04 Scale 3/32" = 1'-0"
4/20/2015 12:24:28 PM
1
1
1 A5.02
A3.03
Sim
1 5 1
A3.02 FD 5
1
A3.06 A
B
C
A3.07 D
Addition - Roof 31' - 4"
P.O. - Parapet 26' - 0" P.O. - Roof 23' - 0"
Addition - Level 2 17' - 4"
P.O. - Level 2 12' - 10"
Level 1 3' - 4" Ground Level 0' - 0"
Basement -10' - 8"
Elevator Shaft Base -16' - 4"
Section - NS 1 3/32" = 1'-0" Norman Arts Council
www.coa.ou.edu
Old Post Office Adaptive Reuse & Addition
No.
Description
Date
Building Sections Project number Date Drawn by Checked by
2014-1 07/22/02 James Duke Checker
A3.01 Scale 3/32" = 1'-0"
4/20/2015 12:24:35 PM
1
1
2
1 3
1
1 2
A3.05 FD 5
A3.04
A3.01 FD 5
3
4
5
6
7
8
9
10
Addition - Roof 31' - 4" P.O. - Parapet 26' - 0" P.O. - Roof 23' - 0" Addition - Level 2 17' - 4" P.O. - Level 2 12' - 10"
Level 1 3' - 4" Ground Level 0' - 0"
Basement -10' - 8" Elevator Shaft Base -16' - 4"
Section - WE A1 1/16" = 1'-0"
Norman Arts Council
www.coa.ou.edu
Old Post Office Adaptive Reuse & Addition
No.
Description
Date
Building Sections Project number Date Drawn by Checked by
2014-1 03/24/14 James Duke Checker
A3.02 Scale 1/16" = 1'-0"
4/20/2015 12:24:40 PM
1
1
2
1 3
1
1 2
A3.05 FD 5
A3.04
A3.01 FD 5
3
4
5
6
7 EQ EQ EQ
8
9
10
EQ EQ Addition - Roof 31' - 4" P.O. - Parapet 26' - 0" P.O. - Roof 23' - 0" Addition - Level 2 17' - 4" P.O. - Level 2 12' - 10"
Level 1 3' - 4" Ground Level 0' - 0"
Basement -10' - 8" Elevator Shaft Base -16' - 4"
Section - WE A2 1/16" = 1'-0"
Norman Arts Council
www.coa.ou.edu
Old Post Office Adaptive Reuse & Addition
No.
Description
Date
Building Sections Project number Date Drawn by Checked by
2014-1 03/24/14 James Duke Checker
A3.03 Scale 1/16" = 1'-0"
4/20/2015 12:24:44 PM
1
A
1
1
1 5
A3.03
A3.06
A3.02 FD 5
B
C
D 1 A3.07 Addition - Roof 31' - 4"
P.O. - Parapet 26' - 0" P.O. - Roof 23' - 0"
Addition - Level 2 17' - 4"
P.O. - Level 2 12' - 10"
Level 1 3' - 4" Ground Level 0' - 0"
Basement -10' - 8"
Section - NS 2 3/32" = 1'-0" Norman Arts Council
www.coa.ou.edu
Old Post Office Adaptive Reuse & Addition
No.
Description
Date
Building Sections Project number Date Drawn by Checked by
2014-1 04/14/14 James Duke Checker
A3.04 Scale 3/32" = 1'-0"
4/20/2015 12:24:50 PM
1
1 A3.06
A
1
1 5
1
A3.03
A3.02 FD 5
A3.07
B
C
D
Addition - Roof 31' - 4"
P.O. - Parapet 26' - 0" P.O. - Roof 23' - 0"
Addition - Level 2 17' - 4"
P.O. - Level 2 12' - 10"
Level 1 3' - 4" Ground Level 0' - 0"
Basement -10' - 8"
Elevator Shaft Base -16' - 4"
Section NS 3 3/32" = 1'-0" Norman Arts Council
www.coa.ou.edu
Old Post Office Adaptive Reuse & Addition
No.
