Year 2 Project 1 - ARC2002M Architectural Design Project BRIEF - Bespoke Tailor
James Michael Brown
The aim of this brief requires you to investigate and interpret a process of ‘making’. The building must accommodate all that is required in your specific ‘making’ process and also house a ‘front of shop.’ The focus of this project is to understand the timeline of production in relation to spatial layout and the relationship between public and private spaces in a commercial building.
Brief
process
suit cloth delivery
cloth storage
pattern cut
pressed
pattern storage
tailored suit cut
customer
choose cloth
collection
measured 1st 2nd 3rd fittings
material
Site Analysis scale 1:1000
union road - lincoln size - 450m2
site
school
retail
vehicular traffic
food/pub
wedding venue
pedestrian traffic
residential
lincoln castle
1 4
3
5 6
2
^
north
approach
vistas
1
2
3
4
5
6
Space Diagrams
staff room
wc wc
workshop
storage
sales floor office
fitting room
suits
cashier
fitting room
cloth shirt ties
workshop - 20m2 pattern/suit storage - 3m2 fabric storage - 5-10m2 office - 10m2 staffroom - 10m2 toilet - 3m2 sales floor - 20m2 fitting room - 10m2 parking - 11.5m2
Site Plan scale 1:500
^
north vehicular access pedestrian access
Elevations scale 1:100
north elevation scale 1:100
south elevation scale 1:100
Elevations scale 1:100
east elevation scale 1:100
west elevation scale 1:100
Ground Floor Plan scale 1:100
1. 2. 3. 4. 5. 6. 7.
sales floor fitting room workshop staff room staff wc customer wc parking
^
north
First Floor Plan scale 1:100
1. office
^
north
Sections scale 1:100
section 1 1:100
section 3 scale 1:100
Sections scale 1:100
section 2 scale 1:100
section 4 scale 1:100
Exterior Visuals
north approach
view from lincoln castle wall
Interior Visuals
workshop
sales floor
Isometric Views
Axonometric View