Description
Date
Building Sections Project number Date Drawn by Checked by
2014-1 04/14/14 Designer Checker
A3.05 Scale 3/32" = 1'-0"
4/20/2015 12:24:55 PM
1
1
2
1 3
1
1 2
A3.05 FD 5
A3.04
A3.01 FD 5
3
4
5
6
7
8
9
10
Addition - Roof 31' - 4" P.O. - Parapet 26' - 0" P.O. - Roof 23' - 0" Addition - Level 2 17' - 4" P.O. - Level 2 12' - 10"
Level 1 3' - 4" Ground Level 0' - 0"
Basement -10' - 8" Elevator Shaft Base -16' - 4"
Section - WE A3 1/16" = 1'-0" Norman Arts Council
www.coa.ou.edu
Old Post Office Adaptive Reuse & Addition
No.
Description
Date
Building Sections Project number Date Drawn by Checked by
2014-1 04/14/14 Designer Checker
A3.06 Scale 1/16" = 1'-0"
4/20/2015 12:24:59 PM
1
1
2
1 3
1
1 2
A3.05 FD 5
A3.04
A3.01 FD 5
3
4
5
6
7
8
9
10
Addition - Roof 31' - 4" P.O. - Parapet 26' - 0" P.O. - Roof 23' - 0" Addition - Level 2 17' - 4" P.O. - Level 2 12' - 10"
Level 1 3' - 4" Ground Level 0' - 0"
Basement -10' - 8" Elevator Shaft Base -16' - 4"
Section - WE O1 1/16" = 1'-0"
Norman Arts Council
www.coa.ou.edu
Old Post Office Adaptive Reuse & Addition
No.
Description
Date
Building Sections Project number Date Drawn by Checked by
2014-1 04/14/14 Designer Checker
A3.07 Scale 1/16" = 1'-0"
4/20/2015 12:25:03 PM
1
Detail Section - Roof Access 1/4" = 1'-0"
C
A3.06
1 A3.02 FD 5
1 5 D
Addition - Roof 31' - 4"
P.O. - Parapet 26' - 0"
P.O. - Roof 23' - 0"
Addition - Level 2 17' - 4"
P.O. - Level 2 12' - 10"
Level 1 3' - 4"
LevelGround 1 Level 0' - 0" 0' - 0"
www.coa.ou.edu
Basement -10' - 8"
Elevator Shaft Base -16' - 4"
Scale 1/4" = 1'-0"
4/20/2015 12:25:07 PM
1
A3.14 2014-1 03/24/14 James Duke Checker Project number Date Drawn by Checked by
Old Post Office Adaptive Reuse & Addition
Detail Building Sections Date Description No.
Norman Arts Council
2 A4.01
Sim
Sim
Sim
1
Addition - Roof 31' - 4"
P.O. - Parapet 26' - 0"
P.O. - Roof 23' - 0"
Addition - Level 2 17' - 4"
P.O. - Level 2 12' - 10"
Level 1 3' - 4"
Ground Level 0' - 0"
Basement -10' - 8"
www.coa.ou.edu
4 A4.01
1 A4.01
Wall Section 1 1/4" = 1'-0"
Scale 1/4" = 1'-0"
4/20/2015 12:25:08 PM
1
A3.15 2014-1 04/14/14 Designer Checker Project number Date Drawn by Checked by
Old Post Office Adaptive Reuse & Addition
Wall Section Date Description No.
Norman Arts Council
COLD-FORMED STEEL FRAMING
8d NAIL CORRUGATED METAL TIE 1" (25mm) AIR SPACE VAPOR BARRIER FLASHING WEEPHOLES @ 24" (600mm) O.C.
CONCRETE BASEMENT WALL
FINISHED GRADE
Wall Section details are still a work-in-progress.
ANCHOR BOLT
FULL COLLAR JOINT FOUNDATION WALL
1
Wall Section 1 - Foundation/Basement Wall N.T.S.
BRICK VENEER METAL TIE
WOOD WINDOW INSULATION BETWEEN STUDS
SEALANT
BUILDING PAPER FLASHING 1" (25 mm) MINIMUM AIR SPACE
SHEATHING WALLBOARD WALLBOARD
SILL FLASHING END DAM
INSULATION BETWEEN STUDS
BRICK VEENER
SHEATHING
BUILDING PAPER SEALANT
Wall Section 1 - Window Jamb N.T.S.
4
Norman Arts Council
www.coa.ou.edu
Old Post Office Adaptive Reuse & Addition
No.
Wall Section 1 - Window Sill N.T.S.
Description
Date
Details Project number Date Drawn by Checked by
2014-1 04/11/14 Designer Checker
A4.01 Scale N.T.S.
4/20/2015 12:25:08 PM
2
GLAZING 08 80 00
GLAZED ALUMINUM CURTAIN WALLS 08 44 13 JOINT PROTECTION 07 90 00 Cont. Around Frame, Typ. Ea. Side ROUGH CARPENTRY 06 10 00 2x Blocking GYPSUM BOARD ASSEMBLIES 09 21 16 BLANKET INSULATION 07 21 16 ROUGH CARPENTRY 06 10 00 2x Wall
1 A5.01
Sim
RIGID FOAM INSULATION 07 21 13 Sheathing
3
(3D) Design Development
AIR BARRIERS 07 27 00 Airspace VENEER UNIT MASONRY 04 20 19 Brick Veneer
Curtain Wall-to-Brick Wall Detail 3" = 1'-0" 2
Curtain Wall-to-Brick Wall Elevation 1/4" = 1'-0"
Norman Arts Council
www.coa.ou.edu
Old Post Office Adaptive Reuse & Addition
No.
Description
Date
Design Development Details Project number Date Drawn by Checked by
2014-1 07/22/02 James Duke Checker
A5.01 Scale As indicated
4/20/2015 12:25:10 PM
1
LiveRoof DEEP SYSTEM
Subterranean Irrigation
Over Conventional Roofing Assembly
Trenched in Modules Recommended for LiveRoof Standard (4.25"), Deep (6"), and Maxx 8"
SIDE VIEW
LiveRoof Standard Module Moisture Portals™ LiveRoof Engineered Soil, elevated during growing with Deep Soil Elevators™ (which are removed upon installation) LiveRoof Green Roof Plants (Minimum 95% Soil Coverage at Installation) Minimum 40-mil Polypropylene or EPDM Slip Sheet, Edges Overlapped & Seamed EPDM, TPO or PVC Waterproofing Membrane Provided Bonding Adhesive by others Insulation Insulation Adhesive
SIDE VIEWS
Use V-Shaped hoe to dig Pipe Trench at Moisture Elevators
. 2 3/4"
SCH 80 Solvent Weld Fittings
. 1/2"
3 1/4" .
6" .
SCH 40 PVC Pipe, Buried
TOP VIEW
SLOPE, REFLECTIVE SURFACES, SHADE, BUILDING HEIGHT AND WIND EXPOSURE AFFECT IRRIGATION NEEDS. CONSULT LIVEROOF LICENSED GROWER FOR APPROPRIATE PLANT SELECTIONS BASED ON SITE CONDITIONS. CONSULT A QUALIFIED IRRIGATION SPECIALIST TO DETERMINE APPROPRIATE DESIGN CONFIGUARTION OF IRRIGATION, INCLUDING PIPE DIAMETER, LAYOUT, HEAD STYLE AND SPACING.
Matched Precipitation Irrigation Heads SCH 40 PVC Pipe buried under Soil and Plants
TOP VIEW
LiveRoof Modules
Drainage Holes
2 Ergonomic Handles
LiveRoof Irrigation A Not to Scale
. 1'
LiveRoof System Saturated Weight: 40-50 lbs / sf ILLUSTRATIONS ARE TO CONCEPTUALLY ASSIST PROFESSIONALS IN DESIGNING LIVEROOF INSTALLATIONS. LIVEROOF DOES NOT ACCEPT RESPONSIBILTY FOR ENGINEERING BASED ON ILLUSTRATIONS. A QUALIFIED ROOFING SPECIALIST SHOULD BE CONSULTED TO DETERMINE APPROPRIATE WATERPROOFING AND ROOF DECK MATERIALS AND SUITABLE DESIGN.
1
LiveRoof, LLC P.O. Box 533 Spring Lake, MI 49456
LiveRoof Drainage A Not to Scale Norman Arts Council
www.coa.ou.edu
Old Post Office Adaptive Reuse & Addition
No.
Description
(800) 875-1392 www.liveroof.co m
Date
Design Development Details Project number Date Drawn by Checked by
2014-1 04/09/14 Designer Checker
A5.02 Scale Not to Scale
4/20/2015 12:25:11 PM
. 2'
Room Number 0
Room Name
Department
Elevator Controls
1.0 Administration, Management, & Meeting 1.01a Lobby/Seating Area 1.0 Administration, Management, & Meeting 1.01b Addition Lobby 1.0 Administration, Management, & Meeting 1.02a Building Manager's Office 1.0 Administration, Management, & Meeting 1.02b Building Manager's Office 1.0 Administration, Management, & Meeting 1.03 Volunteer Staff Office 1.0 Administration, Management, & Meeting 1.04 Org. 1 Chair's Office 1.0 Administration, Management, & Meeting 1.05 Org. 1 Staff's Office 1.0 Administration, Management, & Meeting 1.06 Org. 2 Chair's Office 1.0 Administration, Management, & Meeting 1.07 Org. 2 Staff's Office 1.0 Administration, Management, & Meeting 1.08 Org. 3 Chair's Office 1.0 Administration, Management, & Meeting 1.09 Org. 3 Staff's Office 1.0 Administration, Management, & Meeting 1.10 Cafe Manager's Office 1.0 Administration, Management, & Meeting 1.11 Cafe Storage & Break Area 1.0 Administration, Management, & Meeting 1.12 NAC Intern Supervisor's 1.0 Administration, Office Management, & Meeting 1.13 NAC Interns' Workspace 1.0 Administration, Management, & Meeting 1.14a Meeting Space (Small) 1.0 Administration, Management, & Meeting 1.14b Meeting Space (Small) 1.0 Administration, Management, & Meeting 1.14c Meeting Space (Small) 1.0 Administration, Management, & Meeting 1.14d Meeting Space (Small) 1.0 Administration, Management, & Meeting 1.15a Meeting Space (Large) 1.0 Administration, Management, & Meeting 1.15b Meeting Space (Large) 1.0 Administration, Management, & Meeting 1.16 Shared Kitchenette/ Break 1.0 Administration, Area Management, & Meeting
Programmed Spaces
Level
Area
Addition Level 2
69 SF
Level 1
621 SF
Level 1
301 SF
P.O. Level 2 Addition Level 2 P.O. Level 2 Addition Level 2 Addition Level 2 Addition Level 2 Addition Level 2 Addition Level 2 Addition Level 2 Level 1
163 SF 156 SF 207 SF 155 SF
Room Number
2.0 Art Classrooms 2.01a Classroom (Small) 2.01b Classroom (Small) 2.01c Classroom (Small) 2.02a Classroom (Large) 2.02b Classroom (Large) 3.0 Conference Rooms 3.01a Conference Room (Small) 3.01b Conference Room (Small) 3.01c Conference Room (Small) 3.02a Conference Room (Large) 3.02b Conference Room (Large) 4.0 Studio & Creation Spaces 4.01a Rental Studio
109 SF 4.01b 149 SF 4.01c 107 SF 4.01d 148 SF 4.01e 115 SF 4.01f 149 SF 4.02a
Level 1
95 SF 4.02b
Level 1
291 SF 4.02c
Level 1
394 SF
Level 1
200 SF
Level 1
202 SF
4.02d 4.02e 4.02f Level 1
222 SF 4.02g
P.O. Level 2 Addition Level 2 Level 1
230 SF 4.02h 302 SF 4.03a 305 SF 4.03b
Level 1
Room Name
298 SF
Department
Level
Area
2.0 Art Classrooms 2.0 Art Classrooms 2.0 Art Classrooms 2.0 Art Classrooms 2.0 Art Classrooms
Basement Basement Basement Basement Basement
312 SF 313 SF 319 SF 425 SF 440 SF
3.0 Conference Rooms 3.0 Conference Rooms 3.0 Conference Rooms
Basement 166 SF Basement 155 SF Addition - 143 SF Level 2 Basement 384 SF Basement 385 SF
3.0 Conference Rooms 3.0 Conference Rooms
4.0 Studio & Creation Spaces Rental Studio 4.0 Studio & Creation Spaces Rental Studio 4.0 Studio & Creation Spaces Rental Studio 4.0 Studio & Creation Spaces Rental Studio 4.0 Studio & Creation Spaces Rental Studio 4.0 Studio & Creation Spaces Music Practice Room 4.0 Studio & Creation Spaces Music Practice Room 4.0 Studio & Creation Spaces Music Practice Room 4.0 Studio & Creation Spaces Music Practice Room 4.0 Studio & Creation Spaces Music Practice Room 4.0 Studio & Creation Spaces Music Practice Room 4.0 Studio & Creation Spaces Music Practice Room (Small) 4.0 Studio & Creation Spaces Music Practice Room (Small) 4.0 Studio & Creation Spaces Special Equipment Room 4.0 Studio & Creation Spaces Special Equipment Room 4.0 Studio & Creation Spaces
Norman Arts Council
www.coa.ou.edu
Programmed Spaces
Old Post Office Adaptive Reuse & Addition
No.
Addition Level 2 Addition Level 2 Addition Level 2 Addition Level 2 Addition Level 2 Addition Level 2 Addition Level 2 Addition Level 2 Addition Level 2 Addition Level 2 Addition Level 2 Addition Level 2 Addition Level 2 Addition Level 2 Basement Basement
210 SF
Room Number
Room Name
4.03c
Special Equipment Room
4.03d
Special Equipment Room
Department
5.0 Storage 5.01a Classroom Storage 5.01b Classroom Storage 5.02 Gallery Storage 5.03 Performance Hall Storage 5.04 Music Hall Storage 5.05a Special Equipment Storage 5.05b Special Equipment Storage 5.05c Special Equipment Storage 5.05d Special Equipment Storage 6.0 Performance & Display 6.01 Gallery
200 SF 6.02
Gallery Shop
6.03
Performance Hall
6.04
Music Hall
6.05
Event Space
202 SF 205 SF 211 SF 207 SF
Level
Area
4.0 Studio & Creation Spaces 4.0 Studio & Creation Spaces
Basement
235 SF
Basement
264 SF
5.0 Storage 5.0 Storage 5.0 Storage 5.0 Storage 5.0 Storage 5.0 Storage 5.0 Storage 5.0 Storage 5.0 Storage
Basement 265 SF Basement 355 SF Level 1 604 SF Basement 611 SF Basement 612 SF Basement 101 SF Basement 101 SF Basement 102 SF Basement 102 SF
6.0 Performance & Display 6.0 Performance & Display 6.0 Performance & Display 6.0 Performance & Display 6.0 Performance & Display
Level 1
897 SF
Level 1
300 SF
Level 1
1179 SF
Level 1
1210 SF
Level 1
1518 SF
579 SF 288 SF
7.0 Cafe 7.0 Cafe
Level 1 Level 1
74 SF
7.0 Cafe 7.01 Cafe Seating 7.02 Cafe Prep Unassignable 0.01 Deliveries 0.03 Men's Restroom 0.04 Women's Restroom 0.05 Restroom 0.06 Restroom
Unassignable Unassignable Unassignable Unassignable Unassignable
74 SF
0.07
Janitorial Closet
Unassignable
75 SF
0.8
Roof Access
Unassignable
76 SF
0.09
Maintenance Walkway
Unassignable
300 SF
0.10
Elevator Controls
Unassignable
0.11
Mechanical Room
Unassignable
Level 1 300 SF Level 1 83 SF Level 1 92 SF Level 1 160 SF Addition - 230 SF Level 2 Addition 42 SF Level 2 Addition 20 SF Level 2 Addition - 469 SF Level 2 Addition 42 SF Level 2 Basement 149 SF
74 SF 75 SF 76 SF 75 SF
300 SF
Description
Date
Room Schedule Project number Date Drawn by Checked by
2014-1 03/24/14 James Duke Checker
A6.01 Scale
4/20/2015 12:25:11 PM
Programmed Spaces
(3D) Fixed (South)
Norman Arts Council
www.coa.ou.edu
Old Post Office Adaptive Reuse & Addition
No.
Description
Date
3D Drawings Project number Date Drawn by Checked by
2014-1 07/22/02 James Duke Checker
A9.01 Scale
4/20/2015 12:25:20 PM
1
(3D) Fixed (North)
Norman Arts Council
www.coa.ou.edu
Old Post Office Adaptive Reuse & Addition
No.
Description
Date
3D Drawings Project number Date Drawn by Checked by
2014-1 03/24/14 James Duke Checker
A9.02 Scale
4/20/2015 12:25:30 PM
1
(3D) Structural
Norman Arts Council
www.coa.ou.edu
Old Post Office Adaptive Reuse & Addition
No.
Description
Date
3D Drawings - Structural Project number Date Drawn by Checked by
2014-1 03/24/14 James Duke Checker
A9.03 Scale
4/20/2015 12:25:32 PM
1
www.coa.ou.edu
Old Post Office Adaptive Reuse & Addition
No.
Description
Date
Rendered Isometric Section Project number Date Drawn by Checked by
2014-1 04/28/14 Designer Checker
A9.04 Scale 12" = 1'-0"
4/20/2015 12:25:33 PM
Norman Arts Council
South Perspective View
Norman Arts Council
www.coa.ou.edu
Old Post Office Adaptive Reuse & Addition
No.
Description
Date
South Perspective View Project number Date Drawn by Checked by
2014-1 05/02/14 Designer Checker
A9.05 Scale
4/20/2015 12:25:39 PM
1
Site Plan 1" = 60'-0" Norman Arts Council
www.coa.ou.edu
Old Post Office Adaptive Reuse & Addition
No.
Description
Date
Site Plan Project number Date Drawn by Checked by
2014-1 07/22/02 James Duke Checker
C1.01 Scale 1" = 60'-0"
4/20/2015 12:25:44 PM
1
166' - 10 3/4" 1
2
3
4
5
6
4.03c
7
8
9
235 SF
B
5.04 5.03
612 SF
4.03a
4.03b
4.03d
300 SF
300 SF
264 SF
611 SF
2.01a
5.01a
312 SF
265 SF
3.02b
3.01a
385 SF
166 SF
C
5' - 3 7/8"
32' - 0 13/16"
A
D
3.01b 2.01b
155 SF
2.01c
313 SF
319 SF 3.02a 2.02b
384 SF
440 SF
2.02a 425 SF 5.01b 355 SF
Room Plan - Basement 1" = 20'-0" Norman Arts Council
www.coa.ou.edu
Old Post Office Adaptive Reuse & Addition
No.
Description
Date
Basement Room Plan Project number Date Drawn by Checked by
2014-1 03/24/14 James Duke Checker
C1.02 Scale 1" = 20'-0"
4/20/2015 12:25:45 PM
1
0.03
0.04
83 SF
92 SF
123' - 10 11/16"
51' - 1 7/8" DN
1.16 29' - 1 7/8"
31' - 11 7/8"
6.03 6.04
1179 SF
1210 SF
298 SF 1.12 291 SF
1.13 394 SF
87' - 0"
1.14a
1.14b
200 SF
202 SF
1.15b
0.01
305 SF
300 SF
DN
39' - 2 3/8"
5.02 604 SF 1.14c
1.11
222 SF
95 SF
1.01a
0.05
621 SF 149 SF
7.01 579 SF
6.01 897 SF
6.02
6.05
300 SF
1518 SF
41' - 9 1/16"
160 SF
1.10
7.02 288 SF Room Plan - Level 1 1/16" = 1'-0"
110' - 5"
Norman Arts Council
www.coa.ou.edu
Old Post Office Adaptive Reuse & Addition
No.
Description
Date
Level 1 Room Plan Project number Date Drawn by Checked by
2014-1 03/24/14 James Duke Checker
C1.03 Scale 1/16" = 1'-0"
4/20/2015 12:25:47 PM
1
4.02g
4.02h
3.01c
1.02b
0.10
4.01a
75 SF
76 SF
143 SF
156 SF
42 SF
210 SF
4.02f 74 SF
4' - 0"
4.02e
4.01b
4.01c
4.01d
200 SF
202 SF
205 SF
4.01e
4.01f
211 SF
207 SF
DN
74 SF
4.02b
0.8
4.02c
4.02d
1.04
1.05
1.06
1.07
1.08
1.09
1.15a
0
74 SF
75 SF
20 SF
76 SF
75 SF
155 SF
109 SF
149 SF
107 SF
148 SF
115 SF
302 SF
69 SF
Room Plan - Level 2 Addition 1/16" = 1'-0" Norman Arts Council
www.coa.ou.edu
Old Post Office Adaptive Reuse & Addition
No.
Description
Date
Level 2 Room Plan (Addition) Project number Date Drawn by Checked by
2014-1 03/24/14 James Duke Checker
C1.04 Scale 1/16" = 1'-0"
4/20/2015 12:25:49 PM
1
4.02a
31' - 11 7/8"
198' - 10 11/16"
1.02a 163 SF
OW EL B EN OP
1.03 207 SF
1.14d 230 SF
OW EL B EN OP
Room Plan - Level 2 P.O. 3/32" = 1'-0" Norman Arts Council
www.coa.ou.edu
Old Post Office Adaptive Reuse & Addition
No.
Description
Date
Level 2 Room Plan (Renovation) Project number Date Drawn by Checked by
2014-1 03/31/14 Designer Checker
C1.05 Scale 3/32" = 1'-0"
4/20/2015 12:25:49 PM
1
1
2
3
4 Elevator Shaft Open Below
5
6
7
A
B
C
D
Addition - Level 2 3/32" = 1'-0" Norman Arts Council
www.coa.ou.edu
Old Post Office Adaptive Reuse & Addition
No.
Description
Date
Level 2 - Addition Project number Date Drawn by Checked by
2014-1 03/26/14 James Duke Checker
S1.04 Scale 3/32" = 1'-0"
4/20/2015 12:25:51 PM
1
Current beam dimension are placeholders until in-depth structural analysis is done.
Addition - Roof
Addition - Roof
31' - 4"
31' - 4"
Addition - Level 2
Addition - Level 2
17' - 4"
17' - 4"
Level 1
Level 1
3' - 4" Ground Level
3' - 4" Ground Level
0' - 0"
0' - 0"
Basement
Basement
-10' - 8"
-10' - 8"
Column Locations
A-1, A-2, A-3, A-4, A-5, A-6, A-7, A-8, B-1, B-4, B-7, C-1, A-9, A-10, B-9, B-10, C-2, C-3, C-4, C-5, C-9, C-10, D-9, D-10 C-6, C-7, D-1, D-2, D-3, D-5, D-6, D-7
B-2
B-3
B-5, B-6
B-8
C-8
D-4, D-8
Norman Arts Council
www.coa.ou.edu
Old Post Office Adaptive Reuse & Addition
No.
Description
Date
Column Schedules Project number Date Drawn by Checked by
2014-1 03/26/14 James Duke Checker
S6.01 Scale 1/8" = 1'-0"
4/20/2015 12:25:52 PM
Graphical Column Schedule 1 1/8" = 1'-0"